HomeMy WebLinkAboutB12-0471 REV4 Revision Summary.pdf DOUGLAS MILLER DECHANT ARCHITECTS SHEPHERD RESOURCES INC f AIA POST OFFICE BOX 1624 AVON COLORADO S 1620 T970 949 3302 F970 949 5 1 21 WWW.SRIARCHITECT. COM REVISED PERMIT SUMMARY MARSHALL RESIDENCE REMODEL " PROJECT#1 107 August 1, 2013 The following permit revisions are in reference to project B 12-0471 at 193 Beaver Dam Road. The revisions include significant changes to the drawings since the entire set of drawings was issued for the Revised Permit issued 3/13/13 and the structural drawings were re-issued 5/15/13 to reflect structural changes made/approved between 3/13/13 and 5/15/13. Some of the changes listed below were already reflected in the structural re- issuance 5/15/13. LANDSCAPE PLANS: -The placement of the hot tub is shown moved to the west approximately 3'from its previous location. -The hot tub details have been modified to accommodate negative edges on two sides rather than �� one, as previously represented. -Other hot tub details reflect this change. ARCHITECTURAL PLANS: 1) Sheet A2.Oa -Windows in North wall of Bedroom #4 changed to a single sliding door. -Window and door in North wall of Bedroom #I changed to a single sliding door. -Rec Room moved to North side of level and Bedroom #2 moved to South side of house. Window in newly located Bedroom #2 enlarged to meet egress requirements. -Bath #2 moved with Bedroom #2. -Powder Room added near new Rec Room location. -Kitchenette moved. Hood will exhaust to exterior through North wall of Kitchenette and will be clear of any openings as required by code. -Battery Closet added next to new Rec Room location to house solar PV batteries. Batteries do not require mechanical venting. -Electrical Closet added to East of newly relocated Bedroom #2. It will house low voltage panels and solar panel inverters. 2) Sheet A2.I a -Deck between grids 4&5 at grid as deleted. Glass guard rail similar to previously approved to be added. Marshall Residence Remodel Project#1 107 8/1/13 Page I of 2 3) Sheet A2.I b -Fireplace moved South. Will be vented through North exterior wall and will be clear of any openings as required by code. 3) Sheet A2.2 -Ridge skylight added at grid 2. -(16)solar panels added as shown. 4) Sheet A3.0 -East Elevation: -Stone height increased on East wall of Master Bedroom. -Stone removed from Master Bathroom East wall. -South Elevation: -Stone removed from Master Bathroom South wall. -Stone added to Master Bedroom South wall. 5) Sheet A3.1 -Partial East Elevation @ Bridge: -Enlarged egress window(30)from relocated Bedroom #2. -Partial West Elev @ Master Bath: -Stone deleted from Master Bath West wall. -North Elevation: -Deck between grids 4&5 at grid as deleted. Glass guard rail similar to previously approved to be added. 6) Sheet A3.2 -Stone removed from Master Bathroom South wall. -Stone added to Master Bedroom South wall. 7)Sheet A4.2 -New building sections not previously issued. STRUCTURAL PLANS: -The condenser roof on the east elevation has been revised. -The columns at grids DD/I and 2 have changed from timber to HSS 8x8's. -The entry roof framing has been revised. -A roof rake framing detail (I 7/S4.2) has been added for the south wall of the master bedroom. MEP PLANS: -Minor change to layout of condensing units. -Minor ducting changes. -Lower level ducting changes. -Addition of spa boiler heating system. Marshall Residence Remodel Project#1 107 8/1/13 Page 2 of 2