Loading...
HomeMy WebLinkAboutB13-0422 CR response letter Received r�w� Q F ��l� By Lynne Campbell at 9:42 am,Oct 21,2013 Lyle Project Solutions P.O. Box 1755 Avon, Colorado 81620 e. david.lt le,ci lr le�s.com p. 970.376.5350 18 October 2013 Mr.Martin Haeberle Town of Vail-Community Development Building Safety and Inspection Services 75 South Frontage Road West Vail, Colorado 81658 e. mhaeberle:�r.?vail�ov.com p. 970.376.2672 Re: The Sweet Spot Building Permit Comments—TOV B13-0422 Dear Martin: Thank you for your recent comments and feedback on the building permit application for the proposed tenant improvement at 616 West Lionshead Circle,Vail,Colorado 81657. The existing tenant space is vacant, but was previously permitted and occupied as a retail space. The intent of the building owner and the tenant is to maintain the integrity of the existing space and the associated occupancy classification. Therefore,we are requesting the Town of Vail(TOV)review the permit application as a remodel of the existing construction and occupancy. The building owner will be providing a copy the previous tenant's information to help demonstrate this equivalency. Assuming this approach is acceptable with TOV,we have updated the permit drawings and summarized the permit comments below along with our responses for your consideration: Drawing Sheet Town of Vail Redline The Sweet Spot Team Respvnse Reference Comment General Provide Plans Stamped by a A complete set of documents will be re-submitted Registrant licensed in the electronically with this letter. All sheets will be State of Colorado. stamped and signed as requested. A-1 Provide Building Type & The building is understood to be Type IB. The space Retail is not B Occupancy. use occupancy is M—mercantile. This information has been corrected on the documents. A-1 The residential code does This has been corrected on the updated documents not apply. Must be IBC. to read "2012 International Building Code" in place of"residential". F-1 Terminology has changed Note has been change to reflect the current code with International codes. terminology. Revise Plans. Lyle Project Solutions The Sweet Spot 1 j F-1 No dining Facilities? There will be no dining activity in the space. F-1 Provide detailed listings or This note has been removed from the documents. methods to be used. No disruption or penetrations of any existing fire ratings is anticipated. C-2 Factor is 30 for Retail. The occupant load factor has been updated on the current set of documents. C-3 Provide lighting power The existing lighting system and controls will remain calculation per the IECC from the previous tenant. P-1 Flow Control/Venting for The specified grease interceptor comes with an Grease Interceptor? integral flow control fitting that will be vented above the flood rim of the fixtures served.Additionally the grease interceptor waste discharge is vented into the plumbing vent system as shown on sheet P-1 What size are we using? The specified grease interceptor will be the Z-1171- 700 P-1 Insulate (piping) per IECC All new domestic water piping will be insulated to the energy code. Insulation requirements are called out in note 11 on sheet P-2 in the updated set. M-3 DRB required for this The exhaust fan has been changed to an in-line inst�llation model located in the ceiling space, and the exhaust will be routed out through the side of the building to avoid impacts to the existing roof structure, and requirements for DRB review/approval. M-3 How is the roof bein� The exhaust fan has been changed to an in-line penetrated? Existing Hole? model located in the ceiling space,and the exhaust Structural Details for will be routed out through the side of the building to Opening? Please Clarify? avoid impacts to the existing roof structure,and requirements for DRB review/approval. R-1 Pravide plumbing fixture The new tenant space represents no change to the calculations per Chapter 29 previous building occupant load. The existing of the IBC stamped by restroom facilities requirements remain unchanged registrant. and assumed to be adequate. eas onta me with any questions. ```\`�ar�uuu nu�,�� d� � ' Sinc re y :`��O�P�\D � /�F'• ; 9 ; � = ; = _ : 3 6 � = . . �av' �yle '; : �G ��� - . . � . Cc: Shea Guillory; William leggett '/,/,����'�SnO�Ait„���``````` Attachments: Updated Construction Documents–Stamped and Signed Lyle Project Solutions The Sweet Spot 2 1