Project Name: SIMBA RUN SIDING CHANGE DRB Number: DRB130411
Project Description:
Revisions to the exterior of the building to address several specific situations where materials
could not transistion at interior corners. Includes change to what materials are to be installed on
certain portions of the building.
Participants:
OWNER HURFORD, HILGE M. & JENNIFER 09/05/2013
175 E 62ND ST
NEW YORK, NY
10021
ARCHITECT PIERCE ARCHITECTS 09/05/2013
1650 FALLRIDGE ROAD SUITE C -1
VAI L
CO 81657
License: C000003130
APPLICANT SIMBA RUN CONDOMINIUM ASSOCI 09/05/2013 Phone: 970 - 476 -0344
C/O FARROW H ITT
1100 LIONSRIDGE LOOP
VAI L
CO 81657
Project Address: 1100 LIONS RIDGE LP VAIL Location:
Legal Description: Lot: 6 -10 Block: Subdivision: SIMBA RUN
Parcel Number: 2103 - 121 - 1300 -1
Comments: See conditions
BOARD /STAFF ACTION
Motion By: Action: STAFFAPP
Second By:
Vote: Date of Approval: 09/12/2013
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and /or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
(PLAN): DRB approval shall not become valid for 20 days following the date of
approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS.
Cond : 202
(PLAN): Approval of this project shall lapse and become void one (1) year following
the date of final approval, unless a building permit is issued and construction is
commenced and is diligently pursued toward completion.
Planner: Warren Campbell DRB Fee Paid: $20.00
0 D EC 2odIE
iowN of vAIL ` SEP o5 2013
TOWN OF VAILi
1 Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970 -479 -2128
www.vailgov.com
Development Review Coordinator
Application for Design Review
Changes to Approved Plans
General Information: This application is for all changes to approved plans prior to Certificate of Occupancy. An applica-
tion for Design Review cannot be accepted until all required information is received by the Community development De-
partment. Design Review approval expires one year from the date of approval, unless a building permit is issued and
construction commences.
Submittal Requirements:
The Town of Vail offers two (2) methods for submittal of materials for review of applications. Materials can be submitted
either digitally or on paper. Whichever method you select all materials shall be submitted in that format throughout the
Design Review process. The Town encourages you to consider using the submittal of digital documents and plans.
If submitting digitally all elements of the application shall be uploaded to the Town's share file site as a complete set of
materials. If submitting paper three. (3) copies of the materials noted with an asterisk (") and one (1) copy of all others
are required. The materials necessary to have a complete application are as follows:
1. Copies of all pertinent approved plans with illustrated, labeled changes.
2. Joint Property Owner Written Approval Letter, if applicable.
Fee: $20
i Single Family Duplex !� Multi- Family Commercial
Description of the Request: r� '412QAJ 71 �., 21' ; /NZ6 COL j Q ALL -4 775_:
Physical Address: doo
Parcel Number: (Contact Eagle Co. Assessor at 970 - 328 -8640 for parcel no.)
Property Owner:
Address:
e:
Owner's Signature:
Primary Contact/ OwnerRep entative:
Mailing Address: /✓tl1LL /.�il.n� /��
&a�5 7-Z _Phone:
E -Mail: li-b//', Fax:
For Office Use Only:
Cash_ CC: Visa / MC Last 4 CC # Exp. Date: &uth Check # Fee Paid: � — Received Fr
Meeting Date: DRB No.:
Planner: Project No:
Zoning: Land Use:
Location of the Proposal: Lot: Block: Subdivision:
TOWN OF VA
JOINT PROPERTY OWNER
WRITTEN APPROVAL LETTER
The applicant must submit written joint property owner approval for applications affecting shared ownership properties
such as duplex, condominium, and multi- tenant buildings. This form, or similar written correspondence, must be com-
pleted by the adjoining duplex unit owner or the authorized agent of the home owner's association in the case of a con-
dominium or multi- tenant building. All completed forms must be submitted with the applicants completed application.
I, (print name)
'r�Dw
of property located at /� e_-
approval of the plans dated
a joint ownei,jjor, authority of the association,
, C/� , /, , provide this letter as written
which have been submitted to the
Town of Vail Community Development Department for the proposed improvements to be completed at the address not-
ed above. I understand that the proposed improvements include:
understand that modifications may be made to the plans over the course of the review process to ensure compliance
with the Town's applicable codes and regulations; and that it is the sole responsibility of the applicant to keep the joint
property owner apprised of any changes and ensure that the changes are acceptable and appropriate. Submittal of an
application re in the applicant agreeing to this statement.
�,o %_\�- - Z/� �/)
Signature Dat
Print Name
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R130001383 Amount: $20.00 09/05/201301:54 PM
Payment Method: Check Init: SAB
Notation: 17548- PIERCE
ARCHITECTS
-----------------------------------------------------------------------------
Permit No: DRB130411 Type: DRB -Chg to Appr Plans
Parcel No: 2103 - 121 - 1300 -1
Site Address: 1100 LIONS RIDGE LP VAIL
Location:
Total Fees: $20.00
This Payment: $20.00 Total ALL Pmts: $20.00
Balance: $0.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
DR 00100003112200 DESIGN REVIEW FEES 20.00
A
RAIL TI
o RAIL T3 m
RAIL T4
I D
RAIL TI F
A"T
+ ,.�.•.
A
B
RAIL T2 RAIL T2 e RA�T2 RAIL TI RAIL T2 RAIL TI EL 817CY-42"
J
L 1. RAIL T3 « I RAIL T3
RA
�Q c
j
IL T4 RAIL T4 RAIL T4 =---i
Eoxw,-o,
A
T2 RAIL T1 RAIL T2 RAIL T4 EL 8140'-0'
1p
EL.15INI-o"
2 EAST BUILDING - EAST ELEVATION B
Iff - V-0
t --.
RAIL T2
c B
fug
EAST
KEYNOTE LEGEND
RAILING LEGEND
-�l I IIIED —11
M-c !�3
La%—���-
RAIL TI J RAILT2 RAA
car e
A
Q RAILT3=t�� Z�
A C
71
RAIL T4 -RAIL
LTC
RAIL T4
A
RAIL T2 RAIL Tl
D
. IL
4? 1411 ��7
EL Qj8d-0P,$,
ri
ELI-816.r"',
A
RAIL T2
RAIL T1 RAIL T2
RAIL Tl
RAIL T2 RAIL T1 RAIL
EL, 194V-�!
D
D
p c
RAIL T5
RAIL T5
RAILT k
TCIM Of As-
Dr:SM FWEW
L err+allR ,w
CID 6. SUFF AWPON
ING - EAST IALEVATIO� A
L4,-
180-2-12
PRICING
ICING
21 MAR 2013
2
21 MAR 2013
- SUBMITTAL
1
14. 21111
REV i - PERMIT
SUBMITTAL
15 JULY 2013
SIDING REVISION
co
Z
SW
W
>
0 o<
Z 0
0 L)
Z
CW
A
le
EAST BLDG
EAST
A301
TOM OF VAIL
DESIGN REVIEW
STAFF APPROVAL
o
1 IA-li I
14?1111P-�-
1. OCT 2012
PRICING
21 MAR 2013
KEYNOTE LEGEND
21 MAR 2013
C-E.T-
PERMIT SUBMITTAL
11MA 2013
--E.1.1- T...E-.
❑
R 1 -PERMIT
SUBMITTAL
ow.�waaw
EAST BUILDING - NORTH ELEVATION
30
�
SIDING REVISION
L
1 IA-li I
14?1111P-�-
EAST BUILDING - AMENITIES ELEVATIONS
U)
Z
Li
2
Lli
> <0
0 M,
z0
Z;i>
D
00
2
U)
e
pppp7
EAST BLDG
-S.0 -UlT =
1. OCT 2012
PRICING
21 MAR 2013
KEYNOTE LEGEND
21 MAR 2013
C-E.T-
PERMIT SUBMITTAL
11MA 2013
--E.1.1- T...E-.
❑
R 1 -PERMIT
SUBMITTAL
ow.�waaw
JULY 201]
SIDING REVISION
L
EAST BUILDING - AMENITIES ELEVATIONS
U)
Z
Li
2
Lli
> <0
0 M,
z0
Z;i>
D
00
2
U)
e
pppp7
EAST BLDG
-S.0 -UlT =
#— Ei- myo'-Q*
A
RAIL T2 Tl
tll
r
7 i
D'
T
C_ RAIL T3 RAIL T3
r— LT
RAIL T2 RAIL Ti RAIL, T2 ML T1 RAIL T2 RAI T2 RAIL TI
RAIL T4 T4 c c RAIL T4 •
1 2 2 C' 22
11
+— EL:-otzo'- '.
NORTH BUILDING - EAST ELEVATION B
\1 �O5 lw'"*
II
CZL
EL al3oW-C'
C
Wl
DESIGN REVIEW w- anal
STAFF APPROVAL
DA7E,
NORTH BUILDING EAST ELEVATION A
\A305)
X1411
lll..T2 12
PRICING
21 ~ 2013
21 MAR 2013
—SU M
KEYNOTE LEGEND
ion,
mlllll��
Lai
RAILING LEGEND
U�ME1rEati.��.a�..�TM �,�,�
14 IM 201
RIW 1 - Ml
SUBMITTAL
SIDING REVISION
U)
z
Lli
2
Lu
>
0
aW
2
zo
0
Z
Z)
co
WE
m
e
pppp7
Z7 F�
M4
NORTH BLDG
EAST�
M.�
.1
►mesHardie
/4
d
A
rr-
Ja
FROM SIDING TO
"IV FYI UP
mMade kesHarde f
►`� bt
A
. Nadi
YY ��jt r
rd
..;,, r•
io
Mao
N
I✓
SHa�e
F7 V
RE1i �.
(do
'
FF
f
. Awwat
b` y
- . -:�` x lid
I
' q