HomeMy WebLinkAboutB10-0152 REV2 TRANSMITTAL, LIST OF CHANGES LETTER DDepartment of Community Development
JUL 0 9 2013 75 South Frontage Road
TOWN OF VAIL ' Vail, CO 81657
Tel: 970.479.2128
TOWN OF VAIL www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of$110 will be charged upon reissuance of the permit.
Application/Permit#(s)information applies
to: Attention: Revisions
v �� �I+�IZ 'r ()Response to Correction Letter
LLC f I attached copy of correction letter
PR n J Q Deferred Submittal
0 Other
Project Street Address:
4180 .n D( .
(Number) (Street) (Suite#)
Building/Complex Name: Description of Transmittal/List of Changes, Items Attached:
q TTA .
Applicant Information C VA -
(architect,contractor,owner/owner's rep)
Contact Name: PQ L C i�L1►�1� 41(=5
Address: I (�30 CA-SL�f 1
i
City, c-7! t StatX0 zip: �(z! /
Contact Name: �L e (use additional sheet if necessary)
Contact Phone: 'T�� �I� 02 '4 1(NC1
Building Permits:
IC- S t3� ��'L h� ��cc>M Revised ADDITIONAL Valuations(Labor&Materials)
Contact E-Mail: lr (DO NOT include original valuation)
1 hereby acknowledge that I have read this application,filled out Building: $
in full the information required,completed an accurate plot plan,
and,,stale that all the information as required is correct. I agree to Plumbing: $
co ply Qt the information and plot plan,to comply with all Town
ordinances 4qd state laws, and to build this structure according Electrical: $
to a town's Wing and subdivision codes, design review ap-
e
Intern fin at Building and Residential Codes and other Mechanical: $
ordi ance the Town applicable thereto.
X ." -- Total: $
Owner/•wner's Re
pres ntative Signature(Required)
Date Received:
For Office Use Only
Fee Paid:
Received From: _
Cash Check#
CC: Visa/MC Last 4 CC# exp.date:
Authorization#
Bigsby Detail Sheet for TOV Permit B10-0152
List of Changes
July 9, 2013
Paul & Nancy Bigsby, 1180b Casolar Drive, Vail Colorado
Application for Change to Approved Plans, Project PRJ09-0636, Permit#B10-0152
1) Stucco will be installed (Benjamin Moore color AC31 hot springs stones)on the north side of
the residence to the west of the front door(see Bigsby north elevation) ,the west facing area
below the existing office windows, and continue under the existing west facing deck(see Bigsby
west elevation)to the southwest corner with a new non structural chase wall (4" X 12" to be
installed )with the stucco wrapped to new inside corner on the south side of the residence (see
Bigsby south elevation 1 &2 of new wing wall). Also stucco will be applied to the chimney on all
four sides above the roof line.
Stucco system will be an application of twenty gauge stucco netting over two-ply weather
barrier with proper lathing accessories. Application of fiber reinforced cement plaster base coat
with crack isolation mesh imbedded with an application of an elastomeric acrylic finish coat.
2) 6 Living room windows (3 south and 3 west facing)will be replaced with aluminum clad
Andersen E-series windows in cinnamon toast color. The south facing windows are a fixed pane
but the new west facing windows will be with a fixed pane above an operating awning lower
portion. Spec sheet attached. Other west facing trapezoidal windows condition will be
examined as repairs are made with the determination of any needed repair or replacements to
be communicated and approved by the TOV.
3) New front entry door with full length side light. (awaiting detail and specs for final DRB sign off)
4) Clapboard siding repairs and replacement will be done above the office windows, below the
south facing deck, upper west facing areas and around replacement windows in a same for same
color and materials.
Technical Product Performance Data Summary
Customer information: -0�
GBRECKENRID CO 80424
Job Name: Paul Bigsbv Quote: 991400
Rated Units:
Qty Line Position Unit Type
Non-Rated Units with Applied default U-Factors:
20061ECC Table 102.13(1)
Operable(including sliding and swinging glass doors)
Fixed
Qty Line Position Unit Type
Unit
100
1
CLAD AUXILIARIES
Width
200
1
CLAD AUXILIARIES
41
200
2
CLAD AUXILIARIES
41
300
1
CLAD AWNING/AUXILIARY/GEOMTRIC
41
300
2
CLAD AWNING/AUXILIARY/GEOMTRIC
41
400
1
CLAD AWNING/AUXILIARY/GEOMTRIC
41
400
2
CLAD AWNING/AUXILIARY/GEOMTRIC
36
400
3
CLAD AWNING/AUXILIARY/GEOMTRIC
36
400
4
CLAD AWN I NG/AUXI LIARY/GEOMTRIC
Non-Rated Units with Applied default U-Factors:
20061ECC Table 102.13(1)
Operable(including sliding and swinging glass doors)
Fixed
Qty Line Position Unit Type
Unit
Unit
Weighted performance
Width
Height
Unit Sqft
Total Sqft
41
65
18.5069
18.5069
41
65
18.5069
18.5069
41
65
18.5069
18.5069
41
16
4.5556
4.5556
41
49
13.9514
119514
36
16
4
4
36
16
4
4
36
49
12.25
12.25
36
49
12.25
12.25
0.32
Totals:
106.5277
Single Double
Glazed Glazed
0.95 0.55
0.95 0.55
Unit Unit
Width Height Unit Sqft Total Sqft
Totals:
Eagle
W I N O O W i 0 0 0 R 6
,ri AnkIcracnC.omp;tm
Weighted
Contribution Performance
U-Value SHGC VLT to Entire Job Class
Weighted Average
Job Total With Applied Default U-Factors on Non-Rated Units: 106.5278 34.0889
Percent of Job Non-Rated: 0 % Weighted Average: 0.32
Quote is valid for 30 days from date of issuance.
Page 1 of 2
Weighted performance
U-Value
SHGC
VLT
Contribution Class
to Entire Job
0,32
0.24
0.55
5.922
0.32
0.35
0.61
5.922
0.32
0.24
0.55
5.922
0.32
0.19
0.44
1.458
0.32
0.24
0.56
4.464
0.32
0.19
0.44
1.28
0.32
0.19
0.44
1.28
0.32
0.24
0.56
3.92
0.32
0.24
0.56
3.92
34.0889
Weighted Average
0.32
Weighted
Contribution Performance
U-Value SHGC VLT to Entire Job Class
Weighted Average
Job Total With Applied Default U-Factors on Non-Rated Units: 106.5278 34.0889
Percent of Job Non-Rated: 0 % Weighted Average: 0.32
Quote is valid for 30 days from date of issuance.
Page 1 of 2