Loading...
HomeMy WebLinkAboutB10-0152 PERMIT AND RECEIPT ******************************************************************************************** TOWN OF VAIL, COLORADO Statement ******************************************************************************************** Statement Number: 8130001032 Amount: $301.32 07/24/201311:21 AM Payment Method: Check Init: DR Notation: ck# 1615 Paul Bigsby ----------------------------------------------------------------------------- Permit No: B10-0152 Type: ADD/ALT SFR BUILD PERMIT Parcel No: 2103-121-0100-8 Site Address: 1180 CASOLAR DEL NORTE DR VAIL Location: UNIT B Total Fees: $1, 346.88 This Payment: $301.32 Total ALL Pmts: $1, 346.88 Balance: $0.00 ******************************************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 80.80 PF 00100003112300 PLAN CHECK FEES 52.52 UT 11000003106000 USE TAX 4% 168.00 ----------------------------------------------------------------------------- I NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES TMNOF V Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD/ALT SFR BUILD PERMIT Permit #: B10-0152 Project #: PRJ09-0636 Job Address: 1180 CASOLAR DEL NORTE DR VAIL Status . . ISSUED Location......: UNIT B Applied . . : 06/24/2010 Parcel No....: 210312101008 Issued. .. : 07/21/2011 Expires . ..: 02/01/2014 CONTRACTOR PAUL&NANCY BIGSBY 07/21/2011 Phone: 970-471-1447 1180 B CASOLAR DEL NORTE DR VAIL CO 81657 License: 101-B owner is now contractor APPLICANT BIGSBY, PAUL E. & NANCY A. 06/30/2010 Phone: 970-476-0677 1180 CASOLAR DR 7B VAIL CO 81657 OWNER BIGSBY, PAUL E. &NANCY A. 06/30/2010 1180 CASOLAR DR 7B VAIL CO 81657 Description: REPLACE DECKS, INSTALL NEW EXTERIOR DOOR, CREATE NEW STORAGE ROOM UNDER DECK, REPLACE ROOF OVER STUDY Occupancy: R3 Single Family Residence Valuation: $32,700.00 Type Construction:VB Total Sq Ft Added: 0 *1;;;;**;;;;;**;+**;**;***!!**««!!;«;;!«;;*;;;**;«************+***!**!!******«!!; FEE SUMMARY Building Permit Fee------> $472.05 Will Cal Fee--------------------> $5.00 Total Calculated Fees-------------> $1,347.88 Plan Check--------------------> $306.83 Use Tax Fee---------------------> $454.00 Additional Fees-----------------------> ($1.00) Add'I Plan Check Hours-> $110.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES--------------> $1,346.88 Investigation-----------------> $0.00 Recreation Fee-----------------> $0.00 Payments-------------------------------> $1,346.88 Total Calculated Fees--------> $1,347.88 BALANCE DUE------------------------> $0.00 DECLARATIONS hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM-4:00 PM. Signature of Owner or Contractor Date Print Name bld_alt_construction_permit_041908 R#RRRR#xRRxRYYYYYlwlwfl RRRR#RRRRR*RYY##fw#RRIRw#w###RRRRx4VR#RYY##*!#f#!#wwRf#t*RR##ww#wRRRRxRYYYY#*#ffw##wwww#RRwwYYY#!##f!**t*RRRRRx**xY*YYY#!!ft*!w#w##RRRRRRR###*YYY#YYY#!#R#fRRR APPROVALS Permit* B10-0152 as of 07-24-2013 Status: ISSUED wRw xwwRR#xwRRRYYwxfffl ff!!l RwwxRRRwRRxwwYw#Yfl xxfffRRwx#w#RRxxxxRRRRxRY#YYYf!!!xl ffxfxRRw#wxxxxxxwxt##x!Y!##*RRRw#RxxxwxxYwYl Y!#f#w###RH*RRRxRRRRtYYYxxxff!##f#RRRRRRR**#RxRR##wYYY4 Item: 05100 BUILDING DEPARTMENT 07/20/2010 Martin Action: CR Mr. Bigsby, Please have your design team revise the plans to address the following comments: Sheet 1 1. Indicate that a sphere of 4" or larger cannot pass thru the riling at any point. Plans reflect a 4" opening Sheet S1 1. Revise plans to reflect the 2009 IBC as adopted by the Town of Vail. 2. Provide a copy of the geotech report as referenced on plans. 3.Annotate on plans if Special Inspection is required. fc 3000?? If special inspection is required please complete Town of Vail special inspection form to include third party inspection agency. Thank you, Martin 08/31/2010 JRM Action: AP 07/20/2011 JRM Action: AP APPROVED STRUCTURAL REVISIONS Item: 05400 PLANNING DEPARTMENT 06/30/2010 bgibson Action: AP plans routed to C-4 07/11/2011 bgibson Action: AP Revisions dated 7/7/11 approved by Planning. See conditions of approval. Plans routed to D-1. Item: 05600 FIRE DEPARTMENT 07/01/2010 drhoades Action: AP Item: 05101 BUILDING DEPT REVISION 07/16/2013 Martin Action: AP Rev 2 fxxY##YY#fff!!!fl ff#wx#wwxxxwxxxxxYRYYwxYff!!!:!:#R#wwxxw#RxxxxxxxRRRVRYYwwxYwwYYl fYff#f!l fff#1 xl xxwRRxxxRYYYYYIf#f!!!#*RxRwxxxxx#xx#Y#YY#Yl xxfx!!!xll RRRw#RRx#xxr*x*Rx*Y*#Y#####lfff See the Conditions section of this Document for any that may apply. i I . t bid_alt_construction_permit_041908 i 4 RRY*YRRYYRYYYYYYWW#*!4*4R4RR*RRRRYYYYY!lY44444ff*R*R4Y*RYRRRRRYYRWYYYWYWYWff!!44!*f#4#R*RRR*fYRRRYRYRYY##!f#4#fR**}RRRRYRYRYYYYY*f***#RR***RYRYYRRRYYYYYYYYWYYWY*4!444*##4**R*R#*4Y** CONDITIONS OF APPROVAL Permit#: B10-0152 as of 07-24-2013 Status: ISSUED fH*RYRRYYYYYYYY44 f#**#*ff*RR#RYYRYYYYYYWWWf*!**I RRR####RV4RRRRYRRRRR*YYYW*WYYYYlW4444**##*RRR#YYYYYRRYYYf44RRR**R*4RfRRRYYRYYYWW*WWlR4RRR*R*#RRRY*YRYYYWYYW!!*#f*fR*RRRR4RRRRRRYYRYY Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 44 (BLDG 2009): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION R314 OF THE 2009 IRC, IF APPLICABLE UNLESS A MONITORED FIRE ALARM SYSTEM IS REQUIRED. Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 Cond: CON0012017 Prior to final inspection, the applicant shall replace all decks on both halves of the duplex. All decks shall have matching designs, materials, and colors. bld_a It_constructio n_pe rm it_041908