HomeMy WebLinkAboutB13-0268 1 Department of Community Development
75 South Frontage Road
TOWN OF V41L Vail, CO 81657
Tel: 970-479-2128
www.vailgov.com
Development Review Coordinator
ERMIT AP LICATION
rQQI__Q(n�- (Separate applications are required for alarm &sprinkler)
Project Street Address: Project#:
IZ-
DRB#: c� .PJ`3 o Q toll
`1
(Number) (Street) (Suite#) � D
0L Lo
^` I Buildin g Permit#: 'N f Building/Complex Name:
Contractor Information Lot#: Block# Subdivision:
Business Name: ti
Business Address: Ojp� p3 p Work Class: New( } Addition ) Alteration
City �Q�\ State:_Co zip: Type of Building: 6
Single Family Duplex Multi-Family 0)
Contact Name: Commercial Other 0)
i Contact Phone: ct7o gQ gf L 3p a
p Inn (tJ ¢ ��
�S . LO t� Work Type: Interior 0) Exterior Both
Contact E-Mail: 0
I hereby acknowledge that I have read this application,filled out i Valuation of
in full the information required,completed an accurate plot plan, Work Included Plans Included Work
and state that all the information as required is correct. I agree to ;Electrical )Yes )No )Yes )No
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according to i Mechanical DYes ®)No )Yes DNo
the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other :
Plumbing
( Yes O)No Yes ONo �
i ordinances of the Town appli ble thereto. 07-L,
�/
4B44Mtirtg )Yes ®)No )Yes ®)No t spo
i X Value of all work being performed: $ cc O/ o OoD
Owner/Owner' r Signature(Required) (value based on IBC Section 109.3&IRC Section 108.3)
Electrical Square Footage
Applicant Information Detailed Scope and Location of Work: o.
;Applicant Name: �C)w, � LA 8:�L ' 0.
?Applicant Phone: C( (.) 1?C) c) a t
\-
'APPlicantE-Mail: jc,.�blS, cC,ir, t � O �t-e'CZta. CLL_.j N _
Project Information `"� S�eiz vi ALL C 1Ck� ,."u .TS.QsL1S e,-a Ks�t16�!�
Owner Name: K� .�T-tlZ2� o� t-
Parcel#: P ' o )i - n c � _ 0 I _'C)T lam'
(For Parcel#,contact Eagle County Assessors Office at(970328-8640 or visit ( t�yU (�• nT7
www.eaglecounty.us/patie)
- (use additional sheet if necessary) VPL pj
For Office Use Only: Date Received:
Fee Paid: SQ! 2 9 y �r�E E
Received From:
Cash Check# JUL 16 2013
CC: Visa/ MC Last 4 CC# exp date:
Auth #
TOWN OF VAIL
Dropbox - DRB Shoring & Grading Signed Application.pdf Page I of I
Department of Communi
75 SoW
TOWn OF VAIL T1
w
Development Rev
Application for Design Review
Changes to Approved Plans
General Information: This application is for all changes to approved plans prior to Certificate o(Occup
tion for Design Review cannot be accepted until all required information is received by the Community
partment. Design Review approval expires orte year from the date of approval, unless a building per
construction commences_
Submittal Requirements:
The Town of Vail offers two(2) methods for submittal of materials for review of applications. Materials
either digitally or on paper, Whichever method you select all materials shall be submitted in that form
Design Review process. The Town encourages you to consider using the submittal of digital document
it submitting digitally all elements of the application shalt be uploaded to the Town's share file site as
materials. If submitting paper three (3) copies of the materials noted with an asterisk ( ) and one (1)
are required. The materials necessary to have a comp!ete application are as follows:
1, Copies of all pertinent approved plans with illustrated, labeled charges,
2. Joint Property Owner Wfitten Approval Letter, it applicable.
Fee: $20
Single Family Duplex Multi-Family 0 C(
Description of the Request: DRB approval to proceed and submit for staged building permits and
a shoring and excavation permit in advance of a building permit,
Physical Address: 1067 Riva Glen, Vail, CO 81657
Parcel Number: (Contact Eagle Co.Assessor at 970-328-864C
Property Owner, Michael M. Noell Revocable Trust 1/6 Noell Management Services
Mailing Address: 971 Spraddle Creek, Vail, CO 81657
Phone: 757-572-2735
Owner's Signature: 'ke No fA
Primary Contact/Owner Representative: Mike Foster, Triumph Custom Homes
Mailing Adclrew 12 Vail Road, Suite 700, Vail, CC) 81657
Phone: 303-475-4413
E-Mail: miket*11triumphdev.com Fax: 970-479-0619
https://www.dropbox.com/sh/txaul37caegymll/ddOvOfG6Dc/DRB`/`2OShoring`/`20`/`26... 7/11/2013
Jul 16 13 08:14a Spiegel Construction 9705241213 p.2
J
P.O. Box 1320 970-524-1212
Eagle, CO 81631 (fax) 970-524-1213 CONSTRUCTION 970-904-0694
Site Proposal for: Noell Residence Reveg
To: Beck Building Company
7/1/2013
Bid Scope:
Description Qty. Unit Unit $ Total$
Truck In Fill 2583 CY $17.07 $44,091.81
Grade Fill 2583 CY $2.12 $5,475.96
$0.00
Truck In Top Soil 469 CY $17.07 $8,005.83
Top Soil 469 CY $10.03 $4,704.07
Grade Top Soil 469 CY $5.33 $2,499.77
$0.00
Hydro Seed 21967 SF $0.15 $3,295.05
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$68,072.49
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 .
$0.00
$0.00
$0.00
$0.00
04-23-2014 Inspection Request Reporting Page 9
4:10 pm Vail, CO - City Of
Requested Inspect Date: Thursday April 24 2014
Site Address: 1067 RIVA GLEN JAIL
AKA 1000 SPRADDLE CREEK ROAD
A/P/D Information
Activity B13-0268 Type: COMBO Sub Type: ASFR Status: ISSUED
Const Type Occupancy: Use: R-3 Insp Area:
Owner MICHAEL M.NOELLE REVOCABLE TRUST
Applicant: BECK BUILDING COMPANY Phone: 970-949-1800
Contractor: BECK BUILDING COMPANY Phone: 970-949-1800
Description GRADING AND SHORING WORK
Comment SCANNED APPLICATION. ROUTED TO WARREN AND F-2.-DRHOADES
Comment emailed corrections to contractor-MHAEBERLE
Comment Cannot reduce valauation when work has already been done-MHAEBERLE
Comment REV1 RECEIVED SHOWING REVISIONS TO SOIL NAIL WALLS. REVISED TO TEMPORARY AND
PERMANENT SO THAT NAILS DON'T GO BEYOND PROPERTY LINE. REDUCED THE VALUATION BY
$44,000.00 ROUTED TO C-1.-DRHOADES
Comment: resubmitted plans routed to martin-JMONDRAGON
Requested Inspections)
hem- 90 BLDG-Final Requested Time: 02:00 PM
Requestor Phone:
Comments follow up
Assigned To JMONDRAGON Entered By: JMONDRAGON K
Action Time Exp:
Inspection History Iir-
Item 410 Special Inspect-progress rept
Item 420 Special Inspect-final rept �� .
Item 500 PW-BackfillInspection
Item 501 PW-Access/Staging/Erosion °/Item 90 BLDG-Final
REPT131 Run Id: 14817
r
sr
April 30, 2013
Triumph Development
Attn: Mike Foster
Vail, Colorado 81657
!net�istei_S yahoo.cli-ii
Job No. 113 048E
Subject: Rockfall Hazard Review, Proposed Noell Residence, Lot 6, Spraddle Creek
Estates, 1000 Spraddle Creek Road, Vail, Colorado
Dear Mr. Foster:
As requested, we have reviewed the rockfall potential hazard for the proposed Noell
residence at the subject site. The purpose of our review was to evaluate if the proposed
residence is exposed to a rockfall hazard.
Summary of Findings: Our field observations indicated that the proposed residence on
Lot 6 is not exposed to a rockfall hazard.
Scope of Study: A field reconnaissance of the project area was made on May
In addition we have looked at aerial photographs, detailed topographic maps and 2013.
published regional rockfall information by Schmueser and Associates (1984) and Town
of Vail(2000). This report summarizes our field observations and presents our findings
regarding the rockfall hazard potential at the site. The study is supplemental to our
previous proposal for professional services with Triumph Development dated December
21, 2012.
Hepworth-Pawlak Geotechnical previously performed a subsoils study for foundation
design of the proposed residence at the site and submitted our findings in a report dated
April 15, 2013, Job No. 112 048A.
Site Conditions: Spraddle Creek Estates is located on the south-facing Gore Creek
valley side just to the north of the Vail town center as shown on Figure 1. The general
topography in the project area is shown on Figure 2. The lots are located on a hillside
bench and average slope of the bench across the proposed building site on Lot 6 is around
40% down to the south. This 40% grade hillside slope continues uphill of Lot 6 to the
north. Spraddle Creek Road is located to the north of the proposed building site and
construction of the road has required several retaining walls to limit hillside disturbance.
?�'i_ti tl• f 1 1C.i sa { rlr.; ,i? �:l'`!`n— 1` -633 i)-(12
Triumph Development
May 8, 2013
Page 2
Native vegetation in the area is mostly grass, sage brush and other brush with some aspen
trees. The existing retaining walls and revegetated cut slope uphill of the proposed
building site appear to be performing satisfactorily with respect to erosion and global
stability.
Field Observations: The steep hillside bench at the Spraddle Creek Estates is underlain
by glacial till deposited by valley glaciers that occupied this part of the Gore Creek valley
during the middle Pleistocene-age Bull Lake and late Pleistocene-age Pinedale glaciations
(Kellogg, 2003). The Bull Lake glaciation occurred between about 132 and 302 thousand
years ago and the Pinedale glaciation occurred between about 10 and 35 thousand years.
The glacial till consists of subrounded, gravel- to large boulder-size rocks in a sandy loam
soil matrix.
Rockfalls in the Vail area have occurred during historic times in areas down slope of
some rock outcrops and numerous rockfall blocks are common at the ground surface
below the unstable rock outcrop start zones. Active rockfall zones are also present in the
Vail area on very steep,road cuts that are erosionally unstable. Rock outcrops that could
be potential start areas for future rockfalls are not present uphill of the proposed building
site on Lot 6. The existing road cuts uphill of the proposed building site on Lot 6 are
revegetated and erosionally stable. The existing road cuts should not be a potential
source of future rockfall that could reach the proposed building site on Lot 6.
Regional
Rockfa
ll Information:
The regional rockfall study by Schmeuser and
- - Associates (1984) indicates a potential medium severity rockfall-area-downhill cif
Spraddle Creek road in the area down slope of the valley ide bench
y shown on Figure 2
but the 1984 stud does es not show a hazard over the rest of the
Spraddle Creek k Estates
including Lot 6. The Town of Vail(2000) regional rockfall map shows much of the
Spraddle Creek Estates including Lot 6 in a medium severity rockfall area, but based on
our site specific review, in our opinion, and Lot 6 is not in a rockfall hazard area.
i
I
During excavation for the residence and infrastructure, large cobbles and boulders will
probably be encountered. These rocks could be a source of rockfall below the site which
should be considered in the planning and construction.
Limitations: This study was conducted according to generally accepted engineering
geology principles and practices in this area, at this time. We make no warranty either
express or implied. The information presented in this report is based on our field
observations. This report has been prepared exclusively for our client to evaluate if the
proposed residence is in a rockfall hazard area. Our scope of work is limited to rockfall
hazard potential and does not include evaluation of any other geological hazards that may
Job No. 113 048B _
GeStech
Triumph Development
May 8, 2013
Page 3
be present in the area. We are not responsible for technical interpretations by others of
our information.
If there are questions, please contact us.
Respectfully Submitted,
HEPWORTH- PAWLAK GEOTECHNICAL, INC.
Ralph . Mock
Engineering Geologist
Reviewed by:
J
1
r
s
David A. Young, P.L 32-216
RGM/ksw
attachments Figure 1, Project Site Location
Figure 2, Project Site Map
cc: RMT Architects—Paul Miller(Raul -rnlaaarchi:tects.com
Beck Building Company- Tom Solawetz Qomiil,�a] itcis^eonl)
Monroe and Newell— Craig Carroll (ccarrgll(u t» nroc.-1gwelt --n)
REFERENCES
Kellogg, K. S. and Others, 2003, Geology Wap of the Vail East Quadrangle, Eagle
County, Colorado: U. S. Geological Survey, Map MF-2375, Version 1.0.
Schmueser and Associates, 1984,Rockfall Study- Toi,77 of'Vail: Prepared for the Town of
Vail (November, 29, 1984).
Town of Vail, 2000, Official Roc4lWl Hazard Uap, Town of Vail: Prepared by the Town
of Vail, Vail, Colorado (Adopted by the Town Council on October 17, 2000).
Job No. 11_i 048B - ----
C -�Xtech
I
s
—Spraddle'Creek-
?
Estates
f� III A.-
Vail
t.
e-�u
r•.
st
} ti
-
Explanation: I
f
j'•:ji i_ot6 1
0 2000 ft.
! i I
Scale:1 in.=2000 ft.
Contour Infer al=40 ff.
May 201?
113 0488 �ftecti I Proposed Noell Residence Lot 6 Spraddle Creek Estates
"F="`
)RI t4-AWL,",,CF- EC,�"„ Project Site Location Figure 1
t
s
r
_-. `�`• 9hWaYl7p��stBO�o �\ - � ;ti fit\ -
-
1
lo
Explanation;
Existing Residences
Proposed Residence on Lot 6
Topographic slope Break:
Prominant topographic slope break
along south side of valley side 0 250-"t_
bench. t
Scale:1 in.=250 R.
Topographic information from Town of Val GIS Department Contour Interval: 2 ft-
k-4 I I I May 2013
113 048E :� Proposed Noell Residence Lot 6 Spraddle Creek Estates
HEPWOR7H-pgwLgK GEOTECHNICAI Project Site Map Figure 2
j ll fit f<
"`.^ a,i• it cs: '` t ,... (;_!
1-0--WOItiI f—1..PAWLAK GEOTEi.,E'iN1(:AL fay l'.i� 4,
SUBSOIL STUDY
FOR FOUNDATION DESIGN
PROPOSED NOELL RESIDENCE
LOT 6, SPRADDLE CREEK
1000 SPRADDLE CREEK ROAD
VAIL, COLORADO
JOB NO. 113 048A
APRIL 15, 2013
PREPARED FOR:
TRIUMPH DEVELOPMENT
ATTN: MIKE FOSTER
12 VAIL ROAD
VAIL, COLORADO 81657
nnefoster5(hi),vahoo.coni
<33'z�el 'l}>-`�I iii`;} .
TABLE OF CONTENTS
PURPOSE AND SCOPE OF STUDY...................... _ 1 _
PROPOSED CONSTRUCTION...................................:.....• _ 1 _
SITE CONDITIONS......................... . -2-
. .. ....................................
ROCKFALL HAZARD...... - 2-
FIELD EXPLORATION...........................
SUBSURFACE CONDITIONS................. . _ 3 _
. ....................................
FOUNDATION BEARING CONDITIONS.................................. .
DESIGN RECOMMENDATIONS................................... . _4-
. ..................................
FOUNDATIONS..................................... ....... ..... ... ........................................ -4-
FOUNDATION AND RETAINING WALLS.........................................................- 5 -
FLOOR SLABS...........................
UNDERDRAIN SYSTEM................. - 7-
SITE GRADING ..........................
............
ACE DRAINAGE.....................................................
LIMITATIONS ................................
REFERENCE.................................. - 11 -
FIGURE 1 -LOCATIONS OF EXPLORATORY BORINGS
FIGURE 2 - LOGS OF EXPLORATORY BORINGS
FIGURE 3 - LEGEND AND NOTES
FIGURE 4 - GRADATION TEST RESULTS
TABLE 1 -SUMMARY OF LABORATORY TEST RESULTS
PURPOSE AND SCOPE OF STUDY
This report presents the results of a subsoil study for the proposed Noell Residence to be
located on Lot 6, Spraddle Creek, 1000 Spraddle Creek Road, Vail, Colorado. The
project site is shown on Figure 1. The purpose of the study was to develop
recommendations for the foundation design. The study was conducted in general
accordance with our proposal for geotechnical engineering services to Triumph
Development dated December 21, 2012.
f A field exploration program consisting of exploratory borings was conducted to obtain
information on the subsurface conditions. Samples of the subsoils obtained during the
field exploration were tested in the laboratory to determine their classification and other
engineering characteristics. The results of the field exploration and laboratory testing
were analyzed to develop recommendations for foundation types, depths and allowable
f
pressures for the proposed building foundation. This report summarizes the data obtained
during this study and presents our conclusions, design recommendations and other
geotechnical engineering considerations based on the proposed construction and the
subsurface conditions encountered.
PROPOSED CONSTRUCTION
The residence will be located on the lot as shown on Figure 1 and be a one and two story
structure over a walkout basement. Ground floors will be slab-on-grade. Grading for the
structure will be considerable with cut depths up to about 30 feet along the uphill,
northeastern side of the excavation. The excavation will typically daylight to the
southwest. We assume relatively light to moderate foundation loadings, typical of the
proposed type of construction. Permanent shoring is proposed on the uphill side of the
excavation and directly below Spraddle Creek Road.
The shoring is tentatively planned to be soil nail walls. There will be extensive boulder
walls retaining part of the cuts along the uphill side and the fills along the downhill side
of the residence.
Job No. 113 048A
GZx9techz
i
s
- 2 -
If building loadings, location or grading plans change significantly from those described
above, we should be notified to re-evaluate the recommendations contained in this report.
SITE CONDITIONS
The lot is vacant and located on a southwesterly facing hillside below Spraddle Creek
Road. The ground surface has undergone some previous gr adin g primarily for an access
drive into the lot from Spraddle Creek Road that was constructed with generally shallow
3 cuts and fills. The terrain is moderately steep to steep ranging from about 30 to 40%.
t
Elevation difference across the proposed residence ranges from about 12 to 28 feet.
Vegetation consists of grass and weeds with scattered aspen trees in the west part of the
lot. There are scattered cobbles and boulders on the ground surface. The site was
covered with up to about 2 feet of snow at the time of our field exploration.
k
s
t
ROCKFALL HAZARD
4
I
The lot is in an area of medium severity rockfall potential according to the Town of Vail
I
rockfall hazards mapping(Town.of Vail,.2000). We believe the risk is probably low due
i
to the existing road and development above the site. We can provide a more detailed
study of evaluation of the rockfall hazard desired.
FIELD EXPLORATION
The field exploration for the project was conducted on March 27, 2013. Two exploratory
borings were drilled at the locations shown on Figure 1 to evaluate the subsurface
conditions. The borings were advanced with 4 inch diameter continuous flight augers
powered by a track-mounted CME 45 drill rig. Even with the track-mounted rig, the
borings had to be drilled on the access trail due to steep terrain. Access to a planned third
boring in the western portion of the proposed residence was not possible beyond the
access trail. The borings were logged by a representative of Hepworth-Pawlak
Geotechnical, Inc.
Job No. 113 048A G(�gtech
- 3 -
Samples of the subsoils were taken with 1% inch and 2 inch I.D. spoon samplers. The
samplers were driven into the subsoils at various depths with blows from a 140 pound
hammer falling 30 inches. This test is similar to the standard penetration test described
by ASTM Method DAS86. The penetration resistance values are an indication of the
relative density or consistency of the subsoils. Depths at which the samples were taken
and the penetration resistance values are shown on the Logs of Exploratory Borings,
Figure 2. The samples were returned to our laboratory for review by the project engineer
and testing.
SUBSURFACE CONDITIONS
Graphic logs of the subsurface conditions encountered at the site are shown on Figure 2.
The subsoils encountered, below about 1 foot of organic topsoil, consisted of medium
dense to dense, clayey silty sand and gravel with cobbles and boulders that extended
down to the maximum depth drilled of 17 feet. Drilling in the dense granular soils with
auger equipment was difficult due to the cobbles and boulders and drilling refusal was
encountered in the deposit.
Laboratory testing performed on samples obtained from the borings included natural
moisture content, gradation analyses and Atterberg limits. The soils were too rocky to
obtain undisturbed samples for swell-consolidation testing. Results of gradation tests
performed on small diameter drive samples (minus P/2 inch fraction) of the coarse
granular subsoils are shown on Figure 4. The liquid and plastic limits testing indicate the
fine portion of the subsoils to have low to medium plasticity. The laboratory testing is
summarized in Table 1.
No free water was encountered in the borings at the time of drilling and the subsoils were
slightly moist to moist.
FOUNDATION BEARING CONDITIONS
The natural granular soils possess moderate bearing capacity and relatively low
settlement potential. Spread footings bearing on these soils appear suitable for foundation
Job No. 113 048A
��P
�Otech
- 4 -
support of the building. Based on our experience in the area, we expect the clayey silty
sand and gravel with cobble soils will be encountered in the excavations at the site below
fill and topsoil. We do not expect groundwater will be encountered in the excavation but
additional subsurface exploration could be done to verify these assumptions prior to or
during excavation for the building.
Due to the extensive grade changes above and below the residence, we expect that
boulders above the residence will not be feasible as structural retaining walls but may be
feasible as a facing if properly constructed. The overall stability of the hillside should
also be evaluated as part of the retaining wall system design.
DESIGN RECOMMENDATIONS
FOUNDATIONS
Considering the subsurface conditions encountered in the exploratory borings and the
nature of the proposed construction, we recommend the building be founded with spread
footings bearing on the natural granular soils.
The design and construction criteria presented below should be observed for a spread
footing foundation system.
1) Footings placed on the undisturbed natural granular soils should be
designed for an allowable bearing pressure of 3,000 psf. Based on
experience, we expect settlement of footings designed and constructed as
discussed in this section will be up to about 1 inch.
2) The footings should have a minimum width of 18 inches for continuous
walls and 2 feet for isolated pads.
3) Exterior footings and footings beneath unheated areas should be v'
pro �ded
with adequate soil cover above their bearing elevation for frost protection.
Placement of foundations at least 48 inches below exterior grade is
typically used in this area.
4) Continuous foundation walls should be well reinforced top and bottom to
span local anomalies such as by assuming an unsupported length of at least
i
I
Job No. 113 048A
C (�gtech
1
- 5 -
12 feet. Foundation walls acting as retaining structures should also be
designed to resist lateral earth pressures as discussed in the "Foundation
and Retaining Walls" section of this report.
5) Existing fill, topsoil and any loose or disturbed soils should be removed
and the footing bearing level extended down to the relatively dense natural
granular soils. The exposed soils in footing area should then be moistened
I and compacted. Voids created by boulder removal should be backfilled
with structural fill or concrete. If water seepage is encountered,the
footing areas should be dewatered before concrete placement.
6) A representative of the geotechnical engineer should observe all footing
excavations prior to concrete placement to evaluate bearing conditions.
FOUNDATION AND RETAINING WALLS
Foundation walls and retaining structures which are laterally supported and can be
expected to undergo only a slight amount of deflection should be designed for a lateral
earth pressure computed on the basis of an equivalent fluid unit weight of at least 50 pcf
for walls up to 12 feet high for backfill consisting of the on-site granular soils. For
laterally supported walls taller than 12 feet, the walls should be designed for a uniform
lateral pressure of 25 H in psf where H is the wall height in feet for backfill consisting of
the on-site granular soils. Cantilevered retaining structures up to 12 feet in height which
are separate from the building and can be expected to deflect sufficiently to mobilize the
full active earth pressure condition should be designed for a lateral earth pressure
computed on the basis of an equivalent fluid unit weight of at Ieast 45 pcf for backfill
consisting of the on-site granular soils. Cantilevered retaining structures taller than 12
feet in height which are separate from the building and can be expected to deflect
sufficiently to mobilize the full active earth pressure condition should be designed for a
uniform lateral pressure of 22 H in psf where H is the wall height in feet for backfill
consisting of the on-site granular soils_ The wall backfill should not contain debris,
topsoil or oversized rocks.
Job No. 113 048A
c�gtech
- 6 -
All foundation and retaining structures should be designed for appropriate hydrostatic and
surcharge pressures such as adjacent footings, traffic, construction materials and
equipment. The pressures recommended above assume drained conditions behind the
walls and a horizontal backfill surface. The buildup of water behind a wall or an upward
sloping backfill surface will increase the lateral pressure imposed on a foundation wall or
retaining structure. An underdrain should be provided to prevent hydrostatic pressure
buildup behind walls.
Backfill should be placed in uniform lifts and compacted to at least 90%of the maximum
standard Proctor density at a moisture content within about 2%of optimum. Backfill in
pavement and walkway areas should be compacted to at least 95%of the maximum
standard Proctor density. Care should be taken not to overcompact the backfill or use
large equipment near the wall, since this could cause excessive lateral pressure on the
wall. Some settlement of deep foundation wall backfill should be expected, even if the
material is placed correctly, and could result in distress to facilities constructed on the
backfill. Use of select granular imported material such as road base and increasing
compaction to at least 98% standard Proctor density could be done to reduce the
settlement potential.
The lateral resistance of foundation or retaining wall footings will be a combination of the
sliding resistance of the footing on the foundation materials and passive earth pressure
against the side of the footing. Resistance to sliding at the bottoms of the footings can be
calculated based on a coefficient of friction of 0.45. Passive pressure of compacted
backfill against the sides of the footings can be calculated using an equivalent fluid unit
weight of 375 pcf. The coefficient of friction and passive pressure values recommended
above assume ultimate soil strength. Suitable factors of safety should be included in the
design to limit the strain which will occur at the ultimate strength, particularly in the case
of passive resistance. Fill placed against the sides of the footings to resist Iateral loads
should be suitable granular material compacted to at least 95% of the maximum standard
Proctor density at a moisture content near optimum.
Job No. 113 048A
c(�Xtech
i
s
i
i
d
i
- 7 -
FLOOR SLABS
The natural on-'site soils, exclusive of topsoil, are suitable to support lightly loaded slab-
on-grade construction. To reduce the effects of some differential movement, floor slabs
should be separated from all bearing walls and columns with expansion joints which
allow unrestrained vertical movement. Floor slab control joints should be used to reduce
damage due to shrinkage cracking. The requirements for joint spacing and slab
reinforcement should be established by the designer based on experience and the intended
slab use. A minimum 4 inch layer of free-draining gravel should be placed beneath
basement level slabs to facilitate drainage. This material should consist of minus 2 inch
aggregate with at least 50% retained on the No. 4 sieve and less than 2%passing the No.
200 sieve.
All fill materials for support of floor slabs should be compacted to at least 95% of
maximum standard Proctor density at a moisture content near optimum Required fill can
consist of the on-site granular soils devoid of topsoil and oversized rocks, or a suitable
granular material can be imported.
UNDERDRAIN SYSTEM
Although free water was not encountered during our exploration, it has been our
experience in mountainous areas that local perched groundwater can develop during times
of heavy
vy or seasonal runoff. Frozen round during spring g g p ing runoff can also
create a perched condition. We recommend below-grade construction, such as retaining
walls, craw Ispace and basement areas, be protected from wetting and hydrostatic pressure
buildup by an underdrain system.
The drains should consist of drainpipe placed in the bottom of the wall backfill
surrounded above the invert level with free-draining granular material. The drain should
be placed at each level of excavation and at least 1 foot below lowest adjacent finish
grade and sloped at a minimum 1% to a suitable gravity outlet. Free-draining granular
I
material used in the underdrain system should contain less than 2%passing the No. 200
Job No. 113 048A s gtecn
- 8 -
sieve, less than 50%passing the No. 4 sieve and have a maximum size of 2 inches. The
drain gravel backfill should be at least 1% feet deep.
SITE GRADING
There is a risk of construction-induced slope instability at the site due to the moderately
steep to steep slope and relatively deep proposed cuts of up to about 30 feet for the
basement level. We understand the cuts along the uphill sides will be shored, probably by
soil nailing. This type of system should be feasible for hillside retaining provided the
shoring is properly designed and constructed. Micro-pile wall shoring may also need to
be included. A contractor with considerable experience in this area should design and
install the shoring.
Free standing cut slopes should not exceed one level, about 10 feet and be sloped back to
a stable grade for both temporary and permanent condition. Embankment fills should be
limited to about 10 feet deep and be compacted to at least 95% of the maximum standard
Proctor density near optimum moisture content. Prior to fill placement, the subgrade
should be carefully prepared by removing all vegetation and topsoil and compacting to at
least 9�%of the maximum standard Proctor density. The fill should be benched
horizontally into the steep hillside slope. Some long term settlement of deeper fills
should be expected. Using a select granular material and increasing compaction to 100%
standard Proctor density could be done to reduce fill embankment settlements.
Permanent unretained cut and fill slopes should be graded at 2 horizontal to 1 vertical or
flatter and be protected against erosion by revegetation or other means. The risk of slope
instability will be 'm
creased if f
seepage is encountered in cuts sand flatter slopes may Y be
necessary. If seepage is encountered in permanent cuts, an investigation should be
conducted to determine if the seepage will adversely affect the cut stability. We should
j
review the shoring and site grading plans for the project prior to construction.
i
lob No. l 13 048A
G(;�ortec!'h
- 9 -
SURFACE DRAINAGE
The following drainage precautions should be observed during construction and
maintained at all times after the residence has been completed:
1) Inundation of the foundation excavations and underslab areas should be
avoided during construction_
2) Exterior backfill should be adjusted to near optimum moisture and
compacted to at least 95%of the maximum standard Proctor density in
pavement and slab areas and to at least 90%of the maximum standard
Proctor density in landscape areas.
3) The ground surface surrounding the exterior of the building should be
sloped to drain away from the foundation in all directions. We
recommend a minimum slope of 12 inches in the first 10 feet in unpaved
areas and a minimum slope of 3 inches in the first 10 feet in paved areas.
Free-draining wall backfill should be capped with about 2 feet of the on-
site finer graded soils to reduce surface water infiltration.
4) Surface water should not be allowed to discharge down the steep slopes at
the site uncontrolled. The surface water should be collected and
discharged into rip-rapped or lined channels.
5) Roof downspouts and drains should discharge well beyond the limits of all
backfill.
6) Landscaping which requires regular heavy irrigation should be located at
least 3 feet from foundation walls.
LIMITATIONS
This study has been conducted in accordance with generally accepted geotechnical
engineering principles and practices in this area at this time. We make no warranty either
express or implied. The conclusions and recommendations submitted in this report are
based upon the data obtained from the exploratory borings drilled the locations indicated
on Figure 1,the proposed type of construction and our experience in the area. Our
Job No. 113 048A
G(cgtech
- l0-
services do not include determining the presence, prevention or possibility of mold or
other biological contaminants (MOBC) developing in the future. If the client is
concerned about MOBC, then a professional in this special field of practice should be
consulted. Our findings include interpolation and extrapolation of the subsurface
conditions identified at the exploratory borings and variations in the subsurface
conditions may not become evident until excavation is performed. If conditions
encountered during construction appear different from those described in this report; we
should be notified so that re-evaluation of the recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes. We
are not responsible for technical interpretations by others of our information. As the
project evolves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recommendations, and to
verify that the recommendations have been appropriately interpreted. Significant design
changes may require additional analysis or modifications to the recommendations
presented herein. We recommend on-site observation of excavations and foundation
bearing strata and testing of structural fill by a representative of the geotechnical
engineer.
Respectfully Submitted,
HEPWORTH - PAWLAK --HNICAL, INC.
David A. Young, - P
32-218
Ile' J-7,15
Reviewed by: lANAL
41111/!1
Steven L. Pawlak, P.E.
DAYlksw
cc: Monroe. &Newell— Craig Carroll(ccarroll(<Lmonroe=newell.com)
RIVIT Architects—Paul ]Miller (paul @'rmtarchitects.com_)
Beck Building Company— Tom Solawetz (tomi«beckbuikls.con)
Job No. 113 048A _-
GecPteech
- 11 -
REFERENCE
Town of Vail, 2000. Official RockfallHazard Map, Town of VaiL Prepared by the Town
of Vail, Vail, Colorado (Adopted by the Town Council on October 17, 2000).
I
Job No. 113 048A
GeStech
t
APPROX ATE SCALE:
60'
tt 1�
i
' qj, .!• �
�� t BORING 1M
g.�d��FJ,� f'' N 1 O�acj J9'
iti .`f x\ 4,41
ill �I;
�� "--' p�• _ �
r� BORING 2
ti(( PROPOSED,] Z
R SIDENCE 'o c > d s
act
) 4q
-ry .ar a/r �:, � . , I- }t t5-i, :} ` I err � , �"'-�.,� tr,,<'��•9r
dpi f, "iLr pf' r t f t ►; aF f, t
odi o.
i
F";
113 048A �teCh LOCATIONS OF EXPLORATORY BORINGS FIGURE 1
�EP�t10!�TH-PAWLAK GF:�TECHNIC: _
BORING 1 BORING 2
ELEV.= 8546' ELEV.= 8538'
8550
8550
8545
8545
I
10112
Q�r WC=9.9
+4=25
-200=28
4•
8540 T a° 8540
b 33/12
WC=11.1
-200=31
LL=26
°J ¢= PI=9
LL
8535
LL
0 14/12 8535
c
ro o
> M
a> 4; >
W
'cr W
8530
60/12 8530
WC=3.0
_ +4=30
Q -200=22
.C;P
8525 •c.
39/12 8525
WC=6.9
-200=32
Q LL=20
P1=4
8520 8520
Note: Explanation of symbols is shown on Figure 3.
M
p
113 048A �-r, ' r'tE?ch LOGS OF EXPLORATORY BORINGS FIGURE 2
HEPWORTH-PAWLAK GEO TECHNICAL I J
LEGEND:
TOPSOIL;organic sandy clay and silt with scattered cobbles, firm, moist, dark brown.
aSAND AND GRAVEL (SC-GC);with cobbles and boulders, clayey, silty, medium dense to dense with depth,
slightly moist to moist, brown, low to medium plastic fines, rocks are primarily subrounded.
i
nRelatively undisturbed drive sample; 2-inch I.D. California liner sample.
Drive sample; standard penetration test (SPT), 1 3/8 inch 1.D. split spoon sample,ASTM D-1586.
33/12 Drive sample blow count; indicates that 33 blows of a 140 pound hammer falling 30 inches were
required to drive the California or SPT sampler 12 inches.
Practical drilling refusal. Where shown above bottom of log, indicates that multiple attempts were
made to advance the boring.
NOTES:
1. Exploratory borings were drilled on March 27, 2013 with 4-inch diameter continuous flight power auger.
2. Locations of exploratory borings were measured approximately by pacing from features shown on the site plan
provided.
3. Elevations of exploratory borings were obtained by interpolation between contours shown on the site plan provided.
4. The exploratory boring locations and elevations should be considered accurate only to the degree implied by the
method used.
5. The lines between materials shown on the exploratory boring logs represent the approximate boundaries between
material types and transitions may be gradual.
6. No free water was encountered in the borings at the time of drilling. Fluctuation in water level may occur with time.
7. Laboratory Testing Results:
WC = Water Content(%)
+4 = Percent retained on the No. 4 sieve
-200 = Percent passing No. 200 sieve
LL = Liquid Limit(%)
PI = Plasticity Index(%)
H
113 048A L HEP !>tech LEGEND AND NOTES FIGURE 3
WORTH-PAWLAK GEOTECHN1CAL L
••s
•1 /• 1t t 1
�����f!- ���f!-f�fffff>•!�flrs�
1l-1l-Iffl� �011���lt!♦•01!♦�'
1>��■f1a1lfl�■�It�v��..�l��l��1�
/ �11�11>♦���I�t1l1♦�I>_I)I-���_!+llif��l�t1!♦t1♦1�
/ s����If>•Ifffff l�l>-��11�1�1>-1>-1>-11>•�1!•
t>-1!>-�t>-1�1�1�1l-1��>•11•f��1�11a��1'1�1�
�t>_f!s cif!-f�1>�11!-ifs�!_11l-�f1fl,
■ .1 �-tea-�!-�l�j��t�!l��l/!••���1!•����
fffilt>-!•Bffff�t��'I��I!_ff� 1�l11l�I�r� •
t�Ifl�N�N1�1� �_ ��10�1/I>•1���
1>_f!-f!•f!- m2m
i1>l����11!-ffl-1>_f�t!♦�f!_ff!♦��
t.t���Ot)♦1�1�1�1l1♦ ��1����-�0
i
•/
It!!>♦111/♦�I��I�1�1��l1'•�1!_IIl,�1' .1
1��� �t>-1l-fl-ffffffl���--�1>,I�1!-ff!♦��
1>•��ffff'ffffff�t>-!_���--IVa1l1--�fH�
� r���1>•�Ir,�1� :1
�tl-f1♦tl-it>•ii•I�f�I���ifl>•�/t�fl/•�1��1�
/ �■l-i=�If'�fif,fffff'fff,ff!_t!-�rl�•t��f�flffff!
fl-1-�'f!_�f!_fif,■111=�f� ��=1f•l1��1>,
• Il-I�t�t�1/1_ t't�il>!♦1>'fffiff,l�1�l�11l-11-if!♦1.1'
/ ���O1>-�1I-1/_��Il>♦.�IIf:i1��1�I1)♦�� .1
t>-tl-N)!•fil/♦f�11!-tiff!♦�Ifl,1!-��fl-1>-f>>�>�����
Iil>♦-�-f�fl-fjjjjjf,t�•)- �1����fl-N�=�
�lff!♦/�O�f!♦flf�lflflf!>fa ■
��fa�-cif!-�t111♦11���l�1!-if1,11♦�
/• It // 11• I 1 11 .II • / t
G(�p'rtech GRADATION TEST RESULT
� ' f
� r
i
b �
Q Cd
CO ra Q m
r 0~ `� G» cad
0 -j U 60
z U]
�
LL)
0 CO GO cif ria cn
-� CD 0 a�
C's C's ro cd >, >Ed
U V C'7 U U C7
z
0
o
= U
U)u-
am
U H
Z J
D
J U) U
Q W 0 F-W
U a Z �r
Z IL
= W a
U m
H >- W ~_
O m K e N
v T Q
Y W x
Q J O Zzo° w
LLJ J m m U y N W 00 .--i
Q F Q WQO� N
EL 0-
a_ U-
_ o
} O
O Z Q ° d
O Q o m
a
IL o
L1J U � w
2 U) C7 Q a N p
� m
c�
J
a
Q �W
Z a
J W F-
K
jW
F- O Q�
Z - m
aoo
Zoo
O 1=-
p w N 0
a p
U
U
J
W
J (�
Q Z
m
0 --' Department of Community Development
' 75 South Frontage Road
TOWN OF VAIL � Vail, CO 81657
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of$110 will be charged upon reissuance of the permit.
Application/Permit#(s)information applies
to: Attention: Revisions
Response to Correction Letter
0_attached copy of correction letter
P3 �� Q Deferred Submittal
1� 0 Other
Project Street Address: 1
(Number) (Street) (Suite#)
Building/Complex Name:.E�MZ.JWl P..o.o Description of Transmittal/List of Changes, Items Attached
Applicant Information i?-,\Q-Nt lS('60--S
(architect,contractor, owner/owner's rep) tl)na,`C - K2 y OISRA 7b ``
Contact Name: •tc���..��o�i�-.a (' �...aat�y �`�- -MALI g�_ ll S
Address: b 8 b X_G{D 21 CD
�L Stat
City � ` e: C� Zip:
c «g
Contact Name: C0 Lcti ).p_A Z (use additional sheet if necessary)
Contact Phone: 1 O q O!{- Lb D a Building Permits:
Contact E-Mail: ►�
�� • 1 S C
Revised ADDITIONAL Valuations(Labor& Materials)
p ,� C k�' . o h (DO NOT include original valuation)
I hereby acknowledge that I have read this application.. filled out Building: $—<a-,-,
poo
in full the information required,completed an accurate plot plan,
and state that all the information as required is correct. I agree to Plumbing: $
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according Electrical: $
to the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other Mechanical: $
or f able thereto.
X Total: $0
Owner/Owner R re a Signature(Required) OQ w RISE T-Ax Cg yD))
Date Received: O l
For Office Use Only:
Fee Paid: AUG f
UU
Received From: A 2 3 2013
Cash Check#
CC: Visa/MC Last 4 CC# exp.date:
Authorization# TOWN OF VAI L
i
4
d-PFPWC}RTH—#'AWLAK B)TECHNICAL
May 22, 2013
Triumph Development
Attn: Mike Foster
12 Vail.Road, Suite 400
Vail, Colorado 81657
nietosieryahoo_c9m
Job No. 113 048B
Subject: Debris Flow Hazard Review, Proposed Noell Residence, Lot 6, Spraddle
Creek Estates, 1000 Spraddle Creek Road, Vail, Colorado
Gentlemen:
As requested, we have reviewed the debris flow potential hazard for the proposed Noell
residence at the subject site. The purpose of our review was to evaluate if the proposed
residence is exposed to a debris flow hazard and is an addendum to our rockfall hazards
review report for the project dated April 30, 2013,under the above job number.
Summary of Findings: Our field observations and literature review indicate that the
proposed residence on Lot 6 is not exposed to a debris flow hazard risk.
Scope of Study: A field reconnaissance of the project area was made on May 19, 2013.
In addition we have looked at aerial photographs, detailed topographic maps and
published regional debris flow information by Town of Vail(2000). This report
summarizes our field observations and presents our findings regarding the debris flow
hazard potential at the site. The study is supplemental to our previous proposal for
professional services with Triumph Development dated .December 21, 2012.
Hepworth-Pawlak Geotechnical previously performed a subsoil study for foundation
design of the proposed residence at the site and submitted our findings in a report dated
April 15, 2013, Job No. 112 048A.
Site Conditions: Spraddle Creek Estates is located on the south-facing Gore Creek
valley side just to the north of the Vail town center as shown on Figure 1. The general
n c}iliti ill�„;` ' jti
Triumph Development
May 22, 2013
Page 2
topography in the project area is shown on Figure 2. The lots are located on a hillside
bench and average slope of the bench across the proposed building site on Lot 6 is around
40% down to the south_ This average 40%hillside slope continues uphill of Lot 6 to the
north. About 300 to 400 feet west of Lot 6 is Spraddle Creek, a fairly well incised
drainage. Spraddle Creek Road is located to the north of the proposed building site and
construction of the road has required several retaining walls to limit hillside disturbance.
Native vegetation in the area is mostly grass, sage brush and other brush with some aspen
trees. The existing retaining walls and revegetated cut slope uphill of the proposed
building site appear to be performing satisfactorily with respect to erosion and global
stability.
Field Observations: The steep hillside bench at Spraddle Creek Estates is underlain by
glacial till deposited by valley glaciers that occupied this part of the Gore Creek valley
during the middle Pleistocene-age Bull Lake and late Pleistocene-age Pine-dale glaciations
(Kellogg, 2003). The Bull Lake glaciation occurred between about 132 and 302 thousand
years ago and the Pinedale glaciation occurred between about 10 and 35 thousand years
ago. The glacial till consists of subrounded, gravel- to Iarge boulder-size rocks in a sandy
loam soil matrix. The glacial till has had a relatively stable, recent geologic past and
landslides or potentially unstable slopes that could produce debris flow material are not
present in the area of Lot 6. The existing road cuts uphill of the proposed building site on
Lot 6 are revegetated and erosionally stable. The existing road cuts should not be a
potential source of debris flow that could reach the proposed building site on Lot 6.
Regional Debris FIow Information: The regional debris flow map by Town of Vail
(2000) indicates a medium severity debris flow potential area that crosses the eastern part
of Lot 6 and extends through a narrow width in the central part of Spraddle Creek Estates.
The debris flow risk designation may be from a debris avalanche risk due to the locally
very steep hillside in this area,but based on our site specific review, in our opinion, Lot 6
is not in a debris flow (or debris avalanche) hazard area.
Limitations: This study was conducted according to generally accepted engineering
geology principles and practices in this area, at this time. We make no warranty either
express or implied. The information presented in this report is based on our field
observations. This report has been prepared exclusively for our client to evaluate if the
Job No. 113 048B
Gf C&' ech
Triumph Development
May 22, 2013
Page 3
proposed residence is in a debris flow hazard area. Our scope of services for the current
study is limited to debris flow hazard potential and does not include evaluation of any
other geological hazards that may be present in the area. We are not responsible for
technical interpretations by others of our information.
If there are questions, please contact us.
Respectfully Submitted,
HEPWORTH - � '-, TECHNICAL, INC.
kw b P
P. 15.222
Steven L. Pa. R ak 522
Rev. by: DAY
SLP/ksw
Attachments: Figure 1, Project Site Location
Figure 2, Project Site Map
cc: RIVIT Architects—Paul Miller( aul c rtntaaarchitects.cotn)
Beck Building Company- Tom Solawetz ao mrbeekbuilds.eom)
Monroe and Newell—Craig Carroll (ccarrooll(rt lnoiu'oe-n ll.coni)
REFERENCES
Kellogg, K S. and Others, 2003, Geology Map of the Vail East Quadrangle, Eagle
County, Colorado: U. S. Geological Survey, Map MF-2375, Version 1.0.
Town of Vail, 2000, Official Debris Flow Hazard Map, Town of Vail: Prepared by the
Town of Vail, Colorado (Adopted by the Town Council on October 17, 2000).
Job loo. 113 048B ---
F, -
l 1 { S
¢ �.rt � t .✓�`� qty }`�4 _
Y 8�
^�a, v•I,: Spraddle- reek
r I -
i�t - Estates
_
i. - - - L•1 i sf4� il'
A" 1
N Nv
a YA.
MN
• Y
Explanation:;-
!; Lot 6
0 2000 ft'
f 1 i
Scale:i in.=2000`t.
Contcur Interval=40 ff.
May 2013
'113 048B ��� Proposed Noell Residence Lot 6 Spraddle Creek Estates
FQ_F !)R-';H:-F.�YLAK G_QTCCY.N;CAL Figure 1
Protect Site Location C
to L
. "l "F�" `�` `.;��.•-..; (tRl�f Bob-•..., ,,�.:_.� .\: �• � -
INN
_ •`ice..
Explanation:
�t Existing Residences
Proposed Residence on Lot 6
r� Topographic Slope Break-
Prominant topographic slope break
along south side of valley side
bench. 0 250 fL
r I
Scale:1 In.=250 ft.
Topographic information from Town of Vail GIS Department Contour Interval: 2 ft.
May 2013
Ll13 0488 �f�Ch Proposed Noel) Residence Lot 6 Spraddle Creek Estates
HEPWORn1+PAWCA1:GEOTE471 )CAL Project Site Map Figure 2-
NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
.�
?��I+dO�'Y�II.'.
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B13-0268
Project #: PRJ13-0081
Job Address: 1067 RIVA GLEN VAIL Applied.....: 07/16/2013
Location......: AKA 1000 SPRADDLE CREEK ROAD Issued. . . : 09/05/2013
Parcel No....: 210105301006
OWNER MICHAEL M. NOELLE REVOCABLE 07/16/2013
971 SPRADLE CREEK RD
VAI L
CO 81657
APPLICANT BECK BUILDING COMPANY 07/16/2013 Phone: 970-949-1800
780 NOTTINGHAM ROAD, AVON
PO BOX 4030
VAI L
CO 81658
License: C000003131
CONTRACTOR BECK BUILDING COMPANY 07/16/2013 Phone: 970-949-1800
780 NOTTINGHAM ROAD, AVON
PO BOX 4030
VAI L
CO 81658
License: C000003131
Description:
GRADING AND SHORING WORK
Occupancy: R-3 Type Construction: VB Valuation: $150,000.00
..._..,,.......................................,,....,�...__........._,.......,..,,.. FEE SUMMARY ..............�,,.,.,,.,.....x.=.........._....,,...,._.......,,,�..._.,....,,...._...
Building Permit-----------> $1,273.75 Bldg Plan Check----------> $827.94 Use Tax Fee-----------------------> $2,800.00
Electrical Permit---------> $0.00 Elec Plan Check-----------> $0.00 Restuarant Plan Review--------> $0.00
Mechanical Permit------> $0.00 Mech Plan Check---------> $0.00 Additional Fees--------------------> $0.00
Plumbing Permit--------> $0.00 Plmb Plan Check---------> $0.00 Recreation Fee-------------------->
$0.00
Investigation-----------------------> $0.00
Will Call------------------------------> $5 00
TOTAL PERMIT FEES--------------> $5,016.69
Payments-------------------------------> 55,016.69
BALANCE DUE------------------------> a0.00
.....................x=........_........._.........__...........,......_.......................,,«...............�.......,..,...................,............«.........................
DECLARATIONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
OR AT OUR OFFICE FROM 8:00 AM -4:00 PM.
combination permit_012811
I
•
t
iV���A7 V���... 1� .
w+......+.+:r�+xxx�we:r:r,r..+����xr+x.,r,r,rxrrr�x���+.x:r:wwwxww�txxxx.ewwwwwx,rxwx++n:xx��,rwv.w�w�w�����;��wwwwwxw,rxxxxx.,r:wx��v.,r,r�ww�+x�,rw�,r,r,.,.x��r,r���xxxx+�,.,r,.,.,.x«s.xxxxr���:.���wwww,erxx+.+.r�
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit#: B13-0268 Address: 1067 RIVA GLEN VAIL
Owner: � MICHAEL M. NOELLE REVOCABLE TRUST Location: AKA
1000 SPRADDLE CREEK ROAD
............................x,,,..............,.....,.,,.,...................,...,.�,,......,......,.....,.....,.......,..........,...........,.........,,......,,,,.................
Cond: CON0013345
As built grading plans required [prior to final including
special inspections final report)
combination permit_012811
'
r
�
������ s
**w*w*r****««**.+«******r r r t,t+t**«««r*r*w««««*,t,t**w w«««««,t*t*,t�******x t***w*«*«,r«,t tr**t*****«r*w*r,r***,r,r*te**tr***«,r.,r+t+t+r r r***w w w««,r«tr***�***,t**««««*,r***w*
REQUIRED INSPECTIONS AND STATUSES
Permit#: B13-0268 Address: 1067 RIVA GLEN VAIL
Owner: MICHAEL M. NOELLE REVOCABLE TRUST Location: AKA
1000 SPRADDLE CREEK ROAD
«**�*,.***********«********�**********.,********************««««««*�****««„******�**,..,««*.,�***************,,�„**********************,.,.*«««««**„*.******.,
Item: 00410 Special Inspect-progress rept
Item: 00420 Special Inspect-final rept
Item: 00500 PW-Backfill Inspection
Item: 00501 PW-Access/Staging/Erosion
Item: 00090 BLDG-Final
combination permit_012811
�