Loading...
HomeMy WebLinkAboutB12-0401 TRANSMITTAL - STEEL, SPECIAL INSPECTION Department of Community Development 0 75 South Frontage Road TOWN OF VAIL 3 Vail, CO 81657 Tel: 970.479.2128 www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Use this form when submitting additional information for planning applications or building permits. This form is also used for requesting a revision to building permits. A two hour minimum building review fee of$110 will be charged upon reissuance of the permit. Application/Permit#(s)information applies to: Attention: ( ) Revisions l �^O /`v� ( ) Response to Correction Letter 7" � / attached copy of correction letter r KS 01. —0©q, ( )Other red Submittal Project Street Street Address: (Number) (Street) (Suite#) Building/Complex Name: Description of Transmittal/List of Changes, Items Attached: Applicant,Information (architect, contractor,ov�per/owner's rep) �vD Contact Name: _ t Address: City State: Zip: Contact Name: (use additional sheet if necessary) Contact Phone: / ��` ��� ��,�/ Building Permits: Revised ADDITIONAL Valuations (Labor& Materials) Contact E-Mail: (DO NOT include original valuation) I hereby acknowledge that I have read this application,filled out Building: $ in full the information required,completed an accurate plot plan, and state that all the information as required is correct. I agree to Plumbing: $ comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according Electrical: $ to the town's zoning and subdivision codes, design review ap- proved, International Building and Residential Codes and other Mechanical: $ ordinances of the Z97 appli thereto. X /�l Total: $ Owner/Owner's Representative Signature(Required) Date Received: For Office Use Only: D Fee Paid: Received From: AUG 2 2 2013 Cash Check# CC: Visa/MC last 4 CC# exp.date: Authorization # TOWN OF VAIL Client: Tim Dee Beck Building Company PO Box 4030 ENGINEERING CONSULTANTS Vail, CO 81658 736 Forest Rd - Special Inspections Structural Steel Cover Report Date: August 12,2013 Location: Site Job Number: 13-6563 As scheduled, a representative arrived to perform special inspection services. The following is a summary of services provided on this date. As directed by Tim Dee with Beck Const.: 1)GROUND inspected welded connections of beam modifications at(1)steel support beam,west side of porch,northwest side of home and found these connections to be in general compliance with the project plans and with AWS D1.1-10 clause 6. GROUND received and reviewed welder qualification test records and welding procedure specifications for welder performing welds on site. Tim Dee with Beck Cost.was informed of these results and emailed a copy of this report. Yes No Outstanding Discrepancies Reported this Date? ® O No. of Pages Attached: 1 Field Representatives► MIA"8m R�K1( AEI J W4 Englewood, Commerce City, Loveland, Granby, Gypsum, Grand Junction, Casper Structural Steel Cover Report Date: August 12,2013 Location: Site Job Number: 13-6563 As scheduled, a representative arrived to perform special inspection services. The following is a summary of services provided on this date. As directed by Tim Dee with Beck Const.: 1)GROUND inspected welded connections of beam modifications at(1)steel support beam,west side of porch,northwest side of home and found these connections to be in general compliance with the project plans and with AWS D1.1-10 clause 6. GROUND received and reviewed welder qualification test records and welding procedure specifications for welder performing welds on site. Tim Dee with Beck Cost.was informed of these results and emailed a copy of this report. Yes No Outstanding Discrepancies Reported this Date? � O No. of Pages Attached: 1 Field Representative: R.Michael Whitten R, lik WK I,(^