`°'�"`�°"�°�'� Request For Clarification No. 027
CJNiRwcTOt of Cnoic4"
Detailed by RFC Number
Villa Valhalla Improvements GEJCC Project# M2022
385 Gore Creek Drive Tel: 970.845.2072 Fax: 970.845.0282
Vail CO 81657
�� r�: _ -t.
�. �
Initiati.�n9 Co�npanY �rai#��.�d By Iniqa#qlC itFC No. RequestQd B.y TiHe
G.E.Johnson Construction James Franklin -Select One- -Select One-
Company,Inc.
_ _...__ __°_ __
Subject __ fliscipliae Category
Shaftwall System at Elevator Architecturel Core Request
�pecification Section _._ Reference
-- .`__.� Reference Drawings '�
. _ .
Referen���Details: –
..-. " ., ..��,���:.k!.��
Question Date Required: 9/10J2013
Is it acceplable to use a 1"shaftliner board at the interior face of the metal stud wall in lieu of(2)layers of 5/8"
drywall?In order to hold the 8 1/2"critical wall thickness dimension per Otis,the metal studs will be furred out
accordingly.Please sce attached RFC from Peak Interiors for further description of the proposed change.
_
Sugqestion "
Mswer ��. ;� , -�;�- ,r� • ,.e r " -'-,Y''.�'�,�h'�e�,l�;'•Lh:''` Date Answered:
-...»��
__......_._......�_..... .
AnswerC�m an
p Y ;::._ Answered B --- —
y Co-Respondent , ;
You are directed to Proceed with this RFC.If the response to this RFC constitutes an increase in time and/or cost to
your work,you must notify this office within seven(7)calendar days from the date of this RFC response. Should you fail
to respond by this date we will consider this a"no cost"change to your contract.
Cc: Company Name ContaCt Name Copies
P��QF C �p9
� o
U�n . �' I
-� �� _. �
� 11 ;��
� �/�J. I
`�`.�� . '����:�
r� ,t3 '�`'��'���
.i
147 ��rpork Gr., r28
� Gvpsum, C;C� Q 1 G37
��'t���ll.t3��r' ,��i�. (97U-52�,306C
� Fax: 970-52k•3C��s 3
Date: August 30, 2013 Plans dated: 5/17/2013
Proposal to: GE Johnson Construction Project: Villa Vahalla
RFC Elevator poor Wall
John Halloran 384 Gore Creek Drive
Email: halloranj@gejohnson.com Vail, CO
81657
Phone: 970-471-6048 Phone:
Fax: 970-845-0282 Fax:
Request for Change
Change from the 2 hr wall type 1 to a 2 hr shaftwall system
• Wall type 1 calls for 6"metal stud wall with two layers of 5/8"drywall on each side for
a finished dimension of 8 1/2". This requires difficult staging inside the elevator shaft
of riding the top of the elevator after it's operational.
• We propose using a 4'CH stud, 1"shaftliner board and two layers of 5/8"drywall at
the finished side for a wall dimension of 5 1/4". This has a 2 hr rating and can be built
from outside the shaft. I don't know if the 8 1/2"wall dimension is critical or not. If so
we could furr the 4" CH stud to match the 8 1/2"dimension.
�