Loading...
HomeMy WebLinkAboutB08-0054 E08-0065 DRB080057 Ap r. 28. 2008 2: 28PM EAGLE VALLEY TEMPS No. 1851 P. 2 ,� ,r �� �}� PQ BOX 2494 ,�-`� AVON,CO 81620 � PH.970.949.710� • " � �� FN(.970.949,331� I �T�—�� rJ\1c- � � �lutions .inc �� ��` �� J(.C��/.�5�� E N G I N�E R I N G � ` V ?�� ���� �-� Letter of Record �v� - Cx��`{ :,���FS -66�� �.�—J�'�'`�y� Date: o�1.2s.oa �_�wn of Vail T,,: �c������ �'aPY J��son Morris Atlas Construction,lnc. Pr�l'ect/Job Number. � Nlorgan Remodel Job#0302-08 This°Letter of Recordu is in regards to the above referenced remodel. On 04-07-08 I visited the above rE:ferenced residence at the request of Jason Morris of Atlas Construction, Inc. He was proposing to rr�ove an existing stud pack of 2x4's that supported one of the glulam roof purlins to the north approximately three feet. If that could not be done, Jason wanted to move the post to the south approximately three feet to the end of the new proposed knee wall. After reviewing the as-built ��ndition of the roof, I feel that the new location of the post should be to he south at the end of the new proposed knee wall, not to the north. This new location will shorten the span of the existing glulam purlin. After verification from Jason that a steel beam exist within the floor system below the new lacation of the post and without analyzing the remainder of the building, I believe that the proposed c��lumn reloca6on described above will not diminish the structural integrity of the building, If there are any questions or concems pfease call me at(970�949-7100. �����;, ��� ned: ��� 00�0�0 ,l�� : ��� � r.�;., ''g'°��' u,°.�;�-�;.. d �:;.°�`.�; � as� ��.�� i'�° ; � y P. Leonardo, P.E. ,. o � F'resident "�:* °�,oY29 0 0o a;���; � .�s��a °cbeop0�,>>'=� B�`�:�'i �.;1�� � � «- 10-15-2008 Inspection Request Re orting Page 10 4�37�m Vail,_S'� Citv Requested Inspect Date: Thursday,October 16, 2008 Inspection Area: CG Site Address: 434 GORE CREEK DR VAIL ALL SEASONS B-5 A/P/D Information Activity: 608-0054 Type: A-MF Sub Type: AMF Status: ISSUED Const Type: Occu ancy: Use: VA Insp Area: CG Owner: WYMAN,TIMOTHY E.-M�RGAN, KARIN W.- Contractor: ATLAS CONST �1.ON Phone: 970-926-1455 Description: WINDO DDITION \�'� / �1 Requested Insp�ct�� Item:i 90 BLDG-Final Requeste Phone: 97 70269 -or- 970-390- Requestpr:..ATLAS CONSTRUCTIONf 1476 Commenf : will call Jason 977-0269�A11 Seasons B-5 Assigned T�: JMONDRAGON Entered By: DGOLDEN K Action� Time Exp: Comment: IL�.�PEN `__ _/ '-� --- � � � Inspection Historv � Item: 30 BLDG-Framing '*Approved"* — 04/24/08 Inspector: sgremmer Action: PA PARTIAL APPROVAL ll, Comment: consultaion � 05/01/08 Inspector: JRM Action: AP APPROVED Comment: COLUMN APPROVED AS PER ENGINEER LETTER 05/05/08 Inspector: JRM Action: AP APPROVED �,� Comment: FRAMING APPROVED Item: 50 BLDG-Insulation ""Approved*` 05/05/08 Inspector: JRM Action: AP APPROVED Comment: Item: 60 BLDG-Sheetrock Nail "`Approved"* 05/05/08 Inspector: JRM Action: AP APPROVED Comment: Item: 90 BLDG-Final 10/02/08 Inspector: JRM Action: NR NOT READY FOR INSPECTION Comment: ELEC PERMIT STILL OPEN I i REPT131 Run Id: 8562 NOTE; THI� PERMIT N1UST BE POSTED ON JOBSITE AT ALL TIMES .� T�WNOFYAfI. ' Town of Vail, Community Developmen#, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139 f. 970.479.24�2 inspections 970.479.2149 ELECTRICAL PERMIT Permi# #; E08-OOfi5 '��"�� °`=' ' `� AMF Project #: PRJ08-0057 Job Address: 434 GORE CREEK DR VAIL Staius . . . : ISSUED Location.....: ALL SEASONS B-5 Applied . . : 04/25l20fl8 i�arcel No...: 21�108237012 Issued . . : 04I25120U8 Expires . .: 10/2212008 OWNER WYMAN,TIMOTHY E. - MORGAN, 04/25/2008 TRUS7E�S 31 S HARRISON ST EASTON MD 21601 APPLICANT BOSTpN EL�CTRlC Q4/25/2008 Phone: 970-74�-6980 P.O. BOX 2472 AV�N CO Sfi620 License: 155-E CON7RACTOR BOSTON ELECTRIC 04125/2008 Phone: 970-748-698� �.0. BOX 2472 AVON CO 81620 License: 155-E Desciption: KIYCHEN REMODEL ADD 1 ART�IGHT, PUCK LIGHTS IN UVfNG ROOM,AND 3 PLASMA TV'OUTLETS 1✓aluation: $5,000.00 Square feet: 1600 :FRR+�R+l+thk!*f*frlfRRflIR�llrrtHlfMf!*��l1RR1RYff1f�YWY#tf?!*�kiii�t#Yt'4*#*#/tii FEE SUMMARY kt**i*fiii#4i#ifitYFiitYMVtWYY+Y%'yrftrtYkY%�YYlefY�n4f4lttlt#ff/itfYY4lYiYYrMY"itY EPectrical Permit Fee---------> $86.25 Total Calculated Fees--> $9025 Investigation Fee--------------> $a.00 Additional Fees----------> $0.00 Will Call Fee--------------------> $4.00 Use Tax Fee------------------> $0.00 TOTAL PERMIT FEE---> $90.25 Tofal Calculated Fees-------> $9Q.25 Payments-----------------> $90.25 BALANGE DUE----------> $0.00 f�F#t*Mhk�R#fi�f iti Ytti4++t*in f1 h k*X<#rtrt�i!�M R rtA RefiRiFYrf f f,w rt*M�k1e+l+FaFAy*�rtfiR+FwY'fi�1�'YnVrYA�ilTrwM f!Y W f rtf Rkwwn f�Ay�#RY!#^k W f1�Fhwww'kM'kfiRYrYi�f Y'rtM rtikVrMRlfwf�tk#F hR4R*YrA�#!r�r#�Rf�Rk*�!!!�R*RRRx APPROVALS 9tem: �60D0 ELECTRICA�L DEPARTMENT 04i25l2008 rlf Action:AP Item: a56�0 FIRE DEPARTMENT •i�,aw�t�++rstf ti tr+<r+arrr��,t�.w kw,t*w*,rr r��www,rw,r,ew�wwwwwwew+�wrrt�,t�+.Rwx,rwwwr rrarcwwe e rr►r�k<awwa r►i�w.e�+.,rwr www wwwwx+w�,�wwa�wxwRw+,t�r,w�►*��+,tw*.�r.,�rw�waww,ra�a�w+*a CONDII'IONS O�ApPFiOVAL Cond: 12 (BLDG.): FIELD IIVSPECTIONS ARE REQU9RED TO CHECK FOR COQE COMPLIANCE. i�4.Y k<t t+++f�i:Yi4�k<ik+r.+rf f>itr ka+kl++a1 irt�t�4 k+rRet+.+irlrlr�R k k,t,t*,tlnt*i`f ka w,twlex+wr�rr�*fert+rw,e�r+w!�ww ww#Re.#�s.f�Ywww+rw k+,t,r*�#Aa Mxk�M++ir�r�F+�Y M,t+krr#++f!►+++wk*.F++3r ia ai,ta++fa�ra a+}#r,t D EC LARATIOhf S I h�reby acknowledge that I have read this application, flled out in f�ll the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and stake laws, and to build this structure aceording io the towrns zoning and subdivision codes, design review approved, International Builcfing and Residential Cades and other ordinances of the Towe�applicable thereto. REQUESTS FOR INSPEC�ION SFiALL BE MADE TWENTY-FOUR HOWRS IN ADVANGE BY TELEPHONE AT�970.479.2149 OR AT OUR OFFICE FRQM 8:OQ AN�1 �PM. _ � .�r , ''�./' / �'� + � � � � v� .- •�Signature oi 0wner or Contraclor Date elec_prm_041908 Print Name elec_prm_041906 ***�********�������**��***�*****+*�**rt*�*****�*�***�**�******��************���*********�*�** TD'vVN OF VAiL, COC.ORAD(� Statement �*�***��*����**********�**�**�*****�*�*�*�*�*��****��***��*�*�*��������+****************�*�* Statement Number: R080000541 Amount: $90.25 04/25f200803 :53 PM Payment Method: Check Init: SAB No�.ation: 1712 S45TON ELECT'RTC -----------------T-°---------------------------------------------------_�°--- Permit No: E08-0065 Type: ELECTRICAL PERMIT Parcel No: 2101-082-3701-2 Site Address: g34 GORE CREEK DR VAIL Location: ALL SEASONS B-5 Total Fees: $90 .25 This Payment: $90 .25 Total ALL Pmts: $90 .25 Balanca: $0 . 00 ********************w�w**�****w*�**��**r*�w**�w***��**w*******�*****+�**�*****�************�** ,qCCOUNT CTEM L15T: Account Code Description Current Pmts ----------�--—----- -------------—----------_°--- ------------ EP 00100003111100 ELECTRICAL FERMIT FEES 65,25 WC 00100003112800 WTLL CALL INSPECTI�N FEE 4 . 00 , . APPLICATION WIL! NOT BE ACCEPTED IF INGpMPLETE OR UNSIGNED Project #1;�,��� Building Permit #: � � - �' �} � �' Electrical Permit #c �1�����_ �'���'fFAii ' 970-479-2149 (Inspections} 1rLIl'L 75 S.Fxantage Rd. Vail,Colorado 81657 TOWI� OF VAIL ELECTRICAL PERI�tIT APPLICATION CONTRACTOFt INFORMATIQN Electri I Co�tractor: Town of Vail Reg. �lo.: CQntact Person nd hone #'s: ��'t-�M1�L- SS`� � c� �'1�,�� �?0 9�°� -��' S � E-Mail Address: G� i�� c,J �'�E, C� ��L.,,.� Fax#: L� � � � Contractor Signature� COMPLEI'� SQ. F40TAGE FOR AREA OF'If�I�RK AND VALUATION OF WORK (Labar & Materials) AMOUM"OF SQ FT IN SPRUCTL�#tE: �D ELECTRICAL VALUATION: $ ���r C.�, Contact Ea le Coun Assessors O�ce at 970-328-8640 or visit www,ea !e-coun ,com fc+r Parce/# Parcel # \� ��1 �.."� 01 2, _ 1 l Job Name: �(`�lo�c��n RQ�� �L„� Job Address:��`'� G�'1°- ���C�.; Legal Description Lot: Black: Filing: Subdivisian: ¢,1� `������ �'5�,� � Owners Name:;� Address:-� S �rr��� �'C- Phone: � 0 �hgineer: Address: Phone: � Detailed description a�wark: ����� ��� ��� l,\ ,�,,� ,�� 1_ � t� � � �l,�,.�� Sw..� , w�� ��\ 4 _ . `�° + �` � � � � p"``f, J'l� i ; t ���� , Work Class: f�ew ( ) Addition ( ) Remodel � Repair( ) �emp Pawer ( ) Other ( ) � f Work Type: Interior( Facterior{ ) Both O Does an EHU �xist at this Iocation: Yes O No O Type of Bldg.: Single-family( } Dupkeac O Mvlti-family� Commercial O Reslaurant O Other O �No. of�xisting Dwelling Urt�ts in this building; � I�o. of A�commodatio� Units in this building: Is thi:� ermit for a hot�t�b: Yes No �c' ---;�.-.---- _ Does a Fire Alarm Exist: Yes O Na (- ) Does a Fire Sprinkler Syste is �� .Yes ( • � '?N ' r-�� I '; � li°; ;i ��Lr ,�***���x�***�*�*��*�r��*�*��,��****�*x�,�*� Ly*��***��:��� �� ��**�r*�r*��r*�,•�r�r����*�r�'* FUR OFFICE USE ON 3 , 1 s:� °t � c � , ����'$���_...___�_I�'�4�_- .. _..: Other Fees. Data Received; : DRB.Fees. Acce ted 8 . _Planner Si n-vf�: F:�cdev�FpRMS�PERM�TS�Building�electical�ermit_ii-23-2D05.DOC Page i of 2 11/23J2005 • r ■ � E ���F YA�L ' Am�:ndment#o the 2002 M.E.C. Town of Yail Ordinance 4, Series of 2005 a Uverhead services are nat ailawed in the Town of Vail. o llndergraunci services sha/I be in conduit (PVC) from t'�e u�i/ity transformer t4 the electric meter, main c�isconnect swi�ch, anci ta the grst electrical distribution circui� breaker panel. ❑ "ll�e main disconnect switch shall 6�e readi/yac�ressib/e, an�'located ne�to the mete�on the e�erior wall flf the structure. All underground conduits are required to be inspected before back-�IEing the treneh. o In mult�-family dwelling units, no electrical wirir�g or feec�'er cables shall pass frorr� one unit to another. Commvn waEls ar�d spaces are exemp� ❑ NM Cable (Ftomex) can be used on/y in single and mu/ti-family dwe//rngs net exce.eding 3 stories. Type NM cannot 6e used in any building mix�d rvith Typ��B.F,F,H,I,M&S occupancies. a A/uminum conductorssma'iler th�� size #8 are not permitted with the Tawn of Vail. TOWN OF VAIL ELECTRICAL PERH�IT GUIDELINES � �II in5tallations of e�erior hot tubs or spa's require a DR� a�praval from plar�ning. This applicatiian will �nat �e accepted without a copy of the DRB appraval form attached (if applicable). ❑ If thi� ��rmit is far installation of an exterivr �ot tub or spa on a ne+rv elevated platform or decfc over 34" above grade, you must also abtain a building permit. o If this p�rrnit is for installation of an exterior hot tub or spa on any exist�ng deck or elevated platform, a st�-uctur,�l engineer must revie�r the existi�g condit�on and verify that it wil! support the added concentra�:ed load. Please prawide a ca�y of th� struc�ural engineers w�et s�.imped �ett�r or draw�ng with this �.pplFCation. ❑ If this is a remodel in a multi-family building with a homeowners association, a letter of permission �rom the association is required. d if this perrnit is for a commercial space, two (2) sets of stamped drawi�gs are required. F/ectrica! one-/ine and Rane/schedu/es are required if/oad is added or distributron is a/tered. T have read and understand the above. Sign e Date Signed If you have any questions regardin� th� abo�e infarmation or have additiona! ques�ions, please cani:act the Town of Vail Electrical Inspector at 970-479-21�7. The i�spe+ctor can be � reached an Monday thru Friday mornings between the hours of Sam and 9am. You rv�ay also leave a voic:e mail and the inspector will call you back. F:\cdev�FORMS�PERMITS\Building�electical_permit_11-23-2005.DOC Page 2 of 2 11/23/2005 TOWN OF VAIL DEPARTMENT OF COMMUNITY I�EVELOPMENT 75 S. FRONTAGE ROAD V.AIL, CO 81657 97Q-479-2138 NOTE: THIS PERMIT MUST BE POSTED OI� JOBSITE AT ALL TII'vIES ADD/ALT MF f3UTLD PERMIT Permik #: BOS-0054 Project #: 08-0057 Job Address.: 434 GORE CR'EEK DR VAIi, Status.....: ISSUED Location......: ALL SEASONS B-5 Applied...: 03I25/2008 Parcel No..,.: 21O1Q8237012 Issued ...: 03/31/20�8 Expires...: 09/27/200$ OWNER WYMAN, TIMOTHY E. - MORGAN, 03/25/2008 TRUSTEES 31 S HARRISON 5T EASTON MD 21601 APPLICANT ATLAS CONSTRUCTION 03/25f2008 Phone : 970-926-1455 144 WILDCAT STREET EDWARDS CO 81632 License: 255-A CONTRACTOR ATLAS CONSTRUCTTON 03/25/2008 Phone : 970-926-1455 144 WILDCAT STREET EDWARDS CO 81632 License : 255-A Uesciptian: 1NSNDOW ADDIT�ON Occupancy: R2 Type Construction: VA Valuation: $20,000.00 Revision Valuation: $OAa Total Sq Ft Added: 0 sessrwss+ss+rsrast*ssrss+sswrs*wr*ew�r+ssrr*+***+**r**++*s+*ss**s+** FEG$U MIv1ARY +*«+**+**+**t+�*+:*****+*tw�*++ts+*t+*rr+v�***r+r*+r**+*s+r* f3uilding------> 5321.25 ResluarantPlanReview--> $�.Oq "fotalCalculatedFees--> $534.06 PlanCheek---> g2o6.8�. RecreationFee--------------> $o.00 rldditionalFees--------> $0.00 lmcstigation-> So.oo TOTALFEES-------------> $534.46 'I'acal Permit fee-------� $534.06 Will Call-----> $4.fl o E'ayments------------------> $534.06 BALANCE DUE---------> $0.o0 lRt�h#xti�tit►i�RM�i*Mi�wiR**3t�Fikrt#t4Mik4i4�#i4WFi#�F4�FW*�F*�#W+ktM##k##i*itt*k#rti#*###4##4}##M�k+RW��CwttW*##wi+iWi4WyfMMit►i#R#i#�#t4#i#M�iMtiX�##rt*i4■ Approvals: Item: 05140 BUILDING D�PARTMENT 03/28/2008 cgunion Action: AP •t4wrsw»srasrasNwtswwswwswrra�**t+*t**tf+s*s**.*s+i*+�*++**+�**f**+ss+9**+*t+**++*t+*k+f*+**s+**+**s+*s*�!**w*t.**+t**.*set*+ts+M**f+s***s�***w*s+ 5ee Conditions page of this Document for any canditions that may apply to this permit. DECLARATIQNS t hereby ackno�vledge that I have read this applicatian, filled out in full the information required, eompleted an accurate plot plani arad state xhat all the information as required is correct. I agree to comply wit�► the information�nd plot p�an,to comp�y tivith all Town ordinances and state laws, and to build this structure according to the to�ms zoning and subdivision codes, design review approved, International Building and Residential Cqdes and other ordinances of the Town applicable thereto. RN:Ql1EST5 FOR INSPECTION 5HAL1.BE MADE TWENTY'-FOUR HOUIiS I[Y AD}_'A '1'ELE�HONE A7 A7'�-214 OR AT OUR OFFICE FROM 8:00.A�1• 4 P M11. - �� � ,2�- StGNATUR F OWNER OR CONTI� CTOR FO HIMSELf AND OWNE�2 *��****�***********�*******��******�**********�****�**�***�***�**�****�***********�***�***�***��******** C�3ND[TFONS OF �1PPROVAL Permit#: B08-0054 as of 03-31-20d8 Status: ISSUED *�**�«*********�********+*************************�***��*******+****�*********�****�:****�*�*��***�******* F'ermit Type; ADD/AL,T MF BUI�.D PERMIT Applied: 03/25/2008 Applicant: ATLAS COI�GSTRUCTION Issued: Q3i31/2008 470-92f-1455 To Ex}�ire: 09/271200$ Job Address: 434 GORE CREEK DR VAIL Location: ALL SEASONS B-5 Parcel No: 2l0]08237012 Description: WINDOW ADDITION ***+***��****�**��x****��*******���***�x*****�***Conc�itions:*******�x�*�**�***��********��***+**�*****�*** Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQiJIRED TO CHECK FOR CC�DE COMPLIANCE. Cond: 14 {BLDG.): ALL PENETRATIONS IN WALLS, CEfLIN�S, AND FLOORS TO BE SEALED WITH AN APPRO�IED FIRE MATERIAL. Cond: 1 (FIRE): F1R� DEAARTMENT APPROVAL IS REQUIRED �EF(7RE ANY WQRK CAN BE STARTED. cflria: �a (BLDG): (MFR/COMM) F[RE ALA�tM REQUIRED� C'ER NFPA 72. #*#*####*####*#****###*#*##########**#***##*****�**#**###**##��#��*�#�##############��##���� TOWN OF VA[L, CQLORADO Statement ***********�**************************************�*���*�+���**��*��*������«�������������*�* Statement Number: RQ80000364 Amount: $534 .a6 03/31/20�810:07 AM Payment Method: Check Init: DDG Notation: Atlas Construction 5694 ----------------------------------------------------------------------------- Permit 1Vo: BD8-D054 Type: AI�D/ALT MF BUILD PERMIT Parcel No: 2101-082-3701-2 Site Address: 434 GOR� CREEFC DR VAIL Location: ALL SEASONS B-5 Total Fees: $534 . 06 This Payment: $534 . 06 Total ALL Pmts: $534 , 06 Balance: $0 . 00 **�*��*�***�*�***�*********************�*�����*+�*�*�ww*�**+*�*���*�����*�***��*�*��������*� ACC�U�IT ITEM LIST: Account Code Description Current Pmts -------------------- ---—------------------------- ------------ BP 00100003111I00 BUILDING PERMIT FEES 321.25 PF OO1000Q3112300 PE�AhI CHECK FEES 2178 .81 WC OO100003112800 WII�L CAL� INSPECTI�I�I FEE 4.00 u • APPLICA710N WII�L �IOT BE AGC�PTED IF INCOMP�ETE OR UNSfGNED Pfoject#: � ' Building Permit#: � `' - �' �l�-.�,�tT9-214J�4�e?�fiar�s} �'�����,`. 75 S. Frontage Rd. Vail, Colorado 81657 TOWN OF VAIL BUILD►ING PERIVIIT APPLlCATIO�N Separate Perrnits are reqc�ired for electrical, plumbing, mechanical, etc.j COI�TRACTOlZ iNFORMATION General Contractor,: Town of Vail Reg. No.: Contact Persan and Phone#'s: YSS� � ��; ��.��'�✓ rf��n c �S�- �0.5� �r� � `�?� 3`�p 9��8 Email address: �,,s{�,f• �a,uar� ,�c Fax#: `]'7G `�ZCn �{S-3 Cantractor Si atu : CflMPLETE VALUATI�NS FOR BUiLDING PERMIT tabor 1� Materials BUILQING: $ ELECTRICAL: $ OTH�R: $ PLUMBING: $ MECHANICAL: $ TOTAL: $ �j {� Far Parcel# Contacf Ea !e Caun Assessors Office at 970-328-86�0 or v�sit www.ea le-count .com Par�el�# µ � �2 ` Zt a l 3-Z�f �Z Job Name: � Job Address: �{3� C�� cr-e� �. G)�1 .A-�� �so, Lega! Description Lot: Block; Filing: Subdivision: Qwners N�me� Address: . � � � �� r„� Phone�3 � � � Architect/Designe : Address: Phone: � Engir�eer: c��S A�d �s: Ph�� c�� � Detaifed description of work: �5.��� �-�.���,� �,,t��, Work Class: f�ew( j Addition ( � Remodel� Repair t ) Demo ( ) Other( ) Work Type: Interior O Exteriar O Both(� Does an EHU exist at this location: Yes { ) No ( } Type of Bldg.: Single-farnily O Two-family( � Muati-family(?Q Commercial O Restaurant O Other( } No. of Existing Dwelling Units in this building: � No. of Accomrnodatior� Units in this bui{ding: No/T e of Fire laces Existin : Gas A liances Gas Lo s Waod/Pellet 1Nood Burnin Na/T e of Fire laces Pro osed: Gas A liances Gas Lo s WoocfJPelle# Wood Burnin NOT pLLOWED Does a Fire Alarm Ex9st: Yes ( No O Qc�es a Fire Sprink6er System Exist: Yes O No ) *******************"'**"` FOR OFF�CE USE QNLY�'� �`''� ��-�,����" ,�, � .� [ Date Received: �'i ' ! ` Received 8y: _ M�1� � �l- ���38 ,� - ' TOWN OF W,�li� F:�,cdev�FORMS�Permitsl6uilding�building�ermit 4-1�-2007.DOC Page 1 of 7 04/17/2007 _ �, �� ,� � 'M 's• i ' �, ��: ;i • �_ , . 4�4��� � i � t A1 'l r 'iv:r � �p � ! +d.ai• �^ . � � . 1i� ,:• � _ ;. ���M ' .. ,,-:� , 1 -� � � r ,«l ., �''� � • �� � i• ►F i.-► � � �!� �1� .,�M�Sp r - � .,'!�nTj,'�1 • �k* �� . ;�' � � : � �_ � � ,�. � �� �-, - � .,.r,.a� - �� ; • • ,, �+ - � ��� - •• '� � ,� � ■;. � :— T d r ��'! -»i� � • • E� , � . ' �w�,� p^� . � � � t , '�=.-� � ` ,a , dr.i� � r � �► ..f��,� � � � � � I ' • �i ��' S�_�� i. � a�ll i��. ��� � L � II�Z �i'I,' $�!,'� I"1:�� w � ,. � � i'��' � � � � ,�!A':, i q.':j 1,:i ' �� W 4':>: _ : +1 : .s _ � - � !$!''� � • � ..� - i 3<. '—"=; . . _�, �' • - f » -- .Tl. :� ��i � . :�„ k, �, +� r, , I ,�:. �q . �1 f ���!�I i b � a? . � •._�., °� - - ' �,, ' �. i _� �r - ���� . w ■ � � • � ■ I � ..-� • r .e�� '-.� .:� ..-y�.. • � �� i� 1 • s� '�r� �k�. - J . �,� .K . • � � � � � • - , . � � f� f.§�y- '� � ... . i• � � 'I� � � -- �, 'o` � *- �; ' � • ' . � • • � ., , ,� y _ � • � , � � � �� . �y �;jl�_ ��i • • • � • � G M1� _ �+ ! L�• " , • � � � al ,�iaw`'.�° ,� -.�. . ` a � . 1 ���i� 4., • ` * ' i`'�:� r • � . ^„� .}� ,.g • 4 � � , . ,� ^"�.-'._'a . �:, '-�� � � -� +�� a � _ � Z .. :`,.= �^:- • • � w� .y�. �. � � � _ t �� � • ` F ` � �_� M �� � '-.��' V +� R.O. 80X 2494 MORGAN REMODEL AvoN.co s�szo PROJECT n JOB NO. 0302-08 PN 974.549.710p SHEET N0. SL� QF '� FAX 974.949.3377 �1PL 03-�3-08 CALCULATED BY �ATE � � � t i o � 5 SCALE NO SCALE � E N G � N E E R 1 N G GENERAL NOTES: MURGAN R�MADE! J���0302-OB S IF NcW GONSTRUCTION ADJOINS AN EXISTING STRUCTtJRc,THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYINGl71MENSIONS. DE81GN CRITERIA: ELEVAT�ONS AND ALL EXISTING CONpIT10NS. UNDcRPiNNWG AND SHORMG OF EXISTING S�'RUCTURES S�1ALL BE T}i�RESP�ONSIBILJiY OF TNE C�NTR,4CTOR R(TOF U1IE LOAiI- 100 PSF CpSUSULT W1TH T+iE ENGINEER FOF SHOR4NG DcS9GN AN�+RE��OP�II�AEN�RTIO�IS ROOF DEAD LOAD. 15 PSF BASIC WIND S3'EE��3 SEC GUS�: 90 MPH ('��T IN CONTR,4CT). WIND EXPQSURE: 6 6. WHILE EVERY EF-��RT IS MA�E TCY PROVI�E A COMPLETE AND ACCUR,47E 5ET SE15MIC DESIGN CATE3�RY: C dF CONST�UCSIOt�DOCUMENTS,ERRORS OR OMlS810NS MAY OCCUR. IRC eDl?1'JN: 2003 RE'_EPSE OF THESE DRAWINGS.4E+1T;CI?ATES CONTINI;ED COOPERATIQN AND COMMUN1CAl10N 6E7WE=N THE CONTRAC70R,ARCHIYECT RNJ cNGINEER TO SlAUC1lJRAL WOOD FaAMING: PROVIDE THE BES7 POSSfBLE STRUCTURE. 1, EXCEPT WHEE�E NG7ED OTHERWISE,ALL 2"NOMINALLt1M9ER EXCEPTSTU05 3HALL�E��UGtAS F'R-LAACH�M2 AND BETTER ALL SOLIO TIMBEP POSTS AND BE.4AtiS 3'NOMINAL A�D WIQER SHALL BE�OUGLAS FlR-LARCH#2 UN�SS r�oT�o orHeawisE ou P�rv ABBREVIATIONS LIST 2. S7UD5 5HAt�l,BE S�U6 GPADE AND BETTER HEM FIR OR DOUGLAS FIR-V1qCH, 3. BLOCK9NG W{THIN F LOOR JOIST SPACES BENtiATH POSTS NOTEt ON PL4N ABV. ABOVE SHALL H�OF E�UNAL�NTAREF OF THE COLUMN ABOVE. SWG'_E STJD BLKG. BLOCKING TAIMMERS DO NOT REQUIRE ADDITIONAL BLOCKiNG iN THE FLOOR. BM. BEAM 4. FEFER TO'THE 2002�IRC TABLE R602.3(1)OR 2007318C TABLE 2304.9.t FDR BRG. BE,4RI NG MINIMUM�ASTENING 3CHEDULE A CO?Y OP THIS TABLE CAN 9E PROVIDED UPON REOUEST.AS S'fATED IN SECfiJN 23D4.9.5 OF Ti�iE 20031BC SECTiCN COL. COLUMN 2304.9-5 FASI'ENERS=C?RFRcS;RVA�iVE-TA:A7E�JANd C.p. CRIPP��PQST FIAE-RETU,RDANT•TREi{7ED WQdD SHALL BE 0�HCJT-pIPPEC ZiNC-COATEC GALVANIZED STEEL,S"tAINLESS STEE'"SILICON BRONZE OR COPPER. EO. EQUAL FASTENINGS FOR WOOp FOUNOATIOEVS SHALL BE AS REQUIRE�IN AF&PA �XS��, EXIS�I I�G TECHNICAL REPORT�o.7. HDR. HEADER 5. UNL�SSN01EDOlNERW[SE STEELCONNECTORSSHALL3EUSEDTOJOIN JSTS. JDISTS RA,F"TERS,JOISTS AND BEAMS SLtCH AS SIMPSON STAONG-iFE CONNECTORS OR EaUIVALEN7 K.S. KING S�UD LVL LAMINATEQ VENEER LUMBER 5, NUMBER OF STU03 INDICATE�ON PLANS FOR BUILT UP P�STS ARE TfiIMMERS ONLYAN�DO NDT INCLUDE KING STUDS. O.G. O�I CENTER I� PL,4TE 7. AT BEAM BE.4RING_OCATIQMS IN STUD WALLS,PR�UIDE MC7LTIPLE-STUD REF. FiEFERENCE POSTS EflUAL TO WICTH OF BEAM LINLESS NOTED 07HERW[SE. T TRIMMER B. LAMINqTEp VENEE'�i LUMBER(LVLJ SHALL HAVE THE FOLLOWING MINIMJM PROaERTiES TYP. TYPICAL ��Exuw�e=r�oin�sra�ss z6oc asi VIF VERIFY W FIEL� �noou�us or E�:rncirv: i,soo,000 Psi W� WITF-I TENSI ON PARALLE�TO GR,41N: 1 B50 PSI COMIPRESSION PA'aALLEL T�GRAIN: 2310 PSI COMPRESSiON PA�ALLEL T^v GRAIN: 750 PSI ?EFCP�i�4�ICULA�Tp GLJE tINE , HORiZONTAL SrIt/�Ft: 265 PSI FOLLOW TFiE MANUFF,CTUFER'S EIECOMMENDAl1ONS RcvA3iDING BLOCKING, BRACW�AND WEB Sl IFFENERS AND MULTIPLE MEMBER CONNEC7tON5. GENERAL I�EOUIREME N�S 1. CHECK ALL DIMEN:ilONS AGAINST ARCH9TECTUR.4L DRAW9NGS F�IOR 70 CONSTRUC7ICN. DO aVOT SCALE DRAWINGS. C�N7ACT ENGiNEER IF OISCREPANCIES IN�I'v1E�YSIDiVS ARE DIS�OVEFEB _ 2. TFiE STAUC'L1RaL:)P4WINGS DESCRI3E lNc COMPLET`D S''RUCTUp� �� �' �°'� ���n�' T!-EESE DRAWINGS riAJ�BEEN PREPA7EC FOR THE USE OF A OUALi=iEC � • ��Ij�r'�,���` CONTRACT�JR W{TH EXPERIENCE IN T'r1E CONSTRUCllO�l SYSTEMSAND � . i E `' TECMNI�UES DESCRl3E� THE COhfTRA�TOR SHALL PROVIDE ADE��UA7E SHflRING AND BRACi JG IN TkE PROPER S�OU�NCE.AS MAY B_REQUIREp TO ACHIEVE THE FINAL C�MPIETED STRUCTU3E. THE SERUENGE OF CONSTRUCTION IS TF E RESPONSIBtL'lY OF THE CONT�ACTOR GOh'SULT WITH CONTRACTJ ER FOR f'HORSN3 DcSIGN AND RECOMMENDAl10NS(NQT PN ���r�� ` 1 � 3, THE CONTAACTOF l5 RESPONSIBLE FOR THE MEANS,METHOOS SEOUENCES AND PRQCEDURES Ft?R CONST'rtUCT10R^pF 1}{IS PR^vJECT. NOTIFY -- STRl3CTURAI,cNGI.iJE.E��F ERR�RS�R OMISSIONS IN TH�CONSTRU�i306+t DOCUMENTS IPAMEDI�iTELY. D�NOT FROCE�4 UN71L EFCRpRB OR�MISSIOh:S ARE AESOLVED. COC�FiDINATE REpWREMENTS FOR ALL PEN�"fRATIONS THROUGH STRUCTUF3AL MEMBERS WITH STFlUC7URAL ENGINEER. JOBSITE SAFETY IS 7HE S�LE 13ESP�NSI�ILITY OF THE C�NTRACTC7R. 4. OESeRVATION VIS-5 BY TriE STRUCTURAL_NGfNEER ARE FCiR OEfERMINATIGN OF GENERAL COMP�IANCE WITH TH�CDNSTRUCTkON DOCUMcNTS THRS GBSERVATION VISITIS NbT AN IN$PECTION, TFfE CONTR4CTOF SHALL�O�V7ACT THE ENGlNEER AT THE APPROPAiATE 7lME'� SCHE�ULE THIS VISIl P.O. BOX 2494 MORGAN REM�DEL avoN.co s�s2o PROJEGT � JOB N�. 030�-08 �� PH 970.949.7100 SHEET NO. �L2 OF ��ax s�o.sas.ss�� JPL D3-03-08 CALCULATED BY DATE D � u t i o � s SCALE 3j4�� = 1'-0�� � E N G I E E � N G , — � — — — — T — � — — — -°-- � — �� I ,� � i z �_ ,� � :� ; .� - �' �,d�` _ � � \ �,��__ � � ' � r - - � _ �;. ; <.� _� _ Q r � I � o �,.� I '�J'`��' � I � �'�'�s�`�6' �' z � z `_ S� ` � I �J ��I �J� 'i � � r� I f � i I' � m w � v 'I u� rn a �- v� � � i i � i �I � l,�� � � � � • . z , ��� „9l S,S�z-C3—)��� '� U� U � J ¢ � �I I � ° � ° � � o � ` �II ' �' o W C`� 4 � ri _ �! � �� ^� ��I I � Z m � �,�`��� �� ����Jd i n � I � �.� � , � � 1 '� � � � � � I I � �9-�� �, �� � w � J �� � � 1�� I I cvJw � � � � � � � I �� wN�� � � O � � I � � � inz� ? � _ , � � X �o� z � z � �- - i � o�n � � � - - " $�—_�--- -� L � c��7J za �', � I I n_ .� cn�cn � U o ', I i ": o � � ���J� � �I ����Jb� i � m � � cn �� � �J II � � > ? C� I p p � Z �l � � � mz � zQ _ Q � � � � � � o ° � o ; 1 I!I', � � .. � � � v ��I I � � � oo ; � I Ii 0d � wo III 'I � ww -=o z z z W p _,_ � _ 1 _ L _ � _ �� ! ,, oC gr �� � � 6Y � — �— - � � i � Design Review Boar�d � ACTIOM FORM � ! Departm�nt of Community D�vQlapmQnt ��,j��,�j� ' ' i5 South Fronta�e Road, Yail, t4lorado 8i657 nn r� te1: 970.479.2139 fax: 974.479.2452 oo�►+�.R.�o�,��� wQ�: www.ViIIQOV.com Project Name: MORGAN/WYMAN WINDOW DRB Number: DRB080057 Project Description: FII�AL APPROVAL FOR A TR,4N50M 11VINDOW AppITION Participar�ts: OWNER 4VYMAN,TIMOTNY E. - MORGAN, 03/10/2008 TRUSfEES 31 S HARRI50N ST EASTON MD 21601 APPLICANT ATLAS CONSTRUCTlON 03/10/2a08 Phone: 970-926-1455 144 WILDCAT Sf�tEET EDWARDS CO 81632 License: 255-A CONTRACTOR ATLAS CONSTRUCTION C}3/10/2008 �ho�e: 970-926-1455 144 WILDCAT STREEf EDWARDS C� 81.632 License: 255-A Praject Address: 434 GORE CREEK DR VAIL Location: ALL SEAS�NS B-5 Legal Description: Lot: B Block: Subdivision: AL�L SEASOMS CONDO Parcel Number: 210].-fl82-37�1-2 Cornments: BOARD/STAFF ACTION Motion By: Gillette Action: APRROVED Secand By: Dantas Vote: 4-d-0 Date of Approval: a�/i�/ZOas Conditians: Cond: B (PLAN): No changes to khese plans may be made without the written consent of Town of Vail staff and/or the appropriate re�iew comra�ittee(s). Cond: 0 (PLAN}: DRB approual does not constitute a perrnit for building. Please consult with Town of Vai4 Building personned priar to construc�ion activitie5. Cond: 201 (PLAN}: DRB approval shall not be�corne valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS. � -. Co�d: 202 (PLAN): Approval of this project shall lapse and become void one (1)year following the date of final approval, unless a building permit is issued and construckion is commenced and is diligently pursued toward completion. Cond: CON0009828 The applicant shall add a center mullion to the proposed window to match the slid'ang door below and shall s�abmit a revised rendering at the time of building permit. Planner: Nicole Peterson DRB Fee Paid. $250.00 f A��.SEASON'S C4ND4N�JM ASSQCIATXUN 434 GORE CREEK DR.�VE VAiL,CO 81657 March 6,2Q08 Town of Vail Comnnunity Dcvclopment ]11 S.Frontage Road't�est Vail, CO 81�i57 RE:Remod�l—W3n,siow Addition in Unit�5. Dear Ladies �n.d Gent�emen: T�is letter is to infoz�m you that the Board of`1vManagers of the All Seasons Condominium Assaciation has approv�d the adciition of a window abcave the deck door on t�e south side of Unit B5. Pezmission has also been granted to vent one a�pliance ei�tter thrvugh the east wall or through the roof. I�you should have any questions,please do not hesitate to contact me. Sincerely, , ��'� r� J�+'�'� Lany G. Barnes Managing Agez�t . ��� ' Questions? Cal3 the Building Team at 479-2325 � ����T ✓ { ��d� � ��.i.����1 �" �� f Bui/din Permit Su6mitta/ Check/ist TOI�'�'0� �'��IZ Department of Commun�ty Development Project Name: �C�2�'U ��-(M� Project Address: 3 � �_ �r'�'} 5 ��� Cca ����-�' ✓ This Check/ist must be comp/eted 6efore a Bui/dinp Permit a,�vplication is a ce ted. All pages of applica�ion is complete �as DRB approval obtained (if required) Provide a copy of approval form � Condaminium Association letter of approval attached if project is a Muiti-Family camp�ex �Complete site pla� submitted �blic Way Permit application included if applieable (refer to Public Works chec{clist) Staging plan included (refer to Public Works checklist) No dum s° ter,parkina or material storaae wed on roadwa s and shoulders without written a roval �estas test and results submitted if demolition is occurring Uti"�)�fn- /�vl� Arehitect stamp and signature(All Cammercial and Multi family) � Fu�l f�oor plans incEuding building sectians and elevations(5 sets oF plans for Multi-Family and Commercial Buildings) ❑ Window and door sthedule �Full structura! plans, including design criteria {i.e.loads) �uctural Engineer stamp and sig�ature on structural plans (Afl Commercia{' and Multi Family) � Soils Report must be submitted prior to footing inspecCion �Fire resistive assemblies spec[fied and penetrations indicated ❑ Smoke detectors shown Qn plans ❑ Types and quantity of fire�laces shown Applieant's Signature: � Date of submittal: ���/`�� Received By: 11Vai11dalalcdevlFORMSIPERMITSIBLDGPERM.C3pC D4l0212403 /1 t� i V����I�11J BUILDING PERMIT ISSUANCE TIM� FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and appraval, a Planning Department review or Health Department r�view, and a review by t�e Buiiding Departrnent, the estimated time for a total review will take as long as th�ee (3) weeks. Afl commercial (large or small) and all multi-family permits will have to fallow the above rnentioned maximum requirements. Residential and small projects s�o�ld take a lesser amount of time. However, if residential or smaller projects impact the various abave mentioned departments with regard ta necessary reuiew, the�e projects may also take three (3} weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, �h�e undersigned, understand the plan c9�ecic procedure and time frame. I also �nd�rstand that if the permit is not picked u� by the expiratiQn date, that I Enust still pay rhe plan check fee and that if I faii to do so it �may affect future permits that I apply for. Agreed to by: �'���+�.1 �l� S� 'nt name �- ; 5igna�ure Project Name: I "lO�C� ,�� r��9'�' r Qate: .� Z� o . F:everyone/forms/bldperm3 `�, �� ,. TOI�lYOF VA,[L '� H�W DID WE RATF WITH YOU? Tflwn of Vail Sunrey . Commvnifiy Development�]epartment R�ssell Forrest, Director, (970)479-2139 Check al�thaE appiies. �, Which Departrne�t(s) did yo� contact? � Bui#ding � Envi�onmentaf Housing Admir� Planning DRB_�PEC _ � 2. Was your initiaf contact wi�h our sfaff immediate � siaw or �o an�avaiiable ? 3. If yau were required ta wait, how long was it before you were helped? N/� 4. Was your project re�iewed on a timely basis?�/No ! if no, why�ot? ; ; 5. Was#his yaur first time to file a DRB app � PEC app I S�dg Permit bC NlA , I i 6. Pfease rate#he performance of the staff pers�n who assisted you: 5' 4 3 2 1 Name: N,�o�„� , �o� S�'�� ' � nowledge, responsiweness, avaiiabi ity) a 7. Qveraf� effective�ress af the Front Se�rice Counter.�5 4 3 2 1 8. What is the best time of tlay for you t� use the Front 5ervice Caunter? 9. Any commet�ts you have which would allow us to better serve you next time? ; � � I I 7han�c you for taking the time to comple#e this survey. W� are ' � committed to improving o�r serv�ce. , � . . I i ! qcSi. ��� r:' j� � ��`f �� ��� WWEN A "PUBLIC WA1Y PERMIT" IS REQUIRED PLEASE REAC�AND CHECK OFF EACH OF THE FC�LLOWING QUESfIONS REGARDING THE NEE� FQR A "PUBLIC WAY PERMIT": ❑ Is this a new residence? YES NQ � ❑ Does demolition work being performed require the use af the Right-ot-lNay, easements or public properly? Y�S NQ� ❑ Is any utility work needed? YES NO �` ❑ Is the driveway being repaved? YES NO � o Is a d+fferent accESS needed to the site other than the existing driveway? YES N0�''L ❑ Xs any drainage work being done tf�at affects the Right-of-Way, easements, or ,�ublic propert�r? YES NO � � Is a "Revocable Right-of�Way Permit" required? Y�5 I�O�_ � Is t'�e Right-of-Way, easements or public property to be used far staging, parking or fencing? YES NO �� If answer is N0, is a,,Aarking, staging or fencing plan required by Public Works? YES kVp y` If you answered YES to any of these questions, a "Public'Way Permit" must be obtained. "Public Way Permit°applications may b� obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call l.eanard Sandova] in Publie Works at 479-Z198. � I HAVE READ AND SWERED ALL THE A,BOVE QUESTIONS. � .- f-��1�5 �,,s�'�.���.�J Contractor Signature Company Name Job or Project Name: d" ����`'/��'''1� �ate Sigr�ed: ,3`Zo�'d� F:/everyone/forrns;bldperm4 ��#: u ❑ - 0 ❑ � ❑ � APPLICATION Parce� #: ❑ � ❑ � � � QV ' 0 � - ❑ ❑ ❑ �,`� FOR TOWN OF VAIL � ❑ � , n � � � �� PUBLIC WAY PERMIT 19 Bldg. �'ermit#: L-� TOW�NOF YAIL 1' Job Name Street Address � �; � _ ❑ (lt unknown call 479-2138 ext 0) �' Excavating Contractor Neme Mailing Addre�s TpV Contractor's License Number REQUIR�p ( 1 City State Zip Phone# 3' Start pate Completion Date (Permi#Expiration Date) 4. Work iS #or{circle one) Water Sewer Gas Electric Telephone CATV �andscaping Tem�. Site Access Other � 5. Trench-width Length Depth (min. 4'y Total SF $ Total LF $ i Band Amount $ Permit Fee Total Perrnit Fee $ i B. ALL MATERIAL, EQUIPNfENT, AN[7 TRAFFIC CO ST BE ON THE JOBSITE BEFORE Ti�E JQB IS STARTEa. ' W 7. Rubber out-riggers are required on excav g t en work�ng on asphalt. . , Asphalt surfaces underneath the buc t a g I otected at ai!times. 8. A signature below indicates a revi h util�#y lacations and approvals. Once all utility company '; signatures are abtained, permittee t ting application thro�gh the Pub9ic Works office to obtain the � necessary'�awn of Vai6 signatures, ow up to one week to process. ' Public Service Company (1-800-922 ) I Public 5ervice Natural Gas Grou� (1-800-922-1987) ! U.S. West(1-800-922-1987) j TCI Cablevision of the Rockies {1-800-922-�987) i Eag{e River Wafer & Sanitation District(970-476-7480, ext. 114) I Ho1y Cross Electric Company (1-800-922-1967} Town of Vail Electricians (970-479-2158) Town of Vail Irrigation (970-479-2158) Town of Vail I'ublic Works Construction Inspector(970-479-2198) ' 9. THEfi� WILL BE NO TOTAL STREET CLOSt�R�SE A cortstruction traffic con#rol p{an must be approved by the Public Works Departmer�i prior to issuance of the permit. � 1 a. All excavaiian must be done by hand within �8" of utilities--(Senaie Bill 172}. ; 11. Permittee rr�ust eontaci f'ublic Works De artment at 479- 198 24 hour rior to commencing of work. Failure to notify the Town will res�lt in forfeiture of bond money. Scheduled inspections which are not r�ady may result in the Town � charging the contractor a reinspectior� fee. 12. ! certify that I have read alf chapters of Title 8- Public Ways and Property, of the Vaii Municipal Cade ar�d all utility cflmpany agreements, signed by me, and will abida by the same, and that all utilities have been notified as required. � Contractor's Signature of Agreement Print name clearly Date o#Signature aTTACH PLAN OF WORK, INCLLID�NG CONST�UCTION T�RAFFiC CONTROL PI�AN White-F'ublic Works Show streets with names, buikdings, and location of euts. USE DASH t.iNES FOR CU7 Yallow—Contractor �� d 71D�N�7F YAI�, PUB�IC WORKS AND THE PUBLIC WAY PERMIT PROCESS Ho�v it relates ta Suilcling Permits: :- Fill out the attached check list wFth tE�e Building Permit Application. If yes was answered to any of th� questEOns then a "Pub�ic Way" permit is required. You can pick up an applicatoon at either Communiry Development, Eocated at 75 South Frontage Road or Put�lic Works, located at 1309 Elkhorn Drive. > Notice sign-ofFs for utilrty companies. ALL util9ties must field verify (locate) respectEVe utilities prior to signing applicatior�. Some utility companies require up �0 48 hours notice to schedule a �ocate. � A cvnstruction traffic control/staging plan must be prepared or� a separate sheet of paper. An approved site pfan may also be used. This �lara will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, 5taging, etc.}. This plan will expire on November �st and will need to be resubmitted far consideration for approval through the winter. Be aware that your resubmission far winter may be denied depending on the �ocation of construction. � Sketch of work being per€vrmed must be submitted indicating dimensions (length, width and depth of work). This may be drawn an the traffic control plan or a site plan for the job. � Submit com�leted ap�lication to the Public Work's office for review. If req�ired, locates will be scheduled for the Town of Vail electricians and irrigatic�n crew. The locates take place in the morning, but may requlre up to 48 hours to per�orm. : The Public Work's Constre�ction Inspe�tor will review the a�plicatian and approve or deny the permit. You will be contacted as to the status and any req�irements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. > As soon as tf�e permit is appraved, the B�ilding Department will be notified, aflowing the "Building Permit" to be released. Please do nat confuse the "PublEC Way Permit" with a "Building Permit°. � NOTE: The abo�e process is for work in a public way QNLY. Public Vllay Permits are valid only until November 15th. A new Public Way Permit is required each year if work is nvt complete. Re-application each November 15th does not mean an automatic renewal, I ha read a un stand the aboue. � �Z� / C� B� ignature DaCe Signed :/everyoneJforms/bldperm5 �� � ��1, �!' 1'�1I� �RAINAGE AND CULVE'RT IMSPECTIONS ARE REQUIRED BY PUBLIC WORKS� Please read anr� check off each o#'the items below: �The Towr� of Vail Building Department has developed the following pracedures to ertsure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. / ; .6 The Town of Vaif Publie Works Department will be re�uired to inspect and approve � drainage adjacent to Town of Vail roads or streets and the installation of temporary i or permanent culverts at access points from t�e road or street onto the construction �, site. Such appro�al must be obtair�ed prior to a�ry requests fQr �nspec�i�n by the ' Town of Vail Buiiding Department for footings, temporary electrical or any other inspection. Please call Leonard Sandova� at 479-2198 to request an inspection f�om the �ublic Works Department. Allo�v a minimum of 24 hour notice. ; ,p�Alsa, the Town of Vail Public Warks De�artment will be approving all final drainag� ; and culvert inst�llation with resulting road patching as necessary. Such approvaf must be abtained prior ta any Final C�rtificate of QccupancX issuance. A�greed to by: �lsa� +�-�PST int Name � ; i , Signature Project Name: ���L.l�� �tl ��'✓ Date Signed: � " Z" " � $ F:/everyo n e Jfarm s/b I d pe rm6 l4 � 1 V II 11 V��l�li.r �lATERIAL STORAGE AND C�NSTRUCTION PARKING �lease read and check aff each of the items below. (Copies of cnmplete text are available upon request} CODE 5-2-10; DEPQSI'T5 ON PUBLIC WAYS PROHIBITED Urolawful deposits; Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause ko be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris ar rrtaterial upon any street, sidewalk, alley or public place, or any portion thereof. �Notice; Abatement: The Director of Public Works may r�otify and require any person who violates or causes another ta violate the �rovision of su�section A hereof, or w�o has in the Director's employmenr a persan who violates or causes another to violate the same, tap remove such sand, gravei, rocks, mud, d�rt, snow, ice or any other debris or material wi#hin kwenty four (24) hours after receipt of said notice by the pirettor of Public VVorks. In tne event the persan so notified does not comply with the notiee within the period of time hereo� specified, the Director of Public Warks, or other authorized agent, may cause ar�y such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other materiaE to be removed • from any street or alley at khe exp�nse of the notified. �ummons and �enalty: As an alt�rnative ta the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, rnay be issued a s�mrnons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation he ur�der be punished as provided in Section 1-4-1 of this code. � Notice and Perral : It is unla ty wful for any person to fail or refuse to eomply with the notice of the �irector of Pubfic Works as provided in subsection B �ereof, and any such person shall, in addition to payment af the expense of remaval incurred by the Director of Public Works, as provided in subsectian B hereof, upon �eing found guilty of a �iolation hereunder, be punishable as provided in Section 1-4-1 of this Code. {1997 Code: �rdinance 6 (1979). CODES 7-3A-1 AND 7-3A-3: PARKING 485TRUCTING TRAFFIC &IMPOUNDMENT AUTHORIZED �o person shall park any vehicle upon a street or at any other p[ace wit�in this Municipality in such a ma�ner a� under 5uch conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) � 1) F�enever any police officer finds a vehiele attended or unat�ended, standirag upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any seGtian of this Artiel�, or lef� unattended for a period af twenty f�ur (Z4) hours or more and �resume�l to be abandonetf under the �onditians p�escribed by Calorado Revised Statutes sectian 42-4-1�.02, as amended, the officer shalf require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar{$10) impoundment charge. (Ord. 2(1968) § 3: Ord. Z8(1981) § 1j i have read and will comply with the above code provisions: ��x5n ���5'� int Na �J • � � Si�nature Pasition or Relationship to Project: !-!�f� � •,f�� Date Signed: ���o f°� f:leveryone/forn�s/bld{�erm7 � ., Vai12004 h Vai� Vi�lage and �ionshead 1Jil�age Constructian Hours i Information Handout � Problem Statement The Vail Viliage and Lionshead Vkllage are inva�uable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy everythir�g the Vai� Valley has to offer. The community and merchants rely upon our guest to generate revenue. Our summer/winter guests expect a pleasant experience while in VaiL � I To insu�e that all af the propased construction has as little negative impact an the community and on our i guest as possible, the Town of Vail finds i# imperative to creat� and implem�nt the Vail Village and Lionshead Village Construction Hours Handout. It would be irresponsible for the Town of `Jail, the Cor�struction Contractors and the Merchants, to not actively participate to rr�i�imize the impact of construction in the Vail and Linnshead Voll�ge areas. New for 2004-2006 will be the Vail Village Streetscape Irnprc�vement Project. Work to include ali utility related improvements, streetscape, drainage, snow�nelt systems and landscaping. All Construction projects andlor remode�s within the Vail Vi�lage Core Area shou[cf contact Scott Bluhm Torvn of Vail Streetscape Cc�ordinatar at 970-477-3418 for further information. Givens �� � The following givens are intended to provide the basic foundation by which construction will be complet�d �� in the Villages � � • The public's health, safety and welfare shall be honored at al8 times..� q�� � • Adequate pedestrian, loading/delivery, vehicde, an� em�rgency vehicle-access and circulation shall be maintained. _ ; �.. z �, :, � .,. . • Roadways and pedestr�an walkways shall be kept clean and free of dirt a�nd debris. ��'A • All construction deliveeies, equipment, tools and materials entering the Vail Village and Pede�s#rian � areas rnust go through Check Point Charlie. All Lionshead constructinn activity must gn to the Vai� � Police Department for a parking permit. Da not use d�livery zanes for construction parking, refer to appro�ed staging plan or make other arrangernents for parking. ' _ _,.:.. =�,s.~' • The hours of Outside Constr�ction Activity shall be as follows: - April 95—June 1B & �eptember 7 - November 19, 7 a,m. untif 7 p.m., seven days a week. Jun� 18 thra September 10,work must end by 4:00 p.m. an Friclays. hlovember �3—April 15, 20a5 work allowed within daylighfi hours only. � { - Deliveries shall be restricted to the hours of 7 a.m. to 11:3a a.m. an Gore�Creek Drive and 7 a.m. � to 8:30 a.m. on Bridge Street. - Special Construction deliaery p�rmits must be requested in advance, from Publie Works in '� conjunction w�th Code Enforcement at Checkpoint Charlie. ! i - No construction activity shall occur on Saturday or Sunday between June 19 and , September 5. !, . � - No outside construction activity shall occur on the followi�g dates: Saturday, February 14, Sunday, February 15, and Monday, February �[6. Presider�Ys Weeke�d) Saturday, Nfay 22, Sunday, May 23 and Monday, May 24 (Memorial Dav1 Friday, June 25, Saturday, June 26 and Sunday, June 27. (Vail Arts Festiva!} Friday, July 2, Saturday, Jufy 3 and Sunday, July 4 and Monday July 5. (Inde endence �a Saturday, September 4 , Sunday, September 5 , and Monday, September fi. (Labor Da}�Weekendl. Fr[day, Sept�mber 10, Saturday, September 11, Sunday, September 12 ir� {Lionshead) Saturday, September 18 and Sunday, September 19. at (Vail _Vilfac�e) - (October�est! Thursday, November 25, Thanks ivin Da Friday, November 26, Saturday, November 27 and Sunday, t�ovember 28. � F�riday, December 24, Saturday, December 25, Sunday, December 2fi. [Christrnas Dav Hol�davl Friday, December 31, Saturday, January 1. (New Year 2QU5} Sunday January 2, 2005. No Work allowed the entire week of the Christmas/New Year Floliday w�thin the TOV right of way. • The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m. -- 7p.m. for construction activ�ties from April 1� through June 18, and from September 7 through November 19. The Noise Ordinance shall be in effect and strictly regulated from June 19 through September 6 and November 13, 2004 to April 15, 2005 • All construction sites wiN be required to obtain an Approved Cons#ruction-Stagin��from the Town o� Vail Public Works Department in conjunction with Code Enforcement. (The approved staging/parking �lan is required to be onaite at ail tirnes�. • The Town of Vail reserves the right to a�nend the Vai1 Village and Lionshead Village Construction Hours regulations at anytime should abuses or problems arise. • The Three-Strike R�le will be enfarced. Step 1. {Written warning), Step 2. (Written warning), Step 3. (Construction site will be Red Tagged until all violations ar� resolved}. Expectations The following expecfations are established to insure the success of the Vail Village and Lionshead Village Construction Hours Plan: � Full and complete cooperation and understanding from all �arties ir�volved in the cQnstruction activity in regards to this plan. • Strict adherence and compliance with the requirements outlined in the constructian plan. • I�espect and consideration for the afFected interests and parties. If you have any questians, Please cantact the Town of Vail Pubfic Works Department (Construction Inspector) or the Vail Police Departmerrt(Code Enforcement Officer) 970�79-2198 970-476-7603 . I1 l� �'D�N OF YAIL � Vai12004 Staging / Par'ng Plan Xnformation The Sta�in� ! Parkin� Plan Philosophy- Is a very important step in the building process. Striking a balance between safe public access and giving construction projects room to build is becoming increasingly cha�lenging, for us to meet all the needs of those who will be impacted by construciion projects. The fact is, there is less room to build in the Town of Vail. Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Priviiege, not a given righ�. We talce into account when we review and approve staging / parkir�g plans, impacts on neighborhoods, tourisrn, business and the traveling public alon�; with your right to build. The General Contractor is responsible for a!1 subeontractors and all construction activitv relatinQ to tlte buildin,�proiect. The s�agin� plan will be enfarced accQrc�ing to the Approved Set of Building and Staging Plans. You are required to keep a copy of the � Approved Staging Plan on site. � Two staging /garking plans are required, a sutnmer and winter. Summer staging plans expire on NovembEr 1, and winter staging plans expize on April 15. I'1rlote; There is no on , street parking in the winter season and all rnaterials, equipment, etc must be 10' off the ed�e af asphalt). Enforceme�at of all staging/parking plan is as follow�. A) Staging/ Parking Plans to scale required. B} Once the plan is approved, they will be held to complete coznpliance. C) We will use a 3 step and yo�'re out,process. Step One- Verbal and written warnings as to the staging plan violation, then have contractor sign and date field memo warning. Step Two- Police Department issue t�ckets and tows or public worl�s writes second � written warning to all vio�ators who have been notified under step one and who are still in violation af the approved Staging / Parking Flan. The Town of Vail Chief Build�ng � ��ficial will call the contractor and notify them, the next time any violation happens, the � building department wi13 red tag the constr�ction site for 4$ hours. Sten Three- If still in violation after step two, a 48 hour Red Ta� will be issued to the � project site. If you have any Questians, Please contact the Tawn of Vail Construction Inspector at 974-479-2198 r _ � . Requirements for an Accepta6le Stag�ag Plan It is preferred that and Approved Site Plan is used to draw a staging plan, but a hand drawn plan may be used as long as it is dawn to scale and is neat and legible. l.) The Staging Plan must shaw the followin�: (a) Show all parking that is requzred for the job site. �Includinb constructian equipnient}. (b) Show the locatian of all znaterial that will be staged on site, {c) Show the locatian of all dumpsters and port-o john that are to be on site. {d) If a fence is required, tkr.en show the location of the fence and describe the material used for the fence. (�) Zf trees and / or vegetatian is required to be protected, then show how this will be done. (� If this stagin� plan is for a Demo Perniit, then show staging for dump trucks and all related equipment. I� the Town of Vail Right of Way area is needed far staging, then a Traffic Control Plan is required in conjunction with the staging plan. (g) Please provide and sha��v an Erosion Control Plan, , (h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Sta�ing Plan. 2.) If work needs ta occur in the right of way, then add a Traffic Control Plan to the staging plan showing the foilowing: (a) T'he ��ork zone (area th�t is to be performed) (b) Traffic Control De�ices {warning, signs, cones, flag�ers, ete.) (c) Distances that all devices will be set up fram the work zone. Also shdw alI dimensions of work being perforn7ed in the right of way. All traffic cantrol plans rnust conform to the MUTCD manual.(Manuai af Uniforn� Traffie Control Devices) 2.) This plan �rill be r�viewed by Public Warks and 'af Necessary the Folice, Fire, and Community De��elopment Departrnent. Onc� the stagin� plan is approVed, it will be registered with the departments listed above and enforced. 3.) The Village and Lionshead area have outside construction restrictions, please becanie familiar with the Vai12004, Vail Village and Lionshead Canstruction Haurs handout. **************�+******************************��*****�*********************+********�******* TOWN OF VAIL, COLORADOCopy Reprinted on 10-31-2013 at 14:15:20 10/31/2013 Statement *****�**�*+�****�********+*****************�*�*******�******�****�*******�******�*�**�****** Statement Number: R080000264 Amount: $250.00 03/10/200803:50 PM Payment Method: Check Init: JS Notation: 5548/ATLAS CONSTRUCTION ----------------------------------------------------------------------------- Permit No: DRB080057 Type: DRB-Minor A1t,Comm/Multi Parcel No: 2101-082-3701-2 Site Address: 434 GORE CREEK DR VAIL Location: ALL SEASONS B-5 Total Fees: $250.00 This Payment: $250.00 Total ALL Pmts: $250.00 Balance: $0.00 *****************�********�************************+******+**+**************+*************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ DR 00100003112200 DESIGN REVIEW FEES 250. 00 ----------------------------------------------------------------------------- E08-0065: Entries for Item:190 - ELEC-Final 14:15 10/31/2013 Action Comments By Date Unique_ Ke AP SHAHN 10/06/2008 A000118 398 Total Rows: 1 - ., � :. Page 1