Loading...
HomeMy WebLinkAboutDRB130417 RESPONSE TO COMMENTS.pdf 2882 Wyandot-Denver,CO 303-884-9131 To: Jonathan(Spencel�-ffownbf[VaiIM From: WillllientschelM cc: Franklin[Boyerfl Date: November[18,2013M Re: Parks/leadows[Lodge[URB[2[Submittal.M M M M JonathanM M We[havelteceived[RignIOUromrthe[goIlowingMti Iities.[Signedf gheets[bre[bttached.XDOlThadMoM comment1hntilCJthe[flrawings[EiviIMrawings1breClbngi nee red[for MesignMeveIopment.Mrhe[leports0 arelbsPfollows.l7 M 1. Century Lin U-IN o1bbjections.[ZAI13mprovements3olbeq)aidUforlyllheftanagerm 2.11 Xcel High Pressure Gas—NoMonflict 3.1 1 Holy Cross Electric—NoMomment 4.[1 Xcel—[Xcellgvill(servel theMew l)uildingNvithlbllLfariffs 5.[ Eagle River Water and Sanitation—[Mlearing1bnh11/19/13 6.1_1 Comcast—[Signed,[NoMomment 7.1_1 CDOT—NoMommentslbt3hisllime Our llesponses[MolthelPublicWorks[Comments[brelbasedl bn[bldonversation[#vithlTomXassemellbt0 Public Workslbna1/12/13.®uringllhis[Conversation,N velbiscussed[thellollowingltomments,llomeM ofNvhich[bad[been[lesolved[Vialthe[aO/29/13[DRB[lesubmittal.IJ M Public Works Comments 1. All retaining walls shall be 2' off property line unless otherwise approved by adjacent owner.0 a. Plan has been revised(See sheets C-1 thru 3. Pg 1-2-3) 2.F1 There should be additional separation between the driveway and bike path. a. Planbasbeenlevisec"See sheets C-1 thru 3. Pg 1-2-3)0 3.0 No additional run-off than historical shall be permitted to sheet flow off property onto adjacent properties. No concentrated flows shall flow onto adjacent properties. a. An underground detention vault has been placed on the Northwest corner of the property. All podium and site flows will tie to this. The vault will tie(via pump)into the invert at the southwest corner of the site. (See sheets C-3.) 4.1 Show turning movements for trash and loading and delivery. a. See attached turning radius diagram (sheet 5) S.❑Show dimensions within parking structure complying with Title 14. a. See attached Parking Plan 6.❑Provide Water Quality vault for parking structure drains,foundation/groundwater drains shall not tie in prior to WQ vault. a.=Waterg�ualitygsl toveredgn lthelbewMndergroundlault3o[theM Northwest.QheM nderground[Vault[baslblbottomllorMuality. 7.F]Show snow storage. a. Snow Storage has been accommodated at 10%. See attached. (Sheet 3) 8. Utility tie-ins as shown will be extremely difficult to achieve without an easement on Lot 4. How will this be accomplished? Utilities claim a prescriptive right....notify homelbwners.0 a. Utility Tie-ins have been modified to occur in Tract A. Easements are required at this time. While this is not the most direct route, it is acceptable to the owner/developer and initially agreed upon by Public Works. In the Future, the design team may negotiate with the utility companies and the adjacent property owner via prescriptive right. (See sheets C-1 thru 3. Pg 1-2-3)0 9.[ I Provide guardrail along north edge of driveway and west edge of Loading and delivery space. a. This has been accommodated in the plan. (See sheets C-1 thru 3. Pg 1- 2-3) 10.I-Drainage easement will be required for storm sewer connection on adjacent property at the NE corner of property. a. With the proposed underground detention vault, the storm sewer connection is not needed. . (See sheets C-1 thru 3. Pg 1-2-3) Under separate Cover, you will find all requested Building Details and Elevations 0 M M M M 0 0 2 UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan. including grading plan,floor plan,and elevations,shall be submitted to the fallowing utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. /J O(Leea ew6 - - Subject Property A dress: P �rtp� Lot Block Subdivision: Primary Contact w resentative:f_ Ll hi ate2 hone: PI s Date d: C Primary Contac er resenta a Signature 30) Authorized Signature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts: Barb Davis �� barb_davisftcenturyli nk.com XCEL HIGH PRESSURE GAS ��ef ) �+ 970.406.1784(tel) 970.468.1401 (fax) Contact Remington Baker �(� remington.c.bakeE@xcelene[gy.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081 (fax) Contact:Jeff Vroorn ivroorn@holycross.com XCEL Energy 970.262.4039(tel) 970.252.4038(fax) Contacts: Pam McGuire pamela.mcauire(a7xcelen ergo.com EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact:Tug Birk Ibirk(d)arwsd.org COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact: Michael Johnson Michael johnson(a�cable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact:Dan Roussin Daniel.roussin e.co.0 NOTES- 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-oF way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval &re-verification if the submitted plans are altered In any way after the authorized signature date. _A- UTILITY APPROVAL&VERIFICATION This form serves to verity that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan,floor plan, and elevations,shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. V*(L(co Subject Property Property A dress: �"t�L /"lP �`�- Lot Block Subdivision: Primary Contact/ wmut96v resentative: 'Km etc- hone: PI s Dated: C d Primary Contac r tn�ok a Signature -f)0 [1_ Authorized Signature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts: Barb Davis barb.davis0centu ryli nk.corn XCEL HIGH PRESSURE GAS P ' 970.406.1784(tel) 1/ :5� i� e 4,C=,;u t v ;;r..Rb r= ' c f 970.468.1401 (fax) Contact:Remington Baker rem!ngton.c.bakerOxcelenerov.com HOLY CROSS ENERGY 970.947.5425(tell) 970.945.4081 (fax) Contact:Jeff Vroom ivroom0halycross.com XCEL Energy 970.262.4039(tel) 970.262.4038(fax) i Contacts:Pam McGuire g_amela.mcouireCa7xceleneray.com EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact:Tug Birk tbirk aOerwsd.or4 COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact: Michael Johnson Michael Johnson .cable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact: Dan Roussin Daniel.roussin 0dot.state.co.us NOTES: 1. Udlity locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative Is required to submit any revised drawings to the above agencies for E re-approval&re-verif radon if the submitted plans are altered In any way after the authorized signature date. ,y UTILITY APPROVAL& VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification, PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. VA-(Lrco Subject Prop41w ss: `t�LP l{� Lot Block Subdivision: Primary Con e resentative: f.>iL1 `;+�-1e,Z_ hone: ' PI s Dated: Primary Con resents a Signature _ 30)r<:; Authorized Signature Comments Date CENTURY LINK 974328.8288(tel) 974.328.8282 (fax) Contacts: Barb Davis barb-davis _centuNlink.corn XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401 (fax) Contact: Remington Baker remin,citon.c-baker@xcelenergy.com HOLY CROSS ENERGY Date: 970.947.5425(tel) 2013.11.18 970.945.4081 (fax) Contact:Jeff Vroom 09:25:45 ivroom@holvcross.com -07'00' XCEL Energy 970.262.4039(tel) 970.262.4038(fax) Contacts: Pam McGuire gamela.mcquireoxcelenergv.corn EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact:Tug Birk tbirk(E�erwsd.org COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact: Michael Johnson Michael iohnson@cable.comrast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact: Dan Roussin Daniel.roussin @dot.state.eo.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970,479,2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date. UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan,floor plan,and elevations,shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain in comments within that timeframe please contact The Town of Vail. Subject Property A dress: Lot Block Subdivision: hone: Primary Contact I w a resentative: �1�11 a,P� - �� d I PI s Dated:0 Primary Contac er resenta a Signature2 �•, Authorized Signature Comments ) Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts: Barb Davis barb.davisOcenturylink.com i XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401 (fax) Contact:Remington Baker reminaton c bakerfa xceleneray.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081 (fax) Contact:Jeff Vroom iv r o o m Ccth of vcro s s.co m XCEL Energy 970.262.4039(tel) 970.262.4038(fax) ry Contacts:Pam McGuire tlf. Pamela mcauire aC�xceleneray.com EAGLE RIVER WATER&SANITATION ` DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact:Tug Birk tbirk(cDerwsd.orn COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact:Michael Johnson Michael iohnson(a�cable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact: Dan Roussin Daniel roussin andot.state.ca.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner the R ubmittedlplans required are faltered inbany way after the authorized signabove re date.agencies for re-approval&re-verification I UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. n Y"(Lfe0 Subject Property A dress: Z /"lP L`- Lot Block Subdivision: Primary Contact I w e resentative:EALA, fff-_ hone: PI s Dated: C 0 Primary Contac r n!!n�a Signature _ , Authorized Signature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts: Barb Davis barb.davi s(a-ce ntu rvl i nk.corn XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401 (fax) Contact: Remington Baker remington.c.baker a0Kgglenergv.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081 (fax) Contact:Jeff Vroom ivroom aC�holvcross.com XCEL Energy 970.262.4039(tel) 970.262.4038(fax) Contacts: Pam McGuire Pamela.mcguire0xcelenergv.com EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact:Tug Birk tbirk(@erwsd.org COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) lWhad `70h, f0y� 11-15-201 Contact: Michael Johnson V Michael ohnson 0cable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact: Dan Roussin Daniel.roussin0dot.§tate.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date.