HomeMy WebLinkAboutDRB130230 APPLICATION.pdf Department of Community Development
OT 75 South Frontage Road
TOWN OF VAIL Vail, CO 81657
Tel: 970-479-2128
www.vailgov.com
Development Review Coordinator
Application for Design Review
Conceptual Review
General Information: A conceptual review may be requested by an applicant where new construction or ma-
jor changes are to occur on a property. A conceptual review does not serve as a final approval and an addi-
tional application is required for final review. The conceptual review is intended to allow the applicant to intro-
duce the project to the Design Review Board and receive comments. The Board does not vote on conceptual
reviews.
Fee: $0
I Single Family Duplex I" Multi-Family Commercial
Description of the Request:
Physical Address: 1472 Matterhorn Cir-Park Meadows Lodge property
Parcel Number: 2103-124-01-014 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)
Property Owner: Michael F.Boyer
Mailing Address: 1472 Matterhorn Cir
Vail,CO 81657 Phone:
Owner's Signature:
Primary Contact/ Owner Representative: will Hentchel,BDP/Shopworks and Dominic Mauriello,Mauriello Planning Group
Mailing Address: Po Box 4777
Eagle,CO 81631 Phone: 970-376-3318
E-Mail:willhentschel @gmail.com Fax:
For Office Use Only:
Cash_ CC: Visa/MC Last 4 CC# Exp. Date: Auth # Check#
Fee Paid: Received From:
Meeting Date: DRB No.:
Planner: Project No:
Zoning: Land Use:
Location of the Proposal: Lot: Block: Subdivision:
TOWN OF VAIL' DESIGN REVIEW PROCESS
Pre-application Meeting
A pre-application meeting with Town of Vail Staff is not required; however, highly recommended. The purpose of a pre-
application meeting is to identify any critical issues pertaining to the proposal and to determine the appropriate development
review process for an application. Please call the Development Review Coordinator at 970-479-2128 to schedule a meeting.
Submittal Requirements
The Town of Vail offers two (2) methods for submittal of materials for review of applications. Materials can be submitted
either digitally or on paper. Whichever method you select all materials shall be submitted in that format throughout the
Design Review process. The Town encourages you to consider using the submittal of digital documents and plans.
If submitting digitally all elements of the application shall be uploaded to the Town's share file site as a complete set of
materials. If submitting paper three (3) copies of the materials noted with an asterisk (*) and one (1) copy of all others are
required. The materials necessary to have a complete application are as follows:
Complete applications must be submitted two (2)weeks prior to a scheduled DRB meeting.
• Completed application form.
• 3 Sets of plans
• A conceptual site and landscape plan at a scale of 1"=20' or 1"=10'
• Conceptual architectural elevations showing exterior materials and a description of the character of the proposed
structure or structures.
• Joint Property Owner Written Approval Letter (if applicable).
Submittal Deadline Meeting Date
December 10, 2012 January 2, 2013 Continued. . . Continued. . .
December 24 2012 January 16 2013 Submittal Deadline Meeting Date
January 14, 2013 February 6, 2013 July 15, 2013 August 7, 2013
January 28 2013 February 20 2013 July 29 2013 Au ust 21 2013
February 11, 2013 March 6, 2013 August 12, 2013 September 4, 2013
February 25 2013 March 20 2013 August 26 2013 September 18 2013
March 11, 2013 Aril 3, 2013 September 9, 2013 October 2, 2013
March 25 2013 Aril 17 2013 September 23 2013 October 16 2013
April 8, 2013 May 1, 2013 October 14, 2013 November 6, 2013
April 22, 2013 May 15, 2013 October 28, 2013 November 20, 2013
May 13, 2013 June 5, 2013 November 11, 2013 December 4, 2013
May 28, 2013 June 19, 2013 November 25, 2013 December 18, 2013
June 10 2013 July 3 2013 December 9 2013 1 January 1 2014
June 24, 2013 July 17, 2013 December 23, 2013 January 15, 2014
Deadlines and Meeting Dates
The Design Review Board meets on the 1st and 3rd Wednesdays of each month beginning at 3:00 pm. Complete
applications are due in the Office of Community Development no later than 12:00 noon on the submittal deadlines below:
Staff Review
The Administrator (a member of the Planning Staff) will review and either approve a Design Review application, approve it
with conditions, deny the application, or refer the application to the Design Review Board for a decision. All Staff approvals
are reviewed by the Design Review Board and any administrative decision is subject to final approval by the Board. The
Board reviews applications and may approve, approve with conditions, deny the application, or table the application to allow
applicants to respond to comments.
Design Review Board Meeting Requirements
Prior to the meeting, for new construction and additions, the applicant must stake and tape the project site to indicate
property lines, proposed buildings and building corners. All trees proposed to be removed must be marked. The applicant
must ensure that staking done during the winter is not buried by snow.
The applicant, or their representative(s), shall be present at the Design Review Board public meeting. The item will be
postponed if the applicant fails to appear before the Design Review Board, on their scheduled meeting date.
Property Information
Property Address
Parcel#
Legal Description
Development Site Area sq ft acres buildable sq ft
Zone District/SDD#
Hazard Zones Snow Avalanche F-High Severity F Moderate Severity N/A
Sections 12-21 & 14-7 Debris Flow F_High Flow F Moderate Flow F High Avalanche N/A
Rock fall High Severity Medium Severity [_N/A
Excessive Slopes >_30% N/A
Floodplain F 100 year floodplain Floodway [-Wetlands rV/A
Creeks, Streams HGore Creek Fon site F_ adjacent to site j- N/A
Section 12-14-17 ❑Other tributary: Fon site Fadjacent to site F N/A
Project Information
Project Description
Development Standards Allowed Existing Proposed
Gross Residential Floor Area Primary sq ft
(maximum)
Chapter 12-15 Secondary sq ft
EHU sq ft
TOTAL sq ft
250 Addition Interior Conversion
Credits:
Setbacks (minimum) Front ft
Section 14-10-4
Side ft
Side ft
Rear ft
Watercourse ft
Site Coverage (maximum)
see definition Section 12-2-2
Building Height(maximum) Sloping ft
see definition Section 12-2-2 Flat ft
Landscaping Softscape sq ft
See definition Section 14-2-1
Section 14-10-8 Hardscape sq ft
TOTAL sq ft
Driveway Max Curb-cuts
Sections 14-3-1 & 14-3-2
Max Grade @
centerline
Min Width
Heated drive? F_Yes F_No F-Yes No
Snow Storage %
Parking #Enclosed Spaces
Sections 12-10& 14-5 #Unenclosed
TOTAL
Outdoor Lighting(maximum) #fixtures
Section 14-10-7