HomeMy WebLinkAboutVent Cap Option 2These instructions are supplementary to the Installation and
Operating Instructions supplied with the fireplace and should
be kept together. Refer to the Installation and Operating
Instructions for proper gas supply, safety requirements and
operating instructions.
C
i
�• 1
e
TOWN & COUNT RY
FIREPLACES'M
STAIN LESS STEEL
VENT TERMINAL
rf'
p a IM
p
TCVT.SSWTA
INSTALLATION AND
OPERATING
INSTRUCTIONS
281105 -4 TCVT.SSWTA 5056.4267
The TC Stainless Steel Vent Terminal is
intended for use in climates that warrant
stainless steel construction as well as in
hard to reach places. The 2 phase
installation allows the sleeve to be
installed during the construction phase,
while the terminal can be installed at the
same time as the fireplace.
This terminal kit can be used both in
residential and commercial installation.
EXTERIOR WALL OPENING
Having determined the position of the
fireplace, cut and frame a 16 3/4 x 16 3/4
inch opening centered at a minimum
height above the floor as specified in the
fireplace manual. Height of the opening
will vary with each installation. As the
horizontal vent run increases, so does the
minimum vertical rise.
IMPORTANT: When locating the
opening, it should be noted that
vent terminal exterior clear-
ances must be maintained. See
"Vent Terminal Clearances"
section in the fireplace manual
for proper clearances.
SLEEVE INSTALLATION
Slide the mounting flange over the sleeve
so that the fastening holes are oriented to
the side of the sleeve.
Set the flange back far enough so that the
sleeve will protrude a minimum of 1"
beyond the exterior wall surface.
Flange set back will depend on the type
of installation. If the sleeve is to be fas-
tened over top of siding, set the flange
back 1" from the end of the sleeve. If the
sleeve is to be fastened under the siding
or wall veneer assembly, set the flange
281105 -4
TYRGAL FRWI FCRTBIVIIMAL
i ya * o-�tio
i
R
w
1
jj
L
As per installation manual•
— y'k
,5 f
oh f
4�
ORAIN'AaE " "� DfUU AGE ,
HOLE `- HOLE J
TCVT.SSWTA 5056.4267
(Sleeve installation Continued)
back the thickness of the veneer plus 1 ".
To ensure that the terminal mounts on a
2° descending angle, set the flange back
1/2" more on the top than at the bottom.
Bottom of the sleeve is identified by a
small drainage hole located near the
front.
Drill 1/8" holes and fasten flange to sleeve
with screws provided.
Install the sleeve assembly through the
wall opening from the outside of the build-
ing. Fasten the sleeve assembly to the
building ensuring that the assembly is on
a downward slope to the outside and the
small drainage hole is at the bottom.
The 2° descending angle is
necessary to ensure that there
is no water accumulation within
any of the terminal components.
VENT TERMINAL INSTALLATION
Apply a bead of silicone on the front face
of the terminal. With embossed arrow
pointing up, insert the termination into the
sleeve, guiding the holes over the studs.
Fasten termination in place using the
washers, lockwashers and nuts provided.
Install insulation material into sleeve,
followed by insulation retainer. Insulation
retainer should be fastened to terminal
sleeve using 4 screws.
Install remainder of venting as per the
installation instruction supplied with the
fireplace.
TYPICAL OCMM&CIAL INSTALLATCN
INTERIOR
WALL MEMBRANE WALL
SS SLEEVE FLANGE---,,,,,,, j
NEUTRAL CURE /
SILICONE --
HIGH TEMPERATURE
INSULATION (SUPPLIED)
VVVV' ji
WATER DAM
2.00° PROVIDED BY
BEAD ROLL
HIGH
TEMPERATURE
STAINLESS STEEL SILICONE
WALL TERMINAL
/ - TRIM SLEEVE
TO FIT WALL
114" STAINLESS STEEL
WELD STUDS
TYPICAL WALL
VENEER ASSEMBLY /
4
\_APPLYSILICONE
v / TO FRONT FACE
OF TERMINAL
/ BEFORE INSTALLATION
a
281105 -4 TCVT.SSWTA 5056.4267
RB'LACEMBVf PARTS
V
TOWN & COUNTRY
FIREPLACES TM
:%l z .aa%1zQBI
www .townandcountryfireplaces.net
Toll Free: 1- 888 - 223 -0088
2975 Allenby Road, Duncan, BC Canada V91L 6V8
Printed in Canada 5056.4267