Loading...
HomeMy WebLinkAboutB06-0352 ni Iri ,� n z, 5 *an ¢• h (D O n O• ° • p ! ! O Ort rt -� ' › 0 ,--. c.,., . • N rt 2- (D � g CS -4, H 9 O 2 y oa n •t H 1-' n � ° n (D 5 CD 1:..111 n n 0 Ai o oo o H A , ..1 MM 0 , n z ° 8 ° L�J C � cn o 0 0 C7 0 uy o C" y y o z Cj v ° w (D w =* p c u x fa, al .,, cn CD --t -t 0 Y 0 o o AL `I CO P T z 5, 0 c, c) � ..t-' y C7 ;°, a. A c 4' R 0 00 d H w N v n c,, z , ` c ° d g .t cn = O ,-* CA CA d � ° x rt ~ d ° N Z y z `-C r, ,S g cn (-) .0 pr Ctrl 5 (I _ 5.< .-< oo 0 w w o, o c 11 ID TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES NEW COMM BUILDING PERMIT Permit # B06-0352 Project#: PRJOS-0379 Job Address: 728 W LIONSHEAD CR VAIL Status . . . : COFO Location.....: 728 WEST LIONSHEAD CR Applied . . : 12/13/2006 Parcel No...: 210107217002 Issued . . . 02/03/2010 Expires . .: 09/21/2010 OWNER RCR LLC 07/03/2007 PO BOX 959 AVON CO 81620 ARCHITECT 4240 ARCHITECTURE, INC. 12/13/2006 Phone: 303-292-3388 1621 18TH STREET SUITE 200 DENVER CO 80202 License: C000001868 CONTRACTOR PCL CONSTRUCTION SERVICES IN 12/13/2006 Phone: (303) 365-6500 2000 SOUTH COLORADO BLVD TOWER 2, SUITE 500 DENVER, COLORADO 80222 License: 311-A APPLICANT VAIL RESORTS DEVELOPMENT INC 12/13/2006 Phone: 970-845-2547 TODD GOULDING P.O. BOX 959 AVON CO 81620 License: C000001633 Desciption: RITZ CARLTON HOTEL-PHASED APPROACH FOR THE CONSTRUCTION OF A NEW HOTEL WITH 110 UNITS, 2 LEVELS OF UNDERGROUND PARKING, 6 LEVELS ABOVE GROUND Occupancy Type Factor Sq Feet Valuation ARENA (A4) ZONE 3 IB 233. 41 13, 090 $3, 055, 336. 90 BUSINESS (B) & HMP (H5 ZONE 3 IB 238 . 97 8, 651 $2, 067, 329. 47 INDUSTRIAL/MOD HAZ ( ZONE 3 IB 141 . 98 15, 306 $2, 173, 145 . 88 MERCANTILE (M) ZONE 3 IB 173.21 3, 635 $629, 618 . 35 RESIDENTIAL/MULTFAM ( ZONE 3 IB 197 . 08 257, 238$50, 696, 465. 04 STORAGE/LOW HAZ (S2) ZONE 3 IB 129. 30 16, 134 $2, 086, 126.20 STORAGE/LOW HAZ (S2) ZONE 3 IB 129. 30 148, 567$19, 209, 713. 10 Totals. . . 359, 706$110, 000, 000 . 0* TOV Adjusted Valuation: 0,000,000.00 Revision Valuation: $0.00 Revised Total Valuation: $000,000.00 ►r********«*«**+**�****�**���*�**r��******a************t***r�+**t**t FEE S UMMARY *t***�**********►*►***��****************�r*****►*t*t*rs*�at* Building------> 403,458.75 Restuarant Plan Review--> $75.00 Total Calculated Fees---> 166,701.50 Plan Check---> 403,458.75 Recreation Fee--------------> 359,706.00 Additional Fees-----------> 27,564.67) Investigation-> $0.00 TOTAL FEES-------------> 166,701.50 Total Permit Fee----------> 139,136.83 Will Call-----> S3.00 Payments-------------------> 139,136.63 BALANCE DUE---------> S0.00 #**#4�*1�4���*#*#�#######k/##**4�**�#44#*#��###*R#**4*44F*k*#k*#**F4**##kt**#*�**k#�*#*#**#i*#*4*#*t###*##**W##k*##44**k##i4*#*######*4#####*#�4rt Approvals: Item: 05100 BUILDING DEPARTMENT 01/17/2007 jplano Action: CR Correction letter sent � 03/26/2007 MROYER Action: CR Structural review comments send by email tc Wright 134 comments dated 03/26/2007 . 05/07/2007 jplano Action: DN SENT LETTER OUT ON PHASED SUBMITTAL, THE S� COMMENTS WERE E-MAIL 4/18/07 05/30/2007 MROYER Action: AP Partial approval for grading, excavation ar shoring. OK to issue when Planning, Fire, and Public Works is approved. 07/26/2007 cdavis Action: NO Received Fire Flow and Water supply inform� Put into file Obtained verbal P.W. , Fire and Safebuilt approval 09/17/2007 ependley Action: AP Approved Rev. #2/IR-5269 Raising of shoring no added valuation. Added plan review fee of $120 . 00 09/17/2007 cdavis Action: PA Administrative Modification Requests #2, #: Condo Egress approved and signed on 9/17/07 09/18/2007 jplano Action: AP Full Building Permit approved, see conditi< 01/08/2008 cdavis Action: PA Pre-Stress concrete fabricator submital ap� 03/11/2008 jplano Action: CR Structural engineer reviewer needs answer 1 all architectural issue resolved 03/18/2008 jplano Action: AP Architect to collate ASI#22 into plans pric distribution 3 sets in Safebuilt' s office waiting collation 03/24/2008 jplano Action: AP Rev. 3/IR6631 Approved 7, 7A, ASI 21 and AS: Complete new drawings, delta 7 dated 10/19/07 in revision block. Date stamped by � 1/30/08 . $1800 Due 05/13/2008 jplano Action: AP Rev. 6/IR7469, Deferred submittal and exter= changes to snowmelt and lighting is approved by building. Set of plans routed to PW for rf No Charge. 11/24/2008 jplano Action: AP Rev.7/IR9347, FireStopping submittal appro� hours of plan review due=$120 . 00 12/16/2008 jplano Action: AP Approved submittal for revised CMU 2 hour assembly, no charge, a set of documents is returned to the TOV for filing 02/24/2009 jplano Action: AP Rev8/IR9705, Slab edge drawings approved. _ of plan review due = $780 . 00 03/12/2009 jplano Action: AP Rev9/IR9781, Changes to the plumbing isomei and Sovent revisions apporved. 4 hours of plan review due = $240 . 00 05/13/2009 ependley Action: AP REV11/IR9949, approved ASI 25 ASI #25 gardE bath changes approved. No added valuation. 4hrs of plan review at $240 . 00 05/15/2009 NSC Action: AP REV10/IR#9857 approved buyer changes REV10 changes approved by safebuilt. no added value no added square footage . invoiced $: 05/26/2009 ependley Action: AP REV12/IR#10018 approved changes REV12/ASI � changes approved by safebuilt. no added value no added square footage. invoiced $180 . 00 07/17/2009 E Pendley Action: AP IR#10157/REV 13 Temporary Tunnel Approved � plan review @ $60 per hour=$120 10/26/2009 ependley Action: AP ASI-116/Rev. #14 IR#10490 Approved 10/23/0� Addtional Review Fee of $300 . 00 due 03/22/2010 ependley Action: AP Deferred submittal for sign package approve #15 IR 10891 No additional valuation.No additional plan review fee/deferred submittal Item: 05400 PLANNING DEPARTMENT 05/30/2007 George Action: PA This is a partial approval acknowledging rE of a letter dated May 24, 2007, regarding the phased building permit responses for the Ritz-Carlton Residences. Planning has recieved the letter an has no concerns with responses provide by Matt Royer emailed 5/18/2007 06/08/2007 Warren Action: DN Revision No. 4 is denied by planning. Chanc made to the landscape plan (LA-400) which were not approved and details regarding spruce tree relocation in the northwest corner are needed (Sheet C0002) . All signage wil_ require seperate DRB approval . 06/12/2007 Warren Action: AP Planning has signed off on the phased apprc DIA in the amounto f $2, 661, 846.25 has been recieved. 07/11/2007 Warren Action: AP The Fire Department Access plan during construction is approved by planning. 07/20/2007 Warren Action: AP Planning approves of the response recieved 17, 2007, to address the Fire Department' s concerns . 08/24/2007 Warren Action: AP Planning has approved the Temporary Shorinc Support for Excavation dated recieved by the Town of Vail on August 16, 2007 . 09/12/2007 Warren Action: AP Planning has approved the full building pe� the Ritz Carlton. 02/22/2008 Warren Action: DN Planning has denied Revison Set Number 7 . : 400 does not depict the approved plantings and hardsacpe in the northwest corner of tt adjacent to the intersection of the Frontage Road and West Lionshead Circle . 03/18/2008 Warren Action: AP All concerns of Planning have been addressE Revision number 7 . Those concerns were related to lanscaping. 10/16/2009 warren Action: AP ASI-116 approved by planning. 03/24/2010 Warren Action: AP The interior sign package is approved. Rev IR#10891 Item: 05600 FIRE DEPARTMENT 04/18/2007 mcgee Action: DN The request for the Admin Mod for the Ritz extend the Common path of Travel to 125 feet should in my opinion and as discussed in ou� previous meetings, list the specific units affected. I do not believe we should sign an Admin Mod for the entire bldg. . We need the st� of limitations that this admin applies to the specific rooms only and does not extenc � other project. 05/31/2007 McGee Action: APCR Plans dated 05/24/07 need the following correctioris: 1 . Plans show an existing 8 inch water main feeding a fire hydrant in the existinc access. Plans also show a 4 inch domestic tap and a six inch fire main being tappE the � 8 inch line. Revise C0006 plans to provide adequate fire flow. 2 . C0007 - gas meter location must be protected from vehicular damage. 3. LA100 - Plans show extent of work extends into the fire lane for Gore Creek residences. The fire lane also serves a secondary egress from Gore Creek Residences . 4 . Fire alarm and fire protection plans are not completed and therefore not appro� Permit is approved for grading and excavation only. Items 1 - 3 must be addressed to any further approvals. 06/01/2007 McGee Action: DN Fire alarm plans were submitted on 1/16 sc� Print is too small to read. Plans do not meet minimum submittal requirements as published in TOV Standards . Plans are not shown on reflected ceiling plan. Coverage cannot be verified due to scale and lack of information. 06/07/2007 McGee Action: DN Approval revoked for failure to address ci� plans and provide an approved water supply. 06/21/2007 McGee Action: AP Plans dated 05/24/07 need the following corrections : 1 . Plans show an existing 8 inch water main feeding a fire hydrant in the existinc access. Plans also show a 4 inch domestic tap and a six inch fire main being tappE the 8 inch line. Revise C0006 plans to provide adequate fire flow. 2 . C0007 - gas meter location must be protected from vehicular damage. 3 . LA100 - Plans show extent of work extends into the fire lane for Gore Creek residences. The fire lane also serves a secondary egress from Gore Creek Residences . 4 . Fire alarm and fire protection plans are not completed and therefore not appro� Permit is approved for grading and excavation only. Items 1 - 3 must be addressed to any further approvals . Approval is re-instated provided issues 1 - 3 are addressed to the Town' s satisfac within 30 days of this notice. Agreement is based on receipt of the attached email : Mike, Thank you for your time today on the Ritz outstanding issue for the Phase permit. our conversation we are reviewing the flow test and will resubmit the staging plan. WE going _ to analyze the recommendations made today and incorporate them into the staging p_ agree to the thirty day period granted by you to resolve all issues. It is also m� understanding that you will sign off the phased permit application with the above thirty day period. We will strive to get the information to you as quick as we rec them. Thank you again for all your cooperation. Robert A.Stozek Director of Construction Vail Resorts Development Co. Direct: 970-754-2552 Cell : 970-470-9562 For more information, go to www. snow. com. 07/02/2007 McGee Action: DN Re-submitted staging plan shows 12 ft fire Not approved. 07/09/2007 mcgee Action: AP Fire Dept access is approved per on site ac 3 7 07 . Accurate scalable plans are required. Permission granted to begin mobilization, including jersey barriers. 09/13/2007 McGee Action: AP Approved under condition fire alarm and fi� sprinkler shops conform to agreements made to date as per the Life Safety Report and adenda. Smoke control is apporved in concept. Deferred submital is subject to review. 03/27/2008 McGee Action: AP Fire protection plans are not approved as i The Fire Department does not object to issuance of a building permit with limitat: to proceed past foundation until fire protection plans are re-submitted in sufficieni detail, coordinated and reviewed by FPE. Please submit a list of deferred submittals. Smoke control, elevator control sequencing, and emergency generator should be subr in separate "packages" with all appropriate and related details. Commercial kitchen fire protection systems were not included. Review comments in attached email 3/27/08 and F: //comdev/ 08/05/2008 McGee Action: NA ASI 22, dated 3-10-08 07/14/2009 mvaughan Action: AP revision 12 asi #85 mechanical changes wil: sprinkler line location and height. Sprinkler plans reflecting changes have been submitted 12/03/2009 mvaughan Action: AP asi 116 Ol/25/2010 drhoades Action: NA Book on Hilti Fire Stopping of Penetration: Copy) dated received 11/05/2008 . (Entry per Mike McGee) 03/29/2010 mvaughan Action: AP signage package approved. Advised VRDC to = information on stair signage regarding pressurized stairwells. Item: 05500 PUBLIC WORKS 04/18/2007 csalli Action: DN comments sent to CIA and Todd Goulding 4/lE enroachment agreements must be executed prior to release of shoring. 06/04/2007 ls Action: DN PW will not sign off until we recieve a boz W. Forest Road in the amount of $ 30, 469. 00 dollars. Bond requried for utility relc on W. Forest Road. 07/02/2007 csalli Action: AP Conditional approval for phased permit, gr� excavation and shoring. 1 . No construction/shoring/staging/access allowed in CDOT ROW until copies of exe< agreements are submitted to PW. 07/25/2007 csalli Action: AP approval for the revised water line servicf submitted with response letter dated 7/16/07 11/07/2007 tk Action: DN The Full Building Permit is denied until a� from CDOT is acquired or an alternate Shoring system that remains on the Ritz property submitted and approved. 02/12/2008 csalli Action: AP Based on letter recieved from Todd Gouldinc dated 2-12-08, VRDC has satisfied CDOT requirements . full building permit approvec 03/18/2008 csalli Action: AP Rev 7 approved with the following conditioi l . Frontage Rd plans (plan/profile, drainage, lighting, signage/striping, landscape/irrigation, etc) to be finalized once the final alignment of the frontac is determined. VRDC shall enter into an agreement with the Town to begin constructioi documents for the S Frontage Rd improvements by February 2009 to allow for completion of improvements prior to TCO (see letter dated 2/28/07) . 2 . M0. 0 . 6 - Provide separate zones for areas in ROW vs private property. Use attac detail for snowmelted pavers . NO snowmelt in the curb & gutter along the public si please remove note. 3. Revocable ROW permit required for private improvements in the public ROW 4 . Developer will enter into a snowmelt maintenance agreement for the portions of snowmelted sidewalk located in public ROW. 07/16/2008 csalli Action: AP changes to snowmelt and street lighting on submittal dated 4/11/08 is approved. Item: 05550 ENGINEERING CIVILS .**.*�.�*.+++*.*..*�*,►*+���+��,*,*+.+�+�*.+►*►.++��.��*.++.+*.*..+*�.*+.+�»**+��►�.�+***+�»*»�*:***++�*.�..�+.�*�*�.�.�+++++..�...�+..*...►�*+++ See Conditions section of this Document for any conditions that may apply to this permit. DECLARATIONS l hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM -4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER ******************************************************************************************************** CONDITIONS OF APPROVAL Permit# B06-0352 as of 06-17-2013 Status: COFO ******************************************************************************************************** Permit Type: NEW COMM BUILDING PERMIT Applied: 12/13/2006 Applicant: VAIL RESORTS DEVELOPMENT INC Issued: 02/03/2010 970-845-2547 To Expire: 09/21/2010 Job Address: 728 W LIONSHEAD CR VAIL Location: 728 WEST LIONSHEAD CR Parcel No: 210107217002 Description: RITZ CARLTON HOTEL-PHASED APPROACH FOR THE CONSTRUCTION OF A NEW HOTEL WITH 110 UNITS, 2 LEVELS OF UNDERGROUND PARKING, 6 LEVELS ABOVE GROUND Conditions: Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Entry: 03/28/2008 By: mcgee Action: AP Fire protection plans are not approved as noted. The Fire Department does not object to issuance of a building permit with limitations not to proceed past foundation until fire protection plans are re-submitted in sufficient detail, coordinated and reviewed by FPE. Please submit a list of deferred submittals. Smoke control, elevator control sequencing, and emergency generator should be submitted in separate "packages" with all appropriate and related details. Commercial kitchen fire protection systems were not included. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 17 (BLDG.): A STRUCTUAL ENGINEER WILL BE REQUIRED TO APPROVE ANY STRUCTUAL CHANGES BEFORE A FR� INSPECTION IS APPROVED BY THE TOWN OF VAIL. Cond: 20 (BLDG.): FIELD INSPECTIONS BY FIRE AND BUILDING DEPARTMENTS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE BEFORE BEING USED FOR OCCCUPANCY. Cond: 31 , (BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUN� ON COMBUSTIBLE FLOORING. Cond: 34 (BLDG.): A COPY OF THE SOILS REPORT WILL BE REQUIRED BEFORE A FOOTING INSPECTION WILL BE CALLED Cond: 35 (P.W.): ACCESS AND DRAINAGE INSPECTIONS MUST BE DONE BEFORE FOOTING INSPECTION. Cond: 40 (BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72. Cond: 5 � (PLAN): PRIOR TO THE TOWN BUILDING DEPARTMENT CONDUCTING A FRAMING INSPECTION, AN IMPROVEME LOCATtON CERTIFICATE(ILC) SHALL BE SUBMITTED TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT A MINIMUM OF FORTY-EIGHT HOURS IN ADVANCE OF THE REQUESTED INSPECTION. ROOF RIDGES AND BUILDING FOOTPR SHALL BE INDICATED ON THE ILC. Cond: CON0009367 Conditions of Approval 13 Sheet G 1.1.0 indicates square footage of the sides if the building and percentages of unprotected openings. Provide elevation drawings for the south and east sides of structure include calculations for all openings include protected and un-protected openings. Include dryer vents, range hoods, bath fans, fireplaces etc. in the unprotected opening calculations. The drawings indicate that 45% of the side can have unprotected openings. 45% is only allowed if the entire side is between 10' and 15'to the property line. There are several areas that are less than 10'thus only allowing 25°/o of the side to have unprotected openings. With further research, each story should be dealt with individually. Please address accordingly. (IBC 704.8) ' The review team does not recall that the easement will alleviate the issue. If the path is to be considered a public way then the measurement is to the centerline of the path. Please address accordingly. 49 Provide documentation that the existing path on the Plan South Side is recorded dedicated easement and can never be built on. I am unable to locate the recorded document for the dedicated easement. Please provide a copy for this permit submittal. A copy of the easement is required for the permit record. 69 The patio surrounding the Retail 101 is being utilized as an exit component. This area is an exit balcony and is required to be separated from Retail 101 by walls and opening protection as required for corridors. (IBC 1013.5) G1.1.2 -The exit discharge from corridor 111 and corridor 105 indicate 287 occupants traversing around the retail area to get to a public way. This area was considered exit discharge at the first review. With further analysis this area is actually an exit passageway, as occupants have not left the building until they have traversed past the retail area. Please provide rated walls and protected openings accordingly. (IBC 1020) Provide a signed administrative modification addressing this specific issue or change the drawings to meet code requirements as adopted. 70 The level of exit discharge for Stair#3 traverses along the side of the building. This "sidewalk" is part of the exit discharge. It is considered an exit court, the exterior wall and the 2 windows labeled 106 are required to be fire-rated. (IBC 1023.5.2) The label has been removed, the windows are still shown. Please address accordingly. The windows are still shown. 90 Provide a complete lighting plan for all levels. The lighting plans for various parts of the building have not been included. Include all exit lights and emergency lighting on the lighting plan. Add emergency lighting to the exterior immediately adjacent to the exit doors. I am unable to locate emergency egress lighting at exterior locations of the exits. Add emergency lighting to the exterior immediately adjacent to all exterior exit doors. 183 M1.1.3 -The supply air duct next to stair 4 is not located in a shaft. It appears the duct is located in a closet. Required shaft construction is shown on mechanical plan sheets but is not shown on the architectural plan sheets with appropriate wall tags. Some shafts are still mislabeled. All shafts will be required to be 2 hour rated during construction. 259 A0.3.1 -Corridors G109, G110, G115, G117 and G182 are rated corridors as they serve and/or are connected to corridors serving R occupancies with an occupant load of more than 10. Change doors G108A, Gl 13A, G114A,G131A to the appropriate fire rating requirement. (IBC 715 and IBC Table 1016.1) New door G109A will have to have a minimum rating of 20 minutes to separate rated corridor G182 from non-rated corridor G 109. 266 A0.3.3 -The common path of travel from Pool Equipment Room G176 exceeds the maximum allowed. Please add another exit accordingly. (IBC 1013.3) The added door is to be 1/3 the distance of the diagonal of the space served from the other exit door. (IBC 1014.2.2) 270 M0.3.3, P0.3.3 - Remove all plumbing, mechanical and electrical penetrations that are shown in exit passageway G181 that do not serve the passageway. (IBC 1020.5) The response indicates that a 2 hour ceiling is to be utilized to isolate the items not allowed in the passageway. Where exactly if the reference to a 2 hour ceiling? The room finish schedule on A6.4 indicates concrete. 274 A 1.1.2, M 1.1.2 -Reception 107 and Main Hall 108 are required to be constructed as a corridor. Rated Corridors 131 and 142 directly communicate to these areas. Change the mechanical drawings to add smoke/fire dampers accordingly and change the plenum above the ceiling is to meet 1016.4.1. Please indicate which of the 5 listed methods is being used and where on the plans it can be found. 277 A1.1.2 - tdentify all appliances that are to be installed in Pantry 120 and behind the Bar. There is an "under counter oven" referenced on sheet A6.11. Please indicate the required exhaust required for ovens. (IMC 507.2) 285 A0.2.1 -The unlabeled door on the west end of Skier Storage does not meet the required maneuvering clearances. Latch approach, pull side requires 54". (ANSI A117.1-1998, 404.2.4) The drawings were changed on the push side of the door. The request was to provide 54" on the pull side. 297 M0.3.0 - The parking garage exhaust is to be 10'above the adjoining grade. (IMC 502.7.3.6) The response states that per a meeting at the town that an administrative modification was submitted and that this is a non-issue. Provide a signed administrative modification addressing the specific issue. 298 M0.3.0 - The parking garage exhaust is to be 10'from openings into the building. It is too close to the mechanical intake to the east. (IMC 502.7.3.6) The response states that per a meeting at the town that an administrative modification was submitted and that this is a non-issue. Provide a signed administrative modification addressing the specific issue. 305 M1.1.2 -Remove the 24x16 duct and heat pipes from Stair#2. The response indicates the ducting is within a 2 hour soffit. Please indicate exactly where this is detailed on the architectural sheets. Please be aware that the cabinet heater shown in the Corr/Stair 105 may be an obstruction in the required 44" width. 24. b. April 18th calculations, pp. 24-59 show that 0.312 sqin reinforcing is required along line A. S1.10A shows that dowels 2D or#4 @12" o.c. dowels are provided, please provide additional reinforcing as required for force transfer. Sheet S1.10 shows (10)#6 through slab opening near E-72, please clarify reinforcing requirements on plan. c. S1.10A, line A shows 2.Oklf lateral soil demand, April 18th calculations p. 24-14 shows 3.75k1f. Verify sheet S1.20 should read (12) instead of(2)#6 additional bars at line 69. g. July 27th calculations p. 24g-1 shows 324k factored shear load. SW2 on S7.01.1 shows 120k transfer load at upper parking level (210k below minus 90k above). Please comment on the large difference in shear load for diaphragm and shear wall design. Precast wall loads should state "west wall only" for diaphragm shear force collected at the Upper parking level. Two additional bars per July 27th calculations are not shown on plan, verify additional bars required per analysis are correctly shown on the drawings. 49. f. Weld shown is 1/4"; 5/16" minimum weld is required per AISC J2.4. 55. Response states that diaphragm continuity is not required through roof elevation steps. Please verify 52.41, 28 feet south of SW-1;there is no braced frame in east west direction at upper roof which appears unsupported. 61. Plans still state shoring removal is acceptable at 75% Fc shown on plans, not 100% fc per response. 63. 7/S5.03 does not show a connection from additional L3x3 to concrete slab. Provide shear and axial connection from roof to floor diaphragm. 67. New details 10/S5.02 & 12/S5.07 show 1 '/z" expansion joint. 2 '/z" is shown on plans below, and 3 1/8" per S2.52. 80. Corridor roof structure does not show deck angle or lateral connection to concrete core as referenced in the response. Collector appears required aligned with north wall of SW-7. 98. Verify one sided weld shown in 3,4,5/S5.03 is adequate for maximum snow gravity loading, wind uplift loading, maximum in plane and out of plane wind/seismic collector loading, and out of plane wall anchorage loading. IBC 1604.2, 1604.8.2. 108. Response notes that shear demand for calculation of collector forces to core walls per item 24 was conservatively calculated, resulting in large collector forces to core walls. This means that collector forces for design of diaphragm to exterior perimeter walls are unconservatively low, please comment. 114. Coordinate 2/S8.01.1 with details on S6.01.1, it is unclear where slab'S1'applies. 119. d. Please verify Level 4 & 5 supporting slabs and embeds have been designed for special seismic load combinations with Omega, per previous comment. 121. a. July 27th calculations assume diaphragm lengths longer than the bay of the braced frame. Drawings shall show axial collector load requirements at all connections, for design of connections by others. Verify collector beams have sufficient unbraced length for axial compression loading. b. Please address chord connections at roof corners and plan direction changes, appear to require additional capacity for diaphragm moment resistance. c. Calculations assume 36/7 weld pattern, while 36/4 is specified on S0.02. July 27th calculations assume unconservatively long diaphragm length for the following frames, when checking diaphragm stress: W-3 (29.5' actual, 34' assumed); W-4 (25' actual, 50' assumed); W-6 (11' actual, 29.75' assumed); W-7 upper(31' actual, 35.5' assumed); W-11 (37' actual, 53' assumed); W-]4 (23' actual, 38.75' assumed). Additional sidelap connection per calculations is not shown for frames W-11 & W-15. 125. It appears shear wall calculations for magnified shear loads use working stress demand in spreadsheet calculations, as noted on calc p. 125-9. Please explain how moments have been magnified for 75%V shear wall design check, moment capacity is not evaluated in the submitted calculations. Please verify moment capacity has been checked for magnified loads. 137. S2.02, S2.12, etc: Verify new slab openings adjacent to cores have been considered in diaphragm collector calculations of load transfer from core walls to slabs. Calculations per previous comment 126 appear to consider full length of core wall. Typical all levels. IBC 1604.2. 138. S1.01: Revised shoring submittal, received for review August 24th for review indicated that footing at gridlines UUU-20 would be revised to bear eccentric relative to wall below, to avoid undermining the existing structure. Foundation drawings do not show an eccentric footing. IBC 1805.4. � 139. S2.64: Modified tendon drape at balcony gridline SS is not located at mid-depth of slab at edge, please review. ACI 318, Ch. l 8. 140. Stage stressing criteria has been added to PT transfer girders. Calculations have not been provided; verify stresses per ACI 318, Ch. 18 have been evaluated at all conditions,taking into account live and snow loading during construction. At beam'TG15'verify 1505k secondary stressing should not be "d" stresses instead of"c" as listed, or other similar more gradual stressing. Public Works Department Conditions From: Chad Salli, Project Engineer Re: Ritz Carlton Residences Date: 9/14/07 The Town of Vail Public Works Department comments for the building permit submittal for the Ritz Carlton Residences are as follows. 1. Frontage Rd plans(plan/profile, drainage, lighting, signage/striping, landscape/irrigation, etc)to be finalized once the final alignment of the frontage road is determined. VRDC shall enter into an agreement with the Town to begin construction documents for the S Frontage Rd improvements by February 2009 to allow for completion of improvements prior to TCO(see letter dated 2/28/07). 2. Street lighting along W Lionshead Cir and S Frontage Rd shall be TOV Village fixture(see attached detail)to match Vail Village and Lionshead Village lighting and powered from a TOV source. 3. E0.1.0 - Add a TOV street light at the intersection of the Frontage Rd and W Lionshead Circle (this one will have the wireless node)and continue TOV Village fixtures along the W Lionshead frontage. 4. M0.0.6 -Provide separate zones for areas in ROW vs private property. Use attached TOV detail for snowmelted pavers. NO snowmelt in the curb & gutter along the public streets, please remove note. 5. M0.0.6 - Snowmelt zone 10 should continue south to the northern limits of the existing heated walk along the Gore Creek Residences frontage so there is not a short section of cold walk between two heated sections. 6. Revocable permit required for all private improvements encroaching into the right-of-way. Must be submitted and recorded prior to TCO. Fire Department Conditions Approved under condition fire alarm and fire sprinkler shops conform to agreements made to date as per the Life Safety Report and addenda. Smoke control is approved in concept. Deferred submittal is subject to review." Planning Department Conditions No conditions Entry: 09/21/2010 By: Martin Action: AP Cond: CON0011575 Fire Deparhnent: 1. Alarm reconfiguration in chiller room. System shall transmit supervisory signal to FACP. System shall automatically shut off upon transmission of supervisory. System shall transmit alarm condition upon second stage detection. 2. Locking door hardware shall be installed on three doors as shown to Jim Waugh. 3. PCL shall provide twenty-four hour supervision until access in these area is complete. 4. FAS shall provide training to all Shift command officers in regard to alarm panel function, smoke control panel operation and computer reporting program. 5. Elevators 10 and 11 shall remain out of service until such a time that Otis Elevator is able to configure acceptable battery backup to allow for recall floor discharge. Keys for padlock shall remain in Knox box at FACC. 6. Bollards at FDC's in alley shall be installed as directed. 7. Fire alarm zone control maps shall be installed on south wall of FACC, as agreed to by FAS. As builts are to remain on site. 8. Emergency operation plan shall be updated and approved by VFES. Training of staff shall include VFES prevention staff. 9. Key sets and cards shall be installed in all knox boxes. 10. Access hatches for all tamper, isolation valves, and smoke damper controls shall be labeled. 11. Low branch lines in parking areas shall be appropriately marked as to prevent collision from foot traffic. Entry: 09/21/2010 By: Martin Action: AP B06-0352: Entries for Item:90 - BLDG-Final 11:47 06/17/2013 COND 8/11/2010 sgremmer 08/13/2010 A000135 File:20.4 Punch Lists 548 Created By:JR 1 of 1 Item#Level Room#Description Primary Responsibility Contractor Responsibility Target Completion Date Date Complete Comments 64 L6 corr 616 interior step to roof door GSB/ VRDC PCL 8/16/2010 GSB to issue RFP 65 L6 corr 619 interior step to roof door GSB/ VRDC PCL n/a 8/10/2010 Not a full door 67 L6 unit 615 master bath#2 glass not tempered JeldWen JeldWen replacement glass has been ordered 80 LU P2 Stair 1 identification for head knocker per ANSI GSB/VRDC Classic Metals 8/13/2010 GSB to issue RFP 81 UU P1 Stair 1 stair height going up PCL Classic Metals/ PCL 8/20/2010 82 L5 Stair 1 exterior landing and stairs to roof elevation GSB/VRDC Classic Metals 8I20/2010 GSB to issue RFP 83 LU P2 Stair 2 identification for head knocker per ANSI GSB/VRDC Classic Metals 8/13/2010 GSB to issue RFP 84 L7 Stair 2 install ship latter for access to roof GSB/VRDC Classic Metals 8/20/2010 GSB to issue RFP 85 L7 Stair 2 raise handrail/gaurdrail infront of roof access door GSB/VRDC Classic Metals 8/20/2010 GSB to issue RFP 86 L7 Stair 2 handrail needed on both sides of stairs GSB/VRDC Classic Metals 8/20/2010 GSB to issue RFP 87 LL/P2 Stair 3 indentication for head knocker per ANSI GSB/VRDC Classic Metals 8/13/2010 GSB to issue RFP 88 L1 Stair 3 stair height PCL Classic Metals/ PCL 8/13/2010 89 L1 Stair 3 handrail needed on both sides of stairs GSB/VRDC Classic Metals 8/20/2010 GSB to issue RFP 90 LU P2 Stair 4 identification for head knocker per ANSI GSB/VRDC Classic Metals 8/13/2010 GSB to issue RFP 91 L3 Stair 4 stair height PCL PCL 8/16/2010 92 L6 Stair 4 exterior landing and stairs to roof elevation GSB/VRDC Classic Metals 8/20/2010 GSB to issue RFP 94 ROOF All guard rail at 42"in front of all serviceable mechanical equip>10ft from roof edge GSB/VRDC Classic Metals? GSB to issue RFP Buildin Final Com letion List Page 2 B06-0352: Entries for Item:90 - BLDG-Final 11:47 06/17/2013 AP sgremmer 09/03/2010 A000136 594 Total Rows:2 Page 3 ���************++*******************+*********************************************+*+******* TOWN OF VAIL, COLORADOCopy Reprinted on 06-17-2013 at 11:47:29 06/17/2013 Statement *************+**+*********************++*********************************�****************+* Statement Number: R100001061 Amount: $288 . 00 08/12/201002:51 PM Payment Method: Check Init: SAB Notation: 1954 - graham frank ----------------------------------------------------------------------------- Permit No: B06-0352 Type: NEW COMM BUILDING PERMIT Parcel No: 2101-072-1700-2 2101-072-1900-1 Site Address: 728 W LIONSHEAD CR VAIL Location: 728 WEST LIONSHEAD CR Total Fees: 139, 136.83 This Payment: $288.00 Total ALL Pmts: 139, 136.83 Balance: $0. 00 ****************+*************************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 144 .00 PN 00100003153000 INVESTIGATION FEE (BLDG) 144 .00 ----------------------------------------------------------------------------- C GENERAL NOTES 1. DATE OF SURVEY: JUNE - DECEMBER 2008. (BUILDING WAS DONE IN PHASES OVER THIS TIME PERIOD.) RIDGE HEIGHTS OCTOBER 2009. 2. PROJECT BENCHMARK: HARN CONTROL POINT "SPRADDLE ". ELEVATION = 8287,82' (NAVD 88). 3. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO RIGHT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES AS RESERVED IN UNITED STATES PATENT RECORDED MAY 24, 1904, IN BOOK 48 AT PAGE 503 AND IN UNITED STATES PATENT RECORDED SEPTEMBER 4, 1923 IN BOOK 93 AT PAGE 98. 4. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THE UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED MAY 24, 1904, IN BOOK 48 AT PAGE 503, SEPTEMBER 4, 1923 IN BOOK 93 AT PAGE 98 AND JULY 13, 1939 IN BOOK 123 AT PAGE 617. 5. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO RESTRICTIVE COVENANTS, WHICH DO NOT CONTAIN A FORFEITURE OR REVERTER CLAUSE, BUT OMITTING ANY COVENANTS OR RESTRICTIONS, IF ANY, BASED UPON RACE, COLOR, RELIGION, SEX, SEXUAL ORIENTATION, FAMILIAL STATUS, MARITAL STATUS, DISABILITY, HANDICAP, NATIONAL ORIGIN, ANCESTRY, OR SOURCE OF INCOME, AS SET FORTH IN APPLICABLE STATE OR FEDERAL LAWS, EXCEPT TO THE EXTENT THAT SAID COVENANT OR RESTRICTION IS PERMITTED BY APPLICABLE LAW AS CONTAINED IN INSTRUMENT RECORDED OCTOBER 15, 1971, IN BOOK 221 AT PAGE 991 AND AMENDED BY DOCUMENT RECORDED AUGUST 12, 1977 IN BOOK 258 AT PAGE 453. 6. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO EASEMENTS, CONDITIONS, COVENANTS, RESTRICTIONS, RESERVATIONS AND NOTES ON THE RECORDED PLAT OF WEST DAY SUBDIVISION RECORDED MARCH 10, 2005 AT RECEPTION NO, 908760, INCLUDING, BUT NOT LIMITED TO UTILITY EASEMENT TRAVERSING SUBJECT PROPERTY: 7. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO TERMS, CONDITIONS AND PROVISIONS OF COOPERATION AND EASEMENT AGREEMENT RECORDED JUNE 24, 2005 AT RECEPTION NO. 920513. 8. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO TERMS, CONDITIONS AND PROVISIONS OF PARKING EASEMENTS AGREEMENT RECORDED JUNE 24, 2005 AT RECEPTION NO. 920514 AND FIRST AMENDMENT THERETO RECORDED JULY 27, 2007 AT RECEPTION NO. 200719892, 9. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO TERMS, CONDITIONS AND PROVISIONS OF AGREEMENT REGARDING DENSITY ALLOCATION RECORDED JUNE 24, 2005 AT RECEPTION NO. 920515. 10. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO TERMS, CONDITIONS AND PROVISIONS OF CONSTRUCTION STAGING AND SUPPORT EASEMENT AGREEMENT RECORDED JULY 05, 2006 AT RECEPTION NO. 200617769. 11. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO TERMS, CONDITIONS AND PROVISIONS OF AGREEMENT REGARDING DENSITY ALLOCATION RECORDED JULY 05, 2006 AT RECEPTION NO. 200617770. 12. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO RIGHT OF WAY EASEMENT AS GRANTED TO HOLY CROSS ELECTRIC ASSOCIATION, INC. IN INSTRUMENT RECORDED NOVEMBER 14, 2006, UNDER RECEPTION NO. 200631215, 13. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO TERMS, CONDITIONS AND PROVISIONS OF TRENCH, CONDUIT AND VAULT AGREEMENT RECORDED MAY 16, 2007 AT RECEPTION NO. 200712757. 14. LOT 2, WEST DAY SUBDIVISION IS SUBJECT TO TERMS, CONDITIONS AND PROVISIONS OF TEMPORARY ACCESS EASEMENT RECORDED JUNE 11, 2007 AT RECEPTION NO. 200715212. 15. PEAK LAND SURVEYING, INC. DID NOT PERFORM A TITLE SEARCH OF THE SUBJECT PROPERTY, TO ESTABLISH OWNERSHIP, EASEMENTS OR RIGHTS -OF -WAY OF RECORD, RECORD DOCUMENTS UTILIZED IN THIS TOPOGRAPHIC MAP WERE PROVIDED BY LAND TITLE GUARANTEE COMPANY, ORDER No. ? ? ? ? ??, DATED ?, 2003, AT 5 :00 P.M.. 16. NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT, MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. �Q O ff¢• HOLYCROSS EASEMENT (RECEPTION No, 200718019) C) f { PEAK LAND CONSULTANTS, INC. PEAK LAND SURVEYING, INC. 970- 476 -8644 FAX 970- 476 -8616 1000 LION'S RIDGE LOOP VAIL, CO 81657 1 VM � �Ca tom, Cv SANITARY SEWER EASEMENT (RECEPTION No. 200713390) 1 9$ . 0 Al 5 DRAINAGE EASEMENT (RECEPTION No. 200813972) 6.28' WEST LIONSHEAD CIRCLE l5an R_O.W.l CURVE TABLE CURVE DELTA RADIUS LENGTH I TANGENT CHORD CHORD BEARING Cl 6228'09" 24.91' 27.16' 1511' 25.83' S1 545'30 "W C2 15'44'48" 629.25' 172.94' 87.02' 172.39' N38'00'42 "E C3 80 "45'12" 25.00' 35.24' 21.26' 32.39' S66'36'29 "W C4 32'11'03" 392.00' 220.19' 113.09' 217.31' S88`43'09 "E ACCESS EASEMENT, PRIVATE UTILITY EASEMENT & SHARED DRAINAGE EASEMENT (RECEPTION No. 908760) HOLYCROSS EASEMENT (RECEPTION No. 200631215) 0I 9'� r 1510 ZIP IMPROVEMENT LOCATION CERTIFICATE I HEREBY CERTIFY THAT THIS IMPROVEMENT LOCATION CERTIFICATE WAS PREPARED FOR P.C.L. THAT IT' IS NOT A LAND SURVEY PLAT OR IMPROVEMENT SURVEY PLAT, AND THAT IT IS NOT TO BE RELIED UPON FOR THE ESTABLISHMENT OF FENCE, BUILDING OR OTHER FUTURE IMPROVEMENT LINES, I FURTHER CERTIFY THAT THE IMPROVEMENTS ON THE ABOVE DESCRIBED PARCEL ON THIS DATE, 12/31/08, EXCEPT UTILITY CONNECTIONS, ARE ENTIRELY WITHIN THE BOUNDARIES OF THE PARCEL, EXCEPT AS SHOWN, THAT THERE ARE NO ENCROACHMENTS UPON THE 'DESCRIBED PREMISES BY IMPROVEMENTS ON ANY ADJOINING PREMISES, EXCEPT AS INDICATED, AND THAT THERE IS NO APPARENT EVIDENCE OR SIGN' OF ANY EASEMENT` CROSSING OR BURDENING ANY PART OF SAID PARCEL, EXCEPT AS NOTED. C DATE: _�? 1 © -' BRENT BIGGS - COLORADO P,L.S. NO, 27598 < LOT 1 WEST DAY SUBDIVISION V CD « CU LINE TABLE LINE LENGTH BEARING E4 7.85 N1 5 "47'04 "W E5 42.13 S67 °07'35 "W E6 74.15 573'28'40 "W E7 44.37 N22'33'44 "W E8 34.59 N16'36'35 "W E9 44.64 S28 "18'42 "W E10 9.01 S49'1 2'24 "W E11 3.44 S40'47'36 "E E12 82.67 S28`18'42 "W E13 32.76 S26'13'51 "W E14 81.66 S40 °4726 "W £15 23.44 S1 1'28'55 "W E16 9.78 580'00'00 "W E17 14.17 S49`1 2'23 "W E18 4.98 S28'18'42 "W E19 9.42 S63'46'09 "E E20 31.58 326'13'51 "W E21 10.00 N63'46'09 "W E22 17.15 526'13'51 "W L1 21.30 1 S69'42'49 "W L2 4.79 S20'17'11 "E L3 6,35 N20`17'11 "W _. _. ( IN FEET ) I inch = 20 ft. 08 -11 -2010 A/P /D Information Inspection Request,Reprtin 11-:11 .•.,. R:&_� f% - - Requested Inspect Date: Assigned To: Inspection Type: Inspection Area: Site Address: Wednesday, August 201 JMONDRAGONZ' � PW � CIA 728 W LIONSHEAD CR VAIL 728 WEST LIONSHEAD CR Activity: B06 -0352 Type: COMBLD Sub Type: NCOM Status: APPROVED Const Type: Occupancy: Use: IB Insp Area: CIA Owner: RCR LLC Architect: 4240 ARCHITECTURE, INC. Phone: 303 - 292 -3388 Contractor: PCL CONSTRUCTION SERVICES INC. Phone: (303) 365 -6500 Description: RITZ CARLTON HOTEL - PHASED APPROACH FOR THE CONSTRUCTION OF A NEW HOTEL WITH 110 UNITS, 2 LEVELS OF UNDERGROUND PARKING, 6 LEVELS ABOVE GROUND Item: 539'O*F LM, ©� j o �C} roe i_equestedTime:.U, :,00_4-M X Requestor: '-- C7 Assigned To: JM 14O % �� I Entef Phone: : �HAEBEIFLE K Action: Time Exp: Te,v w� i k fi��Lk _ Inspection History Item: 501 PW- Access /Staging /Erosion Item: Item: 502 PW -Rough Driveway Grade 503 PW -Finar Driveway Grade Item: 10 BLDG - FOOTING Item: 20 BLDG - Foundation /Steel Item: 30 BLDG - Framing Item: 50 BLDG - Insulation Item: 60 BLDG - Sheetrock Nail Item: 70 BLDG -Misc. z Item: 90 BLDG -Final Item: 531 FIRE -TEMP. C/O S Item: 532 PW -TEMP. C/O Item: 533 PLAN -TEMP. C/O Item: 530 BLDG -Temp. C/O Item: 538 FIRE -FINAL C/O Item: 539 PW -FINAL C/O t` _ lr�hd ,Cn 2 it Item: 537 PLAN -FINAL C/O mow -1c;1 Item: 540 BLDG -Final C/O Item: 21 PLAN -ILC Foundation Plan Approved *' 12/16/09 Inspector: Warren Comment: Item: 22 PLAN -ILC FRAMING **A pproved 12/16/09 Inspector: Warren Comment: � � V Action: AP APPROVEQ\ o$ _ O Action: AP APPROVED �' -, A:� PT131 Run Id: 11819 PCL /Town of Vail Public Works TCO Walk Outstanding Items 1) Vegetation and grading at ditch along Frontage Road north of Lionshead 2) 8" x 8" x 14' Post 3) Striping Frontage Road 4) Re -do storm/ditch at snow cat walk path. Alpine to provide revised design. 5) Verify ADA ramps for contrast color. Per ADAG / CDOT. 6) Raise pavers on west side of SAS manhole at North West corner of site. 7) Provide survey of alley and parking garage. 8) Provide copies of storm sewer videos. 9) SOD at Marriot Alley fire hydrant. 10) Complete entry to pool off of Gore Creek path. 11) Install lights along Gore Creek path. 12) Remove wood forms at South West planter area. 13) Remove silt bags from inlets after vegetation installation is complete. 14) Install crosswalk bars and stop bar at Forrest and Frontage Rd. intersection. 15) Install way finding signage. 16) Verify all compact spots are properly labeled and verify count as well as minimum width. 17) Patch asphalt from stop bar back and eliminate swale at Forrest and Frontage Rd intersection and patch asphalt at snow cat walk way and divots at Lionshead and Frontage Rd. intersection. All items on list to be completed prior to C.O., pending input /direction from Design Team and/or RCRV. Accepted by: ' Date: ) (� State of CO - Retail Food Inspection Form (Page 1) Page 1 of 2 ° .i Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South ' Denver, CO 80246 -1530 of ° men Phone (303) 692 -3620 Fax (303) 753 -6809 and Envitonment Page 1 of 2 License #: ESTABLISHMENT OWNER NAME RITZ CARLTON RESIDENCES ADDRESS ZIP 728 CTR VAIL CO 81657 COUNTY FIRM ID INSPECTOR ID DATE TRAVEL TIME INSPECT TIME TYPE L2EGULAR MONTH DAY YEAR DOLLOW -UP 19 225661 521 22 66 __PRE -OPERATIONAL 08 02 10 _COMPLAINT RETAIL FOOD ESTABLISHMENT FOOD INSPECTION REPORT Items circled below identify violations to be corrected as indicated by the regulatory authority. Failure to comply may result in further action by the regulatory authority. Red — Critical Items: These items related direct! to foodborne illness. . FOOD LABELING, FOOD PROTECTION a Approved source c. Cross - contamination a. Original container, properly b. Food protected from contamination b. Wholesome, free of it a d. HACCP lan labeled 0. EQUIPMENT DESIGN, CONSTRUCTION a. Personnel w /infections restricted e. Smoking, eating, drinking a. Food - contact surfaces c. Dishwashing facilities b. Wounds properly covered f. Demonstration of knowledge b. Nonfood - contact surfaces c. Hands washed as needed g. Preventing food contamination 11. TESTING DEVICES d. H .ienic .. ctices from bare hands a. Refrigeration units provided with c. Chemical test kits provided, accurate, conspicuous thermometer accessible a Rapidly cool foods to 41°F or less e. Cold hold at 41 °F or less b. Dishmachine provided with b. Rapidly reheat to 165 °F or greater f Temperature control equipment - accurate thermometer and gauge c. Hot hold at 135 °F or greater food thermometer (probe type) cock d Required cooking temperature g. Temperature control equipment - 12. CLEANING OF EQUIPMENT AND UTENSILS adequate equipment to maintain food a. Food - contact surfaces c. Dishwashing operations tem. -restores b. Nonfood - contact surfaces d Wiping cloths 13. UTENSILS, SINGLE - SERVICE ARTICLES Temperature Concentration Exposure Xa Utensils provided, used, stored c. No reuse of single -service articles a. Manual b. Single -service articles stored, b. Mechanical 190 dispensed, used c. In -Place 14. PHYSICAL FACILITIES Sanitizes: Chlorine Quatemary Ammonium Other. a. Plumbing: installed, maintained f. Locker rooms b. Garbage and refuse g. Premises maintained c. Floors, walls, ceilings h. Separation of living, laundry a. Safe water source . Backflow, bac k_siphona ge d. Lighting i. Restroom facilities X,. Hot and cold water under d. Sewage disposal e. Ventilation ure 15. OTHER OPERATIONS a. Personnel: clean clothes, hair b. Linen properly stored a Adequate number, location c. Soap and drying devices restraints, authorized b. Accessible Recommended Regulatory Action Resolution(s) & Interventions (s) 1 Compliance Warning Letter a Evidence of insects or rodents c. Animals prohibited __ I st Notification of Non- Additional ComplianceWarning b. Pesticide . , y p lication Compliance Letter Additional Notification of Non- Voluntary Closure Release a. Properly stored c. Properly used Compliance C_' Embargo Release b. Properly labeled Notice of Civil Penalty Compliance Agreement Final Order of Civil Penalty On -Site Training Revocation/License Suspension HACCP Study On -site Regulatory Actions . __ Announced Inspection Voluntary Closure FDA Documented Inspection Embargo Notice . Voluntary Condemnation ENVIRONMENTAL HEALTH SPECIALIST: RECEIVED BY: Form RFOOI- 1_revH_InspectionReport_0506 CIVCS: i__iYesX No On -site Follow -Up: __:Yes XNo http: // 1 27.0.0.1: 8080 /dhd/webadmin/ letters /95/ Retail% 20Food /paper_sco_retail_food inspection.cfm ?... 8/2/2010 State of CO - Retail Food Inspection Form (Page 1) Page 2 of 2 Colorado Department of Public Health and Environment Retail Food Inspection Report Items described below identify violations to be corrected as indicated by the regulatory authority. Failure to comply may result in further action by the regulatory authority. stablishment City Firm ID Date (mm/dd/yy) Ri tz Carlton Residences VAIL 225661 08/02/2010 Item # Remarks Method of/for Corrected by Correction (MM/DD/VV) 05 b The hot water generation system must provide a minimum energy input of Corrected 08/02/2010 140,500 BTUs per hour. Provide engineering design data for the building use, On -Site if the kitchen and bar hot water is to be part of the building system. Send Vail (COS) Environmental Health a letter from the building mechanical engineer stating the building hot water system is sized to provide the required BTUs for the foos service peak hot water demand. 05 c Lack of appropriate backflow prevention device; submerged inlet. The Corrected 08/02/2010 employee break room glass washer has a drain line inside the floor sink. The On -Site drain discharge line shall be two pipe diameters above the floor sink rim (COS) providing the required air gap preventing back flow into the glass washing machine. Correction required prior to licensing and operational approval. 13 a Provide a the bar ice machine with a ice bin scoop holder to keep the scoop handle out of the ice. Comments SUBMIT A STATE OF COLORADO FOOD SERVICE LICENSE APPLICATION WITH FEE PAYABLE TO THE TOWN OF VAIL. INCLUDE THE COLORADO DEPARTMENT OF REVENUE SALES TAX ID NUMBER ON APPLICATION. THE BAR AND CATERED SERVICE KITCHEN IS APPROVED FOR LICENSING AND OPERATIONS AFTER THE ABOVE VIOLATIONS HAVE BEEN CORRECTED AND DOCUMENTATION SUBMITTED AS REQUIRED ABOVE. ANTICIPATED OPENING DATE IS SEPTEMBER 7, 2010. OBTAIN APPROVAL FROM VAIL BUILDING, FIRE AND PLANNING DEPARTMENTS PRIOR TO BUILDING OCCUPANCY AND OPERATIONS. PLEASE CALL VAIL EH AT 479- 2333 W YOU HAVE ANY QUESTIONS. Enviro it: H S ialist' R eiv fl i / Sa ' Pe Method of/for Correction Corrected On Site (COS): X CIVCS: ._: Follow -Up (F/U): Compliance Agreement (CA): Fort RF001- 2_ revF_ PageTwolnspectionReport _0706.doc http://127.0.0.1: 8080 /dhd/webadmin/ letters /95/ Retail% 20Food /paper_sco_retail_food inspection.cfm ?... 8/2/2010 k, �,� Community Development Department 75 South Frontage Road ,� Vail, Colorado USA 81657 � ������ � TEMPORARY CERTIFICATE OF OCCUPANCY This certificate is issued pursuant to the requirements of Title 10, Section 10-1-2, ADOPTED CODES of the Vail Town Code certifying that, at the time of issuance, this structure was found to be substantially in compliance with the various ordinances of the town regulating building construction or use for the following: Name and description of project RITZ CARLTON CLUB AND RESIDENCES WITH 11�►UNITS,2 LEVELS OF UNDERGROUND PARKING,6 LEVELS ABOVE GROUND Address of project: 728 West Lionshead Circle Vail,Colorado Owner name and address: RCR LLC PO Box 959 Avon,Colorado IBC Edition: 2003 IBC Occupancy Group(s): R2,S1,S2 Type(s)of Construction: IB Permit Number(s) B06-0352 Occupant Load: Sprinkler System Y/N Type: Y 13 Expi tion Date: 10/11/10 08/12/10 Ma tin Haeberle,Building Official Date SEE ATTACHED CONDITIONS. � � � �- Conditions for Temporary Certificate of Occupancy � Ritz Carlton Club and Residences � � � , � �: Permit Number B06-0352 � Date: 08/12/2010 � � � Conditions � � Building: � 1) See Safebuilt Punch List of 8/11/2010 � 2) Elevator 10 and 11 to be provided with backup power � 3) Install required barrier fence at pool. Owner shall provide 24 hour life guard, if � pool area is used by the public, until barrier is installed. ` � � Planning: � The applicant shall complete the following prior to Final CO inspection or shall bon for �' all incomplete work by September 7, 2010. � � 1) Paint the mechanical venting on the north central elevation to match the stucco � color. 2) Complete the stencil work around the clock on the west elevation. 3) Complete the window store front on retail space lA � 4) Paint the ladder to the main tower Black Fox � 5) Pain the mechanical venting and conduit on top of Unit 615 � 6) Clean the parking garage out of all materials so that it can be utilized. � 7) Finish all landscaping � � Public Works: �� 1) Vegetation and grading at ditch along Frontage Road north of Lionshead � 2) 8"x 8"x 14' Post � 3) Striping Frontage Road � 4) Re-do storm/ditch at snow cat walk path. Alpine to provide revised design. � 5) Verify ADA ramps for contrast color. Per ADAG/CDOT. � 6) Raise pavers on west side of SAS manhole at North West corner of site. � ; 7) Provide survey of alley and parking garage. � 8) Provide copies of storm sewer videos. �' 9) SOD at Marriot Alley fire hydrant. � 10) Complete entry to pool off of Gore Creek path. � 11) Install lights along Gore Creek path. 12) Remove wood forms at South West planter area. � 13) Remove silt bags from inlets after vegetation installation is complete. � 14) Install crosswalk bars and stop bar at Forrest and Frontage Rd. intersection. , 15) Install way finding signage. � � � � � � � � � � � � � e 16) Verify all compact spots are properly labeled and verify count as well as minimum width. � 17) Patch asphalt from stop bar back and eliminate swale at Forrest and Frontage Rd intersection and patch asphalt at snow cat walk way and divots at Lionshead and Frontage � Rd. intersection. � � All items on list to be completed prior to C.O., pending input/direction from Design � � Team and/or RCRV. � � Fire Department: � � � 1. Alarm reconfiguration in chiller room. System shall transmit supervisory signal � to FACP. System shall automatically shut off upon transmission of supervisory. � System shall transmit alarm condition upon second stage detection. � �. s � 2. Locking door hardware shall be installed on three doors as shown to Jim Waugh. � 3. PCL shall provide twenty-four hour supervision until access in these area is � complete. � 4. FAS shall provide training to all Shift command officers in regard to alarm panel � function, smoke control panel operation and computer reporting program. � 5. Elevators 10 and 11 shall remain out of service until such a time that Otis � Elevator is able to configure acceptable battery backup to allow for recall floor � discharge. Keys for padlock shall remain in Knox box at FACC. � 6. Bollards at FDC's in alley shall be installed as directed. 7. Fire alarm zone control maps shall be installed on south wall of FACC, as agreed to by FAS. As builts are to remain on site. �' 8. Emergency operation plan shall be updated and approved by VFES. Training of � staff shall include VFES prevention staff. � 9. Key sets and cards shall be installed in all knox boxes. 10. Access hatches for all tamper, isolation valves, and smoke damper controls shall be labeled. � 11. Low branch lines in parking areas shall be appropriately marked as to prevent � collision from foot traffic. � � � � � � �: �: � � � � � � � � , � E � # �' � � � � � � � �� � VAI L .� {� � �ry � �� � �� � .. .� �:� PERIEtiC`E OF :�� LIFE�TI �1 �: Dear Mr. Martin Haeberle, The Ritz Carlton Residences, Vail LLC. recognizes that the project will have 60 days from the date of issuance of the Temporary Certificate of Occupancy (TCO) from the Town of Vail to complete all items listed as deficient on the TCO. We understand that the TCO will be revoked if the deficient items are not resolved within 60 days. We appreciate the efforts on your behalf to complete this project. Sincerely, J�'�li� //� Mr. Graham Frank Senior Project Manager Ritz Carlton Residences