Loading...
HomeMy WebLinkAboutB13-0477 CR1 GRFA Permit Clarifications � B13-0477 Received ZE H R E N TO WN Q F VAI L By Lynne Campbell at 8:16 am,Nov 14.2013 A N D A S S O C I A T E S Wednesday, November 6, 2013 Town of Vail Community Development Department 75 South Frontage Road Vail, Colorado 81657 Re: Gerald R. Ford Amphitheater Phase 2 Building Permit Clarifications Mr. Haberle: On behalf of the Vail Valley Foundation and the Town of Vail, Zehren and Associates respectfully submits this letter of clarification in response to the comments received on November 5, 2013 in response to Issue D, Permit Set, October 16, 2013 for the Gerald R. Ford Amphitheater phase 2. Please see our responses in our revised set of documents and specifications labeled Issue E, For Construction, November 6, 2013 and as noted below: General • Page 9 of the Geotechnical report provided by Ground Engineering is revised by understating that The drilling contractor will submit a written procedure addressing he use of casing, slurry and concrete placement prior to the commencement of construction of the drilled piers to the Town upon review and approval of the Geotechnical Engineer. ■ Page 30, Item 3 of the Geotechnical report provided by Ground Engineering is revised by understating that special inspections are required for structural concrete. Specifications • Summary 011000, page 2, Section 1.4 Item B has been revised: Per an agreement with the Town of Vail, Contractor must provide pedestrian access to the Nature Center Bridge from East Betty Ford Way by November 15, 2013 and full pedestrian and vehicle access through the site by November 27, 2013. Sheet A0.1 • The Code Summary is provided on Sheet A0.2 • Deferred Submittals include: 1. Final stamped design engineering for the Tensile Structure Canopy Sheets C1-C4 ■ The relocation of the sanitary sewer line has been included in the set Sheet L1.2 ■ We have removed all proposed landscaping in the noted areas at this time and will be meeting with Betty Ford Alpine Center to discuss any future improvements in these areas. Sheet L1.4 ■ Handrail extensions have been revised � ❑� , P.C� f�c�� 1976•Avon,CO 81620• (970) 949-0257• FAX(970)949-1080• vailQzehren.com , �i �t�'„�,,..,.,;,��,�,�.,r 1 U" tl Paseo.•Santa Barbara,CA 93101 •(805)963-6890• FAX(805)963-8102•santabarbara@zehren.com n"�`"" `�'�"":'' www.zehren.com Sheet L1.6 • Sheet Ll.6 is provided Sheet L5.1 ■ Refer to Civil Drawings for Storm Sewer design Sheet L5.2 ■ Stone canopy columns are battered and irregular as indicated in the documents. Sheet A1.1 ■ Chapter 1 1 of the IPC requires a primary and overflow drain, the overflow is allowed to be a scupper which we are showing. ■ The plans have been submitted to Environmental Health and reviewed on site with Bill Carlsen, we expect an approval letter within the next couple of days and will forward upon receipt. Sheet A1.2 ■ Drinking fountain count has been indicated on the Code Summary on sheet A0.2, including identification of existing and accessible fixtures. ■ All counters in the dressing rooms are noted to match detail 5/A5.3, which shows the counters at accessible height with required knee and toe clearance. The intent is all counters will be accessible. Sheet A1.5 ■ The Teflon roof material is designed to shed rather than retain snow and as such edge diverters are incorporated into the design to control where drops zones will occur. The anticipated drop zones are now indicated on sheets A1.4 and A1.5, and the edge diverter detail is also provided. The drop zones are all anticipated to occur in landscaped areas out of the public way, where a drain inlet is provided at grade. Snow slide from the roof will be incremental as the coefficient of friction will not permit a large snow buildup, common with other roof forms, to occur. Sheet A2.1 • See sheet A0.2 for egress information. ■ The building is a "summer use only" facility and is not mechanically conditioned. Sheet A5.2 ■ The building is a "summer use only" facility and is not mechanically conditioned. ■ We have revised the roof/ceiling assembly to indicate fire retardant treated framing as allowed per Section 603 for Type IIB construction. Sheet A5.3 ■ The building is a "summer use only" facility and is not mechanically conditioned. Sheet A5.4 ■ We have revised the wood blocking and framing notes to indicate fire retardant treated framing as allowed per Section 603 for Type IIB construction. ARCH I I tC I U RC • i' LANN ING • iN �i ERi (� RS P.O. Box 1976•Avon,CO 81620• (970) 949-0257• FAX(970)949-1080•vail@zehren.com 101 EI Paseo.•Santa Barbara,CA 93101 •(805)963-6890• FAX(805)963-8102•santabarbara@zehren.com•www.zehren.com ■ The mesh screen note has been revised to indicate 80� min free area, we indicate an 8" wide scupper resulting in 6.4" of free width. I calculated the required scupper width to be 6" at 5 IPH rain fall with a 1" head and 280 square foot roof. Sheet A5.5 ■ The building is a "summer use only" facility and is not mechanically conditioned. Structural re: attached letter. Sincerely, . David Baum, AIA Pedro Campos Architect, LEED AP Land Planner/Landscape Architect Zehren and Associates Zehren and Associates ARCH I I tC I U RC • i' LANN ING • iN �i ERi (� RS P.O. Box 1976•Avon,CO 81620• (970) 949-0257• FAX(970)949-1080•vail@zehren.com 101 EI Paseo.•Santa Barbara,CA 93101 •(805)963-6890• FAX(805)963-8102•santabarbara@zehren.com•www.zehren.com � �J & ������ � I � l�Ionroe � Newell ��;z,�;ii,ct�:�, Iric�. G`,91� • ��i.fiVCf November 7, 2013 Zehren &Associates Inc. �& E. Beaver Cr���Blvd., �uite 303 PO Box 197b Avon, �O 81620 Attr�: David Baum Re: Ford Amphitheatre Phase II Improvements Vail, CO M&N Ref: 8727.09 Det�r 1��Ir. t3a�i�n: The following is our response to the structural portian of the Town of Vail GRFA Town Plan Check Comrnents dated 11✓5/13. Our responses are noted with "M&N Response:" • ��.l - I7ei�rrc�1 �L�1�mittE�l tc� l�c siiL�r�itt�c� i�� t�uilciii�� �e��artqii�i�t I'c��- c�evicw a�ter ��1�i�7eei•cy('rr:cor�i �•��,+icw ant� �»•ini•t�� ii��tall�iticrii. M&N Response: See a�tached revised 51.1 drawing with Section 11 added to General Notes. • S 1.2 -How att�ached? i��Id:Tw R�:s��on5�:: See zt[ac4iec� reviscd S 1.� c�rawin� Gvith ��c�te gn�iicatin� cit��zc�iin�i�t cai`�cn�e�•. • S 1.3 - Arch Details do not reflect a proposed sad roof. M8cN Response: See attached revised 51.� drawing with sod roof removed from Sections. ��-«,'w.371r.1[1 rc)t'-ite�t�t.'I I.L'[)]37 �rIU[1 Gl�n:srr�i • tit�ile lCll • I)c:ti��[:�', (:qlc�r:icln fiil�f7?' (if?3) 6"l3-�is)27 r l=Ak (iUi] (i23-frf�[}y • �mai�; s.lenues'�9r3�t�c�rcrc-ttr��-ckl.cc��ai • S2.? - Wl�ere i� c�et�il fc�r riew �per�in�? M�:N Res��c�ris�;; S�:e att��c€ie�1 rei�isc�l 42.2 c4�•tiGVit�� Lcar i�otc rc�;a€�clit�� sill c�i'�lc��+�� ���ei�ir��. !'�lsa se� �t�w Sec.lic�n �lS 1.3 cut an 53.2. • 53.2 - Ple�sc �•elct°ca�c� �v�ll �ii1�l cranneciian d�iail. MBcN l�ispcja�5e: See t�tc�c€ieci 3-c�ised 53.2 ci�•awii�� tivit�z r�c�te a�ef�re•ict�; tc� Lxislin�, t;trr;�7�ction ��f cxis�irl��V'l Sx�l�. I1'y�u h�vt �tr�y c�ur�5lic�n� �d•c:oi��,me��ts, ��leasc call. V'ery t��uly yt�urs, �9C�Jh19't�C)I;c�: I�F:W�;I.G L;NCi1Nl�.f�FtS. INC. � � ���'�'r� {C c Jan�es I. N�ss, �'.L. ���Q'� '`s'�: j�t'1f7G1�)�1� : .;� I:11C�C7SLl1'G'S �.* . ... `����`�� � ��'�����.E� /► � .� L'' Ford Amphi[f��atre Fhase II Itn�re�+�men[s 2 review�omments fNS+fV 87�7A9 � Memorandum AlpineEng.Inc. To: David Baum,Zehren and Assoc. CC: Jack Hunn,Gary Almgren From: Glenn Palmer AEI,970-926-3373ph. 970-926-3390(fax);Palmer@alpineciviLcom Date: November 7,2013, Updated November 13, 2013 Re: Ford Amphitheater Bldg Permit Comments . 1. Sheet CO1.1 a. Site Specific Note#3. Added: "A separate building permit is required for the sewer line relocarion work". b. Site Specific Note#5: Added: "Refer to Architectural and MEP plans for new electric and water services to the new beverage area". c. Site Specific Note#14.Note Added : "Protect TOV and BFAG raw water irrigation main lines from damage" d. New Note: Added: "Separate Special Inspections,including reports are required by the Soils Engineer for items such as trenching of piping. The Soils Report Prepared by Ground Engineering states: (under"Project Earthwork") i. Existing Fill Soils: A Geotech Eng should be retained during site excavations to observe the excavated materials and provide recommendations for its suitability for re-use. ii. Use of Existing Native Soils: A Geotech Eng should be consulted regarding appropriate recommendations for usage of such materials on a case by case basis,when such materials have been idenrified during earthwork. iii. Imported Fill Materials:If necessary to import material to the site, ..... samples should be approved prior to transport to the site. iv. No fill materials should be placed,worked or rolled while they are frozen, thawing, or during poor weather conditions v. Etc.Refer to the soils report for additional requirements 2. Sheet CO3.1 a. Gore Creek Bridge to Betty Ford Way: Answer: The existing path is to be sloped at 5%from the north end of the bridge to the ADA path along the south side of East Betry Ford Way. b. Arrow pointing to Exist Sewer MH in courtyard: "Possibly back water valve situation": Answer: (Code Check): Per IPC Secrion 715 `Backwater Valves/Sewage Backflow": The topo/surveys indicate that the(lowest)stage level/dressing area floor elevarion is 8201.7,which is higher than the MH in the courtyard(Rim=8198.6,to be raised 0.4 feet+/-=8199.0), or 2.7 feet lower than the floor elev, so the sewer rim is lower than the floor elev. (no valve required). (Logic Check):I am not aware of any previous issues with sewer back up in this area, and the sewer invert is 8188.2(or 13.5 feet lower than the stage/dressing finish floor). Looks ok to me. c. November 13, 2013 3. Sheet C04.1 a. Sand Oil Separator?Provide Documentation. Answer• We do not believe that an interceptor exists, and an interceptor is not proposed. Except for Betty Ford Way,The current runoff area consists of the amphitheater roof, lawn area,and hardscape area,which is not plowed in the winter, (not sanded),and has no vehicular traffic. b. Verify Existence and condition of the 10"starm drain.Verify excess capacity is sufficient far the volume of drainage being introduced. Answer: THe existing 10"storm sewer outlet from the Amphitheater Area was located, on the East side of�the Core Creek Bridge. Water was poured into area drains in the Amphitheater area, to verify that it was the correct pipe. Most of�the line was located and camera'd(not videotaped): The sections seen appeared to be in an acceptable condition. THe recent(AEI)drainage repart calculated the total flow draining to the 10"storm sewer,(with the addition of the new entry area drains). At the time he completed the report,the location of the storm sewer piping was based on year 2000 construction plans,(which is different than the location actually found), B UT, the drainage basins are the same(so runoff volumes should not change).Thus the calculations show that the existing 10"pipe has adequate capacity to carry the existing (amphitheater flows)and proposed(tensile roof with compression post structure).New piping within the roofed area is based upon calculations that will be added to the report. c. Added note: insulate the water line, and or the storm sewer line,for 10 feet each side of where they cross,per ERWSD specifications. d. Added Note: Town Of Vail and VVF to review the lease agreement,to establish maintenance requirements. 4. Sheet CO5.1 a. TOV comment: "this section of sanitary sewer not accessible thru a cleanout". Answer: there is a cleanout directly north (just north of the "clouding"for your note. There is another cleanout at approx. 100 feet downstrearr�of this. (So we think this section is accessible by a Cleanout). b. We read thru the 2012 IPC cleanout section, and believe the plans confarm to requirements. But to be sure,we Added a Note: "Confarm to the 2012 IPC cleanout requirements." c. THe double direction cleanout was deleted. 5. Sheet C06.1 a. TOV comment says"Provide Proof of approved locarion,and flow control(existing outlet far the 10"storm sewer). Answer: This storm line was installed in 2000,for the previous Amphitheater Roof Drain improvements,so assume the location was approved at that time. We will provide a photo of the existing outlet pipe (if and when found,to determine if additional"flow control"(which we assume is rip-rap)is required. 6. Sheet C07.2 a. Sewer Pipe Bedding: added note: "Per Town Code,no rocks greater than 6"are allowed in the trench backfill area". b. Sanitary Sewer Cleanout Detail: TOV comment: "How is the IPC clean out requirement being satisfied?". Answer: We have added some general notes from the cleanout section of the IPC. The double direction cleanout was deleted. c. We will add the water line insulation detail(where storm sewer crosses the water line in BFW) 7. Sheet C08.1 a. WB50 backing to dock comment: "Provide enough paved surface to eliminate off- tracking into landscape areas". 2 November 13, 2013 Answer.• the driveway was widened in these areas. The updated plans show updated autoturns. b. WB62 backing into dock comment "Maintaining of exit? On a previous project egress was established for this exit.With the new gate,how is this going to be maintained? Answer: we are not aware of a new gate in this area, so egress shouldn't be impacted. If we didn't understand the guestion coYrectly,please clarify. Glenn Palmer,PE FordParkPcrmitComments.N ov.2013.doc 3