Loading...
HomeMy WebLinkAboutB13-0045 REV4 PLANS APPROVED#4 @ 24" O.C. #4 @ 24" O.C. 2 #5 CONT. TOP & BOT 4" SLAB 4" GRAVEL 2 #5 CONT. 10 " 6" SECTION D NO SCALE 5"5" 18 6 3"3" 1/2" EXPANSION 4' O.C. 1/2" A.B. @ MATERIAL 1' 2'- 1 0 " M I N . BOTTOM OF FOOTING TO BE 48" MIN. BELOW FINISHED GRADE. ELEVATION ONE 3/8" DIAMETER x 3" EXPANSION BOLT 4 x 4 x 5/16 ANGLE CMU WALL NEW OPENING 4 1/2"1 1/2"SECTION4 1/2" 2 1/2" 1 1/2" 1 1/2" LINTEL DETAIL NO SCALE BOTH SIDES BOTH ENDS NOTE: BOTTOM OF FOOTING TO BE MINIMUM OF 48" BELOW FINISH GRADE MAINTAIN EXISTING STRUCTURAL DECK SLAB IN AREA TO REMAIN. REPLACE TOPPING SLAB TO SLOPE AWAY FROM NEW OPENING. CONTACT STRUCTURAL ENGINEER DURING DEMOLITION. PROVIDE NEW LINTEL JUST ABOVE LOBBY FINISH CEILING AT NEW CMU OPENING. SEE DETAIL #2. ISSUE RECORD 1650 Fallridge Road, Suite C-1 Vail, CO 81657 f.(970) 476-4901 p.(970)476-6342 CO M M O N A R E A I M P R O V E M E N T S 38 4 G O R E C R E E K D R I V E VA I , C O 04 MAY 2013 2 - ASI 002 S1.01 STRUCTURAL PLANS AND DETAILS VI L L A V A L H A L L A - V A I L Pr o j e c t # 1 2 1 0 07 MAY 2013 CD'S 1/4" = 1'-0"S1.01 1 STRUCTURAL PLAN - UNITS 3,4,8 UN I T S 3 , 4 , & 8 I M P R O V E M E N T S P R O J E C T # 1 2 5 2 , 1 3 0 1 , 1 3 1 9 02 JUNE 2013 REVISION 01 1/4" = 1'-0"S1.01 2 LINTEL DETAIL AT UNIT 3 ENTRY By David Rhoades at 3:20 pm, Jun 27, 2013 B13-0045