HomeMy WebLinkAboutB13-0344 Rev 1 Plans approvedBy David Rhoades at 3:27 pm, Oct 10, 2013B13-0344
Re
v
i
e
w
e
d
f
o
r
C
o
d
e
C
o
m
p
l
i
a
n
c
e
Co
d
e
:
2
0
0
9
I
n
t
e
r
n
a
t
i
o
n
a
l
B
u
i
l
d
i
n
g
C
o
d
e
(
I
B
C
)
By
M
Ha
e
b
e
r
l
e
at
2:
4
4
pm
,
Oct 15, 2013
Me
c
h
a
n
i
c
a
l
on
l
y
Ho
o
d
fo
r
pi
z
z
a
ov
e
n
on
l
y
equipment, etc. furnish by mechanical - refer to both electrical and
electrical apparatus as shown on single line diagram and
and mechanical drawing for scope and work and additinal infor-
Complete connection of HVAC/Plumbing motor(s), water heater(s),
Fire alarm system will be by electrical contractor.
Complete provision, installation and connection of lighting fixtures,
exit signs and lamps as specified and as shown on drawings.
Complete branch circuit wiring required for the connection of
emergency lighting and exit signs to existing emergency stand
Complete feeder(s) installation as required for new and/or
devices, new control devices, etc. for a complete lighting and
including new panelboards, new conduits, new wires, new wiring
Complete wiring system for new lighting and power as shown,
contract. Electrical work shall include, but not limited to, these major
as indicated on drawing and as specified, as necessary to complete the
SCOPE: Furnish all materials and labor required to execute this work
2.
3.
4.
6.
5.Provide grounding and bonding Facilities.
Complete all electrical demolition as required.
mation.
A.
ELECTRICAL SPECIFICATIONS
1.
drawings.
by power system.
and power system.
b.
a.
items:
A.Contractor shall submit shop drawings for engineer review and approval.
MC cable permitted per local codes. Run hard pipe from panel to local
Lighting fixtures.
Shop drawing submittal shall include:
Panelboard(s).
CONDUIT AND WIRE:
B.
13.
A.
B.
2.
1.
and contractor shall have written approvals from building owner prior
Core drilling and patching of existing building structure required for
Operating, Maintenance and identification instructions manuals, if
electrical work. Core drilling shall follow Building Standard procedures
Applicable codes: National Electric Code (2008)
PERMITS AND FEES: Obtain and pay for all necessary permits, inspec-
tions, examinations and fees or charges necessary for execution and
and to the requirements of Federal, State or other City agencies
Town of Vail Electrical Code, pertinent NFPA publications
Conform to the prevailing edition and amendments thereto of the
SHOP DRAWINGS AND SUBMITTAL:
to start of any work.
Test of entire system and work.
REGULATIONS AND CODES:
having jurisdiction.
completion of electrical work.
12.
11.
A.
7.
9.
8.
10.
any.
N. All cabling shall be bundled and properly secured and terminated.
warranty period shall begin at the point of system acceptance or beneficial
system during this warranty period at no additional cost to the owner. The
free of defects of workmanship or products and will inspect and repair the
from the date of project completion. The contractor warrants the system to be
O. The warranty set forth for this system shall consist of a full three (3) years
use, whichever comes later.
Coordinate numbering scheme with owner.
enclosed within cable trays, raceways or conduit, as specified.
engineer. Cabling shall be in the wall, above the ceiling or where exposed,
M. No exposed wiring will be accepted unless approved in writing by the
Care must be taken to ensure cables are not kinked, bent beyond limit,
including NEC, EIA/TIA 568,569 and 606, and federal, state and local codes.
familiar and install in accordance with all applicable codes and standards,
L. All cable hangers shall be no more than 48" apart. Contractor shall be
Cables are to be kept a minimum of 6" from power lines, electric motors,
K. Cable bends shall be no less than eight times the cable diameter or 1.00".
termination. No more than .5 inches of exposed untwisted pairs shall be
the extent in which each twisted pair is unraveled at the point of its physical
J. All connections of twisted wiring shall be made in such a way as to minimize
length of the run. Splices and bridge taps with cabling are strictly prohibited.
Cabling shall be free from tension at both ends, as well as through out the
I. All wiring shall be protected from moving mechanical or physical contacts.
cable runs exceeding 90 meters and provide solution to meet the 90 meter
H. Route cables so as not to exceed 90 meters in length. Bidder will identify any
the case of "hard" drywall ceilings, adequate support shall be accomplished
independent hangers. Cable "draped" across ceiling tiles is unacceptable. In
G. All cable above the ceiling must be tied and properly supported with
F. Provide plenum rated cable when required by article NEC 300-22.
overloaded, over-cinched, crushed, improperly untwisted, etc.
fluorescent fixtures or heat generating devices.
present at these locations.
Wiring is to be run in cable tray and conduit where specified.
requirement.
where reasonably possible.
patch panel location, and each wall/floor faceplate that has wiring installed.
E. All cables will be labeled with self-laminating labels at each cable end, at each
jacks, match faceplates to power, color coded for voice and data, match to
modular RJ-45, 8 pin, 8 conductor, Hubbell, Leviton, or lucent or equivalent
C. The terminations at the station locations must be Category 6, T568B (AT&T)
B. Data cable will be colored blue. Voice cable will be colored white.
manufacturers include: Berk-Tek, Belden, Lucent or equivalent.
500 Mhz or better category 6, 4 pair UTP as applicable. Acceptable
A. The cabling for voice and data must be continuous, home run, non-spliced,
D. Wall mounted patch panels will be provided.
cable. Outlets will be securely held in place.
B. Cat 6 Wiring Requirements
A. General Requirements
14.
decora style. Finish per owner or architect.
Convenience receptacles will be 20 amp, commercial grade
Light switches will be 20 amp, commercial grade,B.
ELECTRICAL DEVICES
A.
decora style. Finish per owner or architect.
Provide decora style, finish per owner or architect.
Dimming switches will be a minimum of 600w or as noted.C.
15.
Support all electrical equipment independent of accessible ceilings as
required by NEC.
SUPPORT
A.
All mounting heights will conform to ADA guidelines. Typical receptacleD.
heights will be +18"AFF and switch heights will be +46"AFF
unless noted otherwise.
16.
At fire rated wall space electrical boxes at opposite sides of the wall
no less than 24" horizontal distance.
ELECTRICAL BOXES
A.
When phone, TV & power receptacles are shown on plan next to each other.
Locate respective receptacles next to each other on site with no more
B.
than 1" seperating cover plates.
Provide GFI type receptacles at kitchens, bathrooms,
garages, exterior etc. as required by code.
E.
H/P HEAT/PHOTOELECTRIC SMOKE DETECTOR
ELECTRICAL LEGEND
(NOT ALL SYMBOLS REQUIRED FOR THIS PROJECT)
RECESSED OR SURFACE DOWNLIGHT
WALL MOUNTED LIGHT FIXTURE
RECESSED FLUOR. LIGHT FIXTURE
SURFACE FLUOR. LIGHT FIXTUREAa
Aa
FIXTURE DESIGNATIONS:
UPPER CASE - FIXTURE TYPE
LOWER CASE - SWITCH DESIGNATION
SHADING ON FIXTURE INDICATES EMERG. BATTERY BACKUP
FLUORESCENT STRIP FIXTURE
TRACK LIGHT AS NOTED OR SCHEDULED
WALL WASHER
POLE-MOUNTED FIXTURE
POST (BOLLARD) FIXTURE
CEILING OR WALL MOUNTED EXIT LIGHT
EMERGENCY BATTERY LIGHTS
DUPLEX RECEPTACLE @ 18" UNLESS NOTED
DOUBLE DUPLEX RECEPTACLE @ 18" UNLESS NOTED
SPECIAL OUTLET AS NOTED
FLUSH FLOOR DUPLEX RECEPTACLE
DUPLEX RECEPTACLE HALF-SWITCHED @ 18" UNLESS NOTED
TELE-POWER POLE
JUNCTION BOX IN FLOOR, CEILING OR IN WALL
MULTI-OUTLET PLUG STRIP
COMPUTER/TELEPHONE OUTLET IN FLOOR OR WALL
CONDUIT RUN CONCEALED IN WALL OR ABOVE CEILING
TELEPHONE BACKBOARD
CIRCUIT HOMERUN
CONDUIT RUN BELOW FLOOR OR GRADE
CONDUIT STUB-UP - CAP & MARK
LIGHT SWITCH AT 46" UNLESS NOTED
SUBSCRIPTS:
2 = 2-POLE SWITCH
3 = 3-WAY SWITCH
4 = 4-WAY SWITCH
K = KEY-OPERATED SWITCH
TO = THERMAL OVERLOAD SWITCH
P = SWITCH WITH PILOT LIGHT
DIMMER SWITCH W/ WATTAGE
MAGNETIC MOTOR STARTER
DISCONNECT SWITCH
TRANSFORMER
GROUND
PUSHBUTTON CONTROL STATION
PHOTOELECTRIC CELL
TIME SWITCH
THERMOSTAT AT 60" UNLESS NOTED
DIVISION 15 EQUIPMENT
CIRCUIT BREAKER
MOTOR OUTLET
AUTOMATIC TRANSFER SWITCH
FOOD SERVICE EQUIPMENT
PC
TS
T
ABBREVIATIONS
- ABOVE COUNTERAC
AFF - ABOVE FINISHED FLOOR
- ABOVE FINISHED GRADEAFG
- ALUMINUMAL
- EMERGENCYEM
- GROUNDGND
- GROUND FAULT INTERRUPTERGFI
NIC - NOT IN CONTRACT
NL - NIGHT LIGHT
NTS - NOT TO SCALE
UG - UNDERGROUND
WP - WEATHER PROOF
XFMR - TRANSFORMER
+18"- MOUNTING HEIGHT TO CENTERLINE
OF DEVICE AFF OR AFG
FIRE ALARM SYSTEM
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM PULL STATION
ALARM HORN OR SPEAKER
COMBINATION HORN/STROBE OR SPEAKER/STROBE
THERMAL HEAT DETECTORH
SMOKE/IONIZATION DETECTORI
PHOTOELECTRIC SMOKE DETECTORP
DUCT DETECTOR
SPRINKLER SYSTEM FLOW SWITCH
SPRINKLER SYSTEM TAMPER SWITCH
STROBE
SMOKE/FIRE DAMPER CONNECTION
REMOTE INDICATOR LIGHT
COMMUNICATION SYSTEM
SPEAKER IN CEILING OR WALL
VOLUME CONTROL AT 60" UNLESS NOTED
MICROPHONE OUTLET IN FLOOR BOX OR WALL
CALL-IN SWITCH
PROGRAM BELL
INTERCOM
CLOCK
AMPLIFIER
TELEVISION OUTLET
CONTACT DOOR SWITCH IN JAMB OR HINGE
SECURITY SYSTEM
KEY-OPERATED ACCESS SWITCH
SURVEILLANCE CAMERA
DISTRIBUTION EQUIPMENT SYMBOLS
DISCONNECT SWITCH
FUSES
CIRCUIT BREAKER
CURRENT TRANSFORMER
TRANSFORMER
METER
CU - COPPER
STEP LIGHT
FACP
M = MOTION-OPERATED SWITCH
POP-UP RECEPTACLE
- ELECTRICAL CONTRACTOREC
- AUTHORITY HAVING JURISDICTIONAHJ
- MECHANICAL CONTRACTORMC
- PLUMBING CONTRACTORPC
UTP - UNSHIELDED TWISTED PAIR
- GENERAL CONTRACTORGC
- REFERENCEREF
junction box, and run MC cable from junction box to device.
1. WALL ASSEMBLY - THE 1, 2, 3 OR 4 HR FIRE-RATED GYPSUM WALLBOARD/STUD WALL ASSEMBLY
SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER DESCRIBED IN THE INDIVIDUAL
U300 OR U400 SERIES WALL OR PARTITION DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY AND
SHALL INCLUDE THE FOLLOWING CONSTRUCTION FEATURES:
A. STUDS - WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS (MAX 2 HR FIRE RATED
ASSEMBLIES) OR STEEL CHANNEL STUDS. WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN. (51 BY 102
MM) LUMBER SPACED 16 IN. (406 MM) OC WITH NOM 2 BY 4 IN. (51 BY 102 MM) LUMBER END PLATES
AND CROSS BRACES. STEEL STUDS TO BE MIN 3-5/8 IN. (92 MM) WIDE BY 1-3/8 IN. (35 MM) DEEP
CHANNELS SPACED MAX 24 IN. (610 MM) OC.
B. GYPSUM BOARD* - NOM 1/2 OR 5/8 IN. (13 OR 16 MM) THICK, 4 FT. (122 CM) WIDE WITH SQUARE
OR TAPERED EDGES. THE GYPSUM WALLBOARD TYPE, THICKNESS, NUMBER OF LAYERS, FASTENER
TYPE AND SHEET ORIENTATION SHALL BE AS SPECIFIED IN THE INDIVIDUAL U300 OR U400 SERIES
DESIGN IN THE UL FIRE RESISTANCE DIRECTORY. MAX DIAM OF OPENING IS 26 IN. (660 MM).
2. THROUGH PENETRANT - ONE CONDUIT INSTALLED EITHER CONCENTRICALLY OR
ECCENTRICALLY WITHIN THE FIRESTOP SYSTEM. THE ANNULAR SPACE BETWEEN PIPE, CONDUIT OR
TUBING AND PERIPHERY OF OPENING SHALL BE MIN OF 0 IN. (0 MM) (POINT CONTACT) TO MAX 2 IN. (51
MM). PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY.
THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:
A. CONDUIT - NOM 6 IN. (152 MM) DIAM (OR SMALLER) STEEL CONDUIT OR NOM 4 IN. (102 MM) DIAM
(OR SMALLER) STEEL ELECTRICAL METALLIC TUBING
3. FILL,VOID OR CAVITY MATERIAL* - CAULK OR SEALANT - MIN 5/8. 1-1/4,1-7/8 AND 2-1/2 IN.
(16, 32, 48 AND 64 MM) THICKNESS OF CAULK FOR 1, 2, 3 AND 4 HR RATED ASSEMBLIES,
RESPECTIVELY, APPLIED WITHIN ANNULUS, FLUSH WITH BOTH SURFACES OF WALL. MIN 1/4 IN. (6 MM)
DIAM BEAD OF CAULK APPLIED TO GYPSUM BOARD/PENETRANT INTERFACE AT POINT CONTACT
LOCATION ON BOTH SIDES OF WALL.
THE HOURLY F RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE HOURLY FIRE RATING
OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED, AS SHOWN IN THE FOLLOWING TABLE.
THE HOURLY T RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE TYPE OR SIZE OF THE
PIPE OR CONDUIT AND THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED,
AS TABULATED TO THE LEFT.
3M COMPANY - CP 25WB+ CAULK OR FB-3000 WT SEALANT,
*BEARING THE UL CLASSIFICATION MARKING
PENETRATION THROUGH A FIRE-RATED WALL
T
18
"
(
1
'
6
"
)
46
"
(
3
'
1
0
"
)
48
"
(
4
'
-
0
"
)
80
"
(
6
'
8
"
)
TYPICAL DEVICE
MOUNTING HEIGHTS
MAIN CIRCUIT BREAKER &
BRANCH CIRCUIT BREAKERS
MAXIMUM MOUNTING HEIGHT
IS 79", MINIMUM IS 18".
THE ELECTRICAL CONTRACTOR WILL PROVIDE A WALK THROUGH WITH THE
OWNER/ARCHITECT PRIOR TO FINAL ROUGHIN AS FOLLOWS:
x CONFIRM ALL LOCATIONS FOR LIGHT SWITCHES; ADD THREE WAYS IF
FOUND NECESSARY.
x REVIEW RECEPTACLE LOCATIONS; MOVE AS REQUIRED. PROVIDE
UNIT PRICING IF ADDITIONAL RECEPTACLES ARE REQUIRED.
x REVIEW RECEPTACLE LOCATIONS AT COUNTERS AND CONFIRM IF
THOSE RECEPTACLES SHOULD BE ABOVE COUNTER OR BELOW. MOVE
AS REQUIRED.
IN GENERAL CONFIRM POWER AND LIGHTING REQUIREMENTS. THE
ELECTRICIAN SHOULD BE PREPARED TO REWORK SOME DEVICE LOCATIONS.
SIGNIFICANT REWORK SHOULD BE FLAGGED AND UNIT PRICING PROVIDED
AND WRITTEN AUTHORIZATION FOR ADDITIONAL COSTS APPROVED PRIOR
TO PROCEEDING.
+80"AFF
P
+80:AFF
TELEPHONE ONE-
LINE DIAGRAM
TELEPHONE/
COMPUTER ROUGHIN
CONDUCTOR SIZES AND TYPES: For sizes #1/0 AWG and larger, use
coppper THW or aluminum XHHW. For sizes #1 AWG and smaller, use only
copper wire with 600V insulation, types TW, THHN, or THW - stranded in
sizes #8 and larger, solid in sizes #10 and smaller. Control wiring shall be #14,
stranded. Use type THHN for wires entering or passing through fluorescent
lighting fixtures. All motors shall be wired with copper conductors only.
UNO - UNLESS NOTED OTHERWISE
2"C PVC WITH PULLWIRE
BURIED 20" BELOW GRADE
CATV
PEDESTAL
COAX RECEPTACLE IN SINGLE
GANG BOX @ 18" A.F.F. UNO
QUANTITIES PER FLOOR PLANS
(RG6 QUAD SHIELDED CABLE) 3/4"C
CONDUIT STUBBED TO ACCESSIBLE
CEILING, PLENUM RATED WIRE, WHEN
REQUIRED, RAN TO BACK BOARD
STRUCTURED CABLE
DISTRIBUTION PANEL
#6 CU G
METALLIC COLDWATER PIPE
ROUTE WIRE AT CEILING PARALLEL OR
PERPENDICULAR TO STRUCTURE. SECURE
TO STRUCTURE AT 4' INTERVALS OR LESS.
STUB UP TO ABOVE
ACCESSIBLE CEILNG
STRUCTURED CABLE
DISTRIBUTION PANEL
(2#CAT 6) 3/4"C
PLENUM RATED WIRE
WHEN REQUIRED
(1) RJ-11 & (1) RJ-45
IN SINGLE GANG
BOX AT 18" AFF UNO
COLD WATER PIPE
NOT TO SCALE
NOTES:
1.HEIGHTS SHOWN ARE TYPICAL TO CENTERLINE OF BOX
UNLESS NOTED OTHERWISE.
2.DEVICES ABOVE DOORS SHALL BE CENTERED BETWEEN TOP
OF DOOR TRIM AND CEILING LINE.
3.MOUNTING HEIGHTS SHOWN ON ARCHITECTURAL ELEVATIONS
AND NOTED ON ELECTRICAL FLOOR PLANS SHALL GOVERN
OVER THOSE SHOWN ABOVE.
4.FOR CEILING HEIGHTS HIGHER THAN 7'2", INSTALL FIRE ALARM
NOTIFICATION AUDIO AND VISUAL APPLIANCES AT 80"AFF
OTHERWISE INSTALL AT 6" BELOW CEILING.
5.MOUNTING HEIGHTS PER IBC 2009 AND ADA CODES
MAIN TELE/DATA
ROOM
(PULLWIRE)4"C
NOT TO SCALE
NO SCALE
NO SCALE
FINISHED FLOOR
TYPICAL 8'0" CEILING
Provide tamper proof receptacles at all residential
areas as required by code.
F.
.+'51*
'.'%64+%#.
.')'0&
52'%5
&'6#+.5
5%#.'010'
'
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
C
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
F
a
x
:
9
7
0
-
7
4
8
-
8
5
2
1
EG
Drawn By:Checked By:
DATE:ISSUE:
08-09-13 PROGRESS
AEC PROJECT #:
EX
P
A
N
S
I
O
N
29
1
B
R
I
D
G
E
S
T
R
E
E
T
VA
I
L
,
C
O
8
1
6
5
7
13062
$Q
2
I
I
L
F
H
Z
L
W
K
/
(
(
'
$
F
F
U
H
G
L
W
H
G
3
U
R
I
H
V
V
L
R
Q
D
O
V
08-19-13 PERMIT
09-09-13 REVISION #1
09-30-13 PERMIT REVISION #2
T
PP
PANEL
100/2
BAR
PANEL
VP1
PANEL
VP2
PANEL
EXISTING WIRE
UTILITY
TRANSFORMER EXISTING MAIN DISTRIBUTION
CENTER "MDC"
800A, 120/208V, 3P, 4W
42kAlC
NO SCALE
NOTE: PROVIDE SHORT CIRCUIT BRACING TO MEET REQUIREMENTS NOTED
AT ONE-LINE, NOTED AS "AIC AVAILABLE". SERIES RATED COMBINATION
ACCEPTABLE, SUBMIT MANUFACTURER'S SERIES RATINGS WITH SHOP
DRAWING REVIEW.
NO SCALE
NOTE: PROVIDE #3/0 CU CONDUCTORS TO ALL GROUNDING ELECTRODES.
N
G
INCOMING WATER SERVICE
PIPE
(3) 3/4"x10' DRIVEN
GROUND RODS IF
REQUIRED BY
LOCAL AHJ
BONDING JUMPER
(#3/0 CU G)3/4"C
#6 TO TELEPHONE/TV
CONCRETE- ENCASED
ELECTRODE
WATER METER
BUILDING STEEL
INCOMING GAS SERVICE PIPE
R1
PANEL
REWORK CIRCUIT
AND PANEL TO NEW
LOCATION.
OTHER EXISTING BLDG METER LOADS
100/2 400/3 100/2
CIRCUIT AND
PANEL
EXISTING TO
REMAIN
CIRCUIT AND
PANEL
EXISTING TO
REMAIN
CIRCUIT AND
PANEL
EXISTING TO
REMAIN
2
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
C
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
F
a
x
:
9
7
0
-
7
4
8
-
8
5
2
1
EG
Drawn By:Checked By:
DATE:ISSUE:
08-09-13 PROGRESS
AEC PROJECT #:
EX
P
A
N
S
I
O
N
29
1
B
R
I
D
G
E
S
T
R
E
E
T
VA
I
L
,
C
O
8
1
6
5
7
13062
$Q
2
I
I
L
F
H
Z
L
W
K
/
(
(
'
$
F
F
U
H
G
L
W
H
G
3
U
R
I
H
V
V
L
R
Q
D
O
V
08-19-13 PERMIT
09-09-13 REVISION #1
09-30-13 PERMIT REVISION #2
.+'51*
'.'%64+%#.
10'Ä.+0'
2#0'.
5%*'&7.'5
5%#.'010'
'
SHEET DETAIL NOTES:
LOCATION OF EXISTING PANEL PP IN EXISTING TOY SHOP. REWORK
AND MOVE TO NEW PANEL PP LOCATION IN MECHANICAL ROOM.
2' PLUG MOLD WITH 2 OUTLETS PER FOOT AND GFI PROTECTION.
NO CIRCUITS ADDED TO THIS PANEL. KEEP EXISTING CIRCUITS INTACT.
EF-1 LOCATED ON ROOF.
CIRCUIT EF-2 TO SWITCHED LIGHTING CIRCUIT IN BATHROOM
1
PANEL-PP
PANEL-BAR [E]
1
AC-GFI REFRIG-GFI
CEILING
CEILING
CEILING
TV RECPT
REFRIG-GFI
TV RECPT
TV RECPT
TV RECPT
2
2
2
PP-1
PP-5
PP-7
PP-4
PP-6
PP-12
PP-8
PP-11
PP-2
PP-9
PP-10
3
3
TO
KH
1
MAU
1
EF
1
PP-12
4
4
PP-15
PP-19
EF
2TO
5
5
PP-21
P
1
TO
PP-18
PP-20
2
GFI
2
2
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
C
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
F
a
x
:
9
7
0
-
7
4
8
-
8
5
2
1
EG
Drawn By:Checked By:
DATE:ISSUE:
08-09-13 PROGRESS
AEC PROJECT #:
EX
P
A
N
S
I
O
N
29
1
B
R
I
D
G
E
S
T
R
E
E
T
VA
I
L
,
C
O
8
1
6
5
7
13062
$Q
2
I
I
L
F
H
Z
L
W
K
/
(
(
'
$
F
F
U
H
G
L
W
H
G
3
U
R
I
H
V
V
L
R
Q
D
O
V
08-19-13 PERMIT
09-09-13 REVISION #1
09-30-13 PERMIT REVISION #2
.+'51*
(+456
(.114
219'4
2.#0
5%#.'Ä
'
NORTH
FIRST FLOOR POWER & SYSTEMS PLAN
SCALE: 1/4" = 1'0"
A A
A A
A A
A
A
A
A
A
A
A A A
A A
A A
A
A
B B B B B
B
B
AA
C D D D D C D D D D C D D D D
A A A
AAA
A
A
G
PP-14
SHEET DETAIL NOTES:
LOCATION OF EXISTING PANEL PP IN EXISTING TOY SHOP. REWORK
AND MOVE TO NEW PANEL PP LOCATION IN MECHANICAL ROOM.
2' PLUG MOLD WITH 2 OUTLETS PER FOOT AND GFI PROTECTION.
NO CIRCUITS ADDED TO THIS PANEL. KEEP EXISTING CIRCUITS INTACT.
EF-1 LOCATED ON ROOF.
1
2
3
4
GENERAL NOTES:
1.PROVIDE COMPATIBLE DIMMER FOR EACH LIGHT TYPE.
2.MATCH EXIT SIGNS AND EGRESS LIGHTS TO EXISTING.
PP-16
(E)
(E)
(E)
(E)
F F 2
2
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
C
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
F
a
x
:
9
7
0
-
7
4
8
-
8
5
2
1
EG
Drawn By:Checked By:
DATE:ISSUE:
08-09-13 PROGRESS
AEC PROJECT #:
EX
P
A
N
S
I
O
N
29
1
B
R
I
D
G
E
S
T
R
E
E
T
VA
I
L
,
C
O
8
1
6
5
7
13062
$Q
2
I
I
L
F
H
Z
L
W
K
/
(
(
'
$
F
F
U
H
G
L
W
H
G
3
U
R
I
H
V
V
L
R
Q
D
O
V
08-19-13 PERMIT
09-09-13 REVISION #1
09-30-13 PERMIT REVISION #2
.+'51*
(+456
(.114
.+)*6+0)
2.#0
5%#.'Ä
'
NORTH
FIRST FLOOR LIGHTING PLAN
SCALE: 1/4" = 1'0"
RADIANT FLOOR SUPPLY
RADIANT FLOOR RETURN
NOTE: ALL SYMBOLS SHOWN ON LEGEND
ARE NOT NECESSARILY USED.
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
MECHANICAL LEGEND
MEDIUM PRESSURE NATURAL GAS
SNOWMELT RETURN
SNOWMELT SUPPLY
GAS
HWS
T
A
B
HWR
CWS
CWR
SMS
SMR
RFS
RFR
G
MPG
PIPE RISER
PIPE DROP
PIPE TAKEOFF (FROM BOTTOM OF MAIN)
PIPE TAKEOFF (FROM TOP OF MAIN)
PIPE END CAP
PIPE CONTINUATION
PIPE EXPANSION GUIDE
PIPE UNION
PIPE ANCHOR
FLEXIBLE PIPE CONNECTION
PIPE EXPANSION JOINT
POINT OF NEW CONNECTION
AIR VENT
PLUG VALVE
CHECK VALVE
BALL VALVE
BALANCING VALVE
BUTTERFLY VALVE
PRESSURE REDUCING VALVE
STRAINER
PRESSURE - TEMP. TAP
PRESSURE GAUGE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
SUPPLY GRILLE
RETURN GRILLE
EXHAUST AIR
SUPPLY AIR
RETURN AIR
OUTDOOR AIR
SUPPLY AIR DAMPER
RETURN AIR DAMPER
SUPPLY DIFFUSER
OA
RA
SA
EA
RAD
SAD
SG
RG
SD
RETURN DIFFUSERRD
TRANSFER GRILLETG
TRANSFER DIFFUSERTD
THERMOSTAT
FIRE/SMOKE DAMPER
FIRE DAMPER
MOTOR OPERATED DAMPER (MOD)
MANUAL BALANCING DAMPER
7851,1*9$1(6,1(/%2:
??x??
DUCT SIZES ARE NET FREE AREA
1ST NO. IS DUCT WIDTH.
2ND NO. IS DUCT DEPTH.
SECTION THRU SUPPLY AIR DUCT
SECTION THRU RETURN/EXHAUST AIR DUCT
SUPPLY DUCT TURN DOWN
RETURN/EXHAUST DUCT TURN DOWN
CHANGE OF ELEVATION
FLEXIBLE DUCT CONNECTION
R/D (D) DROP (R) RISE
SENSOR (CALL OUT ON DRAWINGS)
SUPPLY REGISTER/DIFFUSER/LOUVERNECK SIZE
CFM-S
RETURN REGISTER/DIFFUSER/LOUVERNECK SIZE
CFM-R
OUTSIDE AIR REGISTER/DIFFUSER/LOUVERNECK SIZE
CFM-O.A.
EXHAUST REGISTER/DIFFUSER/LOUVERNECK SIZE
CFM-E
U DOOR UNDERCUT CFM
(A) SECTION CUT LINE
(B) SHEET SHOWN ON
S
SECTION THRU ROUND DUCT
ROUND DUCT TURN DOWN
4-WAY CONTROL VALVE
FLOW REGULATOR VALVE
DIFFERENTIAL BYPASS VALVE
NATURAL GAS PRESSURE REGULATOR
THERMOMETER
AUTHORITY HAVING JURISDICTION
ELECTRICAL CONTRACTOR
MECHANICAL CONTRACTOR
PLUMBING CONTRACTORP.C.
M.C.
E.C.
A.H.J.
MECHANICAL SPECIFICATIONS:
1.GENERAL:
a.FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES NECESSARY TO FURNISH, FABRICATE,
DELIVER, STORE AND INSTALL ALL WORK NOTED ON THE DRAWINGS AND/OR SPECIFIED HEREIN.
b.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE A COMPLETE SYSTEM WHETHER
OR NOT SUCH DETAILS ARE MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS, BUT WHICH ARE
OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT ARE
SPECIFICALLY MENTIONED HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING DRAWINGS AS BEING INSTALLED
UNDER ANOTHER SECTION OF THE SPECIFICATIONS.
2.WORKMANSHIP:
a.THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKE MANNER SATISFACTORY TO AND
MEETING THE APPROVAL OF THE OWNER AND ARCHITECT.
3.MATERIALS:
a.ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE KIND, FREE FROM ALL
DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED.
4.SITE INSPECTION:
a.CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS BID AND THOROUGHLY FAMILIARIZE
HIMSELF WITH THE WORKING CONDITIONS & EXACT NATURE OF THE WORK.
b.SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A COMPLETE AND FUNCTIONAL
SYSTEM.
c.NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS FOR ANY OMISSION WHICH
RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION.
5.CODES AND PERMITS:
a.ALL MECHANICAL EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE 2012 INTERNATIONAL MECHANICAL
CODE (IMC), 2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) AND ORDINANCES AS INTERPRETED BY
THE TOWN OF VAIL BUILDING DEPARTMENT.
b.CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS.
c.COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE ARCHITECT.
6.AS-BUILTS:
a.CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS WITH ALL CHANGES NOTED THEREON
AT THE COMPLETION OF THE PROJECT AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT.
7.GUARANTEE:
a.CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIALS ON ALL WORK AGAINST DEFECTS
IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION.
8.SUBMITTALS:
a.CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES SHALL BE SUBMITTED TO THE ARCHITECT
FOR REVIEW (SIX COPIES OF EACH).
9.COORDINATION:
a.THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE.
b.THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE BEST ARRANGEMENT OF ALL
DUCTS, PIPES, CONDUIT, ETC.
10.CUTTING AND PATCHING:
a.ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING) SHALL BE PROVIDED UNDER
OTHER SECTIONS OF THE WORK.
b.PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT.
c.X-RAY SLABS PRIOR TO CORING.
11.CLEANUP:
a.UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR SHALL REMOVE ALL SURPLUS
MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND ORDERLY.
12.MECHANICAL IDENTIFICATION
a.EQUIPMENT NAMEPLATES: METAL, WITH DATA ENGRAVED OR STAMPED, FOR PERMANENT ATTACHMENT ON
EQUIPMENT.
b.PIPE MARKERS: PREPRINTED, COLOR CODED, WITH LETTERING INDICATING SERVICE, AND SHOWING DIRECTION OF
FLOW.
c.VALVE TAGS: STAMPED OR ENGRAVED WITH 1/4" LETTERS FOR PIPING SYSTEM ABBREVIATION AND 1/2" NUMBERS,
WITH NUMBERING SCHEME. PROVIDE 5/32" HOLE FOR FASTENER.
d.VALVE TAG SCHEDULE: PREPARE A VALVE TAG SCHEDULE TO BE SUBMITTED TO THE MAINTENANCE ENGINEER
FOR RECORD.
13.DUCTWORK:
a.DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH THE 2012 IMC AND SMACNA STANDARDS.
b.DUCTWORK SHALL BE GALVANIZED STEEL GAUGES TO MEET SMACNA STANDARDS. DUCTWORK SIZES INDICATED
ARE FREE CLEAR DIMENSIONS.
c.ALL DUCT JOINTS SHALL BE SEALED AIR TIGHT WITH RCD CORP. # 6 MASTIC ADHESIVE WITH VERSA GRIP OR MESH.
d.FLEXIBLE DUCT USED FOR CONDITIONED AIR SHALL BE UL APPROVED, VINYL COATED, WIRE REINFORCED
FIBERGLASS, WITH MAXIMUM THERMAL CONDUCTIVITY OF 0.30 BTU-IN/HR-FT2-F AND A MAXIMUM LENGTH OF FIVE
FEET.
e.DUCTWORK SHALL BE SIZED AT A MAXIMUM VELOCITY OF 1,000 FPM/.08" PRESSURE DROP PER 100 FEET.
f.EACH MECHANICAL VENTILATION SYSTEM (SUPPLY AND/OR EXHAUST) SHALL BE EQUIPPED WITH A MEANS OF
SHUT-OFF WHEN VENTILATION IS NOT REQUIRED, AND BACKDRAFT DAMPERS WHICH CAN BE CLOSED ON FAN
SHUTDOWN SHALL BE PROVIDED FOR AIR INTAKES AND/OR DISCHARGES.
g.CLEAN OUT ALL DUCTS PRIOR TO SUPPLY AND RETURN GRILLE INSTALLATION
h.'28%/(7+,&.1(667851,1*9$1(66+$//%(86('21$//'8&7785162)
14.TYPE I GREASE DUCTWORK.
a.TYPE I GREASE EXHAUST DUCTWORK SHALL BE CONSTRUCTED FROM 16 GAUGE WELDED BLACK IRON.
b.PROVIDE GREASE CLEAN OUT ACCESS PANELS EVERY 20' AND IN EVERY CHANGE OF DIRECTION.
15.HEATING PIPING:
a.+($7,1*+27:$7(53,3,1*ò´,1&+(6$1'%(/2:6+$//%(7<3(/&233(5+$5''5$:1:,7+:528*+7
COPPER SWEAT FITTINGS. JOINTS SHALL BE SOLDERED WITH 95-5 OR SILVER SOLDER. CONDENSER WATER AND
HEATING HOT WATER PIPING 3" AND ABOVE SHALL BE SCHEDULE 40 BLACK STEEL A-53 SEAMLESS PIPE WITH
WELDED FITTINGS.
b.VALVES SHALL BE CRANE, WALWORTH, NIBCO, STOCKHAM OR EQUAL; SERVICE PRESSURE SHALL BE AS REQUIRED.
VALVES SHALL BE SUITABLE FOR SERVICE INTENDED.
c.PROVIDE HANGERS, SUPPORTS AND INSULATION SADDLES AS REQUIRED AND PER ANSI REQUIREMENTS.
PLUMBERS TAPE AND WIRE ARE NOT ACCEPTABLE.
d.PIPING SHALL BE SIZED AT A MAXIMUM PRESSURE DROP OF 3.5 FT PER 100 FEET & 4 FEET/SEC VELOCITY.
e.CONTROL VALVE CV RATINGS SHALL BE SELECTED AT A MAXIMUM PRESSURE DIFFERENTIAL ACROSS THE VALVE
OF 2 PSI.
f.3529,'(´',$;/6&+('8/(39&,1/,1(),/7(5),//(':,7+/,0(6721($**5(*$7(721(875$/,=(7+(
BOILER'S CONDENSATE DRAIN.
16.DUCTWORK INSULATION:
a.ALL DUCTWORK SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS PER SECTION 604 OF THE 2012 IMC.
b.INSULATION SHALL BE UL LISTED IN COMPLIANCE WITH A FLAME-SPREAD INDEX NOT MORE THAN 25 AND SMOKE
DEVELOPED INDEX NOT MORE THAN 50, PER THE 2012 IMC. INSTALLATION SHALL BE IN ACCORDANCE WITH IMC
REQUIREMENTS.
c.RECTANGULAR SUPPLY, RETURN & TRANSFER DUCTWORK SHALL BE INTERNALLY LINED WITH A VAPOR RESISTANT
DUCT LINER OF THICKNESSES SPECIFIED BELOW.
d.CONCEALED ROUND, CONCEALED OVAL & OUTDOOR AIR DUCTS SHALL BE EXTERNALLY WRAPPED WITH
FIBERGLASS INSULATION WITH AN EXTERNAL VAPOR BARRIER. REQUIRED R-VALUES ARE SPECIFIED BELOW.
e.ALL SUPPLY, RETURN & TRANSFER DUCTWORK LOCATED WITHIN THE BUILDING ENVELOPE SHALL BE INSULATED
72$0,1,0802)5´/,1(581/(6663(&,),('27+(5:,6(217+(3/$16
f.$//6833/< 5(7851'8&7:25.6+$//%(,168/$7('72$0,1,0802)5´/,1(5:+(1/2&$7(',1
81&21',7,21('63$&(6$1'6+$//%(,168/$7('72$0,1,0802)5´/,1(5$1':($7+(53522)('
WHEN LOCATED OUTSIDE THE BUILDING
g.ALL OUTDOOR AIR DUCTS SHALL BE INSULATED TO A MINIMUM OF R-6 WITH A VAPOR BARRIER.
17.PIPING INSULATION:
a.ALL HYDRONIC PIPING SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS PER SECTION 1204 OF THE
2012 IMC.
b.INSULATION SHALL BE UL LISTED IN COMPLIANCE WITH A FLAME-SPREAD INDEX NOT MORE THAN 25 AND SMOKE
DEVELOPED INDEX NOT MORE THAN 450, PER THE 2012 IMC. INSTALLATION SHALL BE IN ACCORDANCE WITH IMC
REQUIREMENTS.
c.ALL HYDRONIC PIPING INSULATION SHALL HAVE A THERMAL CONDUCTIVITY LESS THAN OR EQUAL TO 0.27
BTU-IN/HR-FT2-F
d.$//+($7,1*:$7(53,3,1*´2560$//(56+$//%(,168/$7(':,7+´7+,&.1(66+($7,1*:$7(5
3,3,1*/$5*(57+$1´6+$//%(,168/$7(':,7+´7+,&.1(66
e.$//&+,//(':$7(53,3,1*6+$//%(,168/$7(':,7+´7+,&.1(66:,7+$1$33529('9$325%$55,(5
f.ALL PIPING ROUTED BELOW THE SLAB UNDERGROUND SHALL BE TYPE "K" COPPER AND SHALL BE INSULATED WITH
ARMIFLEX TYPE INSULATION.
18.TEMPERATURE CONTROL DEVICES:
a.THE HVAC SYSTEM SHALL BE PROVIDED WITH 7-DAY PROGRAMMABLE AUTOMATIC SPACE TEMPERATURE CONTROL
DEVICES (THERMOSTATS) AS SHOWN ON THE PLANS. THE THERMOSTATS SHALL BE CAPABLE OF SCHEDULING
2&&83$1&,(6$1'3529,',1*6(7%$&.&$3$%,/,7,(6720$,17$,1=21(6(732,176'2:172)258372
)
b.CONTROLS SHALL BE CAPABLE OF OPERATING THE SYSTEM HEATING AND COOLING IN SEQUENCE AND SHALL BE
$'-867('723529,'($'($'%$1'2)$7/($67)%(7:((1+($7,1*$1'&22/,1*
c.7+(50267$766+$//+$9(180(5,&6(732,176,1)$'-867$%/(6(732,1767236$1'6+$//%(02817('
AT 48" ABOVE FINISHED FLOOR ADJACENT TO THE ROOM'S LIGHT SWITCH.
19.GAS APPLIANCE VENTING:
a.ACCEPTABLE VENT MATERIALS, ROUTING, DISTANCE AND TERMINATION LOCATIONS SHALL COMPLY WITH
MANUFACTURER'S INSTALLATION INSTRUCTIONS AND ALL REQUIREMENTS IN CHAPTER 8 OF THE 2012 IMC. PVC
PIPING IS NOT ACCEPTED FOR BOILER OR WATER HEATER VENTING.
20.BEFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS SECTION OF THE WORK SHALL EXAMINE A COMPLETE
SET OF DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL, STRUCTURAL, HVAC, ELECTRICAL, FIRE
PROTECTION AND PLUMBING. DIMENSIONS, SPACE REQUIREMENTS AND POINTS OF CONNECTION TO ALL
EQUIPMENT SHALL BE VERIFIED, AND ANY MINOR ADJUSTMENTS NECESSARY TO AVOID CONFLICT WITH THE
BUILDING STRUCTURE AND THE WORK OF THE OTHER TRADES SHALL BE MADE. CONTRACTOR SHALL NOTIFY
ARCHITECT IMMEDIATELY IF ANY MAJOR CONFLICTS OCCUR.
21.COORDINATE LOCATIONS OF ALL ROOF AND EXTERIOR WALL OPENINGS WITH ALL RELEVANT TRADES, AND PROVIDE
WATERTIGHT FLASHINGS WHEREVER PENETRATIONS OCCUR. EXACT LOCATIONS AND SIZES MAY BE DEPENDENT
UPON EQUIPMENT SELECTIONS; COORDINATE SIZES AND LOCATIONS OF ALL OPENINGS WITH APPROPRIATE
EQUIPMENT REQUIREMENTS.
22.PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 30" CLEAR WORKING SPACE IN
FRONT OF ACCESS PANELS TO THE COMPRESSOR, BLOWER ASSEMBLY AND AIR FILTER SECTION OF THE
EQUIPMENT SHALL BE PROVIDED BY GENERAL CONTRACTOR.
23.ALL EQUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE WITH CODE APPROVED VIBRATION
ISOLATORS.
24.EACH PIECE OF EQUIPMENT AND ALL SYSTEMS SHALL BE ADJUSTED AND RE-ADJUSTED TO INSURE PROPER
FUNCTION OF ALL CONTROLS, MAINTENANCE OF TEMPERATURE, ADEQUACY OF FLOWS AND CAPACITIES,
ELIMINATION OF NOISE AND VIBRATION, AND SHALL BE LEFT IN PROPER OPERATING CONDITION.
25.TEST & BALANCING:
a.THE ENTIRE HEATING AND VENTILATING SYSTEM SHALL BE BALANCED BY AN INDEPENDENT CERTIFIED TEST AND
BALANCE COMPANY.
b.5 COPIES OF THEIR BALANCE REPORTS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL.
c.ALL REQUIRED RE-SHEEVING AND ADJUSTING OF EQUIPMENT SHALL BE MADE BY THE TEST & BALANCE
CONTRACTOR.
d.ALL FINAL MEASURED CAPACITIES SHALL BE WITHIN 10% OF THOSE INDICATED ON THE PLANS.
26.FINAL LOCATION OF GRILLES, REGISTERS & DIFFUSERS SHALL BE PER THE ARCHITECTURAL PLANS, ELEVATIONS OR
AS PER FIELD REQUIREMENTS.
27.THE GENERAL CONTRACTOR SHALL FURNISH & INSTALL ALL OF THE REQUIRED ACCESS PANELS IN THE DRYWALL
CEILINGS TO GAIN SERVICE ACCESS TO THE EQUIPMENT. EQUIPMENT WITH MANUFACTURER MANDATED SERVICE
REQUIREMENTS INSTALLED WITHIN CRAWLSPACES MUST BE A MAXIMUM OF 20 FEET FROM AN ACCESS PANEL.
28.ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTALLATION, OPERATION &
MAINTENANCE MANUAL'S RECOMMENDATIONS ESPECIALLY FOR SERVICE CLEARANCES.
29.FILTERS:
a.SHALL BE UL RATED AND APPROVED.
b.PRESSURE DROPS SHALL NOT EXCEED .10" STATIC PRESSURE.
30.ELECTRICAL CONNECTIONS:
a.UNLESS OTHERWISE INDICATED ALL MAGNETIC MOTOR STARTERS, THERMAL OVERLOADS, LOW VOLTAGE
THERMOSTATS, CONTROL RELAYS, CONTROL TRANSFORMERS AND SOLENOID VALVES SHALL BY FURNISHED BY
THE MECHANICAL CONTRACTOR.
b.PROVIDE MOTORS AND EQUIPMENT FOR ONLY THOSE CURRENT CHARACTERISTICS INDICATED ON THE DRAWINGS.
c.IT IS THE INTENT OF THIS DIVISION TO REQUIRE A COMPLETE SYSTEM PER THE CONTRACT DOCUMENTS.
d.COORDINATE ALL EQUIPMENT REQUIRING ELECTRICAL POWER, REGARDLESS OF VOLTAGE, WITH OTHER TRADES,
SO THAT ALL SYSTEMS ARE COMPLETE AND OPERATIONAL.
e.ALL THREE PHASE MOTORS SHALL BE PROVIDED WITH PHASE LOSS PROTECTION.
f.ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS PROVIDED BY MECHANICAL CONTRACTOR
AND WIRED BY THE ELECTRICAL CONTRACTOR.
31.TEMPORARY HEATING DURING CONSTRUCTION:
a.MECHANICAL EQUIPMENT SHALL NOT BE UTILIZED FOR TEMPORARY HEATING.
b.GAS FIRED TEMPORARY HEAT SHALL BE PROVIDED BY THE GENERAL CONTRACTOR.
SEQUENCE OF OPERATION:
KH-1 & (E) EF-1:THE CONTROL SYSTEM OF KH-1 SHALL BE INTERLOCKED WITH (E) EF-1, AND MAU-1. WHEN THE ON/OFF SWITCH ON KH-1 CONTROL IS TURNED ON,
(E) EF-1 & MAU-1 SHALL BE ENERGIZED AND OPERATE. WHEN THE KH-1 SWITCH IS TURNED OFF, THE SYSTEM SHALL BE DE-ENERGIZED. WHEN
THE FACTORY BUILT DUCT SENSOR SENSES HEAT UNDER THE KH-1, THE KH-1 CONTROL OVERRIDES THE OFF SWITCH AND TURNS THE (E) EF-1 &
MAU-1 ON.
MAU-1:THIS UNIT SHALL BE INTERLOCKED WITH KH-1 CONTROL, EF-1 AND UH-1. WHENEVER THE KH-1 IS OPERATING MAU-1 SHALL BE ENERGIZED AND
PROVIDE MAKE-UP AIR. THIS UNIT SHALL BE EQUIPPED WITH AN ON/OFF SWITCH OR NAN DOOR SENSOR (VERIFY WITH THE OWNER). WHENEVER
THE NANA DOOR IS OPEN, THE MAU-1 CAN BE MANUALLY TURNED OFF.
IF MANUAL ON OFF SWITCH IS PROVIDED, INTERLOCK KH-1 DUCT SENSOR WITH MAU-1, PROVIDE OCCUPIED/UNOCCUPIED TIMER ON MAU-1, AND
VISUAL ALARM LIGHT ON KH-1.
DURING UNOCCUPIED PERIODS THE KH-1 DUCT SENSOR OVERRIDES MAU-1 ON/OFF SWITCH AND ENABLES MAU-1.
DURING OCCUPIED PERIODS KH-1 SENSOR OVERRIDE SHALL BE DISABLED. IF MAU-1 IS IN "OFF" POSITION THE VISUAL ALARM ON KH-1 SHALL
TURN ON TO REMIND THE STAFF TO EITHER OPEN THE NANA DOOR OR TURN MAU-1 ON.
IF NANA DOOR SENSOR IS INSTALLED, WHENEVER THE SENSOR SENSES THE DOOR BEING OPEN, THE MAU-1 SHALL BE DISABLED.
UH-1:THIS UNIT SHALL BE INTERLOCKED WITH MAU-1 AND DUCT MOUNTED DISCHARGE SENSOR. WHENEVER MAU-1 IS UNDER OPERATION, UH-1 &
CIRCULATING PUMP P-16+$//%((1$%/(':+(17+('8&702817('',6&+$5*(6(16256(16(67+(7(03(5$785('523%(/2:)
THE UH-16+$//%((1(5*,=('$1'0$,17$,10,1)$,57(03(5$785((17(5,1*MAU-1.
EF-2:THIS UNIT SHALL BE INTERLOCKED WITH WALL MOUNTED ON/OFF SWITCH.
2
2
2
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
C
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
F
a
x
:
9
7
0
-
7
4
8
-
8
5
2
1
EG
Drawn By:Checked By:
DATE:ISSUE:
08-09-13 PROGRESS
AEC PROJECT #:
EX
P
A
N
S
I
O
N
29
1
B
R
I
D
G
E
S
T
R
E
E
T
VA
I
L
,
C
O
8
1
6
5
7
13062
$Q
2
I
I
L
F
H
Z
L
W
K
/
(
(
'
$
F
F
U
H
G
L
W
H
G
3
U
R
I
H
V
V
L
R
Q
D
O
V
08-19-13 PERMIT
09-09-13 REVISION #1
09-30-13 PERMIT REVISION #2
/<61%
/'%*#0+%#.
52'%5.')'0&
5%*'&7.'5
/
COIL
RETURN
SUPPLY
2-WAY MODULATING CONTROL
VALVE, NORMALLY CLOSED
OR OPEN AS REQUIRED TO
PREVENT FLOW THRU COIL
WHEN DE-ENERGIZED
GRISWOLD "ULTRA 2"
COMBINATION BALL SHUT-OFF
AND FLOW CONTROL VALVE
2-WAY COIL PIPING DIAGRAM
NO SCALE
PUMPIN-LINE
PROVIDE VIBRATION ISOLATING
TYPE PUMP SUPPORTING HANGERS
AT INLET AND DISCHARGE OF
THE PUMP. DO NOT SUPPORT
THE PUMP FROM ITS MOTOR.
CHECK VALVE
OMIT ON SINGLE
PUMP INSTALLATIONS
METAL BRAIDED
FLEXIBLE CONNECTOR
PRESSURE GAUGE
W/ GAUGE COCKS
& SNUBBER
COMBINATION ISOLATION
VALVE & CIRCUIT SETTER
SHUTOFF VALVE BALL VALVE UP TO 2"
BUTTERFLY VALVE 2 12" AND LARGER
STRAINER W/ BLOW
DOWN VALVE
UNION OR FLANGE
CONNECTION IN-LINE PUMP DIAGRAM
NO SCALE
1/4 O
F
"
W
"
O
R
AIR F
L
O
W
RETU
R
N
/
E
X
H
A
U
S
T
6" MI
N
I
M
U
M
.
SUPP
L
Y
AIR F
L
O
W
WSEAL AIRTIGHT
AROUND ENTIRE
TAKE-OFF.
'8&77$.(2))
NO SCALE:
1/4 O
F
"
W
"
O
R
AIR F
L
O
W
RETU
R
N
/
E
X
H
A
U
S
T
6" MI
N
I
M
U
M
.
SUPP
L
Y
AIR F
L
O
W
WSEAL AIRTIGHT
AROUND ENTIRE
TAKE-OFF.
'8&77$.(2))
NO SCALE:
RADIUS ELBOW DETAIL
NO SCALE
RADIUS ELBOW DETAIL
NO SCALE
DRAIN 3/4" PERIMETER GUTTER
12
"
EXHAUST RISER
HANGING ANGLE
INCANDESCENT LIGHT FIXTURE-HIGH TEMP
ASSEMBLY, INCLUDES CLEAR THERMAL AND
SHOCK RESISTANT GLOBE (L55 FIXTURE)
BACKSPLASH 104.00" HIGH
X 90.00" LONG
FIELD WRAPPER 18.00" HIGH
(SEE HOOD OPTIONS TABLE)
EQUIPMENT
BY OTHERS
80
"
A
F
F
T
Y
P
.
24
"
N
O
M
.
72"
IT IS THE RESPONSIBILITY
OF THE ARCHITECT/OWNER TO
ENSURE THAT THE HOOD CLEARANCE
FROM LIMITED-COMBUSTIBLE
AND COMBUSTIBLE MATERIALS
IS IN COMPLIANCE WITH
LOCAL CODE REQUIREMENTS.
TYPE II HOOD DETAIL
NO SCALE
2
2
2
2
2
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
C
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
F
a
x
:
9
7
0
-
7
4
8
-
8
5
2
1
EG
Drawn By:Checked By:
DATE:ISSUE:
08-09-13 PROGRESS
AEC PROJECT #:
EX
P
A
N
S
I
O
N
29
1
B
R
I
D
G
E
S
T
R
E
E
T
VA
I
L
,
C
O
8
1
6
5
7
13062
$Q
2
I
I
L
F
H
Z
L
W
K
/
(
(
'
$
F
F
U
H
G
L
W
H
G
3
U
R
I
H
V
V
L
R
Q
D
O
V
08-19-13 PERMIT
09-09-13 REVISION #1
09-30-13 PERMIT REVISION #2
/<61%
/'%*#0+%#.
&'6#+.5
/
GENERAL NOTES:
1.ALL DUCTWORK DIMENSIONS ARE SHOWN INSIDE TO INSIDE.
2.ALL INTERIOR SUPPLY AND RETURN DUCTWORK SHALL INCLUDE 1" LINER
UNLESS OTHERWISE NOTED. ALL OUTSIDE AIR INTAKE AND ROUND
DUCTWORK SHALL BE WRAPPED WITH 1.5" THICK INSULATION UNLESS
OTHERWISE NOTED.
3.ALL ROUND DUCT CONNECTIONS TO ROUND DUCTWORK SHALL BE
CONICAL TEES.
4.ALL SQUARE 90 DEGREE ELBOWS SHALL HAVE TURNING VANES.
5.ALL DUCTWORK SHALL BE RUN TIGHT TO UNDERSIDE OF STRUCTURE
WHERE IT EXISTS UNLESS OTHERWISE NOTED.
6.ALL DUCTWORK PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL
INCLUDE FIRE DAMPERS RATED TO MATCH THAT OF THE ASSEMBLY.
7.COORDINATE ALL ACCESS PANEL LOCATIONS WITH THE ARCHITECT.
SHEET DETAIL NOTES:
EXISTING HYDRONIC BASEBOARD TO REMOVE.
EXISTING 12x4 FLOOR DIFFUSER IN THIS LOCATION TO REMOVE. CAP
THE EXISTING DUCTWORK IN THE CRAWL BELOW.
EXISTING DIFFUSERS TO REMAIN. THE DIFFUSERS IN THIS LOCATION
WILL BE REWORKED BY A FUTURE TENANT.
EXISTING TYPE II. DUCTWORK TO REMAIN. CLEAN CONNECTION POINT
PRIOR TO ATTACHING NEW EXTENSION TO IT.
MAINTAIN INDICATED FLUE ROUTING AND NUMBER OF ELBOWS,
ROUTE THRU THE SHAFT AND UP ABOVE THE ROOF. IF THE ROUTING
AND NUMBER OF ELBOWS CHANGES DUE TO FIELD CONDITIONS,
CONTACT MECHANICAL ENGINEER PRIOR TO CONTINUING THE WORK
TO VERIFY DRAFT PRESSURE.
VERTICAL RUN = 46'
HORIZONTAL RUN =12'
(/%2:=3
(/%2: 1
EXISTING EF-1 TO REMAIN.
DELETED
5287(9(17 &20%867,21$,583$1'$%29(7+(522)
TERMINATE 24" ABOVE THE ROOF. G.C. TO PROVIDE DUCT ENCLOSURE
ON THE FACADE.
EXISTING TYPE II. DUCTWORK TO REMAIN.
CONNECT NEW 4" EF-2 EXHAUST TO THE EXISTING RESTROOM
EXHAUST LINE (SERVING THE ORIGINAL REMOVED EMPLOYEE
RESTROOM) IN THIS AREA. VERIFY SIZE AND AIR FLOW DIRECTION IN
FIELD PRIOR TO CONNECTING TO IT.
ROUTE 3/4" HWS & HWR TO THE MECHANICAL ROOM AND CONNECT TO
MAIN BOILER LOOP.
EXISTING FAN COIL EITHER TO REMAIN AND BE REUSED FOR
AUXILIARY HEATING OR ABANDONED AND REPLACED WITH (2)
ELECTRIC CEILING MOUNTED HEATERS.
EXISTING RETURN DIFFUSER TO REMAIN IF THE (E) FAN COIL IS
REUSED, OTHERWISE REMOVE THE GRILLE AND ABANDON.
COMBINE (2) EXISTING DIFFUSERS INTO ONE (MATCH SIZE OF THE
RETURN) TO ALLOW REMOVING THE SOFFIT IN THIS AREA. RELOCATE
AS REQUIRED.
PROPOSED LOCATION OF THE ELECTRIC CEILING HEATERS (I.E.
RAYWALL E3035DWBW) IF THE FAN COIL IS ABANDONED.
INSTALL TYPE II HOOD FOR DECK PIZZA OVEN AS PER IMC 2012
SECTION 507.2.1 COMMENTARY EXCEPTION TO DECK PIZZA OVENS.
1
20x10
20x10 [22x12] DN
KH
1
MAU
1
(
A 1050-S
26x14
1
2
N.I.C.
3
3
3
4
5
6
7
8
9
EF
2
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
UH
1
10
10
((;+$867
P
1
11
11
20x10 [22x12] UP
1
20x10 [22x12] UP HIGH IN THE CEILING
EXISTING PLUMBING
TO REMAIN
20
x
1
0
EXISTING PLUMBING
TO REMAIN
8
9
(
(E) EF-1
4
5
6
12
12
13
13
14
1414
15
15 15
16
162
2
2
2
2
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
C
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
F
a
x
:
9
7
0
-
7
4
8
-
8
5
2
1
EG
Drawn By:Checked By:
DATE:ISSUE:
08-09-13 PROGRESS
AEC PROJECT #:
EX
P
A
N
S
I
O
N
29
1
B
R
I
D
G
E
S
T
R
E
E
T
VA
I
L
,
C
O
8
1
6
5
7
13062
$Q
2
I
I
L
F
H
Z
L
W
K
/
(
(
'
$
F
F
U
H
G
L
W
H
G
3
U
R
I
H
V
V
L
R
Q
D
O
V
08-19-13 PERMIT
09-09-13 REVISION #1
09-30-13 PERMIT REVISION #2
/<61%
/#+0.'8'.
*8#%
2.#0
5%#.'Ä
/
NORTH
MAIN LEVEL HVAC PLAN
SCALE: 1/4" = 1'0"
Reviewed for Code Compliance
Code: 2009 International Building Code (IBC)
By M Haeberle at 2:43 pm, Oct 15, 2013
OR EQUIVALENT V / PH / HzHP\W
P-
1
GR
U
D
F
O
S
UP
S
1
5
-
5
5
S
F
C
UH
-
1
M
E
C
H
A
N
I
C
A
L
R
O
O
M
I
N
L
I
N
E
3
.
2
5
.
0
1
1
5
/
1
/
6
0
8
7
W
TOTAL HEAD (FT)ELECTRICAL DATA
UN
I
T
TA
G
MA
N
U
F
A
C
T
U
R
E
R
&
MO
D
E
L
N
O
.
REMARKS
SE
R
V
I
C
E
L
O
C
A
T
I
O
N
T
Y
P
E
G
P
M
PU
M
P
S
C
H
E
D
U
L
E
Re
v
i
e
w
e
d
f
o
r
C
o
d
e
C
o
m
p
l
i
a
n
c
e
Co
d
e
:
2
0
0
9
I
n
t
e
r
n
a
t
i
o
n
a
l
B
u
i
l
d
i
n
g
C
o
d
e
(
I
B
C
)
By
M
Ha
e
b
e
r
l
e
at
2:
4
4
pm
,
Oc
t
15
,
20
1
3
GREASE WASTE BELOW GRADE
INDIRECT WASTE
NOTE: ALL SYMBOLS SHOWN ON LEGEND
ARE NOT NECESSARILY USED.
WASTE ABOVE GRADE
DOMESTIC HOT WATER RECIRC.
DOMESTIC HOT WATER
DOMESTIC COLD WATER
PLUMBING LEGEND
MEDIUM PRESSURE NATURAL GAS
GREASE WASTE ABOVE GRADE
WASTE BELOW GRADE
GASG
MPG
VENT THROUGH ROOF
CLEAN OUT TO GRADE
FLOOR CLEAN OUT
WALL CLEAN OUT
CLEAN OUT
NEW
EXISTING
CO
WCO
FCO
COTG
(E)
(N)
VTR
IW
VENT
CONDENSATE DRAINC
UP THROUGH ROOFUTR
PIPE RISER
PIPE DROP
PIPE TAKEOFF (FROM BOTTOM OF MAIN)
PIPE TAKEOFF (FROM TOP OF MAIN)
PIPE END CAP
PIPE CONTINUATION
PIPE EXPANSION GUIDE
PIPE UNION
PIPE ANCHOR
FLEXIBLE PIPE CONNECTION
PIPE EXPANSION JOINT
POINT OF NEW CONNECTION
AIR VENT
PLUG VALVE
CHECK VALVE
BALL VALVE
BALANCING VALVE
BUTTERFLY VALVE
PRESSURE REDUCING VALVE
STRAINER
PRESSURE - TEMP. TAP
PRESSURE GAUGE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
4-WAY CONTROL VALVE
FLOW REGULATOR VALVE
DIFFERENTIAL BYPASS VALVE
NATURAL GAS PRESSURE REGULATOR
THERMOMETER
UPUP
DOWNDN
GW
GW
W
W
HOSE BIBHB
PURGE PORTPP
FREEZE PROTECTEDFPHB
HOSE BIB
FLOOR SINKFS
PIPE CAP
PTRAP
INLINE PUMPIP
ELECTRICAL CONTRACTOR
MECHANICAL CONTRACTOR
PLUMBING CONTRACTORP.C.
M.C.
E.C.
AUTHORITY HAVING JURISDICTIONA.H.J.
PLUMBING SPECIFICATION:
1.GENERAL:
a.FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES NECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTED ON THE DRAWINGS
AND/OR SPECIFIED HEREIN.
b.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESE SPECIFICATIONS OR
SHOWN ON THE PLANS, BUT WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONED HEREIN OR
PLAINLY MARKED ON THE ACCOMPANYING DRAWINGS AS BEING INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS.
2.WORKMANSHIP:
a.THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN-LIKE MANNER SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNER AND ARCHITECT.
3.MATERIALS:
a.ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE KIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED.
4.SITE INSPECTION:
a.CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF HIS BID AND THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS & EXACT NATURE OF THE WORK.
b.SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM.
c.NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION.
5.CODES AND PERMITS:
a.ALL PLUMBING EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE 2012 INTERNATIONAL PLUMBING CODE (IPC), 2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) AND
ORDINANCES AS INTERPRETED BY THE TOWN OF VAIL BUILDING DEPARTMENT.
b.CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS.
c.COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE ARCHITECT.
6.AS-BUILTS:
a.CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS WITH ALL CHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECT AND PRIOR TO FINAL ACCEPTANCE
AND PAYMENT.
7.GUARANTEE:
a.CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIALS ON ALL WORK AGAINST DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER
COMPLETION.
8.SUBMITTALS:
a.CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX COPIES OF EACH).
9.COORDINATION:
a.THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE.
b.THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE BEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC.
10.CUTTING AND PATCHING:
a.ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING) SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK.
b.PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT.
c.X-RAY SLABS PRIOR TO CORING.
11.CLEANUP:
a.UPON COMPLETION OF THE WORK UNDER THIS SECTION, THE CONTRACTOR SHALL REMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THIS WORK AND LEAVE THE
PREMISES CLEAN AND ORDERLY.
12.PLUMBING IDENTIFICATION
a.EQUIPMENT NAMEPLATES: METAL, WITH DATA ENGRAVED OR STAMPED, FOR PERMANENT ATTACHMENT ON EQUIPMENT.
b.PIPE MARKERS: PREPRINTED, COLOR CODED, WITH LETTERING INDICATING SERVICE, AND SHOWING DIRECTION OF FLOW.
c.VALVE TAGS: STAMPED OR ENGRAVED WITH 1/4" LETTERS FOR PIPING SYSTEM ABBREVIATION AND 1/2" NUMBERS, WITH NUMBERING SCHEME. PROVIDE 5/32" HOLE FOR FASTENER.
d.VALVE TAG SCHEDULE: PREPARE A VALVE TAG SCHEDULE TO BE SUBMITTED TO THE MAINTENANCE ENGINEER FOR RECORD.
13.PIPE INSULATION:
a.DOMESTIC WATER PIPING INSULATION SHALL HAVE A THERMAL CONDUCTIVITY LESS THAN OR EQUAL TO 0.27 BTU-IN/HR-FT2-F.
b.HOT & COLD WATER SUPPLY PIPING (EXCEPT RUN OUTS 12 FT. OR SHORTER TO INDIVIDUAL FIXTURES) SHALL BE INSULATED AS FOLLOWS:
PIPE SIZE (IN.)INSULATION THICKNESS (IN.)
1/2", 3/4" & 1"1"
1 1/4" THROUGH 6"1 1/2"
c.NO HOT OR COLD WATER PIPING SHALL BE ROUTED IN EXTERIOR WALLS UNLESS PROPERLY INSULATED.
d.CONDENSATE PIPING SHALL BE INSULATED WITH 3/8" FOAM PLASTIC.
e.STORM DRAIN PIPING SHALL BE INSULATED WITH FIBERGLASS INSULATION FROM THE UNDERSIDE OF THE DECK TO THE VERTICAL RISER.
14.PIPING:
a.WASTE AND VENT PIPING:
i.SHALL BE STANDARD WEIGHT CAST IRON HUB LESS TYPE.
ii.UNDERGROUND PIPING CAN ALSO BE SCHEDULE 40 PVC.
iii.VENT PIPING IN RETURN AIR CEILING PLENUMS SHALL BE ABS OR COPPER PIPING.
b.WATER PIPING:
i.SHALL BE TYPE "L" COPPER HARD DRAWN WITH WROUGHT COPPER FITTINGS.
ii.JOINTS SHALL BE SOLDERED WITH 95-5 OR SILVER SOLDER.
iii.:$7(53,3,1*´ 60$//(5&$1$/62%(:,56%2$48$3(;$355(+$85$83(;25(48,9,/$173529,'('('8&7$/7(51$7(35,&,1*
c.CONDENSATE PIPING SHALL BE TYPE "M" COPPER WITH SOLDER JOINTS.
d.NATURAL GAS PIPING:
i. 2" AND SMALLER SHALL BE THREADED STANDARD WEIGHT SCHEDULE 40 BLACK STEEL PIPE WITH SCREWED MALLEABLE IRON FITTINGS.
ii.PIPING 2 1/2" AND LARGER SHALL BE WELDED.
iii.ALL OUTDOOR EXPOSED PIPING SHALL BE PAINTED WITH OUTDOOR ENAMEL.
iv.REGULATOR VENTING SHALL BE NO LONGER THAN MANUFACTURER'S RECOMMENDATION, ALUMINUM, VENTED TO THE OUTDOORS, AND A MINIMUM OF 3' FROM ANY OPENING INTO BUILDING
AND 6' FROM ANY MECHANICAL INTAKE AND 1' FROM ANY ELECTRICAL EQUIPMENT.
e.UNDERGROUND NATURAL GAS PIPING:
i.SHALL BE IPS SDR 10 TUBING WHICH MEETS ASTM D2513 MANUFACTURED BY UPONOR OR IAPMO.
ii.ANY GAS PIPING ROUTED BENEATH HARD POURED SURFACES SHALL BE SLEEVED TO MEET THE REQUIREMENTS OF THE UTLITY COMPANY.
15.EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN FEET FROM ANY MECHANICAL INTAKE AND AT LEAST THREE FEET FROM ANY OPENING INTO THE BUILDING.
16.CLEAN-OUTS SHALL BE INSTALLED AS PER 2012 IPC SECTION 708.
17.3527(&7522)5(&(372521522))5205$,1:$7(5%<(/(9$7,1*7+(5,0ò´,1&+(6$%29(522)685)$&(
18.PROVIDE WATERTIGHT FLASHING WHEREVER PIPES PASS THRU EXTERIOR WALLS, ROOF AND FLOORS.
19.PENETRATION IN WALLS REQUIRING PROTECTED OPENINGS SHALL BE FIRE-STOPPED. FIRE-STOPPING SHALL BE AN APPROVED MATERIAL SECURELY INSTALLED AND CAPABLE OF
MAINTAINING ITS INTEGRITY WHEN SUBJECTED TO TEST TEMPERATURE FOR SPECIFIC WALL OR PARTITION.
20.PROVIDE FELT WITH METAL BACKING VIBRATION ISOLATION SLEEVES OR PADS AT ALL PIPE HANGERS OR SUPPORTS AND ALL POINTS WHERE PIPING COMES IN CONTACT WITH ANY PORTION
OF THE STRUCTURE. APPLIES TO ALL WATER AND WASTE PIPING.
21.LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DEPTHS OF UTILITIES PRIOR TO STARTING WORK OF THIS SECTION. MAKE
REQUIRED ADJUSTMENTS TO CONNECT TO EXISTING UTILITIES. IF INDICATED POINTS OF CONNECTION CANNOT BE MADE TO UTILITIES AS FOUND, THE CONTRACTOR SHALL, BEFORE
CONTINUING, NOTIFY THE ARCHITECT PRIOR TO INSTALLING ANY WORK WHICH MAY BE AFFECTED.
22.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY AVAILABLE SPACES FOR INSTALLING THE WORK.
23.VALVES SHALL BE NIBCO, JENKINS, WALWORTH, STOCKHAM OR EQUAL. SERVICE PRESSURE SHALL BE SUITABLE FOR SERVICE INTENDED.
24.PROVIDE HANGERS AND SUPPORTS MEETING THE REQUIREMENTS SPECIFIED IN THE 2012 IPC SECTION 308. PLUMBERS TAPE AND WIRE ARE NOT ACCEPTABLE.
25.CONTRACTOR SHALL AFFIX A MAINTENANCE LABEL TO ALL EQUIPMENT REQUIRING ROUTINE MAINTENANCE AND SHALL PROVIDE THREE COPIES OF MAINTENANCE AND OPERATING MANUALS
TO THE OWNER/OPERATOR.
26.CONTRACTOR SHALL ARRANGE FOR AND PAY FOR ALL UTILITY METERS AND UTILITY CONNECTIONS.
27.ALL PLUMBING LINES SHALL BE CONCEALED WITHIN THE BUILDING STRUCTURE TO THE GREATEST EXTENT POSSIBLE. ALL LINES NOT CONCEALED SHALL BE SECURED 6" OFF FLOOR AND
3/4" FROM WALL AND CEILINGS USING OFFSET BRACKETS.
28.AN APPROVED BACKFLOW PREVENTER SHALL BE PROPERLY INSTALLED UPSTREAM OF ANY POTENTIAL HAZARD BETWEEN THE POTABLE WATER SUPPLY AND A SOURCE OF CONTAMINATION.
29.ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AND WIRED BY THE ELECTRICAL CONTRACTOR.
TYPICAL LOW PRESSURE
GAS CONNECTION DETAIL
NO SCALE
GAS SHUT OFF VALVE
TYP.
LOW PRESSURE
GAS LINE
6" MIN. DRIP LEG
MECHANICAL
EQUIPMENT
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
C
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
F
a
x
:
9
7
0
-
7
4
8
-
8
5
2
1
EG
Drawn By:Checked By:
DATE:ISSUE:
08-09-13 PROGRESS
AEC PROJECT #:
EX
P
A
N
S
I
O
N
29
1
B
R
I
D
G
E
S
T
R
E
E
T
VA
I
L
,
C
O
8
1
6
5
7
13062
$Q
2
I
I
L
F
H
Z
L
W
K
/
(
(
'
$
F
F
U
H
G
L
W
H
G
3
U
R
I
H
V
V
L
R
Q
D
O
V
08-19-13 PERMIT
09-09-13 REVISION #1
09-30-13 PERMIT REVISION #2
/<61%
2.7/$+0)
52'%5.')'0&
5%*'&7.'5
2
SHEET DETAIL NOTES:
VERIFY DIMENSIONS OF THE LINES IN FIELD. VERIFY EXISTENCE OF
HWC LINE IN FIELD. IF NO HWC IS PRESENT LOCATE IT IN FIELD AND
CONNECT NEW FIXTURES TO IT ACCORDINGLY OR COORDINATE WITH
THE OWNER INSTALLATION OF ONE.
CONNECT 1/2" HW & CW TO HS-1.
ROUTE PIPING IN THE BAR WALL UNDER THE COUNTER TOP. HERE
SHOWN OFFSET FOR CLARITY.
ROUTE 1/2" CW & 1" HW DOWN. CONNECT 1/2" CW TO P-4 AND
CONTINUE 1/2" CW & 3/4" HW UNDER THE COUNTER TOP.
ROUTE 1/2" CW & HW DOWN AND CONNECT 1/2" CW & HW TO HS-1 & 1/2"
CW TO P-4.
CONNECT 1/2" CW TO P-4.
CONNECT 1/2" CW & HW TO LV-1.
CONNECT 1/2" CW TO WC-1.
9(5,)<7+$7),1'(3(1'(17+27:$7(5/,1(,6,167$//(',1
THIS AREA OR NEARBY. IF SO, CONNECT THIS LINE TO THE DW-1. IF NO
)'(',&$7('/,1(,6,167$//(',167$//$1(:)+:/,1(
FROM THE WATER HEATER TANKS. CONTACT MECHANICAL ENGINEER
FOR FURTHER ASSISTANCE IF DESIRED. INSTALL HAMMER ARRESTOR.
ROUTE 1/2" CW, HW, & HWC DOWN. CONNECT TO HS-1. PROVIDE
BALANCING VALVE ON HWC LINE AND BALANCE TO 0.5 GPM FLOW.
INSTALL BALANCING VALVE UNDE THE HS-1 COUNTER TOP (NOT
SHOWN FOR CLARITY).
9(5,)<(;,67(1&(2))+:)257+(DW-1 IN THE EXISTING
RESTAURANT. IF NONE IS INSTALLED INSTALL THIS LINE. SEE NOTE #9
FOR DETAILS.
EXISTING 1/2" G LINE. REMOVE THE LINE AND UPSIZE IT TO 1-1/4"
BELOW AT THE EXISTING CONNECTION TO 2" EXISTING GAS LINE.
CONTINUE UNDER SLAB OR PROVIDE NEW PENETRATION AND
CONTINUE UNDER THE COUNTER TOP TO THE NEW PIZZA OVEN
LOCATION. CONNECT 3/4" TO PIZZA OVEN.
EXISTING 1/2" G LINE IN THE KITCHEN CEILING BELOW CONNECTED TO
MAIN 2" G LINE.
1
EXISTING 2" CW, HW
& 1/2" HWC LINES 1
HS-1
LV-1
WC-1
DW-1
HS-1
P-4
P-4
HS-1
3/4" HW
2
2
2
2
1/2" HW
1/2" CW
1/2" HWC
1/2" CW
1/2" HW
3
3
4
4
5
5
6
6
6
7
7
8
8
3/4" CW
1/2" HW
9
9
3
1/2" HW
3/4" CW
1/2" HWC
1" HW
1" CW
1/2" HWC
1" HW
1" CW
1/2" HWC
10
10
)+:
)+:
)+:
11
11
1-1/4" G
12
12
13
13
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
C
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
F
a
x
:
9
7
0
-
7
4
8
-
8
5
2
1
EG
Drawn By:Checked By:
DATE:ISSUE:
08-09-13 PROGRESS
AEC PROJECT #:
EX
P
A
N
S
I
O
N
29
1
B
R
I
D
G
E
S
T
R
E
E
T
VA
I
L
,
C
O
8
1
6
5
7
13062
$Q
2
I
I
L
F
H
Z
L
W
K
/
(
(
'
$
F
F
U
H
G
L
W
H
G
3
U
R
I
H
V
V
L
R
Q
D
O
V
08-19-13 PERMIT
09-09-13 REVISION #1
09-30-13 PERMIT REVISION #2
/<61%
/#+0.'8'.
&*9 )#5
2.#0
5%#.'Ä
2
NORTH
MAIN LEVEL DHW & GAS PLAN
SCALE: 1/4" = 1'0"