HomeMy WebLinkAboutB12-0329 REV2 TRANSMITTAL, REQUESTED INFO Department of Community Development 75 South Frontage Road TOWN O F VA I I. ' Vail, CO 81657 Tel: 970.479.2128 www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Use this form when submitting additional information for planning applications or building permits. This form is also used for requesting a revision to building permits. A two hour minimum building review fee of$110 will be charged upon reissuance of the permit. Application/Permit#(s)information applies to: Attention: ) Revisions �� Response to Correction Letter attached copy of correction letter Deferred Submittal Other TJa-o Project Street Addrg,s: �, �oU�R`d V l/ (Number) (Street) I 9 AE Suite#) Building/Complex Name: fa I t.(J / W) Description of Transmittal/List of Changes, Items Attached: Applicant Information (architect, contractor,owner/owner's rep) Contact Name: t rr Address:�.1 Z 5 () � > �S � C I IZ � ��� - S� !✓i rS City 6! x K-* �1 State: zip: Contact Name: l T 7Z- 9G (use additional sheet if necessary) Contact Phone: -? H r Building Permits: Contact E-Mail: J @ �E fa CQ-, Revised ADDITIONAL Valuations (Labor&Materials) ire/ (�� �J_l. T (DO NOT include original valuation) - I hereby acknowledge that I have read this application,filled out Building: $ in full the information required,completed an accurate plot plan, and state that all the information as required is correct. I agree to Plumbing: $ comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according Electrical: $ to the town's zoning and subdivision codes, design review ap- proved,International Building and Residential Codes and other Mechanical: $ ordinan"6 of the Town ap licable thereto. X , { � � Total: $ Owner/ wner's Representative nature(Required) Date Received: For Office Use Only: D Fee Paid: SEP 0 4 2013 Received From: Cash Check# C� CC: Visa/MC Last 4 CC# exp.date: TOWN OF VA I L Authorization# B12-0329 : Entries for Item:190 - ELEC-Final 09:55 09/04/2013 Action Comments By Date Unique_ . , Key DN Provide GFI breaker settings from sgremmeT 08/14/2013 A000161 manufacture 294 all name plates to be installed provide lug torque schedules panic hardware at door to MDP room provide all en finer testing results Total Rows: 1 Page 1 Inspection Items for B12-0329 09:54 09/04/2013 Sec Item Id Description --ApprTReq Items Action Inheritable * 20 BLDG-Foundation/Steel No R 0 No * 120 ELEC-Rough Ys R 3 AP No * 190 ELEC-Final R 1 DN No 90 BLDG-Final R 1 DN No Total Rows:4 Page 1 wr •�► Superior client service. Practical solutions. GUARANTEE ELECTRICAL CONTRACTING Avon & Vail Colorado Avon / Vail WWTP Upgrades June 3-4 File: G3479-1 Project Manager: Ar'c Proskurniak infol�magnoiv.com my neejing & Technical Field Services Canada wwv..mcgnoiv.corn United States Document !D: CANF-5tv103) Cmle 96 Inverness Drive East, Suite R Englewood, CO 80112 303.7Q9,1273 303.790.4815 300.462.3157 File: G3479-1 06/21/2013 GUARANTEE ELECTRICAL CONTRACTING Via: ® email 21250 EAST 31ST CIRCLE ❑ fax AURORA, CO 80011 ❑ mail Attention: Jeremy Wilson Project Manager Dear Mr. Wilson. Re: Avon / Vail WWTF Upgrades We are pleased to submit our report and test sheets pertaining to the project mentioned above. The work was performed by Paul Chihoski and the undersigned, with the helpful assistance of you and your onsite representative Mike Hartsfield. All on-site work was completed during our site visits on June 3 & 4. Based on our analysis of the test results, the equipment tested is in acceptable condition and suitable for continued service. However, during the course of our activities, we made certain observations which should be investigated outlined under summary of results below. We suggest you review the test results at your convenience to better appreciate the condition of your equipment, and we invite any questions that may arise following your review. We trust this report meets with your approval and requirements. Should you need further information or assistance, please do not hesitate to contact us. We take this opportunity to thank you for your continued cooperation and assistance during our site visits, and for retaining the services of Magna IV Engineering. We look forward to being of service to you in the future. Yours Truly, MAGNA IV ENGINEERING Aric Proskurniak Field Service Client Manager AP in;o< rrnagnoiv.com Engineering 8 Technical Field Services _anoda wwv.,.magnaiv.com United States Document ID: CANT-5M03! Chile INDEX 1 .0. EXECUTIVE SUMMARY..............................._.............................._.............................._...................4 2.0. SCOPE Or WORK ..............................—.......................................................................................5 3.0. SUMMARY OF 7ESTS...............................».............................................................».......................5 4.0. SUMMARY OF RESULTS AND DEFICIENCIES ..............................._.............................._................b 5.0. TEST RESULTS..............................................................._.............................._.............................._...7 Document ID: CANE-5M031 3 *o 4 1.0. EXECUTIVE SUMMARY The services of Magna IV Engineering were retained by Guarantee Electrical Contracting to perform low voltage acceptance testing at the waste water treatment plants located in Vail and Avon Colorado. Our scope of work for the project included acceptance testing, function testing, cleaning, and inspection of electrical distribution equipment based on the standards developed between Guarantee Electrical Contracting and Magna IV Engineering, previous projects, IEEE, NETA and NEMA standards, and Magna's practices and procedures for acceptance testing. Based on our test results, the equipment tested is suitable for service at rated capacities. Section 4.0 of this report detail the deficiencies and recommendations that were found during our activities. Please review the Summary of Results and Deficiencies to determine what actions should be scheduled and budgeted for prior to and during the next maintenance period to optimize the operation of your equipment. We strongly recommend continuing a maintenance program to ensure oil equipment is tested annually or included in a 4-year plan to continue the reliable and, most importantly, safe operation of the equipment. Docurnena D: CANF-SM031 4 2.0. SCOPE OF WORK Our scope of work for this project included the following equipment: 2.1. 600 Volt Equipment • Circuit breakers • Switchboards • Service Entrance Disconnect Switch (Vail site) • Low voltage cables (Avon site) • Meters • Transfer Switch (Vail site) 3.0. SUMMARY OF TESTS All tests performed are based on the scope of work developed between Guarantee Electical Contracting and Magna IV Engineering, previous projects, IEEE, NETA and NEMA standards, and Magna's practices and procedures for acceptance testing. Specific tests performed on the power distribution equipment are as follows: 3.1. Circuit Breakers • Visual inspection • Nameplate verification • Complete cleaning • Electrical and mechanical function tests • Contact resistance test • Insulation integrity test • Random torque test of terminations and accessible connections 3.2. Switchboards • Visual inspection • Nameplate verification • Complete cleaning • Electrical and mechanical function tests • Contact resistance test • Phase identification • Insulation integrity test • Random torque test of terminations accessible connections 3.3. Transfer Switch • Visual inspection • Liquid level check • Nameplate verification • Insulation resistance test • Function test • Random torque test of accessible connections Document 10' CANE-5P WII 3.4. Low Voltage Cables • Visual inspection • Random torque test of accessible connections • Continuity test • Phase identification and verification • Insulation resistance test 4.0. SUMMARY OF RESULTS AND DEFICIENCIES 1 When completeing the testing activities at the Avon site, it was noticed that the ground bus splicing on MCC-6 was not correctly installed. Correct splicing is important for proper grounding of the electrical system and helps to protect in the event of an electrical fault. After bringing the issue to Mike's attention, corrective measures were taken to resolve the defeciency. 5.0. TEST RESULTS Please review the enclosed test sheets for detailed test results and field observations. Document ID: CANF-5tA031 ? i-._,I, VAIL WASTEWATER TREATMENT PLANT TEST RESULTS Document ID: CANF-5M031 7 1 Page PREPARED FOR "-- SMAINT11111CIR/C w�~w LOW VOLTAGE MOTOR CONTROL CENTER CANF-5EO45 WO# G3479-1 TAG# DS-1 DATE June 4,2013 SITE VAIL WWTF TEST BY AP AREA MDP-1 ROOM STANDARD ACCEPTANCE APPROVED BY PC NAMEPLATE DATA MANUF. EATON RATED VOLTS 600 YEAR 2013 MODEL MDP RATED AMPS 1600 BIL(KV) NL SO# SDN0364912 RATED FREQ. 60 ENCL. NEMA IA #OF SECT. 2 BRACING (KA) 65 TEST SUMMARY REF.NETA STANDARD 7.16.2.1 TEST SUMMARY OK FAIL TNOT COMMENTS Z COMPARED TO DRAWING ✓ COMPARED TO VE2-02 NAMEPLATE VERIFICATION/CHECK ✓ VISUAL a VISUAL INSPECTION ✓ NO DAMAGE Z CONTACT RESISTANCE ✓ SEE RESULTS BELOW INSULATION RESISTANCE ✓ SEE RESULTS BELOW W INSPECTIONS DESCRIPTION OK FAIL N/A COMMENTS DAMAGE ✓ NONE APPARENT ANCHORAGE ✓ BOLTED TO CONCRETE PAD IN 4 CORNERS GROUNDING ✓ NOT YET TERMINATED TO SOURCE COVER PANELS ✓ APPEAR TO CLOSE AS APPROPRIATE AREA CLEARANCES ✓ VERIFIED DIRT ACCUMULATION ✓ CLEAN CORRECT LABELING ✓ COMPARED TO VE2-02 NOTES 1 COVER PANELS NOT YET INSTALLED 2 3 4 VAIL MCC Page 1 of 8 PREPARED FOR Lf Tl�/G' .�wcwrw fiUlRANTEEE C LOW VOLTAGE MOTOR CONTROL CENTER F7ANF 5E045 WO# G3479-1 TAG# DS 1 DATE June 4,2013 LAYOUT MCC FRONT VIEW METER FEED MAIN CABLES `JAIL MCC Page 2 of 8 PREPARED FOR URAHTfEELE Tl3/C oU C LOW VOLTAGE MOTOR CONTROL CENTER CANF-5E045 WO# G3479-1 TAG # DS-1 DATE June 4, 2013 TEST RESULTS IAMB.TEMP 68.7°F HUMIDITY 35% CONTINUITY / RESISTANCE TESTS EQ.# D00003 RESISTANCE(pQ) FROM TO PHASE A PHASE B PHASE C MAIN BUS SECT 1 MAIN BUS SECT 2 40 40 40 FROM TO GROUND BUS GROUND BUS SECT 1 GROUND BUS SECT 5 40 VAIL MCC Page 3 of 8 PREPARED FOR �a�RA�rEEE�ECrR�c -�wcrw LOW VOLTAGE MOTOR CONTROL CENTER CANF-5E045 WO# G3479-1 TAG # DS-1 DATE June 4,2013 TEST RESULTS INSULATION RESISTANCE REFER TO NETA TABLE 100.1 EQ.# D0002 RESULTS (MO) - 0-0-GND TEST SETUP TEST VOLTS TIME PHASE A PHASE B PHASE C 1 500 60 sec. >20 000 >20 000 >20 000 2 1000 60 sec. >20 000 >20 000 >20 000 3 4 VAIL MCC Page 4 of 8 PREPARED FOR _ I�UARUNTEEELECTR/C �w�~w LOW VOLTAGE MOTOR CONTROL CENTER CANF-5EO45 WO# G3479-1 TAG# MDP-1 DATE June 4,2013 SITE VAIL WWTF TEST BY AP AREA MDP-1 ROOM STANDARD ACCEPTANCE APPROVED BY PC NAMEPLATE DATA MANUF. EATON RATED VOLTS 600 YEAR 2013 MODEL MDP RATED AMPS 1600 BIL(KV) NL SO# NL RATED FREQ. 60 ENCL. NEMA IA #OF SECT. 1 BRACING (KA) 65 TEST SUMMARY REF.NETA STANDARD 7.16.2.1 TEST SUMMARY OK FAIL TESTED COMMENTS Z COMPARED TO DRAWING ✓ COMPARED TO VE2-02 NAMEPLATE VERIFICATION/CHECK ✓ VISUAL d VISUAL INSPECTION ✓ NO DAMAGE Z CONTACT RESISTANCE ✓ SEE RESULTS BELOW INSULATION RESISTANCE ✓ SEE RESULTS BELOW W r INSPECTIONS DESCRIPTION OK FAIL N/A COMMENTS DAMAGE ✓ NONE APPARENT ANCHORAGE ✓ BOLTED TO CONCRETE PAD IN 4 CORNERS GROUNDING ✓ NOT YET TERMINATED TO SOURCE COVER PANELS ✓ APPEAR TO CLOSE AS APPROPRIATE AREA CLEARANCES ✓ VERIFIED DIRT ACCUMULATION ✓ CLEAN CORRECT LABELING ✓ COMPARED TO VE2-02 NOTES 1 COVER PANELS NOT YET INSTALLED 2 3 4 VAIL MCC Page 5 of 8 PREPARED FOR aUARi ffirliELECTR/C .•�•�•�•••�• LOW VOLTAGE MOTOR CONTROL CENTER CANF-5E045 WO# G3479-1 TAG# MDP-1 DATE June 4, 2013 LAYOUT MCC FRONT VIEW 1000AT 600AT 600AT 350AT 150AT VAIL MCC Page 6 of 8 PREPARED FOR , MAWARTEEELECTR/C LOW VOLTAGE MOTOR CONTROL CENTER CANF-5E045 WO# G3479-1 TAG # MDP-I DATE June 4, 2013 TEST RESULTS IAMB.TEMP 68.7°F HUMIDITY 35 CONTINUITY / RESISTANCE TESTS EQ.# D00003 RESISTANCE(p0) FROM TO PHASE A PHASE B PHq54 TOP MAIN BUS SECT 1 BOTTOM MAIN BUS SECT 2 64 58 i FROM TO NEUTRAL TOP NEUTRAL BUS SECT I BOTTOM NEUTRAL BUS SECT 1 62 VAIL MCC Page 7 of 8 PREPARED FOR �UARAA/TfEELECTR/C �w�"~w LOW VOLTAGE MOTOR CONTROL CENTER F CANF-5E045 WO# G3479-1 TAG# MDP-1 DATE June 4,2013 TEST RESULTS INSULATION RESISTANCE REFER TO NETA TABLE 100.1 EQ.# D0002 RESULTS(MD) - 0-0-GND TEST SETUP TEST VOLTS TIME PHASE A PHASE B PHASE C 1 500 60 sec. >20 000 >20 000 >20 000 2 1000 60 sec. >20 000 >20 000 >20 000 3 4 VAIL MCC Page 8 of 8 PREPARED FOR �UABANTfffLfCTR/C �w�"~w MOLDED CASE CIRCUIT BREAKER CANF-5E020 WO# G3479-1 TAG# DS-I DATE June 4,2013 PLANT VAIL WWTF TEST BY AP AREA MDP-1 ROOM STANDARD ACCEPTANCE APPROVED BY PC NAMEPLATE DATA MANUF. EATON RATED AMPS 1600 YEAR NL MODEL RD NOM.VOLTS 600 POLES 3 CAT# RD65K INT CAP (KA) 65 FREQ. 60 SERIAL# NP6635C68H15 BIL NL TEST SUMMARY REF.NETA STANDARD 7.6.1.1 TEST SUMMARY OK FAIL TES TOT COMMENTS Z COMPARED TO DRAWING ✓ VE2-02 O NAMEPLATE VERIFICATION/CHECK ✓ VERIFIED U V/ VERIFIED a VISUAL INSPECTION z CONTACT RESISTANCE ✓ INSULATION RESISTANCE ✓ SEE RESULTS BELOW uj N ✓ THERMAL MAGNETIC TRIP TEST INSPECTIONS DESCRIPTION OK FAIL N/A COMMENTS AUX WIRING ✓ GROUND CT WIRING CONFIRMED FUNCTION TEST-OPEN/CLOSE ✓ FUNCTIONED DIRT ACCUMULATION/CORROSION ✓ CLEAN TIGHTEN BOLTS/MISSING HARDWARE ✓ TORQUED STATUS INDICATION ✓ FRONT OF BREAKER LUGS ✓ CABLES NOT CONNECTED THERMAL/MAGNETIC TRIP ✓ SHUNT/ELECTRIC TRIP ✓ FUNCTIONED PRIMARY GND TRIP UV/BLOWN FUSE DEVICES ✓ Vail Breakers Page 1 of 14 PREPARED FOR �UARANTEEELECTR/C �w�~w MOLDED CASE CIRCUIT BREAKER CANF-5E020 WO# G3479-1 TAG # DS-1 DATE June 4, 2013 TEST RESULTS AMB.TEMP 68.7°F HUMIDITY 35% CONTACT RESISTANCE TEST EQ.# D00003 RESISTANCE(Nil) DIAGRAM DESCRIPTION PHASE A PHASE B PHASE C INITIAL 90 90 110 AFTER CLEANING (IF REQ'D) N/A N/A N/A COMMENTS: CONTACT RESISTANCE FROM SECTION 1 TO LOAD SIDE BREAKER NEUTRAL BUS-76 UGHMS GND BUS- 140 UGHMS INSULATION RESISTANCE REFER TO NETA TABLE 100.1 EQ# D00002 RESULTS (MO) - 0-0-GND TEST VOLTS TIME PHASE A PHASE B PHASE C CONTACTS OPEN 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 CONTACTS CLOSED 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 THERMAL/MAGNETIC TRIP TEST - PRIMARY INJECTION REFER TO NETA TABLE 100.7 AND 100.8 TESTS PHASE A PHASE B PHASE C MANUF. AV E. THERMAL 3007o(sec) INST TRIP (LO) amps MANUFACTURER TESTED INST TRIP (HI) amps IWITHSTAND (MID) NOTES 1 GND FAULT PICKUP AND TRIP TESTED BY PRIMARY INJECTION SETTING"A" 2 3 4 5 Vail Breakers Page 2 of 14 PREPARED FOR w �UABQ/YTffELfCTB/C �w�"~w MOLDED CASE CIRCUIT BREAKER CANF-SE020 WO# G3479-1 TAG# 1000A BREAKER DATE June 4,2013 PLANT VAIL WWTF TEST BY AP AREA MDP-1 ROOM STANDARD ACCEPTANCE APPROVED BY PC NAMEPLATE DATA MANUF. EATON RATED AMPS 1000 YEAR NL MODEL HFD NOM.VOLTS 600 POLES 3 CAT# RD65K INT CAP(KA) 65 FREQ. 60 SERIAL# NOT VISIBLE BIL NE TEST SUMMARY REF.NETA STANDARD 7.6.1.1 TEST SUMMARY OK FAIL TES TOT COMMENTS Z COMPARED TO DRAWING ✓ VE2-02 r- NAMEPLATE VERIFICATION/CHECK V/ VERIFIED a VISUAL INSPECTION ✓ VERIFIED N Z CONTACT RESISTANCE ✓ INSULATION RESISTANCE ✓ SEE RESULTS BELOW Lu ✓ THERMAL MAGNETIC TRIP TEST INSPECTIONS DESCRIPTION OK FAIL N/A COMMENTS AUX WIRING ✓ FUNCTION TEST-OPEN/CLOSE ✓ FUNCTIONED DIRT ACCUMULATION/CORROSION ✓ CLEAN TIGHTEN BOLTS/MISSING HARDWARE ✓ TORQUED STATUS INDICATION ✓ FRONT OF BREAKER LUGS ✓ CABLES NOT CONNECTED THERMAL/MAGNETIC TRIP ✓ SHUNT/ELECTRIC TRIP ✓ UV/BLOWN FUSE DEVICES ✓ Vail Breakers Page 3 of 14 i PREPARED FOR w ROaRWrEEEiECrRic MOLDED CASE CIRCUIT BREAKER CANF-5E020 w0# G3479-1 TAG# 1000A BREAKER DATE June 4, 2013 TEST RESULTS AMB.TEMP 68.7'F HUMIDITY 35 CONTACT RESISTANCE TEST EQ.# D00003 RESISTANCE (N4) DIAGRAM DESCRIPTION PHASE A PHASE B PHASE C INITIAL 78 76 86 AFTER CLEANING (IF REQ-D) N/A N/A N/A COMMENTS: CONTACT RESISTANCE FROM SECTION I TOP TO LOAD SIDE BREAKER INSULATION RESISTANCE REFER TO NETA TABLE 100.1 EQ # D00002 RESULTS (MO) - 0-0-GND TEST VOLTS TIME PHASE A PHASE B PHASE C CONTACTS OPEN 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 CONTACTS CLOSED 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 THERMAL/MAGNETIC TRIP TEST - PRIMARY INJECTION REFER TO NETA TABLE 100.7 AND 100.8 TESTS PHASE A PHASE B PHASE C MANUF. AVE. THERMAL 30070(sec) INST TRIP (LO) amps MANUFACTURER TESTED INST TRIP (HI) amps WITHSTAND (MID) NOTES 1 2 3 4 5 Vail Breakers Page 4 of 14 PREPARED FOR w , �UABAA/TfffLfCTR/C 'J"w11r"~w MOLDED CASE CIRCUIT BREAKER CANF-5E020 WO# G3479-1 TAG# 600A BREAKER DATE June 4, 2013 PLANT VAIL WWFF 2ND FROM TOP TEST BY AP AREA MDP-1 ROOM STANDARD ACCEPTANCE APPROVED BY PC NAMEPLATE DATA MANUF. EATON RATED AMPS 600 YEAR NL MODEL HFD NOM.VOLTS 600 POLES 3 CAT# RD65K INT CAP (1 65 FREQ. 60 SERIAL# NOT VISIBLE BIL NL TEST SUMMARY IREF.NETA STANDARD 7.6.1.1 TEST SUMMARY OK FAIL TESTOT COMMENTS Z COMPARED TO DRAWING ✓ VE2-02 NAMEPLATE VERIFICATION/CHECK ✓ VERIFIED a VISUAL INSPECTION ✓ VERIFIED z CONTACT RESISTANCE ✓ INSULATION RESISTANCE ✓ SEE RESULTS BELOW N ✓ ~ THERMAL MAGNETIC TRIP TEST INSPECTIONS DESCRIPTION OK FAIL N/A COMMENTS AUX WIRING ✓ FUNCTION TEST-OPEN/CLOSE ✓ FUNCTIONED DIRT ACCUMULATION/CORROSION ✓ CLEAN TIGHTEN BOLTS/MISSING HARDWARE ✓ TORQUED STATUS INDICATION ✓ FRONT OF BREAKER LUGS ✓ CABLES NOT CONNECTED THERMAL/MAGNETIC TRIP ✓ SHUNT/ELECTRIC TRIP ✓ UV/BLOWN FUSE DEVICES ✓ Vail Breakers Page 5 of 14 PREPARED FOR MAl3A/YTEEELECTR/C MOLDED CASE CIRCUIT BREAKER CANF-SE020 WO# G3479-1 TAG# 600A BREAKER DATE June 4,2013 TEST RESULTS AMB.TEMP 68.7°F HUMIDITY 357. CONTACT RESISTANCE TEST EQ.# D00003 RESISTANCE (u4) DIAGRAM DESCRIPTION PHASE A PHASE B PHASE C INITIAL 140 140 140 AFTER CLEANING (IF REQ-D) N/A N/A N/A COMMENTS: CONTACT RESISTANCE FROM SECTION 1 TOP TO LOAD SIDE BREAKER INSULATION RESISTANCE REFER TO NETA TABLE 100.1 EQ # D00002 RESULTS (MO) - 0-0-GND TEST VOLTS TIME PHASE A PHASE B PHASE C CONTACTS OPEN 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 CONTACTS CLOSED 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 THERMAL/MAGNETIC TRIP TEST - PRIMARY INJECTION REFER TO NETA TABLE 100.7 AND 100.8 TESTS PHASE A PHASE B PHASE C MANUF. AVE. THERMAL 300%(sec) INST TRIP (LO) amps MANUFACTURER TESTED INST TRIP (HI) amps IWITHSTAND (MID) NOTES 1 2 3 4 5 Vail Breakers Page 6 of 14 PREPARED FOR 89KNO /T11111CTR/C I d 1111"w d"~w MOLDED CASE CIRCUIT BREAKER I CANF-SE020 WO# G3479-1 TAG# 600A BREAKER DATE June 4, 2013 PLANT VAIL WWTF 3RD FROM TOP TEST BY AP AREA MDP-1 ROOM STANDARD ACCEPTANCE APPROVED BY PC NAMEPLATE DATA MANUF. EATON RATED AMPS 600 YEAR NL MODEL HFD NOM.VOLTS 600 POLES 3 CAT# RD65K INT CAP (KA) 65 FREQ. 60 SERIAL# NOT VISIBLE BIL NIL TEST SUMMARY REF.NETA STANDARD 7.6.1.1 TEST SUMMARY OK FAIL TESTED COMMENTS Z COMPARED TO DRAWING ✓ VE2-02 0 NAMEPLATE VERIFICATION/CHECK ✓ VERIFIED a VISUAL INSPECTION ✓ VERIFIED z CONTACT RESISTANCE ✓ INSULATION RESISTANCE ✓ SEE RESULTS BELOW N ✓ uj THERMAL MAGNETIC TRIP TEST INSPECTIONS DESCRIPTION OK FAIL N/A COMMENTS AUX WIRING ✓ FUNCTION TEST-OPEN/CLOSE ✓ FUNCTIONED DIRT ACCUMULATION/CORROSION ✓ CLEAN TIGHTEN BOLTS/MISSING HARDWARE ✓ TORQUED STATUS INDICATION ✓ FRONT OF BREAKER LUGS ✓ CABLES NOT CONNECTED THERMAL/MAGNETIC TRIP ✓ SHUNT/ELECTRIC TRIP ✓ UV/BLOWN FUSE DEVICES ✓ Vail Breakers Page 7 of 14 PREPARED FOR _ co�Ra�rEEE�ECrRic � w�.wcwiw MOLDED CASE CIRCUIT BREAKER CANF-5E020 WO# G3479-1 TAG# 600A BREAKER DATE June 4,2013 TEST RESULTS AMB.TEMP 68.7°F HUMIDITY 357. CONTACT RESISTANCE TEST EQ.# D00003 RESISTANCE (N4) DIAGRAM DESCRIPTION PHASE A PHASE B PHASE C INITIAL 130 140 140 AFTER CLEANING (IF REQ-D) N/A N/A N/A COMMENTS: CONTACT RESISTANCE FROM SECTION 1 TOP TO LOAD SIDE BREAKER INSULATION RESISTANCE REFER TO NETA TABLE 100.1 EQ# D00002 RESULTS(MO) - 0-0-GND TEST VOLTS TIME PHASE A PHASE B PHASE C CONTACTS OPEN 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 CONTACTS CLOSED 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 THERMAL/MAGNETIC TRIP TEST - PRIMARY INJECTION REFER TO NETA TABLE 100.7 AND 100.8 TESTS PHASE A PHASE B PHASE C MANUF. AVE. THERMAL 3007o(sec) INSTTRIP (LO) amps MANUFACTURER TESTED INST TRIP (HI) amps WITHSTAND (MID) NOTES 1 2 3 4 5 Vail Breakers Page 8 of 14 PREPARED FOR fiaARaffirEEElECrR/c MOLDED CASE CIRCUIT BREAKER CANF-5E020 WO# G3479-1 TAG # 350A BREAKER DATE June 4,2013 PLANT VAIL WWFF 4TH FROM TOP TEST BY AP AREA MDP-1 ROOM STANDARD ACCEPTANCE APPROVED BY PC NAMEPLATE DATA MANUF. EATON RATED AMPS 350 YEAR NL MODEL HFD NOM.VOLTS 600 POLES 3 CAT# RD65K INT CAP (KA) 65 FREQ. 60 SERIAL# NOT VISIBLE BIL NL TEST SUMMARY REF.NETA STANDARD TEST SUMMARY OK FAIL TEBTOT COMMENTS Z COMPARED TO DRAWING ✓ VE2-02 NAMEPLATE VERIFICATION/CHECK ✓ VERIFIED H VISUAL INSPECTION ✓ VERIFIED Z CONTACT RESISTANCE ✓ INSULATION RESISTANCE ✓ SEE RESULTS BELOW N uj THERMAL MAGNETIC TRIP TEST ✓ INSPECTIONS DESCRIPTION OK FAIL N/A COMMENTS AUX WIRING ✓ FUNCTION TEST-OPEN/CLOSE ✓ FUNCTIONED DIRT ACCUMULATION/CORROSION ✓ CLEAN TIGHTEN BOLTS/MISSING HARDWARE ✓ TORQUED STATUS INDICATION ✓ FRONT OF BREAKER LUGS ✓ CABLES NOT CONNECTED THERMAL/MAGNETIC TRIP ✓ SHUNT/ELECTRIC TRIP ✓ UV/BLOWN FUSE DEVICES ✓ Vail Breakers Page 9 of 14 PREPARED FOR 8UARANTEEELECTR/C MOLDED CASE CIRCUIT BREAKER CANF-5E020 WO# G3479-1 TAG# 350A BREAKER DATE June 4, 2013 TEST RESULTS IAMB.TEMP 68.7°F HUMIDITY 35 CONTACT RESISTANCE TEST EQ.# D00003 RESISTANCE(pQ) DIAGRAM DESCRIPTION PHASE A PHASE B PHASE C INITIAL 210 220 220 AFTER CLEANING (IF REQ'D) N/A N/A N/A COMMENTS: CONTACT RESISTANCE FROM SECTION 1 TOP TO LOAD SIDE BREAKER INSULATION RESISTANCE REFER TO NETA TABLE 100.1 EQ# D00002 RESULTS (Mfg) - 0-0-GND TEST VOLTS TIME PHASE A PHASE B PHASE C CONTACTS OPEN 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 CONTACTS CLOSED 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 THERMAL/MAGNETIC TRIP TEST - PRIMARY INJECTION REFER TO NETA TABLE 100.7 AND 100.8 TESTS PHASE A PHASE B PHASE C MANUF. AVE. THERMAL 30017.(sec) INST TRIP (LO) amps MANUFACTURER TESTED INST TRIP (HI) amps WITHSTAND(MID) NOTES 1 2 3 4 5 Vail Breakers Page 10 of 14 PREPARED FOR _ ca�R,��rEEE�ECrR�c � �w�w�w MOLDED CASE CIRCUIT BREAKER CANF-5E020 WO# G3479-1 TAG# 150A BREAKER DATE June 4, 2013 PLANT VAIL WWTF 5TH FROM TOP TEST BY AP AREA MDP-1 ROOM STANDARD ACCEPTANCE APPROVED BY PC NAMEPLATE DATA MANUF. EATON RATED AMPS 150 YEAR NL MODEL HFD NOM.VOLTS 600 POLES 3 CAT# RD65K INT CAP (KA) 65 FREQ. 60 SERIAL# NOT VISIBLE BIL NL TEST SUMMARY REF.NETA STANDARD 7.6.1.1 TEST SUMMARY OK FAIL TEBTOT COMMENTS Z COMPARED TO DRAWING ✓ VE2-02 PNAMEPLATE VERIFICATION/CHECK ✓ VERIFIED H VISUAL INSPECTION V/ VERIFIED z CONTACT RESISTANCE ✓ INSULATION RESISTANCE ✓ SEE RESULTS BELOW L., ✓ Lu THERMAL MAGNETIC TRIP TEST INSPECTIONS DESCRIPTION OK FAIL N/A COMMENTS AUX WIRING ✓ FUNCTION TEST-OPEN/CLOSE ✓ FUNCTIONED DIRT ACCUMULATION/CORROSION ✓ CLEAN TIGHTEN BOLTS/MISSING HARDWARE ✓ TORQUED STATUS INDICATION ✓ FRONT OF BREAKER LUGS ✓ CABLES NOT CONNECTED THERMAL/MAGNETIC TRIP ✓ SHUNT/ELECTRIC TRIP ✓ UV/BLOWN FUSE DEVICES ✓ Vail Breakers Page 11 of 14 PREPARED FOR ,90,49,9NMIRICTN/C MOLDED CASE CIRCUIT BREAKER CANF-5E020 WO# G3479-1 TAG# 150A BREAKER DATE June 4, 2013 TEST RESULTS AMB.TEMP 68.7°F HUMIDITY 35 CONTACT RESISTANCE TEST EQ.# D00003 RESISTANCE (p0) DIAGRAM DESCRIPTION PHASE A PHASE B PHASE C INITIAL 3500 3500 3500 AFTER CLEANING (IF REQ-D) N/A N/A N/A COMMENTS: CONTACT RESISTANCE FROM SECTION I TOP TO LOAD SIDE BREAKER INSULATION RESISTANCE REFER TO NETA TABLE 100.1 EQ# D00002 RESULTS (MD) - 0-0-GND TEST VOLTS TIME PHASE A PHASE B PHASE C CONTACTS OPEN 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 CONTACTS CLOSED 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 THERMAL/MAGNETIC TRIP TEST - PRIMARY INJECTION REFER TO NETA TABLE 100.7 AND 100.8 TESTS PHASE A PHASE B PHASE C MANUF. AVE. THERMAL 300%(sec) INST TRIP (LO) amps MANUFACTURER TESTED INST TRIP (HI) amps IWITHSTAND (MID) NOTES 1 2 3 4 5 Vail Breakers Page 12 of 14 PREPARED FOR MOLDED CASE CIRCUIT BREAKER CANF-5E020 WO# G3479-1 TAG # ATS BREAKER DATE June 4, 2013 PLANT VAIL WWTF TEST BY AP AREA BENCH TESTED STANDARD ACCEPTANCE APPROVED BY PC NAMEPLATE DATA MANUF. EATON RATED AMPS 30 YEAR NL MODEL HFD NOM.VOLTS 600 POLES 3 CAT# HFD3030L INT CAP (KA) 65 FREQ. 60 SERIAL# 13032801 BIL NL TEST SUMMARY REF.NETA STANDARD TEST SUMMARY OK FAIL TES TOT COMMENTS Z COMPARED TO DRAWING ✓ CONFLICT WITH VE2-02 NAMEPLATE VERIFICATION/CHECK ✓ VERIFIED H VISUAL INSPECTION V, VERIFIED Z I CONTACT RESISTANCE ✓ SEE RESULTS BELOW INSULATION RESISTANCE ✓ SEE RESULTS BELOW N LU THERMAL MAGNETIC TRIP TEST ✓ INSPECTIONS DESCRIPTION OK FAIL N/A COMMENTS AUX WIRING ✓ FUNCTION TEST-OPEN/CLOSE ✓ FUNCTIONED DIRT ACCUMULATION/CORROSION ✓ CLEAN TIGHTEN BOLTS/MISSING HARDWARE ✓ TORQUED STATUS INDICATION ✓ FRONT OF BREAKER LUGS ✓ CABLES NOT CONNECTED THERMAL/MAGNETIC TRIP ✓ SHUNT/ELECTRIC TRIP ✓ UV/BLOWN FUSE DEVICES ✓ Vad Breakers Page 13 of 14 PREPARED FOR -- MOLDED CASE CIRCUIT BREAKER CANF-5E020 WO# G3479-1 TAG# ATS BREAKER DATE June 4,2013 TEST RESULTS AMB.TEMP 68.7°F HUMIDITY 35 CONTACT RESISTANCE TEST EQ.# D00003 RESISTANCE (pO) DIAGRAM DESCRIPTION PHASE A PHASE B PHASE C INITIAL 3000 3000 3000 AFTER CLEANING (IF REQ'D) N/A N/A N/A COMMENTS: LINE TO LOAD OF BREAKER INSULATION RESISTANCE REFER TO NETA TABLE 100.1 EQ# D00002 RESULTS(Mfg) - 0-0-GND TEST VOLTS TIME PHASE A PHASE B PHASE C CONTACTS OPEN 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 CONTACTS CLOSED 500 30 sec. >20 000 >20 000 >20 000 1000 30 sec. >20 000 >20 000 >20 000 THERMAL/MAGNETIC TRIP TEST - PRIMARY INJECTION REFER TO NETA TABLE 100.7 AND 100.8 TESTS PHASE A PHASE B PHASE C MANUF. AVE. THERMAL 3007o(sec) INST TRIP (LO) amps MANUFACTURER TESTED INST TRIP (HI) amps IWITHSTAND (MID) NOTES 1 NEED TO LOOK INTO BREAKER SIZE 2 3 4 5 Vail Breakers Page 14 of 14 GUARA.LT TEE Page / of ELECTRICAL CONTRACTING 21250 East 31st Circle,Aurora,CO 60011 Nip(303)373-2400 tx (303)373-4722 a gecowest.com RESISTANCE TESTING OF EQUIPMENT AND FEEDERS 'R� /bco V Equipment Serial# Cable# Location A T - Gnd B (D -Gnd C m -Gnd N (D - Gnd AO - 13 (l) A T - C (l) SO -CO f, Cy(J 7 7 Tested By. l� a " !r'r'r pr Witness: i Date: _GUARANTEE Page of ELFCTRICAL CONTRACTING 21250 East 31st Circle,Aurora.CO 80011 !,t, (303)373-2400 r,(303)373-x1772\22 .--i,gecowest.com DESISTANCE TESTING OF EQUIPMENT AND FEEDERS �pc.JQ Equipment Serial # Cable# Location A m - Gnd 130 - Grid C m - Gnd N (D - Gnd A (P- B 0 A (P - C (D B (P-C rl -3 1 J1 rrl SO Tested By: W itness: '/ 1- a' l 0%..e Date: GUARANTEE Page of FLEC'FRICAL co,4'rRACTING 21250 East 31 st Circle,Aurora,CO 80011 (303)373-2400 (303)373-4722 —b gecowe"t.cmr' RESISTANCE TESTING OF EQUIPMENT AND FEEDERS Equipment Serial# Cable # Location AO -Gnd B4) - Gnd C (D - Gnd N (l) -Gnd A (D - 13 (1) 0 -CO ("try, :2 C., 7 Tested By: 11V lr !- / /! Witness: I Date: GUARANTEE __ Page / of Z. ELECTRICAL_ CONTRACTING 21250 East 31st Circle,Aurora.CO 80011 pt,(303)373-2400 f.(303)373-4722 web gecowest.com RESISTANCE TESTING OF EQUIPMENT AND FEEDERS ' ✓ Equipment Serial# Cable# Location A m -Gnd B m -Gnd C O -Gnd N O - Gnd A m - B 0 A m - C (D B 4)-C m z 4 . b i 3 oa Tested By: , Lalr; Witness: (I� ?) Date: GUARAN TEE Page of FLFCTRICAI_ CONTRACTING 21250 East 31st Circle,Aurora,CO 80011 pi,(303)373-2400 rx(303) 373-4722 ­f,gecowest.com RESISTANCE TESTING OF EQUIPMENT AND FEEDERS 0 Equipment Serial# Cable# Location A 4) -Gnd B 0 -Gnd C (D -Gnd N (P -Gnd A(P - B O A4) -C4) B 0 -C O r C>< -3 Z al p . Tested By: Witness: 4 0 1oor GUARANTEE ,L F C T R I CA L CONTRACTING 21250 East 31st Circle,Aurora,CO 80011 vn(303)373-2400 r.(303)373-4722 wen gecowest.com TORQUE WRENCH CALIBRATION DATE: TORQUE APPLICATION DATE: (, —1 5- ►� EQUIPMENT : - Z EQUIPMENT SERIAL # : E)N LOCATION: �1 Qc�i t c �oM BOLT SIZE: TORQUE VALUE: S WORK DONE BY: a WITNESSED BY: J�r7 K"a kt GAG u 2 GUARANTEE FLFCTRICAI. ((7N 7 RA(-TING 21250 East 31st Circle,Aurora.CO 60011 Pn(303)373-2400 r.(303)373-4722 ec gecowest.com TORQUE WRENCH CALIBRATION DATE: TORQUE APPLICATION DATE: EQUIPMENT : h GC -&AA EQUIPMENT SERIAL # : LOCATION: E BOLT SIZE: TORQUE VALUE: t WORK DONE BY: a. WITNESSED BY: A sc- -y C' z GUARANTEE F,LECTRICAL CONTRACT 1N(; 21250 East 31st Circle,Aurora,CO 80011 ph(303)373-2400 f.(303)373-4722 wco$ecowest.com TORQUE WRENCH CALIBRATION DATE: q- t:3 TORQUE APPLICATION DATE: EQUIPMENT : (V\cc I i EQUIPMENT SERIAL # : qS �r LOCATION: �� r� BOLT SIZE: TORQUE VALUE: 3 �� WORK DONE BY: YoSf- ?-Jd 't z WITNESSED BY: unaC� �kll X ��duj GUARANTEE Et-ECCFRICAI. CON I RACTING 21250 East 31st Circle,Aurora,CO 80011 ph(303)3732400 f,(303)373-472 2 ..ten gecowest.com TORQUE WRENCH CALIBRATION DATE: TORQUE APPLICATION DATE: - S � EQUIPMENT : /tACC wes T - EQUIPMENT SERIAL # : 3 G FIST C �C LOCATION: E/e (Loo M BOLT SIZE: 5//z// '1411C h TORQUE VALUE: 3 6' /- 6_5 WORK DONE BY: 71' M 14,rinJ 12Ya n Swu//a4� WITNESSED BY: ,50,se 20J r-% fvGZ A 0 x 3 TI, k`st � .3 C � IQs c � 3 CVO IA(,1 GUARANTEE ELECTRICAL CONTRACTING 21250 East 31st Circle,Aurora,CO 80011 ph(303)373-2400 t.(303)373-4722 wen gecowest.com TORQUE WRENCH CALIBRATION DATE: q- q- /3 TORQUE APPLICATION DATE: EQUIPMENT : r, EQUIPMENT SERIAL # : LOCATION: 66,ne.e,Itn,2 BOLT SIZE: -31,C- TORQUE VALUE: WORK DONE BY: ,�• \ WITNESSED BY: ��, ��^ �i ( �L► fi3 G� PHA YC /I --�