Loading...
HomeMy WebLinkAboutB09-0217 plans Door to Condominiums Line of Keep Duct as Existing Ceiling � . High as Possible Edge of Soffit Width to Match , Existing Wall Relocate Existin Fur pown Ceiling per g Opposite Wail Width D�!ct Be ond Fire Sprinkler to � Metal Capet Transition Between Reflected Ceding Plan _,- _, Y Side of New Soffit Relocate Fire Sprinkler , t � to Side of Soffit Wing Wall Depth Determined New and Existing Carpets _ � Thermostat by Duct and Furring Depth � .� _ � _ � , - , i Line of Existing Wall, Typ, �`- _ ! - � - - Metal Carpet Transition " Soffit Depth as Required G - OC - OC - QC - -- and Co c ete Slab rn for Furred Out Duct _ Line of New Soffit ' Line of New Soffit Line of ' , � Soffit Width Equal � :� New Fire Rated Door New Soffit I to Wall Depth +i v Casin to Applied Moldings for 8'+ Flat Ceilin Remove Existing EXIStirlg COY1'IdOt' � O ° °' g Two Panels, 6" Stiles -0 B - 9 0 F Exit Sign at Stair I 2 '/2" Metal Framing Carpet Door to Stairway � X Match Existing � � � Edge Skip Trowel Finish Ceilm Line of Wall Walls, Ceilings , Typ 9 � Ceding Line Changes Changes Ceiling Line Line of Existing Line of � � 9'± Flat Ceilirig Changes 8' Flat Ceiling Existing Soffit - Q p 5/8"Type X Drywall, Typ @ New � Exterior Wall and Drop Ceilings � New Fire Sprinkler Head Befinreen QB Existing 7'-6"± Flat Ceiling Enclosed Entry � Roof Structure and Dropped Ceiling Cabinet Existing Air Intake Car et � p � Replace Existing Outlet Unit E�evator �oor 'WEST FACING SECTION/ELEVATION � Cover, Repairwall Heater - - - -- --- - New Concealed Existing Grille Metal Threshold Between Baseboard to Match Existin Fire Sprinkler Head �B - Metal Threshofd, Carpet and Elevator � , g _ " Caulk in Place ,� New Wall and L�ne of - E � ' 0 Entry Door , 6" Metal Framing, Center Between ` Existing Ceiling ' � Shading Indicates � Batt Insulation, Wall and Door - Existing Elevator Shaft New Construction - New Soffit Width � Cabinet Unit'Heater �As Required for Stone A �S�9n � u� Veneer, Sheathing to Match Wall Width - - --- �-- — �� - Niche � J � � Existing Soffit Stone Veneer to ' - Match Existing 3'-0"± '-9" 1'-6" 9" � � , , 5/8" Type X Drywall, Typ @ New � Existing Soffit � o Existing Elevator Shaft - , Exterior Wall and Drop Cei�ings to Remain Existing Stone on � a`. _ -- � Walk to Remain ,;r, o • - -- � - - - Covered Wa � , "' Existing Stone Wall Soffit Depth to Match Furred Edge Existing � " ' " ' " ""'�"" Duct Depth at Corridor poor of Wall Door Trim � � , i � � Q ±I � Assumed Property Line Medium Skip Trowel Finish � � ° � • be Field Verified Walls and Ceilings, Typ. � Elevator poor ° � °' �, Existit�g Stone Railing ' _ � � c�' . n � Baseboard to Match Existing °p • ° Note: Reflected ceiling plan includes electrical lighting and exit �� ° � � sign layout. See Electrical Legend for fixture description. - _ / Coordinate electrical switching location with Owner. Plan also includes fire sprinkler locations Fire protection , -- -- , - system to be designed and specified by others. �/° � � _ __ _ _ _ �EAST FACI�N� SECTION/ELEVATION , Casing to , - -- -- - REFLECTED CEILING PLAN 3/8"=1'-0" ' FLOOR PLAN 3/8"=1 - " ' Match Ex�sting � - - - � , � ; j ' � , , BUILDI�lG SECTIONS 3�8��=��-��� . � I � � � �� � � �� � ELECTRICAL LEGEND & LUMINAIRE SCHEDULE DOOR SCHEDULE - � Symbol Type MFG Cat. # Finish Lamp No. Size Face Material Fire Rating Hardware Remarks , - . t�l1G 2 6 2009 1� 30XX Knott Alder Unlabeled Ma netic Card Hotel Loc*/ 4'-8" Radius Arched To Door, 6'-8" Le s, T4WN QF VAIL � A Wall Mount Troy B9371 SY Sycamore CF14EL Med Base Y 9 P 9 Glass Lites Fire Exit Hardware Kick Plate on Ski Entry Side of Door , 0 B Recessed Can Halo H27T, 426CG Trim White CF16EL/BR30 2O 3068 Knotty Alder Veneer 1/3 Hour Passage Lever/ Replace Door Using Existing Frame, Alder Applied Molding� Fire Exit Hardware Kick Plate on Condominium Side of Door Existing Roof Fascia - 0 C Recessed Can Halo H991CT, 999H Tnm Whit� CF9EUR20 _ 3O 3068 Knotty Alder Veneer 1.5 Hours Passage Lev�r/ Replace Door Using Existing Frame — 0 D Recessed Can Existing N/A �Ider Applied Molding* Fire Exit Hardware � � Stone to Match Existing Notes: All hardware and finishes to match and/or coordinate with existing hardware used throughout the pro�ect. , � ❑ a +� E Exit Sign, Surface Lithonia LRP-X-1-GW-XX-ELN Brushed Aluminum L.E.D. by Mfr Knotty Alder, Knotty Alder veneer and Alder applied moldings to be finished to match existing doors in Lodge �ower lobb . �� 1 � Existing y / � Stone Wall Q F Smoke Detector Existing N/A *Apply moldings to create appearance of two panel doors on Doors 2 and 3. Apply molding to both side of Door 2 and to � d Ski Entry side of Door 3 � Thermostat Per Mechanical Drawings, Verify Location with Owner � Bottom of Light Fixture Top of Arch Dimensional Cut Stone .,�;���._, Sign Niche � � 2'-9" Radius, to Match Existing ;.�,���. - - ' Stucco to a? � , _ � ���� a Match Existing "' '� CONSTRUCTION NOTES GENERAL NOTES Existmg Stucco Wall , rc��'�� _ _ > _ Top of Cut Stone Sil � a� 1. New exterior wall to be installed over existing flagstone. 9 Install new electrical fixtures and exit sign as indicated on Contractor is to visit the site, verify ex'rsting conditions and approved by the Owner. Coordinate the mechanical, electrical and ' "- Provide sill plate insulation and caulk to create watertight the drawings Field verify light fixture switch location wilh systems, including fire protection system, utility locations, fire protection systems with the work and as approved by the �`? seal Owner hookups and stubs, as well as familiarize himself with all new OW11e('. - Existmg Stone Railing — — °' ~ work In the event of discrepancies between the drawings and M 2. Apply stone veneer as indicted on the drawings Sign 10 Remove existing signage at the elevator and replace wi-h existing conditions, notify the Architect and/or Owner prior The Architect assumes no responsibility for errors, omissions and niche to have 2'-9" radius arch, stucco back, cut stone sill new signage to match those used elsewhere in Lodge commencing work All work to be performed in accordance with applicable code requirements of consultants The Architect Top of Stone Stone veneer to create side walls and to of si n niche Tower Remove and dis ose of existin wall mount all a licable codes and re ulations assumes no res onsibilit for utilit coordination, care of ad'acent A�P����� � - - ' P 9 P 9 pp 9 p Y Y J _ i Communitv Development Depart en � ashtray. properties, performance specifications and the components of T0�{i'V OFVAIL � Buddmg Safety and lnspection Services„ 3 Install new fresh air intake ductwork er mechanical The Contractor shall remove from the site and dis ose of all construction safe , nor for the Contractor's failure to car out the 5 ± Dimensional , - P P tY rY section Cut Stone drawings. Keep all ducting as close to existing ceilings and 11. Patch all damaged wall and ceilings areas. Apply new skip demolition materials, debris and rubbish as soon as pract�cable. WO�k 111 aCCOfdaClCe Wlth the COI'TSt�UCtlOf1 DOCUCT12f1tS. International Buddmg Codellnternational Residential Door with Glass Lites Existing Stone Railing walls as ossible, fur out and d all. trowel texture on walls, soffits, and ceilin s throu hout ski Protect all existin areas from the new work and re air all Code Vafidity ot permit The issuance or granting of a permit shall � P M� 9 9 9 P not be construed to be a perm�t for,or an approval of,any violation of � Entrance Area Equal to entry. Provide sample for Owner approval prior to damaged work that is to remam. The building and grounds shall The investigation of hazardous materials is beyond the scope of anyof the provis�ons of this code or of any other ordinance of the 25% Exterior Wall Area 4. Drop ceilings in vaulted areas as indicated on the reflected application be kept clean at all times. these Architectural Services The Owner shall be responsible for all lunsdiction Permits presuming to give authonty to violate or cancel the �--F �-0 � prov�sions of this code or other ordinances of the Jurisdiction shall not be � �Q ceiling plan. . existing hazards on the property, and for the discovery, presence, valid The rssuance of a permit based on construction documents and �� 'Q.9 other data shall not prevent the buddirtg offic�al from reqwnng the , Q� � �� - 12 Install new fire rated corridor and stairway doors within In the case of remodel work or additions to existing construction, handling, removal or disposal of or exposure of persons to correction of errors in the construction documents and other� �a.T '� �, d 5 Relocate existing side mount fire sprinkler to side of new existing metal frames. Paint metal frames and case with exterior and interior detailing, finishes and materials, including hazardous materials, waste ar substances in any form on the building offiaal is also a horizzd io prevent occupancy or afa � ��_ � �� � �(qj ' -�9 soffit, install new concealed s rinkler in 9' flat ceilin , and trim to match existin alder casin material and erFormance s ecifications are to match existin or ro e includin but not limited to radon as asbestos asbestos Str��turewhereinviolati thiscodeorofanyotheror esot FRONT ELEVATION 3/8 -1 -0 - � � � p 9 9 9 p p , 9 p p rtY, 9 , , this�unsdiction * � install new sprinkler in dropped ceiling space above as selected and/or approved by the Owner unless otherwise products, etc. g� � PLF�NS EXAMINER ATE: D v � � � 13 Apply self leveling compound per manufacturer's noted These include, but are not limited to doors, door hardware, V 6 Remove and dispose of existing exit sign at stairway door instructions to existing concrete and flagstone floor. casing, baseboard, lighting fixtures and trim, exit signs, fire Ownership and possession of the original Architectural drawings �- F �'�� , and existing fluorescent strip light on west walL - protection system, security systems, and signage. shall remain that of the Architect. Reproducible copies will be ���� �� ���� � � Ep qRG�` 14 Install carpet per manufacturer's specifications and install provided at the Owner's request and expense These drawings are ., �q �,� � �p� __ _ � , ��� � � 7 Center cabinet unit heater east to west in the 9 dropped metal transitions at all exposed edges Mechanical, electrical, and fire protection systems design shall be not to be used on other proJects except on agreement in writing and ceiling and center it between the north stone veneer wall the responsibility of licensed consulting engineers, the General with appropriate compensation to the Architect PeeULanqenwalter Architects, L.L.C. and the entrance door 15 Install baseboard to match existing alder base tnm Contractor, required subcontractor or others as selected and/or Lodge Tower Ski Entry David Mark Peel, A I A Kathy Langenwalter 8 Install soffits as indicated on the drawings. All electrical 16. Install logo and signage in sign niche per Ov��er Sign . P.O. Box 1202 Vail, Colorado 81658 , conduit and/or wirmg, all fire protection and heat piping design by others Enelosure and Renovation Tele 970-476-4506 Fax 970-476-4576 date 8-24-09 sha(I be concealed within soffits and/or dropped ceilings � 200 Vail Road pro�ect � Val�, Colorado drawn KL sheet 1 of 1 � ��I N vry N � � � W N I H General Mechanical Specifications � � � � �XISTINC� pUGT TO BE � cf� General CONTINUED. SIZ� U1�tiGNOUJN. � +- -� o � O � � r 1. Immediately notify the engineer of any discrepancies. � � , 6� 36x12 LOUV�R TO 8� � � � � 2. Do not scale drawings. Verify dimensions in field prior to commencement of work. GONNECT �XIStINC� DUGT TO N�I.0 Q � D�MOL IS�4ED. 2�x8. PR01�ID� ��2 " DUCT L fNE�' � � � X Z � 3. It is the intent of these drawings and specifications to establish a standard of quality. The engineer �OR NO I S� i��DUCT I ON, z � � � � reserves the right to take exceptions to approve methods and materials not reflected herein. � � � w CONN�CT Sx2� DUCT TO W � � � � 4. Failure to order, or release order, for matenals and/or equipment will not be accepted as a reason to LOUV�iv }=L�NUM. z � � � � fi=izOVID� Sx2� SN��T C�) 3� " �-IUJS/R � ^ � substitute alternate materials, equiprnent, or installation methods. � � 6� p M�T�4L S�}�,4fi��4TION TO � � x t- � �NSUR� T+-IAT INT�4K� �41R w � ' o 5. Work shall be performed in a workrnanlike manner to the satisfaction of the owner & the engineer. I S NOT FiZOM TN� � SX2� � �-[� T � � � � � 6. Labor, matenals, and equipment shall conform to the latest applicable editions of local, State of Colorado, �'a`�'d'��- � �,� � � � - and National Codes and ordinances. If conflict between those publications exists, the most stnngent � � 3i�," ��s/j?. � � � � requirement shall apply. i=ROVID� TAM�'��2 �'�00� � � � p- � �- �NCLOSUi�� �OR T��i�MOST,4T � L -- - - v�-. 6� � 7. The drawings show the intent of the mechanical systems but do not show all details required. It is the �� EXISTINCs CORRIDOFZ L IN� O� CONCi��TE �.. � responsibility of the contractors to install complete & operable systems, which conform to the -- �_ _ _ ABOV� sea I � PNGLOSED ENTRY manufacturers' installations instructi�ns & industry standards. IXI I/I Sx8 UNLINED DUC7 TRr4NSITION. REG�s o ,....., r �xISTINC� 114x�� C�,4i��4C�� G��_� " � CoNTi��4CTOR To M,4K� �; W ,��•.F9 � 8. Systems shall be tested for proper operation. If tests show work is defective, contractor shall make Ti��4NS f T I ON D I1"IENS I ONS L�4fi�C�ER r F o � f NT�4K� LOUV�fiz c�s �, corrections necessary at no cost to o��vner. I� D�TERMIN�D TO 8� ��ASISL� � ��p ; � IN �I�LD. �,. ��CJ�r' � 9. It is the contractors' and manufactur�rs' responsibility to assure themselves that the code authorities „ ••.�,,.••� � will approve any product to be insta led on the pro�ect. �X I ST f NC� 12 NEW WALL <HNTRY DOOR q�,�' C,4�i��20X.� �'L�NUM Z � 10. Provide necessary supports, piping, insulation, saw cutting, patching, etc., as required. �o��RED WALiG p � �"� � z 11. Offset piping, ductwork, etc. as necessary to accommodate structure, beams, columns, and existing m � � equipment. � � � O � Remodel & Demolition fi ,4i���,��. ��OOfi� fi��i�l �- °- � 12. Visit site pnor to bid and verify the conditions. Include in the bid, costs required to make work meet No SC,4LE � m O exis ting con di tions, w he t her in dicG te d or no t. � � z � � u 13. Provide mechanical demolition required. Visit site prior to bid to determine extent of work involved. � W 0 Provi de la bor an d materia ls as require d to maintain an d/or restore continuity o f service to existing 0 0 � � systems. � � O � � 14. In as much as design for remodel and/or rehabilitation requires that certain assumptions be made � � � m regarding existing conditions and because some of these assumptions cannot be verified without � � � destroying otherwise adequate or serviceable portions of the building. The engineer cannot assure the • ■� �, � . ■ owner or the contractor that the professional consulting services herein encompass all contingencies. w � Field coordination during construction is imperative. Contractors bidding this work must make � � z reasona b le a l lowances for unseen con ditions. � u 3 � U p Z � 15. Field verify locations of all existin�piping, equipment, ductwork, etc. U � � 1„C�C�,�l�l f C�� �Ql,� f i=1��1��" �C��l�l.��� O � o � 16. All equipment shown on this plan is new, except where noted. � O � � � Sl'M. DESCRIPTION CAPAC171' ELECtRIC M�4NU�. � MODEL REM�4RKS W z 17. All removed piping, ductwork, equipment, etc. are to be disposed of by contractor unless noted � Z � otherwise. � C A B I N�T U N I T $,gmm BruH 1 1�/1 S T E R L I N C� �GESSFD GEILINCs UNIT � W � Insulation CUN-1 ���T�� �-m �� 1/1� �-4P, m.8 �4 izC-12�fd-�2 LOW ��4N SP��D � i � w � 18. Insulate all new heating water witY�U.L. approved, white, all service, glass fiber, snap-on, 1/2" thick on A � N runouts, pipe insulation. Insulate fittings with glass fiber blanket insulation and premolded PVC covers. � _ • O � Sequence of Operat�on ,41R VENt +��A��N� � � 19. Insulation for all types of piping shall be carried full size through pipe hangers. CoIL � � �- Pi in 1. CUH-1 Cabinet Unit Heater PR�SS.-t�MP. TAP,�` f z w Issued For a. M o u n t t h e r m o s t a t a t 5'-0" A F F. t��• z O � � b. Upon a call for heating from thermostat, set at 60°F (adj.),zone valve shall I No. Date comment W � 2 0. H e a t i n g W a t e r p i p i n g - F o r n o n-b�r i e d p i p i n g, t y p e M c o p p e r, w r o u g h t c o p p e r f i tt i n g s, a n d n o l e a d CIRCUIT S�Tt�R 1 8/1�/0 9 C O O R D I N,4 T I O N w o pen to flow coil and unit shall run. solder. Provide alternate price for PEX tubing (with oxygen diffusion barrier). All pipe sizes on plans 2 8/20/fa9 GONSTRUGtION � W 1 I � � ar e f or c o p p e r pi p e. ���R m 0 _ 21. Copper pipe Valves and Specialties: � Q �-NIUS � � Gate Valves: Bronze, Class 1Z5, 2001b. W.O.G. � � Ball Valves: Bronze, Class 125, 2001b. W.O.G. Check Valves: Bronze, Class 1Z5, 2001b. W.O.G. W � 2-UJ�41' ZONE VALVE � � Balancing Valves: 125 psig w.p. for 250F service tight shut-off, CSIZE �oR M,4x 3' P.D.) � � Illinois dual-purpose, balancing/shut-off valve,Hoffman, Saxco, or equivalent. LOC�4t� IN GUN-1 ENCLOSURE. �q � � � Controls NoTE: o � P I PE IU.C. �OR � � 22. See Sequence of Operation for additional control information. GouNTE�LoW Z u � � _ T�i�f C�L �4�,4�"f NC� sc��DU��s, s��cs, � } � CO f� S C�-4�1"��4�'f C s�Q U�s N C� o� = W ? No sc�aLE O Oi��R�4T I ON � � W � SC+�EMAT i CS o � � � � w Z � z O � Q � w APPROVED w � w • �'� Commurnty Development De artment ProJect No. Sca le: � z � TOIYNQF YAIL ' Bu�►dmg Safery and inspection Services sectian 9�3 9.f�f� 1/�" = 1'-�" O � m ------__International Budding Code/International Residential Drawn Sy: Ghecked By: � � 0 Code Validity of permit The issuance or granting of a permit shall N not be construed to be a permit for,or an approval of,any violation of `��G JD� � Z = any of the provisions of this code or of any other ordinance of t h e �urisdiction Permits pre s u m m g t o g i v e au t hon ty to violate or cancel the Z Z � provisions of this code or other ordmances of the�urisdiction shall not b e , oQval�d The issuance of a permi t b a s a d o n c o ns truc tion documenfs and � � � heer do fn of erro st prthe cons�rurt�tln���me ts and other data T � � •O U � O budding offici�l is aiso authcr��F�;�,��feY�nt occupancy or use of a he U structure��,here in viol t�on of ihr _ode or of any other ord nances of 'd �O , this�urisd�ction PLA�S EX;?Pfl�•JER � DATE � I� !� -�., ,