Date: August 3, 2011
Re: 227 Bridge Street B11-0226
Dear Karl,
RESPONSE INSTRUCTIONS
● Submit three complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified.
● Please respond in writing to each comment with a response letter addressing each comment.
BUILDING COMMENTS
Architectural Comments:
Sheet X1
1. Please provide calculations for the total occupant load utilizing the bathrooms showing compliance with Table 2902.1 IBC.
2. Clarify access to bathrooms is at all times per 2902.3.1 IBC. Bathrooms in another place of business will not meet the intent of the code.
Structural Comments:
NA
Plumbing Comments:
NA
Mechanical Comments:
Sheet M1
1. Please clarify outside air intake in relation to property line to adjoining properties. Fire protection may be required
Sheet M4
1. Revise mechanical compliance certificate to the 2009 IECC as adopted by the Town of Vail.
Electrical Comments:
Sheet E4
1. Revise lighting compliance certificate to the 2009 IECC as adopted by the Town of Vail.
PLANNING COMMENTS
DRB Application required for exterior vents. Please contact Warren Campbell, Chief of Planning. 970-479-2148
FIRE COMMENTS
Reviewed and accepted
PUBLIC WORKS COMMENTS
NA
Sincerely,
Martin A. Haeberle
Chief Building Official