HomeMy WebLinkAboutDRB130154 including Approved PlansBy David Rhoades at 9:54 am, May 13, 2013
DRB130154
PRJ13-0190
VAIL VILLAGE FILING 13331
06/05/2013
Pope Remodel
2620 Bald Mountain
Vail, Colorado 81657
(970) 926-2993 (F)
(970) 926-4993 (P)
AVON, COLORADO 81620
P.O. BOX 1825
Vail Village Filing 13, Block 2, Lot 13, Unit B (West)
Approved by the Design Review Board By jspence at 9:09 am, Aug 08, 2013
Pope Remodel
2620 Bald Mountain
Vail, Colorado 81657
(970) 926-2993 (F)
(970) 926-4993 (P)
AVON, COLORADO 81620
P.O. BOX 1825
Vail Village Filing 13, Block 2, Lot 13, Unit B (West)
Pope Remodel
2620 Bald Mountain
Vail, Colorado 81657
(970) 926-2993 (F)
(970) 926-4993 (P)
AVON, COLORADO 81620
P.O. BOX 1825
Vail Village Filing 13, Block 2, Lot 13, Unit B (West)
Ap
p
r
o
v
e
d
b
y
t
h
e
De
s
i
g
n
R
e
v
i
e
w
B
o
a
r
d
By
js
p
e
n
c
e
at
9:
0
9
am
,
Au
g
08
,
20
1
3
Pope Remodel
2620 Bald Mountain
Vail, Colorado 81657
(970) 926-2993 (F)
(970) 926-4993 (P)
AVON, COLORADO 81620
P.O. BOX 1825
Vail Village Filing 13, Block 2, Lot 13, Unit B (West)
Pope Remodel
2620 Bald Mountain
Vail, Colorado 81657
(970) 926-2993 (F)
(970) 926-4993 (P)
AVON, COLORADO 81620
P.O. BOX 1825
Vail Village Filing 13, Block 2, Lot 13, Unit B (West)
Pope Remodel
2620 Bald Mountain
Vail, Colorado 81657
(970) 926-2993 (F)
(970) 926-4993 (P)
AVON, COLORADO 81620
P.O. BOX 1825
Vail Village Filing 13, Block 2, Lot 13, Unit B (West)
Pope Remodel
2620 Bald Mountain
Vail, Colorado 81657
(970) 926-2993 (F)
(970) 926-4993 (P)
AVON, COLORADO 81620
P.O. BOX 1825
Vail Village Filing 13, Block 2, Lot 13, Unit B (West)
Siding Change Not approved by DRB
Ap
p
r
o
v
e
d
b
y
t
h
e
De
s
i
g
n
R
e
v
i
e
w
B
o
a
r
d
By
js
p
e
n
c
e
at
9:
0
9
am
,
Au
g
08
,
20
1
3
Pope Remodel
2620 Bald Mountain
Vail, Colorado 81657
(970) 926-2993 (F)
(970) 926-4993 (P)
AVON, COLORADO 81620
P.O. BOX 1825
Vail Village Filing 13, Block 2, Lot 13, Unit B (West)
Ap
p
r
o
v
e
d
b
y
t
h
e
De
s
i
g
n
R
e
v
i
e
w
B
o
a
r
d
By
js
p
e
n
c
e
at
9:
1
0
am
,
Au
g
08
,
20
1
3
Pope Remodel
2620 Bald Mountain
Vail, Colorado 81657
(970) 926-2993 (F)
(970) 926-4993 (P)
AVON, COLORADO 81620
P.O. BOX 1825
Vail Village Filing 13, Block 2, Lot 13, Unit B (West)
Approved by the Design Review Board
By jspence at 9:10 am, Aug 08, 2013
sn’oo’a:l~:!s’~.op@u!ssnoJ’la!USC]
u!ssno~l ueu
(lo~) ~,SZ9’~89’OL6
(Aeza-Joqq6.rd i0~3 Ul AIUO) J.OQ~
~ucoqse3u~o3’alqea@ uosu qoF’lae q~lN
uosuqo£ laeqa!N :~3~:1uo3
(xe:l) ~Lg~’89b’OL6
(la:l) ~:ILb’O6~’OL6
~I~ ISVDN03
(xe$)
(la:l) ~’zzb’oz6
.I.D~B.I~Z~ NO~J.
uJo~’ADJaualaDx@ uosuJlTas!n ot
uosu~!£ as!nol
(la:l) OSOP’~gZ’OL6
(xej)
~uo:~’ssoJ~l, lo q @ uJooJ^.[
(x~J) 1C801,’S~6’0L6
(la:l) ~L~S’LI,6"OL6
uao~’AOJauala~X@e~aJnq’~’a!uuoJ
e:laJn8 uo~J :~3m, uo9
(x~J) ![Ot,~’89b’OL6
(la:l) 60~’90b’OL6
Wo~’~u!lhm-]u aa @AalOO~,’la n mes
,~alOO£ lanuJes ;s~luo:)
(xej)ZL90"89b’OL6
(1al)0989"89t,’0/6
oJn|euDIS paz!Joq].nv
NOI£V3IdI~:~A ¯ 1VAO~lddV ~IlIlfl
UTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify
service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and
verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are
unable to obtain comments within that timeframe please contact The Town of Vail.
Subject Property Address: ____________________________ Lot______ Block _____ Subdivision: ____________
Primary Contact / Owner Representative: ___________________________ Phone: _______________________
______________________________________________________ Plans Dated: ________________________
Primary Contact/Owner Representative Signature
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public
Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
Authorized Signature Comments Date
CENTURYLINK
970.328.8288 (tel)
970.328.8282 (fax)
Contacts: Barb Davis
barb.davis@centurylink.com
XCEL HIGH PRESSURE GAS
970.406.1309 (tel)
970.468.1401 (fax)
Contact: Ron Bureta
ronnie.j.bureta@xcelenergy.com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax) Contact: Jeff Vroom
jvroom@holycross.com
5/1/13
XCEL Energy
970.262.4039 (tel)
970.262.4038 (fax)
Contacts: Pam McGuire
pamela.mcquire@xcelenergy.com
EAGLE RIVER WATER & SANITA-
TION DISTRICT
970.477.5449 (tel)
970.845.7218 (fax) Contact: Tug Birk
tbirk@erwsd.org
COMCAST CABLE
970.930.4713 (tel)
303.603.1004 (fax)
Contact: Michael Johnson
Michael_johnson@cable.comcast.com
CDOT (Only in CDOT Right-of-way)
970.683.6284 (tel) Contact: Dan Roussin
Daniel.roussin@dot.state.co.us
UTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also ta verify
service availability and location for new construction and should be used in conjunction with preparing your utility plan and schedul-
ing installations. A site plan, including grading p~an, Boor plan, and elevations, shall be submitted to th~ following utilities for approval
and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTB FROM THE UTILITY COMPANIES. If yOU
are unable to obtain comments within that timeframe please contact The Town of Vail.
Subject Property Address: 2620 Bald Mountain Rd Lot 13 Block 2 Subdivision: W 13
Primary Beth Levine Architect, Inc.Phone: 970-926-4993
Plans Dated: April 17, 2013
natureP~mary
CENTURY TEL
970.468,6860(tel)
970,468.0672(fax)
Contacts~ Samuel Tooley
samuel,toolev~centurvlink.com
XCEL HIGH PRESSURE GAS
970.406.1309 (tel)
970.468.1401 (fax)
ContacE Ron Bureta
rennie.Lbureta(~xcelenerev.corn
HOLY CROSS ENERGY
970.947.5471 (~1)
970.945.4081 (~
Con~G: Jeff Vrcom
N DISTRICT
970.477.5435 (tel)
970.477.5434 (fax)
Contact; Tug Birk
COMCAST CABLE
970.390.4713 (tel)
970.468.2672 (fax)
Contact: Michae] Johnson
Micha el_joh nson @ca ble.comcast.com
CDOT (Only in CDOT Right-of-way)
970,683.6284 (tel)
Contact’. Dan Roussin
Daniel roussin @ dot.state.co.us
Authorized Si Date
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3.It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.