HomeMy WebLinkAboutDRB130156 and DRB130157 Plans Conditionally ApprovedU.Ineeter
RUTH 2013
xLOCK: 1, LOT*07, 800 POTATO PATCH DR. 413 VAIL, CO 81657
GENERAL NOTES:
1. DO NOT SCALE DRAWINGS.
2. VERIFY ALL DIMENSIONS, CONDITIONS, AND UTILITY LOCATIONS PRIOR TO BEGINNING ANY
WORK OR ORDERING ANY MATERIALS. NOTIFY ARCHITECT OF ANY CONFLICTS OR
DISCREPANCIES IN THE DOCUMENTS IMMEDIATELY.
3. AREAS OF CONFLICTS OR DISCREPANCIES MUST BE FULLY RESOLVED WITH WRITTEN
APPROVAL FROM THE ARCHITECTS BEFORE CONSTRUCTION CONTINUES IN THESE PARTICULAR
AREAS.
4. PLAN DIMENSIONS ARE TO FACE OF STUD, CENTERLINE OF STEEL, TIMBER, STUD COLUMNS, OR
FACE OF CONCRETE UNLESS OTHERWISE NOTED. SECTION AND ELEVATION DIMENSIONS ARE
TO TOP OF CONCRETE, TOP OF PLYWOOD, OR TOP OF WALL PLATES OR BEAMS UNLESS
OTHERWISE NOTED.
5. PROVIDE ALL NECESSARY BLOCKING IN STUD WALLS AND CEILINGS. LOCATIONS INCLUDE
BUT ARE NOT LIMITED TO CEILING AND WALL MOUNTED FIXTURES, TOILETS, TOILET
ACCESSORIES, CABINETRY, COUNTERTOPS, SHELVES, CLOSET RODS AND FALSE BEAMS.
6. REFER TO FLOOR PLANS FOR DOOR LOCATIONS. REFER TO DOOR SCHEDULE FOR DOOR
TYPES.
7. REFER TO FLOOR PLANS FOR WINDOW LOCATIONS. REFER TO WINDOW SCHEDULE FOR
WINDOW TYPES.
8. COORDINATE ALL ELECTRICAL AND MECHANICAL FIXTURES TO FIT WITHIN CEILING FLOOR
AND WALL SPACES. VERIFY WITH ARCHITECT WHEN DIVERTING FROM DRAWINGS.
9. IN THE EVENT THAT ADDITIONAL DETAILS OR GUIDANCE IS NEEDED BY THE CONTRACTOR
FOR CONSTRUCTION OF ANY ASPECT OF THE PROJECT, THEY SHALL IMMEDIATELY NOTIFY THE
ARCHITECT. FAILURE TO GIVE 10 DAY NOTICE TO ARCHITECT SHALL NOT CONSTITUTE A DELAY
IN THE PROJECT.
10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ALL APPLICABLE CODES
AND OBTAINING ALL PERMITS AND REQUIRED APPROVALS. THIS PROJECT IS GOVERNED BY THE
INTERNATIONAL BUILDING CODE AND THE INTERNATIONAL RESIDENTIAL CODE. COMPLIANCE
IS MANDATORY. THE CONSTRUCTION DOCUMENTS SHALL NOT PERMIT WORK THAT DOES
NOT CONFORM TO ALL RELEVANT CODES INCLUDING IN IBC AND ALL LOCAL AND REGIONAL
CODES.
11. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL FIELD COORDINATE AND
OBTAIN APPROVALS FROM THE ARCHITECT /ENGINEER BEFORE ANY CUTTING, NOTCHING, OR
DRILLING OF ANY CAST -IN -PLACE CONCRETE, STRUCTURAL FRAMING, OR ANY OTHER
STRUCTURAL ELEMENTS WHICH MAY AFFECT THE STRUCTURAL INTEGRITY OF THE
CONSTRUCTION.
12. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING GRADES AND SCALE OUT THE
BUILDING FOOTPRINT FOR OWNER AND ARCHITECT APPROVAL PRIOR TO BEGINNING ANY SITE
WORK.
13. THE OWNER HAS BEEN ADVISED THAT DUE TO HARSH WINTER CONDITIONS, ROOF & DECK
SURFACES MUST BE MAINTAINED REASONABLE FREE OF ICE & SNOW TO ENSURE MINIMAL
PROBLEMS WITH THESE SURFACES.
€4. SUBSTITUTIONS OF "EQUAL" PRODUCTS WILL BE ACCEPTABLE WITH ARCHITECT'S WRITTEN
APPROVAL,
15. IT IS THE INTENT AND MEANING OF THESE DOCUMENTS THAT THE GENERAL CONTRACTOR
AND EACH SUBCONTRACTOR PROVIDE ALL LABOR, MATERIALS TRANSPORTATION, SUPPLIES,
EQUIPMENT, ETC. TO OBTAIN A COMPLETE JOB WITHIN THE RECOGNIZED STANDARDS OF THE
INDUSTRY.
16. ALL CONSTRUCTION IS TO FIT WITHIN THE BUILDING ENVELOPE AND/OR OUTSIDE
SETBACKS WITHOUT CREATING EASEMENTS. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
17. THE GENERAL CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL EXISTING
UTILITIES. ALL UTILITIES SHALL BE LOCATED TO MINIMIZE EXCAVATION AND VEGETATION
IMPACTS TO THE SITE.
18. THE GENERAL CONTRACTOR SHALL MINIMIZE THE LIMITS OF EXCAVATION AND TAKE
ADEQUATE MEASURES TO PROTECT ALL VEGETATION BEYOND THE LIMITS OF EXCAVATION. ALL
AREAS OF DISTURBANCE SHALL BE RE- VEGETATED TO BLEND WITH THE NON - DISTURBED
LANDSCAPE EXCAVATION. ALL AREAS OF DISTURBANCE SHALL BE RE- VEGETATED TO BLEND
WITH THE NON - DISTURBED LANDSCAPE.
19. THE SOILS REPORT IS AVAILABLE FROM OWNERS SOILS ENGINEER.
20. GENERAL CONTRACTOR SHALL VERIFY ALL SITE DEVELOPMENT WITH LANDSCAPE
CONSTRUCTION DOCUMENTS. THE SITE PLAN IS FOR GRADING AND LANDSCAPE PLAN IS FOR
LAYOUT; ANY DISCREPANCIES VERIFY WITH ARCHITECT.
ITIR MUT
A monitored fire alarm
required and must comply with NFPA
! VFES standards
GENERAL # •A>
't
970.845,
CONTACTS:
ROLAND KJESBO
0 t
Grid Bubble Material Tag
A
I
{ 003 #
004 I
A 103
06 #
A 202 1/4 It T 11011
A 203 1/4 IV = I$oil
Wfilfm
CALCULATIONS
BASEMENT CALCULATIONS EXHIBIT
SITE COVERAGE CALCULATIONS EXHIBIT
PROPOSER UPPER LEVEL GRFA EXHIBIT
BUILDING HEIGHT EXHIBIT - EXISTING
BUILDING HEIGHT EXHIBIT - PROPOSED
WEST ELEVATION - EXISTING
WEST ELEVATION - PROPOSED
+Ir
r
•
•
0
0
r
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
O KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
V
Q,.
AM
AM
�aror�i
.r►
CU
-E•�
v
..
•
•rr•
C3
0
0
r
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
O KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
..
)WRAWN BY:
iA
E;
4m
AM
AM
.r►
.rte►
..
•
•rr•
..
)WRAWN BY:
iA
E;
I �
'le
Ile
l �
FA
MEDIUM SEVERITY ROCKFALL
HAZZARD ZONE EAST OF THIS L
(SEE NOTE 9)
41199 HIGHWAY 6 & 24, EAGLE -VAIL
P.O. BOX 1230
EDWARDS, CO. 81632
(970)949 -1 406
rte/ 8630"��z
LOT 8
1) DATE OF SURVEY: 5/21/13
2) SURVEYOR HAS MADE NO INVESTIGATION OR INDEPENDENT SEARCH FOR AMENDED
PLATS, EASEMENTS OF RECORD (OTHER THAN PLATTED), ENCUMBRANCES,
RESTRICTIVE COVENANTS, OWNERSHIP TITLE EVIDENCE, OR ANY OTHER
FACTS THAT AN ACCURATE AND CURRENT TITLE SEARCH MAY DISCLOSE.
3) NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL
ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS
AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT, MAY ANY
ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE
THAN TEN YEARS FROM THE DATE OF THE CERTIFICATION SHOWN
HEREON.
4) THIS SURVEY AND THE INFORMATION CONTAINED HEREON IS THE PROPERTY OF
EAGLE VALLEY SURVEYING, INC. AND IS INTENDED FOR THE SOLE USE OF THE
ORIGINAL CLIENT ONLY. ANY USE OF OR TRANSFER TO OTHERS IS PROHIBITED.
5) BASIS OF PROPERTY LINE LOCATION: •' ! POINT
PARCEL B AND COMMON > PT PARCEL A/B.
6) BASIS OF ELEVATION: SEWER MH 0200 INVERT EL- 8640.47' LOCATED IN THE
END CUL -DE -SAC OF POTATO PATCH DRIVE.
7) BUILDING SETBACK INFORMATION IS NOT PLATTED. PRIOR TO ANY DESIGN
OR CONSTRUCTION IMPROVEMENTS ON "!' ERTY, THE TOWN OF
SHOULD BE CONTACTED FOR CORRECT BUILDING SETBACK INFORMATION.
i BUILDING SHOWN ! ! MEASURED TO MM AND VARIOUS EXTER107F,
MATERIALS. STRUCTURE AND DIMENSIONS SHOWN SHOULD NOT BE RELIED UPON
FOR ADDITION
9) A PORTION OF THIS LOT FALLS WITHIN A MEDIUM SEVERITY ROCKFALL
ZONE ACCORDING TO OFFICIAL ROCKFALL HAZZARD MAP OF •
ACCORDANCE OF VAIL, COLORADO AS ADAPTED BY COUNCIL ON OCTOBER 17, 2000
IN ! • OF •i• D'
INDICATES CONIFEROUS TREE W/ APPROX. TRUNK DIAMETER
4 x.x'
INDICATES DECIDUOUS TREE W/ APPROX. TRUNK DIAMETER
x.�
SURVEYOR'S CERTIFICATE
1, Michael J. Post, a Professional Land Surveyor registered under the laws of
the State of Colorado, do hereby certify that this topographic survey was
made by me and under my supervision, and that the survey is accurate and
correct to the best of my knowledge.
Michael J. Post
..o i
i• -
Z
O
[A
L U Lf)
Z 0
Lu Z
Lu
u
0
<
ui
x
F-0
CL <
V)
< Lf)
ui
z
<
u
<
LZLJ CC
z
a 0 Ln
UJ LLJ
a C-)
LU
CD
Q�
o I-- > w =
z
RLu
uj
w (D
(D<
o
macs
U.) w
to
LU Lij I.-
Lf) Z
Ln
(D uj a.
z
Ln _j
dui
57
CL
V)
LL =F
000
< <
=
0 o
F-
CL
Lu
w (D
Lu Lu
z
(n
Lu
u
U"
u-
lu:
p 02 LL,
0
u (LLD,
ui
:S Lu Z
0
uj
wwQLL
ul) F-
LU 0 o
0
'unj :') LULJJ <
ul C'C W
z
Z 0 57
� F- Z
w 57 ul a-
W F- r-
:1
Lu
N
ui
0
z
uj
LLJ
cr-
F-
z
ui
CL
•
Lx �
(y)
I
9
•
C=>
011
01%
I
Lij
m
V)
I-
0
u')
<
-r
Z
uj
V T)
0
Lij
U-j UJ Z
:c m 0
U �1--
<
u
D
o I-- > w =
z
m Z
r)
w
0
O -
z F-
uj
Q� U
z
< -j <
Lij U
oz
0
000
=
u
Z 0 -1
NOT VALID FOR BUILDING PERMIT
V)
Uj Lf)
w 0
w Z
3:
M LLJ UJ
LLJ 6
Lu <
co -j
0 z
J0-
0 ry)
CL
oz
w w V)
CL Ln <
<00a
V)
w
z
Lo
<
<
L) (L Lu
Lh 0 -1
W <
13� w
0 it w
;7 a. m
< (D
-
'< Lu
ui J
CL
ui
CL
<
V) F-
<
u
u
a., >-
(f) z
:5
u) V)
LLJ Cc 0
w o -r
00-
<
LLJ V)
�- Lu
V) 0
3: Z
o
u
< z
<
cn
a z
in C)
Lli
-'570 CL
uj
F-
j:c M Lu
-j
Lu
F- - -p CL
D UJ Z
0
z
uj
a. Ln
F- M
(D M 0 z
-
-j
V)
- -1 (D
0 <
V)
0,
Z -J Lu Q
P =� F- <
<
Cr
uj
Z
-i Z
i - §
-i z
3:
U-) <
T< U
z
<
-j
< o
LLJ
0 Lu
0 a:
(N V)
m F- w uj v)
•
Lx �
(y)
I
9
•
C=>
011
01%
I
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 201 3
PROJECT: WHEELER
DRAWN
DATE: 05,1313
REVISIONS:
ml
qs
L4j
Zz)
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCH ITECTS WET STAMP
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 201 3
PROJECT: WHEELER
DRAWN
DATE: 05,1313
REVISIONS:
ml
qs
ml
qs
LOT AREA.,
F.
. 7 / 1,
40/60 Split: Unit
A:
up
to 3,461 sq. ft.
Unit
a
tip
to 5,192 sq. ft. (60% max. of total )
Garage Space: 600
sq.
ft.
per unit
*Zite Coverage: 6,.314sf (20% of total site area) Allowed
f
2,913sf � (5,352)
DEDUCTION FLOOR AREA (SF):
9*m
A
1 IM...
6
3,152
1 t
APPROVED
•
TOWDESIGN N
W J BOARD
ow
- .
0
•
r
:1
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
O KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
ow
e_
Ism
M.
.w►
:1
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
O KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
L II :J
�ROJECT: RUTH
ArRAWN BY: ii
�M ♦ i 0•
REVISIONS:
X11
ow
r
Ism
M.
.w►
L II :J
�ROJECT: RUTH
ArRAWN BY: ii
�M ♦ i 0•
REVISIONS:
X11
1
2.1
BASEMENT CALCULATION - EXHIBIT - UNIT A
1/81, = 11-011
-L r) n Cl rinr3 ACCCKADI V
BASEMENT DEDUCTION CALCULATION:
A—UNIT I B—UNIT TOTAL
1
511-7111
4
T.O. FINISH FLOO
ca
Mz
/ /X/
i//j
X
X/
42-2
9
R
B.O. FLOOR ASSEMBLY,
l DESIGN REMEW BOARD
51'-7 it
DTEO
A
PLANNERO..-��-
W
T.O. FINI
SH FLOOR 5 M
42° -711 311
8
10 11 12 13 14 15
BASEMENT CALCULATION - EXHIBIT - UNIT B
1/811 = 11-0.1
Z
0
cc
V)
z
0
U
w
0
u-
8
Z
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
ca
ow
low
Or
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
ow
low
dM
.11111P
-00
low
LLJ
—.j
rz)
Lai
C=l
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
PROJECT: RUTH
DRAWN BY: ii
DATE: 06.17.13
REVISIONS:
=Ti��
A1.11 MILE WIN I Is]
ow
low
dM
.11111P
-00
low
PROJECT: RUTH
DRAWN BY: ii
DATE: 06.17.13
REVISIONS:
=Ti��
A1.11 MILE WIN I Is]
GARAGE LEVEL PLAN — EXISTING T
2 /16 11c
3" = V-011
GARAGE '
_0 LEVEL PLAN— PROPOSED T
i
as
i
wo
M 97
Lu
mac
MY
No
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
@ KHWE►B ARCHITECTS, PC
COPYRIGHT 2013
*1ROJECT: WHEELER
PRAWN BY: ii
#ATE: 05.13.13
REVISIONS:
3
A200
LL_ __u
HOT TUB
_J
__— ----- ---
WALL TYPE KEY:
— -------------- ----- - -
EXISTING WALL TO REMAIN
Azov - Ak
DEMO
4
A200
BUNK
ROOM
212
�� EXISi`ING RIDGE BEAM --
i T
ENTRY BELOW
LANDING i
201
NEW f
BEAM
WORK IN
ENTRY. MECH.
BEAMS
6" DEEP. PIN 202
-7-
—WATERPRO
�rW�DEC TD.
EXTEND 4'OVE
........................__.- ENTRY, DOOR
3116" = 11-01,
lAll- I
LAUNDRY
208 n
BATH
k 207
CLOSET
206
UP
40--1 1j'
HALLWAY
205
206
1 1 1 1
LLL
DIN EREE7F]
KITCHEN
203
PANTRY
4 alt
SUNROOM
204
HEARTH
GAS
—
E.P. —
M0.
7
D ENp AIR AIR
CONDITIONING CONDITIONING
211 COMPRESSOR COMPRESSOR
DININ
209
.......... .
COVERED.
MASTER
BUMP-OUT
OVERHEAD
NEW
BEAM
LIVING WORK IN
LIVING.
210 BEAMS
6" DEEP.
4=
4=Pl
011
ca
co
9=1
t-A
BUILT -IN- BUUt'T�IN
NIGHT CLOSETS
STAND
BELOW
LAJ
TWIN
MATTRESS
18' v 75*
M 4 ATTRESS
S .07W*
BUNK
ROOM
212
�� EXISi`ING RIDGE BEAM --
i T
ENTRY BELOW
LANDING i
201
NEW f
BEAM
WORK IN
ENTRY. MECH.
BEAMS
6" DEEP. PIN 202
-7-
—WATERPRO
�rW�DEC TD.
EXTEND 4'OVE
........................__.- ENTRY, DOOR
3116" = 11-01,
lAll- I
LAUNDRY
208 n
BATH
k 207
CLOSET
206
UP
40--1 1j'
HALLWAY
205
206
1 1 1 1
LLL
DIN EREE7F]
KITCHEN
203
PANTRY
4 alt
SUNROOM
204
HEARTH
GAS
—
E.P. —
M0.
7
D ENp AIR AIR
CONDITIONING CONDITIONING
211 COMPRESSOR COMPRESSOR
DININ
209
.......... .
COVERED.
MASTER
BUMP-OUT
OVERHEAD
NEW
BEAM
LIVING WORK IN
LIVING.
210 BEAMS
6" DEEP.
4=
4=Pl
011
ca
co
9=1
t-A
Q,*) 3z
E!
pl-
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
PROJECT: WHEELER
0
DRAWN
#ATE: 05.13.13
• �*
LAJ
L
141
Q,*) 3z
E!
pl-
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
PROJECT: WHEELER
0
DRAWN
#ATE: 05.13.13
• �*
mo
ME
•
L
mo
ME
•
3/16" = 11-0t,
NEW WALL
UPPER LEVEL PLAN - PROPOSED Ill
3/16" = i.-oll
@ KHWE►B ARCHITECTS, PC
COPYRIGHT 2013
an
NOT VALID FOR BUILDING PERM
WITHOUT
ARCHITECTS WET STAI
@ KHWE►B ARCHITECTS, PC
COPYRIGHT 2013
an
SITE COVERAGE EXHIBIT 0
u-
11811 = 1' -011 F-
0
z
•
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
a KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
i
.
AMW
r
.. ...
..
mm
1 7-71
PROJECT: RUTH
DRAWN i
!A 1•
ON=
EXHIBIT
X11
U
Q
cs�
•
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
a KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
i
.
AMW
r
.. ...
..
mm
1 7-71
PROJECT: RUTH
DRAWN i
!A 1•
ON=
EXHIBIT
X11
1
1
1
1
E
L_
WALL TYPE KEY: I
I
EXISTING WALL
DEMOLISH
1/4" ^ 11-011
11
i
•
•
Em
0
o.
o.
ra
n:
r-.
b-
0
a
►.n
.o
oa
c a
0
.3
.cc
H
LLJ
LAJ
�c
v
•ac
_.,
I
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
V
4--
i.a
.w.
Qb
el-}-..
i
44W
Ci
•
Em
0
o.
o.
ra
n:
r-.
b-
0
a
►.n
.o
oa
c a
0
.3
.cc
H
LLJ
LAJ
�c
v
•ac
_.,
I
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
PROJECT: •
DRAWN i
DATE:
r
M
.w.
1
i
44W
'low
•7
Am
PROJECT: •
DRAWN i
DATE:
r
M
m
4
A20
A(i 1 )
/2
A201
'16kOOF PLAN -PROPOSED
1/4" = V-0"
z
0
U
D
CC
I--
Ln
Z
0
u
CC
0
u-
F-
0
z
C=
rV
t.j
ow
•
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECTS WET STAMP
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
MOJECT: RUTH
DRAWN
J!'ATE:
05.13.13
REVISIONS:
1 , �
AIM
Aft
MOJECT: RUTH
DRAWN
J!'ATE:
05.13.13
REVISIONS:
1 , �
ROOF PLAN - EXISTING
3/16" = I.-oll
i
r-,� ROOF PLAN - PRROPQ�SED�.. T
3116" = p-ou
Lij
-j
C-j
va
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
PROJECT: WHEELER
DRAWN BY:
DATE: 05.13.13
REVISIONS:
A103
cx
LAJ
4-
C>
k-j
U-1
va
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
PROJECT: WHEELER
DRAWN BY:
DATE: 05.13.13
REVISIONS:
A103
A103
- MAIN RIDGE
TOP OF FLOOR
4i— —"
1 �65, o �-IV
GARAGE SLAB
8653'-2
1/4" = l'-O"
UPPER LEVEL
•
-74- -e- -�Jkj
z
0
U
z
0
u
cr.
0
LL
0
z
I
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
4�
4=k
40000
PROJECT: RUTH
DRAWN BY: A
DATE: 06.20.13
REVISIONS:
FA-v-
'L AIM
AM
V
GU
to
I
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECT'S WET STAMP
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
4�
4=k
40000
PROJECT: RUTH
DRAWN BY: A
DATE: 06.20.13
REVISIONS:
FA-v-
'L AIM
AM
TOP OF FLOOR
8664'-0"
TOP OF FLOOR
GARAGE SLAB
8653'-2
i i
ROOF LINE
EXTRUDED
1-L SOUTH
1
2 FEET
�'�_,_�il`ROM EXISTING
:N
/4
ROOF LINE
EXTRUDED
SOUTH
2 FEET
FROM EXISTING
HARDWARE
IN SUPPORTS
TO MATCH
GARAGE
HARDWARE
m
lws�
FM-0Q STONE MOSS ROCK
Fm-O--?] VERTICAL SIDING
goFASCIA TO MATCH EXISTING
p o WINDOWS AND JELDWIN WINDOWS AND DOORS, MATCH EXISTING
DOORS
O ROOF (PRIMARY) MULTI•WIDTH DAVINCPS SHAKE - TAHOE BLEND
GUTTER
ISO SNOW FENCE
SOD ROOF
RAILING EXISTING
IFLASHING (ACCENT) To MATCH EXISTING
muI GARAGE DOOR MARVIN COPPER PANELED
[M:31 WOOD BEAM WOOD BEAM HEADER OVER GARAGE DOORS
NEW
WINDOWS
�I� E
NEW NEW
WINDOW !DOW L
HIF
j'
hm
NEW I NEW
WINDOW WINDOW
W
WI
-
1/4" = V-0"
aim
•
•
•
NOT VALID FOR BUILDING PERMIT
WITHOUT ARCHITECTS WET STAMP
@ KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
W407iwn
IN
dam
PROJECT: RUTH
I
DRAWN BY:
DATE: 06.20.13
law=
�0, OFFLOOR
10 P CC) F F L0,0 R
TO 0,Ff
FLO
P OR
g
s 4 0%
WEST ELEVATION - EXISTING
1/8" = 11-0..
TOP OF FLOOR
8672-10
TOP OF FLOOR &
TOP OF FLOOR '
�Ao
SOUTH ELEVATION - EXISTING
1/81, = 11-01,
FINISHES KEY
rM-0-1]
STONE
MOSS ROCK - ARK VALLEY
t
Ij I
MFO-21
VERTICAL SIDING
EXISTING TO REMAIN
FASCIA
TO MATCH EXISTING
WINDOWS AND
DOORS
JELDWIN WINDOWS AND DOORS, CHESTNUT BRONZE
ROOF (PRIMARY) I
MULTI-WIDTH DAVINCI'S SHAKE -TAHOE BLEND
Fmb;TIMBER
�
RECLAIMED TIMBER BEAMS
0-
R-7]
! PERGOLA
NEW PERGOLA- WOOD
MFO—i
9
RAILING
EXISTING
'FLASHING (ACCENT);
-- ------ ----
TO MATCH EXISTING
RAILING
WROUGHT IRON
rM 1G
GARAGE DOOR
MARTIN COPPER DOOR
FM 13
----- ----- -------- ----
WOOD BEAM
-------- -
WOOD BEAM HEADER OVER GARAGE DOORS
SNOW FENCE
WOOD
fmlqr
"I'NG FOR NE
WAMPAW
DECK A801E
ENTRY
u
a
867 .'1.10
mg
8 6
, &C0'
fl 11
m
s �iw
t,
O
Ae
cz)
cyll
ra
r.
C>
is LAJ
tw
fl KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
Ij I
va
fl KHWEBB ARCHITECTS, PC
COPYRIGHT 2013
PROJECT: WHEELER
DRAWN
DATE: 05.13.13
REVISIONS:
milk
�l 00
cc
F_
Z
0
u
cr_
01
0 z
tMr,
4K
PROJECT: WHEELER
DRAWN
DATE: 05.13.13
REVISIONS:
milk
�l 00
cc
F_
Z
0
u
cr_
01
0 z