Loading...
HomeMy WebLinkAboutB13-0401 COMCHECK.pdf Generated by COMcheck-Web Software Envelope Compliance Certificate 2012 IECC Section 1: Project Information Project Type:Alteration Project Title : Solaris 5HW Construction Site: Owner/Agent: Designer/Contractor: 141 East Meadow Drive Sharon Cohn Scott Nevin Vail,Colorado 81657 Solaris Davis Partnership Architects 0225 Main Street,Unit C101 Edwards,Colorado 81632 970-926-8960 Section 2: General Information Building Location(for weather data): Vail,Colorado Climate Zone: 6b Building Space Conditioning Type(s): Residential Activity Type(s) Floor Area Hotel:Guest rooms 3377 Section 3: Requirements Checklist Envelope PASSES Climate-Specific Requirements: R-Value Proposed Max.Allowed Post-Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC Window:Wood Frame,2 Pane w/Low-E,Tinted, Fixed, Fixed --- --- --- --- --- --- Exemption:Glazing replacement in existing sash or frame. Door:Wood, Non-Swinging --- --- 0.350 --- 0.350 --- Air Leakage, Component Certification, and Vapor Retarder Requirements: 1. Continuous air barrier is provided throughout the building thermal envelope. 2. Air barrier joints and seams are sealed.The joints and seals are securely installed in or on the joint for its entire length. 3. Penetrations of the air barrier and paths of air leakage are caulked,gasketed or otherwise sealed in a manner compatible with the construction materials and location.Joints and seals are sealed in the same manner or taped or covered with a moisture vapor-permeable wrapping material.The joints and seals are securely installed in or on the joint for its entire length. 4. The air barrier is continuous for all assemblies that are the thermal envelope and across the joints and assemblies. 5. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283,tested to—2.0 cfm,and are sealed with gasket or caulk. 6. Completed building air leakage tested to<=0.40 cfm/ft2. 7. Air leakage of fenestration.Windows/non-glazed sliding and swinging doors/skylights with no weepage openings—0.20 cfm/ft2.Skylights with weepage—0.30 cfm/ft2.Curtain walls/storefront glazing<=0.06 cfm/ft2.Doors:glazed swinging entrance/revolving/rolling<=1.00 cfm/ft2. Doors:garage<=0.40 cfm/ft2. Exceptions: J Field-fabricated assemblies. Project Title: Solaris 5HW Report date: 10/09/13 Data filename: Page 1 of 3 8. Doors and access openings from conditioned space to shafts,chutes stairways and elevator lobbies are gasketed,weatherstripped or sealed. Exceptions: J Door openings required to comply with International Building Code as per Section C402.4.4. 9. Stairway and shaft vents are provided with Class I motorized dampers with a leakage rate—4 cfm/ft2. Dampers are installed with controls so that they are capable of automatically opening upon activation of any fire alarm or the interruption of power to the damper. 10.Outdoor air supply and exhaust openings are provided with Class IA motorized dampers having a leakage rate­4 cfm/ft2. Exceptions: Gravity(nonmotorized)dampers having a leakage rate­20 cfm/ft2 are permitted for exhaust and relief dampers for buildings less than three stories in height above grade,or where the design outdoor air intake or exhaust capacity­300 cfm. Dampers smaller than 24 inches in either dimension are permitted to have a leakage­40 cfm/ft2. 11.Cargo doors and loading dock doors are weather sealed. 12.Building entrance doors have a vestibule equipped with self-closing devices. Exceptions: Building entrances with revolving doors. Doors not intended to be used as a building entrance by the public,or intended solely for employee use. Doors that open directly from a space less than 3000 sq.ft.in area. Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. Doors opening directly from a sleeping/dwelling unit. Alteration projects that replace an existing door,provided,however,that existing vestibules(i.e., pre-alteration)are not removed. 13.Component R-values&U-factors labeled as certified. 14.No roof insulation is installed on a suspended ceiling with removable ceiling panels. 15.'Other'components have supporting documentation for proposed U-Factors. 16.Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated,and in a manner that achieves the rated R-value without compressing the insulation. Except when instructed otherwise,edge joints between overlapping layers of continuous insulation are staggered. 17.Radiant panels and associated components,designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5 Section 4: Compliance Statement Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application.The proposed envelope alteration project has been designed to meet the 2012 IECC requirements in COMcheck-Web and to comply with the mandatory requirements in the Requirements Checklist. Chandler Deimund - Project Manager C" M 10/9/2013 Name-Title Signature Date Project Title: Solaris 5HW Report date: 10/09/13 Data filename: Page 2 of 3 Generated by COMcheck-Web Software Interior Lighting Compliance Certificate 2012 IECC Section 1: Project Information Project Type:Alteration Project Title : Solaris 5HW Construction Site: Owner/Agent: Designer/Contractor: 141 East Meadow Drive Sharon Cohn Scott Nevin Vail,Colorado 81657 Solaris Davis Partnership Architects 0225 Main Street,Unit C101 Edwards,Colorado 81632 970-926-8960 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Hotel:Guest rooms: Exempt Total Allowed Watts= N/A Area Category Exemption Qualifications Total Wattage Total Pre-Alt. #Fixtures Activity Area Pre-Alt. Post-Alt. Fixtures Repl./Added Hotel:Guest rooms(3377 sq.ft.): Exemption:Less than 50%fixture 9513 9513 111 13 replacement. Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Hotel:Guest rooms(3377 sq.ft.): Exempt Total Proposed Watts= N/A Section 4: Requirements Checklist Interior Lighting PASSES Section 5: Compliance Statement Compliance Statement: The proposed lighting alteration project represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application.The proposed lighting alteration project has been designed to meet the 2012 IECC,Chapter 8, requirements in COMcheck-Web and to comply with the mandatory requirements in the Requirements Checklist. Chandler Deimund - Project Manager C" 0 10/9/2013 Name-Title Signature Date Project Title: Solaris 5HW Report date: 10/09/13 Data filename: Page 3 of 3