HomeMy WebLinkAboutDRB090062 Dockstader check sheet
PLANNING CHECK SHEET
Property Information
Property Address
3987 Lupine Drive
Parcel #s
Legal Description
Parcel B, Lot 8 Bighorn Subdivision
Development Site Area
Ac
0.7638
Sq
Ft
33,271.13
Buildable
33,271.13
Zoning / SDD #
Two-Family Residential (R)
Land Use Designation
Low Density Residential
Known Non-Conformities
Na
Previous Approvals
Hazard
Zones
Sections 12-12, 12-21, 14-6 & 14-7
Snow Avalanche
Powder Blast Zone over most of site
Debris Flow
No
Rockfall
High severity over whole site
Excessive Slopes
(Site Disturbance 12-21-14)
No
Floodplain
No
Wetlands Y/N
No
Creeks, Streams
Section 12-14-17
Gore Creek on north side
Setback
50 ft
Proposed
Meets standard
Sidewalks/
Trails
None
Contact Information
Planner/ Date
Nicole Peterson 04/10/2009
Owner Contact Info
Primary Contact/ Owner Representative Info
Project Information
Project
Description
Unit A – Replace wood shake roof
Unit B: Replace wood-shake roof, 2-story addition, remove existing stair, remodel and new bedroom (910 sf new GRFA)
Land Use Application(s)
#
DRB09-0062
Proposed Uses
(As defined by Zoning)
Duplex
Permitted, Conditional, Prohibited?
Permitted
Date Routed/ DRT Meeting
Comments received PW 3/26 – no issues, Fire
3/27 monitored fire alarm required.
Gross Residential Floor Area (Chapter 15)
Total Allowed
8,646.3
-Existing
6,867
-Proposed
910
Remain
869.3 sf
250 or Interior Conversion?
No
Zoning District Standards
Setbacks (perimeter)
Projections 14-10-4
Minimum Front
20
Proposed
No change
Minimum Side
15
Proposed
No change
Minimum Side
15
Proposed
No
change
Minimum Rear
15
Proposed
No change
Site Coverage
Maximum
20% (6,654.23)
Proposed
14.06% (4,681)
Building Height
Maximum
33’
Proposed
No change
Landscaping
Sections
14-10-8 & 14-10-9
Minimum
60%
Proposed
No change (Area already walkway)
Lighting
Section 14-10-7
Allowed
16 fixtures allowed (unit B)
Proposed
11 fixtures existing, 2 proposed,
total 13 - ok (Unit B)
Lighting
Section 14-10-7
Allowed
16 fixtures allowed (unit B)
Proposed
11 fixtures existing, 2 proposed, total 13 - ok (Unit B)
Roof Material
Sections 12-11-3C & 14-10-5
Complies
Y/N
Replace entire duplex roof – from wood shake to composite shingles – wheathered grey
Notes