Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Check Sheet
PLANNING CHECK SHEET Property Information Property Address 2955 Bellflower Drive Parcel # 210314307007 Legal Description Lot 6 Block 6 Vail Intermountain Development Site Area Ac Sq Ft Buildable Zoning / SDD # Two-Family Primary/Secondary (PS) Land Use Designation Low Density Residential Known Non-Conformities Setbacks, parking Previous Approvals 2003- Variances to setbacks, & parking in ROW Hazard Zones Sections 12-12, 12-21, 14-6 & 14-7 Snow Avalanche Debris Flow Rockfall Excessive Slopes (Site Disturbance 12-21-14) Floodplain Wetlands Y/N Creeks, Streams Section 12-14-17 Setback Proposed Sidewalks/ Trails Contact Information Planner/ Date Nicole Peterson 4/9/2008 Owner Contact Info Primary Contact/ Owner Representative Info Project Information Project Description Land Use Application(s) # Proposed Uses (As defined by Zoning) Permitted, Conditional, Prohibited? Date Routed/ DRT Meeting Commercial Floor Area Existing Proposed Gross Residential Floor Area (Chapter 15) Total Allowed -Existing -Proposed +Credits P/S District Only Primary -Existing -Proposed +Credits Second. (40%) -Existing -Proposed +Credits Total Remaining Primary Total Remaining Secondary Total Remaining 250 or Interior Conversion? Zoning District Standards Setbacks (perimeter) Projections 14-10-4 Minimum Front Proposed Minimum Side Proposed Minimum Side Proposed Minimum Rear Proposed Lot Area/ Width Minimum Proposed Site Coverage Maximum Proposed Building Height Maximum Proposed Landscaping Sections 14-10-8 & 14-10-9 Minimum Proposed Min. Plant size Proposed Fences Proposed Retaining Walls Sec. 14-6-7 Max. Height Proposed Min. Setback Proposed Driveway Sections 14-3-1 & 14-3-2 Max. Curb-cuts Proposed Max-Min Slope Proposed Max-Min Width Proposed Heated Y/N Drive Material Snow Storage % Proposed Parking Sections 12-10 & 14-5 Min. Spaces Proposed Min. Loading Proposed Lighting Section 14-10-7 Allowed Proposed Waste Management Section 5-9 Wildlife Proof/ Resistant Screened Screening Sections 14-10-9 & 14-10-10 Required Proposed Roof Material Sections 12-11-3C & 14-10-5 Complies Y/N Building Separation Section 14-10-6 Complies Y/N Adopted View Corridors Complies Y/N Utilities (Location, easements) Section 14-10-10 Grading (Less than 2:1) Section 14-6 Development Impact Fees / Mitigation Employee Housing Traffic Impact Art In Public Places Notes