HomeMy WebLinkAboutB13-0084 REV 1 & 2 TRANSMITTALTRANSMITTAL FORM
Project Street Address:
__________ ______________________________ ___________
(Number) (Street) (Suite #)
Building/Complex Name: ________________________________
Building Permits:
Revised ADDITIONAL Valuations (Labor & Materials)
(DO NOT include original valuation)
Building: $_____________________
Plumbing: $_____________________
Electrical: $_____________________
Mechanical: $_____________________
Total: $_____________________
Description of Transmittal/ List of Changes, Items Attached:
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
(use additional sheet if necessary)
Application/Permit #(s) information applies
to: Attention: ( ) Revisions
( ) Response to Correction Letter
____________________________________ __________________________ ___attached copy of correction letter
( ) Deferred Submittal
____________________________________ __________________________ ( ) Other
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of $110 will be charged upon reissuance of the permit.
Date Received:
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
For Office Use Only:
Fee Paid:
Received From:
Cash _____ ____ Check # __ _ _______
CC: Visa / MC Last 4 CC # exp. date:
Authorization #
Applicant Information
(architect, contractor, owner/owner’s rep)
Contact Name: ________________________________________
Address:
City _____________________ State: _______ Zip: ____________
Contact Name: _________________________________________
Contact Phone: _________________________________________
Contact E-Mail: _________________________________________
I hereby acknowledge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according
to the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other
ordinances of the Town applicable thereto.
X___________________________________________________
Owner/Owner’s Representative Signature (Required)
B13-0084 Martin Haberle 4
950 RED SANDSTONE ROAD 13 & 14
POTATO PATCH CLUB
Victor Mark Donaldson Architects
90 W. Benchmark Road, Suite 207
Avon CO 81620
Mark Donaldson
970.390.5300
markd@vmda.com
Mark Donaldson
Revision 1 & 2 changes - SEE ATTACHED LETTER
0
By Shelley Bellm at 9:35 am, Jul 05, 2013
0048 E BEAVER CREEK BLVD
SUITE 207
PO BOX 5300
AVON, CO 81620
970/949-5200
FAX 949-5205
WWW.VMDA.COM
MEMORANDUM
TO: Town of Vail Building Department
FROM: Chris Juergens /VMDA
DATE: July 3, 2013
RE: Unit 13-14 Plan Revisions
Building Department
Permit Application: B13-0084
Project Address: 950 Red Sandstone Road, Vail, CO 81657, Units 13-14
Occupancy Group: R-2
Type of Construction VB
Number of Stories: 2
The following general updates have been incorporated into the Building Permit Plans for
the above referenced project.
Architectural
Sheets A0.0-A0.2 Demolition Plans
1. Demolition Key – Scope revised to patch and repair. - NOTE CLOUDED
2. Remove & replace skykight – CLOUDED
Sheets A1.0-A1.2 Floor Plans
1. Exterior Colors & Material Legend – Notes 5, 11 & 13 - NOTES CLOUDED
2. Detail call-out for areas of foundation wall above / below grade
3. Deck Requirements – reflects change from “Trex” to “Evergrain”
4. A1.0 Revised windows to meet egress requirements - CLOUDED
5. A1.1 Added additional insulation note (13) - CLOUDED
6. A1.1 Removed horizontal mullions - CLOUDED
7. A1.2 Added additional insulation note (13) - CLOUDED
8. A1.2 remove and replace existing skylight - CLOUDED
Sheets A2.1-A2.2 Elevations
1. Exterior Colors & Material Legend – Notes 5, 11 & 13 - NOTES CLOUDED
2. A2.1 removed horizontal mullions - CLOUDED
3. A2.1 Revised windows to meet egress requirements - CLOUDED
4. A2.1 remove and replace existing skylight - CLOUDED
5. A2.2 Stucco replaced some siding - CLOUDED
Sheets A6.1-A6.5 Details
1. Detail organization – revised / added details, added notes
2. A6.1 Detail 7 replaced by detail 4/A6.4 – SHEET CLOUDED
3. A6.2 Detail revised - CLOUDED
4. A6.3 revised details – SHEET CLOUDED
5. A6.4 clarified / consolidated details – SHEET CLOUDED
Sheets A7.1-A7.4 Details
1. Detail organization, updated window schedules per added / revised windows
2. A7.1 revised / organized details – SHEET CLOUDED
3. A7.3 removed mullions, Revised windows to meet egress requirements – CLOUDED
4. A7.4 removed mullions, Revised windows to meet egress requirements – CLOUDED
Revisions have been clouded with #1 & #2.
Structural
Sheets S0.0-S1.1
1. S0.0 Added concrete fasteners to General notes
2. S0.1 Revised deck details
3. S1.1 Added skylight framing details
4. Misc. – Letter w/ additional instructions, details and adjustments per field conditions
Please let us know if you need anything further in regards to this permit. Thank you for your
time and consideration.
Sincerely,
Chris Juergens
Principal VMDA