HomeMy WebLinkAboutB11-0351 B11-0412 FINAL REPORT OF SPECIAL INSPECTIONS GROUND ENGINEERING *VAILTOWN
FINAL REPORT OF SPECIAL INSPECTIONS
Project:Snow Forest Chalet-186 Forest Rd Permit Number: Bll-0351/0412
Project Location: 186 Forest Road, Vail, CO 81657
Owner Francisco Rojas
Address City: Zip:
Special Inspections Agency
-D esigRPFofessieRal4--Ghaf GROUND Engineering Consultants, Inc .
Address: PO Box 464
City: Gypsum State: CO Zip: 81637 Phone: (9 7 0) 524-0720
Fax: (970) 524-0720 E-mail: ChrisH @groundeng. com Car1H @groundeng. com
To the best of my information, knowledge, and belief, the special inspections and/or testing required for
this project, have been completed in accordance with the contract documents.
*See Final Summary Letter 12-6506 dated 131121 .
Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be
considered an integral part of this final report. Any discrepancies that were noted in all interim reports
have been corrected.
Prepared by:
p0 RE
,
Carl Henderson, P.E .
T pe or Print N e cn
via 38882 O.
Signature O�ss��NA��o
11-21-2013
Date
Preparer's Seal and Signature Required
-12-
November 215', 2013
Subject: Summary of Materials Testing Services and Special
Inspection Services, Snow Forest Chalet — 186 Forest Road,
Vail, Colorado
Ground Engineering Job Number: 12-6506
TOV Permit Number(s): B11-0351 & B11-0412
Mr. Mike Charles
Maximum Comfort Pool and Spa
PO Box 2670
Vail, Colorado 81658
Attn: Mr. Charles,
This letter summarizes the special inspection services GROUND Engineering Consultants, Inc. (GROUND)
performed during the improvements to the Rojas residence (Snow Forest Chalet) at 186 Forest Road located in
Vail, Colorado. The special inspection and materials testing services were performed at times scheduled by the
Owner, Contractor and/or Subcontractors on February 14th, 2012 and according to GROUND's proposal # 1202-
0228 dated February 10th, 2012.
During construction, a certified welding inspector (CWI) visited the project site on a part-time basis, when
scheduled by the Contractor and/or Owner, to observe the structural steel field welded and fastened connections.
We did not, at any time, observe any drilled and epoxy connections.
Based on the field observations to date, RFI's received and/or project documentation received from the design
team, it is our opinion that the materials observed for the structural steel were in general accordance with project
plans, specifications, and/or applicable RFI's.
The observations and materials testing as indicated above were performed periodically to provide data to the
Owner, Contractor and Subcontractors to assist them in evaluating the general compliance of the materials
and/or work with the contract documents at the times of our observation and testing. We did not supervise, direct
or have any control over any of the Contractor's or Subcontractor's work. We were not responsible for the
Contractor's or Subcontractor's scheduling of our services, means, methods, procedures, techniques, or
sequences of construction, nor responsible for ensuring that any Contractor or Subcontractor performed or
completed the work in accordance with the contract documents or construction industry standards.
If you have any questions concerning this letter, please contact our office.
�O RFr,
Sincerely, _ �S
GROUND Engineering Consultants, Inc. / tit;✓Ej'• to
:G 3uC►ci (�;
�; •. 0,•
Chris Hutto, C.E.T. Reviewed by Carl Henderson, P.E.
ROUND
ENGINEERING CONSULTANTS INC.
IOTA Airpark Dr.,Unit 9,PO Box 464,Gypsum,CO 81637 Phone(970)524-0720 Fax(970)524-0721 www.groundeng.com
Office Locations: Englewood . Commerce City Loveland Granby Gypsum Grand Junction . Casper,WY
i
GROUND
ENGINEERING CONSULTRNTS
VISUAL OBSERVATION REPORT
Project Name: Snow Forest Chalet— 186 Forest Date: February 14, 2012
Road
Project No: 12-6506 Report No: 1
Client: Maximum Comfort Pool and Spa
Address: P. O. Box 2670
Vail, CO 81658
Attn: Mr. Mike Charles
As requested, a representative from GROUND arrived at the project site to observe welded
connections as directed by Ryan with Maximum Comfort Pool and Spa.
The following is a summary of the observations performed on this date:
1) Observed anchor bolt connections of beam to existing wall and HSS tube to existing wall
and found them to be in general compliance with the project plans.
2) Observed welded connections of beam to HSS 4"x8"x3/8" and HSS 4"x4"x3/8" to
4"x8"x3/8" and 4"x4"x3.8" cross member was not welded all around per Detail 3/S1. It is
welded on three sides only. Discrepancy Item #1. All other areas were found to be in
general compliance with AWS D1.1-2010 Clause 6 and project plans.
3) Detail 3/S1 shows HSS 7"x4"x1/4", HSS 8"x4"x3/8" was used. Discrepancy Item #2.
4) GROUND is requesting Welding Procedure Specification (WPS) for the welders on this
project. Discrepancy Item #3.
5) GROUND received the Welder Qualification Test Record (WQTR).
Ryan with Maximum Comfort Pool and Spa was notified of these observations and received a
copy of this report and Discrepancy List.
Submitted By:
GROUND Engineering Consultants, Inc.
Everett Schulze
Field Representative
Grand Junction Office Corporate Office Gypsum Office
1008 3rd Avenue,Suite D 41 Inverness Drive East P.O.Box 464
Grand Junction,CO 81501 Englewood,CO 80112 Gypsum,CO 81637
P:(970)242-4300 P:(303)289-1989 P:(970)524-0720
F:(970)524-0721 F:(303)289-1686 F:(970)524-0721
Page 1
GROUND
ENGINEERING CONSULTRNTS
List of Outstanding Discrepancies
Project Name: Snow Forest Chalet - 186 Forest Road
Project No: 12-6506 Date 11-21-13
Client: Maximum Comfort Pool and Spa
Address: P. O. Box 2670
Vail, CO 81658
Attn: Mr. Mike Charles
Faxed to
Faxed to
Date Item Outstanding Discrepancy Date Per Plan/
Reported No. I Accepted- Per RFI
02-14-12 1 HSS 4"x4"x3/8" cross member welded to HSS 11/21/2013 Per KRM
4"x8"x3/8" is welded 3 sides only, not all around as letter
per Detail. 11/20/13
02-14-12 2 HSS 4"x8"x3/8" was used in lieu of HSS 4"xTx1/4". 11/21/2013 Per KRM
letter
11/20/13
02-14-12 3 GROUND is requesting WPS from the welders on 11/19/2013 Per Plan as
this project. Submitted
11/19/13
It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re-
observations. The contractor should provide our office hard copies of any changes or approvals made by the
Structural Engineer of Record.
41 Inverness Drive East 7393 Dahlia Street 2468 East 9th Street
Englewood,CO 80112 Commerce City,CO,80022 Loveland,CO 80537
Tel:(303)289 1989 Tel:(303)289 1989 Tel:(970)622 0800
Fax:(303)289 1686 Fax:(303)289 6742 Fax:(970)622 0801
KRMCONSULTANTS, INC. RECORD
P.O.Box 4572 • Vail,Colorado 81658 • 970-949-9391
TO: Greg Samson
j
I
DATE.• 11/20/2013 JOB NUMBER. 1109-12
PROJECT.• 186 Forest Rd Patio
❑ RFI ❑ MEETING NOTES ❑ RESPONSE ® CLARIFICAT ION/CHANGE
We were informed that there were two outstanding issues to resolve as indicated in the
inspection report by Ground Engineering Consultants dated 02-14-12. These items
include:
1 . The HSS 4x4 header is only welded on three sides (rather than four sides per plan).
2. An HSS 8x4x3/8 was used for the cantilevered beams rather than HSS 7x4x1/4 per
plan.
Both of these variations are structurally acceptable, and no further modifications are
required.
Please do not hesitate to call with any questions.
KRM Consultants, Inc.
k EGlSTF9
�JJJO•�SO HENN° � -
o
SIGNED: 0 3 67 o COPY TO:
�I 2� :c
,
° Gies Architects
Tim D. Hennum, PE /�c °••••°°'� -'
REVIEWED:
l
i
i
I
MARK CONLEY WELDER QUALIFICATION TEST REPORT (WQTR)
AWS D 1.1 Structural Welding Code - Steel
WQTR No.: MC-121 PQR1 MC Welder Name: Mark Conley(5789) Welder ID: MC5789
WPS No.: MC-121 Welder Type: SMAW Rev 0 Date: 12/10/12
Project Number:WJMG 2012422
Record Actual Values Qualification Range
Used in Qualification
Variables
Process/Type SMAW SMAW
Electrode(single or multiple) Single Single
Current/Polarity DCEP DCEP
Position 6G Groove: all
Fillet: all
Weld Progression up u
Backing or back weld: No, open root open, backing, backweld, back ou e
Material/Spec. Group 1
Base Metal ASTM A106B Group 1 to Group 1
Thickness: (Plate)
Groove 0.125"to 0.600"
Fillet 0.125"to Unlimited
Thickness: (Pipe/tube)
Groove 0.300" 0.125"to 0.600"
Fillet 0.125"to Unlimited
Diameter: (Pipe)
Groove 3" 5 4"diameter and?24"
Fillet 5 4"diameter and z 24"
Filler Metal
Spec. No. A 51 A 5.1
• Class E7018 E7018
F-No. 4 4 and less
Gas/Flux Type N/A N/A
Diameter 1/8" 1/8"and less
VISUAL INSPECTION—Accept
Guided Bend Test Results
Type Result Type Result
Face 1 Accept Root 1 Accept
Testing Witnessed by: Jesse A. Grantham.AWS-CWI#98041061;Welding Witnessed by: Devan Cheist
Inspected by: Jesse A. Grantham,AWS-CWI#98041061 Test Number: 2012422
Organization: Welding&Joining Mgmt Group,West Date: 12110/12
RADIOGRAPHIC TEST RESULTS
Film Identification Results Remarks Film Identification Results Remarks
Number Number
N/A N/A
Interpreted by: N/A Test Number: N/A
Organization: N/A Date: N/A
We,the undersigned,certify that the statements in this record are correct and that the test welds were prepared,welded.
and tested in accordance with the requirements of Clause 4 AWS D1.1, Structural Welding Code-Steel.
Company: Mark Conley Authorized By:
Mario Conley
P.O. Box 444 ♦ Vail CO 81658