Loading...
HomeMy WebLinkAboutB13-0021 REV1 PLANS APPROVED;I t r; 0 0 N Vicinity map U 1 1/2" = V -0" EXISTING PHOTOS OF EAST SIDE OF BUILDING -UNIT 16 Design Review Staff Approval Of � By Joe Batcheller at 8:17 am, Jul 16, 2013 TOWN Reviewed for Code Compliance Code: 2012 International Residential Code (IRC) TOWN OF VAIL 0 By J Mondragon at 1:25 pm, Jul 09, 2013 3 g CONCRETE CUT OUT PROPOSED LOCATION OF NEW WINDOW WELL VERIFY CLEARANCE TO TREE ROOTS DEMOLITION Lower Level U 1/411 = 1' -0" PROJECT DESCRIPTION - EXTERIOR FIELD VERIFY ALL WINDOW OPENING AND COORDINATE WINDOWS SIZES. 1 THE EAST ELEVATION IS PROPOSED TO HAVE A WINDOW WELL DUG OUT AND THE CONCRETE WALL CUT TO ACCEPT (1) NEW CASEMENT 2'- 11 "x3' -5" EGRESS WINDOW. NEW WINDOWS BEING PROPOSED SHALL BE REFERED TO AS 16.0.E 2 THE NEW WINDOW WELL SHALL BE A BILCO ESCAPE WELL (A GUTTER AND DOWNSPOUT IS EXISTING IN THIS LOCATION) CWV=� OSED EAST ELEVATION V -0" LUpper Level 117' -2 "' l\Main Level E8' -8 LowerLower Level o" Ao„ STRUCTURAL ENGINEER KRM CONSULTING INC. HAS REVIEWED THE WINDOW WELL CUT OUT AND HEADER SIZE FOR THE PROPOSED WINDOW WELL. (1) KING AND (2) TRIMMERS ON EACH SIDE TOP OF EXISTING FOUNDATION WALL PROVIDE NEW (3) 1 3/4 "x7 1/4" LVL HEADER VfVYUC ' ' n CEMENT STUCCO STSTEM IS II TO EXTEND OVER WATER PROOF MEMBRANE TIE -IN I PROVIDE 12" (WIDER THAN —I I CONCRETE CUT OUT) _ WATERPROOF MEMBRANE OVERLAP /TIE -IN TO THE EXISTING FOUNDATION WALL — WATERPROOFING III = GRAVEL DRY WELL AT BTM OF WDW WELL (EXTEND PROTION DOWN TO PERIMETER DRAIN SYSTEM CEMENT STUCCO FINISH ON THERMAL AND AIR INFLITRATION BARRIER TO EXTEND FROM FINISH ABOVE TO BOTTOM OF WINDOW WELL. EXPOSED FOUNDATION WALLS ARE TO RECEIVE WATERPROOF MEMBRANE EXH EXTENDING FROM FOOTING AND UP WALL AT LEAST 24" E ABOVE PROPOSED FINISHED BOTTOM OF WINDOW WELL 1 GRAVEL ELEVATION. AT THE WINDOWS, THE WALL SHEET WATERPROOFING IS TO EXTEND UP THE WALL AND UNDER THE WINDOW /OVER THE ROUGH SILL. WINDOW IS TO BE INSTALLED WITH 6" WATERPROOF WINDOW TAPE OVER ALL FLANGES. THE DRAINAGE PLANE OF THE THERMAL AND AIR INFILTRATION BARRIER ABOVE IS TO PROPERLY OVERLAP AT THE WINDOW HEAD CONDITION. BILCO SCAPEWELL 54 "x41" , MODEL #4048 -54 CONCRETE CUT OUT NEW WINDOW TRIM /CASING /SILL AND APPRON ARE TO MATCH THE EXISTING TYPICAL UNITS STYLE AND FINISH. EFFORT IS TO BE MADE TO PROTECT AND PRESERVE THE WINDOW IS TO BE INSTALLED WITH 6" WATERPROOF WINDOW TAPE OVERALL FLANGES. THE DRAINAGE PLANE OF THE THERMAL AND AIR INFILTRATION BARRIER ABOVE IS TO PROPERLY OVERLAP AT THE WINDOW HEAD CONDITION. II II Main Level A---� F. • CEMENT STUCCO FINISH ON THERMAL AND AIR INFLITRATION BARRIER TO EXTEND FROM FINISH ABOVE TO BOTTOM OF WINDOW WELL. EXPOSED FOUNDATION WALLS ARE TO RECEIVE WATERPROOF MEMBRANE EXTENDING FROM FOOTING AND UP WALL. AT THE WINDOWS, THE WALL SHEET WATERPROOFING IS TO EXTEND UP THE WALL AND UNDER THE WINDOW /OVER THE ROUGH SILL. III I BILCO SCAPEWELL 54 "x41" —MODEL #4048 -54 Lower Level J -- -- Off il III III —III. II �1 DETAIL ELEVATION FOR WINDOW WELL. 3/8" = 1' -0" RECEIVED By David Rhoades at 2:08 pm, Jun 28, 2013 B13 -0021 1/411 = 1' -0" PROJECT INFORMATION Project description: The unit under this phase is adding 2 windows to the north elevation and 2 windows in a new window well on the east. A new Hot Tub slab and 2 ac condensing unit are proposed. Detailed description on sheet A3.2 Location: 950 Red Sandstone Road, UNIT 16 Subdivision: Potato Patch Club Condominiums Vail, Colorado 81657 Parcel Number 2101 - 063 -06 -016 Owner: Patsy Rowe 950 Red Sandstone Drive, Potato Patch Club Condominiums, Unit 16 100 NONANTUM ST NEWTON, MA 02458 Contractor: GE Johnson Project coordinator Matt Lewis OAC Architect: Martin Manley Architect Jeffrey P Manley AIA PO Box 1587 Eagle, CO 81631 970.328.5151 jeff @martinmanleyarchitects.com Structural Engineer:KRM Consulting Tim Hennum PO Box 4572 Vail, CO 81658 970.949.9193 Class of Work: Renovation Type of Construction: V -N Type of Occupancy: R2 (condominium) Sprinkler system: No Levels: 2 -story + Basement unit W J z ■ Z� F- ,- E co o CO U W 0 00 U U O I U� O a� L) LO co W� 00 co m c X co o' m° E O� 0- 04- 0 JEFFREY P MANLEY 19 ARC, � r O 0 � W W 2 Cn Q N NO E r j U) � U O I1 Z O U z =3 / C\Ci o U� ocn w ct O O .� -0-0 O o ^, n 'W ry U) _0 ^, W N ry O (n Q. O 0� L. W � D 6 z 04- 0 JEFFREY P MANLEY 19 ARC, � r O T M r � W W 2 Cn Q N NO E r j In � U O I1 Z O U =3 / C\Ci o U� ocn w ct O O .� -0-0 U W ^, n 'W ry U) _0 ^, W N ry O CY) O 0� 04- 0 JEFFREY P MANLEY 19 ARC, � r O T M r � W W 2 Cn Q N NO E r j In � U O I1