REVISED PERMIT SUMMARY
MARSHALL RESIDENCE REMODEL "
PROJECT#1 107
August 1, 2013
The following permit revisions are in reference to project B 12-0471 at 193 Beaver Dam Road. The revisions
include significant changes to the drawings since the entire set of drawings was issued for the Revised Permit
issued 3/13/13 and the structural drawings were re-issued 5/15/13 to reflect structural changes made/approved
between 3/13/13 and 5/15/13. Some of the changes listed below were already reflected in the structural re-
issuance 5/15/13.
LANDSCAPE PLANS:
-The placement of the hot tub is shown moved to the west approximately 3'from its previous
location.
-The hot tub details have been modified to accommodate negative edges on two sides rather than ��
one, as previously represented.
-Other hot tub details reflect this change.
ARCHITECTURAL PLANS:
1) Sheet A2.Oa
-Windows in North wall of Bedroom #4 changed to a single sliding door.
-Window and door in North wall of Bedroom #I changed to a single sliding door.
-Rec Room moved to North side of level and Bedroom #2 moved to South side of house. Window in newly
located Bedroom #2 enlarged to meet egress requirements.
-Bath #2 moved with Bedroom #2.
-Powder Room added near new Rec Room location.
-Kitchenette moved. Hood will exhaust to exterior through North wall of Kitchenette and will be clear of any
openings as required by code.
-Battery Closet added next to new Rec Room location to house solar PV batteries. Batteries do not require
mechanical venting.
-Electrical Closet added to East of newly relocated Bedroom #2. It will house low voltage panels and solar
panel inverters.
2) Sheet A2.I a
-Deck between grids 4&5 at grid as deleted. Glass guard rail similar to previously approved to be added.
Marshall Residence Remodel
Project#1 107
8/1/13 Page I of 2
3) Sheet A2.I b
-Fireplace moved South. Will be vented through North exterior wall and will be clear of any openings as
required by code.
3) Sheet A2.2
-Ridge skylight added at grid 2.
-(16)solar panels added as shown.
4) Sheet A3.0
-East Elevation:
-Stone height increased on East wall of Master Bedroom.
-Stone removed from Master Bathroom East wall.
-South Elevation:
-Stone removed from Master Bathroom South wall.
-Stone added to Master Bedroom South wall.
5) Sheet A3.1
-Partial East Elevation @ Bridge:
-Enlarged egress window(30)from relocated Bedroom #2.
-Partial West Elev @ Master Bath:
-Stone deleted from Master Bath West wall.
-North Elevation:
-Deck between grids 4&5 at grid as deleted. Glass guard rail similar to previously approved to be added.
6) Sheet A3.2
-Stone removed from Master Bathroom South wall.
-Stone added to Master Bedroom South wall.
7)Sheet A4.2
-New building sections not previously issued.
STRUCTURAL PLANS:
-The condenser roof on the east elevation has been revised.
-The columns at grids DD/I and 2 have changed from timber to HSS 8x8's.
-The entry roof framing has been revised.
-A roof rake framing detail (I 7/S4.2) has been added for the south wall of the master bedroom.
MEP PLANS:
-Minor change to layout of condensing units.
-Minor ducting changes.
-Lower level ducting changes.
-Addition of spa boiler heating system.
Marshall Residence Remodel
Project#1 107
8/1/13 Page 2 of 2