Loading...
HomeMy WebLinkAboutDRB130225 Zone Check SheetPLANNING CHECK SHEET Property Information  Property Address 625 Forest Road  Parcel # 210107210013  Legal Description Vail Village Filing 6, Block 2, Lot 2  Development Site Area Ac .357 Sq Ft 15,550 Buildable   Zoning / SDD # Two Family Primary/Secondary Residential  Land Use Designation Low Density Residential  Known Non-Conformities   Previous Approvals DRB130091  Hazard Zones Sections 12-12, 12-21, 14-6 & 14-7 Snow Avalanche na   Debris Flow na   Rockfall na   Excessive Slopes (Site Disturbance 12-21-14) na   Floodpl ain na  Wetlands Y/N   Creeks, Streams Section 12-14-17 na Setback  Proposed   Sidewalks/ Trails   Contact Information  Planner/ Date Joe Batcheller  Owner Contact Info 970-904-8939  Primary Contact/ Owner Representative Info Scott Turnipseed  Project Information  Project Description SFR – New Construction  Land Use Application(s) #   Proposed Uses (As defined by Zoning) SFR Permitted, Conditional, Prohibited?   Date Routed/ DRT Meeting 7-17-2013  Commercial Floor Area Existing  Proposed   Gross Residential Floor Area (Chapter 15)  Total Allowed 6,571 -Existing 0 -Proposed 6,436     East  -Existing  -Proposed      West  -Existing  -Proposed     Total Remaining 135 East Total Remaining  West Total Remaining   250 or Interior Conversion?   Zoning District Standards  Setbacks (perimeter) Projections 14-10-4 Front 20’ Proposed or Y/N 37.5’   Side 1 5’ & 15’ Proposed or Y/N 15’ & 19’   Rear 15’ Proposed or Y/N 15’  Minimum Lot Area/ Width Required 14,000 Proposed or Y/N 15,550  Site Coverage % Allowed 20% (3,110) % Proposed 20% (3,110)  Building Height Allowed 33’/30’ Proposed 33’  Landscaping Sections 14-10-8 & 14-10-9 % Required 60% (9,330) % Proposed 61% (9,450)   Plant size  Proposed    Fences  Proposed    Retaining Walls Sec. 14-6-7 Height Allowed 6’ Proposed 4’   Setback 3’ Proposed 3’  Driveway Sections 14-3-1 & 14-3-2 Max Curb-cuts 1 Proposed 1   Max-Min Slope 12% Proposed 10 %   Max-Min Width  Proposed 12’   Heated Y/N Y Drive Material Brick   Snow Storage % 10% Proposed 12%  Parking Sections 12-10 & 14-5 Spaces Required 5 Proposed 6   Loading  Proposed   Lighting Section 14-10-7 Allowed 15 Proposed 15  Waste Management Section 5-9 Wildlife Proof/ Resistant  Screened   Screening Sections 14-10-9 & 14-10-10 Required  Pr oposed   Roof Material Sections 12-11-3C & 14-10-5 Complies Y/N Metal  Building Separation Section 14-10-6 Complies Y/N   Adopted View Corridors Complies Y/N   Utilities (Location, easements) Section 14-10-10   Grading (Less than 2:1) Section 14-6   Development Impact Fees / Mitigation Employee Housing    Traffic Impact    Art In Public Places   Notes