HomeMy WebLinkAboutB13-0029 REV1 TRANSMITTAL.pdf Department of Community Development
OT 75 South Frontage Road
TOWN OF VAIL Vail, CO 81657
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of$110 will be charged upon reissuance of the permit.
Application/Permit#(s) information applies
to: Attention: Revisions
Response to Correction Letter
B13-0029 REV1 Martin Haberle attached copy of correction letter
PRJ13-0012 C)Deferred Submittal
Other
Project Street Address:
950 RED SANDSTONE ROAD 18 & 19
(Number) (Street) (Suite#)
Building/Complex Name: POTATO PATCH CLUB Description of Transmittal/List of Changes, Items Attached:
Revision 1 &2 changes-SEE ATTACHED LETTER
Applicant Information
(architect, contractor, owner/owner's rep)
Contact Name: Victor Mark Donaldson Architects
Address: 90 W. Benchmark Road, Suite 207
City Avon State: CO Zip: 81620
Contact Name: Mark Donaldson
(use additional sheet if necessary)
Contact Phone: 970.390.5300
Building Permits:
vmda.com Revised ADDITIONAL Valuations (Labor&Materials)
Contact E-Mail: markd @ (DO NOT include original valuation)
I hereby acknowledge that I have read this application,filled out Building: $
in full the information required,completed an accurate plot plan,
and state that all the information as required is correct. I agree to Plumbing: $
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according Electrical: $
to the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other Mechanical: $
ordinances of the Town applicable thereto.
X Mark Donaldson Total: $0
Owner/Owner's Representative Signature(Required)
Date Received:
For Office Use Only:
Fee Paid:
Received From:
Cash Check#
CC: Visa/ MC Last 4 CC# exp. date:
Authorization #
V 0048 E BEAVER CREEK BLVD
D 0 D ON
SUITE 207
PO BOX 5300
AVON, CO 81620
970/949-5200
FAX 949-5205
ARC WWW.VMDA.COM
PLANNING
INTER I ORS
S INC E 19 71
ARCHITECTS MEMORANDUM
TO: Town of Vail Building Department
FROM: Chris Juergens /VMDA
DATE: July 3, 2013
RE: Unit 18-19 Plan Revisions
Building Department
Permit Application: B13-0029
Project Address: 950 Red Sandstone Road, Vail, CO 81657, Units 18-19
Occupancy Group: R-2
Type of Construction VB
Number of Stories: 2
The following general updates have been incorporated into the Building Permit Plans for
the above referenced project.
Architectural
Sheets A0.0-A0.2 Demolition Plans
1 . Demolition Key- Scope revised to patch and repair. - NOTE CLOUDED
2. A0.1 Opening for new window - CLOUDED
3. A0.2 Opening for new windows, remove & replace skykights - CLOUDED
Sheets A1 .0-A1 .2 Floor Plans
1 . Exterior Colors & Material Legend - Notes 5, 11 & 13 - NOTES CLOUDED
2. Detail call-out for areas of foundation wall above / below grade
3. Deck Requirements - reflects change from "Trex" to "Evergrain"
4. A1 .0 Added step to meet egress requirements, Light & Ventilation note - CLOUDED
5. A1 .1 added new window 19.OW.1 - CLOUDED
6. A1 .1 removed horizontal mullions - CLOUDED
7. A1 .2 added new windows 19.OW.2 and 18.OW.1 - CLOUDED
8. A1 .2 remove and replace existing skylights - CLOUDED
Sheets A2.1-A2.2 Elevations
1 . Exterior Colors & Material Legend - Notes 5, 11 & 13 - NOTES CLOUDED
2. A2.1 removed horizontal mullions - CLOUDED
3. A2.1 added new window 18.OW.1 - CLOUDED
4. A2.1 remove and replace existing skylight - CLOUDED
5. A2.2 removed horizontal mullions - CLOUDED
6. A2.2 remove and replace existing skylight - CLOUDED
7. A2.2 Stucco replaced some siding - CLOUDED
8. A2.2 added new windows 19.OW.1 & 19.OW.2 - CLOUDED
Sheets A6.1-A6.5 Details
1 . Detail organization - revised / added details, added notes
2. A6.1 revised deck waterproofing detail -SHEET CLOUDED
3. A6.3 revised details -SHEET CLOUDED
4. A6.4 clarified / consolidated details - SHEET CLOUDED
5. A6.5 added skylight detail -SHEET CLOUDED
Sheets A7.1-A7.4 Details
1 . Detail organization, updated window schedules per added / revised windows
2. A7.1 revised / organized details -SHEET CLOUDED
3. A7.3 removed mullions, added windows - CLOUDED
4. A7.4 removed mullions, added windows - CLOUDED
Revisions have been clouded with #1 & #2.
Structural
Sheets S0.0-S 1 .1
1 . S0.0 Added concrete fasteners to General notes
2. SO.1 Revised deck details
3. S1 .1 Added header schedule, added skylight framing details
4. Misc. - Letter w/ additional instructions, details and adjustments per field conditions
Please let us know if you need anything further in regards to this permit. Thank you for your
time and consideration.
Sincerely,
Chris Juergens
Principal VMDA
Monroe & Newell
Engineers, Inc.
Vail • Denver
FIELD REPORT
Date: June 3, 2013 Project: # 9020
Project: Potato Patch Location: Vail, CO
Weather: Clear, Calm Temp: 55 'at P.M.
To: Victor Mark Donaldson Architects
90 Benchmark Road, Suite 207
PO Box 5300
Avon, CO 81620
Attn: Brent Crouch
The purpose of this site visit was to observe the site conditions now that demolition and
reconstruction has begun.
The following was observed:
The deck of Unit 19 is near grade such that it is confirmed that framing lumber should be treated.
This appears to be the case for most decks.
The triangular "bay" on both units 19 and 18 were rotted to the extent that they have been
removed. This appears to be the case at other units also. Attached is a framing plan to redo the
triangles.
The existing wall stud framing of Units 19 and 18 is 2x4 instead of 2x6 as anticipated. Because
of this, it is acceptable to revise the new headers from three members to two plus a piece of
plywood.
The framing to re-support the existing bays at the kitchens should be done per the current plans.
Some of these bays are simple span framing as part of the decks and some appear to be
continuous.
After demolition of the existing decks on units 15, 16, and 17, the existing steel beam blocking is
in bad condition and the existing beams are quite rusted. Instead of incurring the cost of
removing the existing blocking and cleaning the steel beams with the change that they cannot be
re-used, new steel beams of the same size or 3-12" U.L. wood beams should be installed This
will also allow the rotted 6x6 wood posts that support the beams to be replaced.
www,monroe-newell.coin
1400 Glenarm • Suite 101 • Denver, Colorado 80202
(303) 623-4927 • FAX (303) 623-6602 • email: denver®monroe-newell.com
The existing 2x10 framing supporting the kitchen 'bay' of units 15,16,and 17 have been cut off.
These units should then be framed similar to Units 18 and 19 with a new header supporting the
bay edge supported on triple beams on each side. The header supporting the deck on Unit 16 can
be extended past the end of the kitchen 'bay' to allow the triple 2x10 supporting it to frame into
the building outside the existing vent. The opposite end of this header will bear on a concrete
wall.
The condition of the triangular bay on unit 13 and possibly on Unit 11 are such that they will
probably need removal and replacement. These should be evaluated further once sheathing is
removed
On Unit 11, the header above the kitchen bay windows is a double 2x4 flat. This header is not
adequate and is deflecting. This header should be replaced with a header of (3)-13/4x5'/2 U.L.
Even with the new header the windows should be installed to accommodate 5/8 inch of
movement.
On Unit 9, the header at the wall for the kitchen window should be (3)-7'/4" U.L.
MONROE &NEWELL ENGINEERS, INC.
Peter Monroe, P.E.
Principal
June 6,2013 M&N#9020
2
Monroe & Newell J°B
Engineers, Inc. SHEET NC. CF
CALCULATED BY � DATE v }1�
CHECKED BY DATE
SCALE
..-
�-, w
z Z1�111.1G
qu
- _ -
' I
I �
1 I
a4 1
—i— ��� .
g
I
I y
k
E
_z
r . .
Zx �� I—:T
,
4
+ I
'
11 I i
l ' - 1
1 ! ! l I 1
—'r I
i r '
1
! ( ! 1 h a 7 ! 7� 1 —
PRODUCT 204.1(Single Sheets)205-1(Padded)