HomeMy WebLinkAboutPEC130021 Plans Approved Sebastian Memo & Attachments 0923130) TOWN OF VAIL ` Memorandum To: Planning and Environmental Commission From: Community Development Department Date: September 23, 2013 Subject: A request for a recommendation to the Vail Town Council on a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12- 9A-10, Amendment Procedures, Vail Town Code, to allow for an addition to an existing dwelling unit, located at 16 Vail Road, (The Sebastian) /Part of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. (PEC130021) Applicant: AMPH, LLC, represented by Mauriello Planning Group Planner: Warren Campbell I. SUMMARY The applicant, AMPH, LLC, represented by Mauriello Planning Group, is requesting a recommendation to the Vail Town Council on a major amendment to Special Development District (SDD) No. 6, Vail Village Inn, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to increase the allowable Gross Residential Floor Area (GRFA) to allow for an addition to an existing dwelling unit in The Sebastian. Based upon Staff's review of the criteria outlined in Section VII of this memorandum and the evidence and testimony presented, the Community Development Department recommends the Planning and Environmental Commission forwards a recommendation denial, of the major amendment to Special Development District (SDD) No. 6, Vail Village Inn, subject to the findings noted in Section VIII of this memorandum. II. DESCRIPTION OF THE REQUEST The applicant is proposing to add approximately 839 square feet of GRFA to the existing penthouse unit. The proposed addition would result in the unit increasing in size to approximately 5,989 square feet of GRFA. To accomplish the addition the proposal includes the following: The entry on the first floor of the penthouse would be reconfigured resulting in GRFA being converted to common area hallway for the lodge. • The existing roof form over the second floor of the penthouse at the northeast corner of the building would be raised 2 feet in elevation in order to increase the interior height of the space. • The second floor would be increased in size by with an expansion to the south. This proposed area would include a new roof form which would extend to the south approximately 26 feet. The roof extension would be an increase in height of approximately 12 feet above the existing roof form. • An outdoor patio is proposed to extend approximately 11 feet south of the second floor expansion. In response to comments provide by the Planning and Environmental Commission on September 9, 2013, several changes were made to the proposed plan. Those changes are as follows: • The roof overhang on the south elevation which served as a partial covering of the new patio was reduced from 6 feet to 18 inches. • The shed dormers on the upper floor expansion to the south where changed to traditional gable forms. • The existing dormers on the lower floor of the penthouse (fourth floor) below the addition to the south were clipped. • On the south elevation the new upper floor roof form has been changed to allow the eave to return creating the appearance that it is a dormer. • The reduction in the upper floor roof overhang and the conversion from shed dormers to traditional gable dormers altered the impact of the proposal on the pedestrian view from the south, internal to Vail Village Inn. The applicant has provided a written description of their request, dated September 17, 2013, (Attachment A) and plans dated September 17, 2013 (Attachment B), which are provided for review. Staff included the elevations presented at the September 9, 2013 public hearing into the plans attached for review so that the changes that were made can be identified (Attachment B). Those pages have been identified with a text box stating that they are from the September 9, 2013 proposal. III. BACKGROUND On September 4, 2001, the Vail Town Council adopted Ordinance No. 21, Series of 2001, which amended Special Development District No. 6 to allow for the construction of the Vail Plaza Hotel (The Sebastian) with one dwelling unit, 99 accommodation units, 18 employee housing units, and 50 fractional fee club units. The Planning and Environmental Commission held public hearings to discuss a request to convert 2 fractional fee units to dwelling units and one dwelling unit to a fractional fee unit on April 27, and May 11, 2009. On May 11, 2009, the Planning and Environmental Commission voted 7 -0 -0 to forward a recommendation of approval, with conditions, to the Town Council for the proposed special development district amendment. Town of Vail Page 2 At its May 19, 2009, hearing the Town Council approved the first reading of Ordinance No. 13, Series of 2009, with modifications that reference to the conversion of the penthouse dwelling unit to a fractional fee club unit be stricken, and that the sale of the penthouse unit be a trigger for the expiration of this ordinance in addition to the Commission's recommended triggers of the specific date May 11, 2012, or the issuance of an occupancy certificate for the penthouse unit. On June 2, 2009, the Vail Town Council denied Ordinance No. 13, Series of 2009, upon second reading. The summary minutes are as follows: "Connie Dorsey asked that the applicant not be forced to move until there is a TCO on another unit in the building. During a pause for public comment, Robert Vogel said there was a pattern of deceit being exhibited by the applicant and there was no compelling reason to grant the applicant's request. Fractional owner's legal representative Lindsey Richards spoke against allowing the applicant to continue to live there. The applicant, Waldir Prado, said he had been occupying a vacant unit and no one had been negatively financially impacted. Councilmember Rogers stated, "1 don't feel like 1 was given a straight story on it ... I don't have a good feeling we are going to know what is happening here ... I don't feel like passing this ordinance on second reading is going to help the Town of Vail.../ do have an interest in hot beds. "Rogers then moved to deny the ordinance with Councilmember Newbury seconding. Councilmember Foley said employee housing in the hotel should be satisfactory for any employee of the hotel. Councilmember Hitt said he felt like he had been misled. He also agreed that employee housing should be adequate for the applicant. Newbury said one of the town's overriding policies is to maintain hot beds. Councilmember Cleveland said the solution that was presented was not in the public interest. 'It is inconsistent with the SDD approval plan." Councilmember Daly said there is a lot more revenue the town is giving up than was previously anticipated. The motion passed unanimously, 7 -0." On May 14, 2012, the Planning and Environmental Commission forwarded a recommendation of approval for amendments to SDD No. 6, Vail Village Inn, and approved amendments to the existing conditional use permit (CUP) to convert fractional fee unit 401 to a dwelling unit. This recommendation and CUP amendment approval resulted in no change to GRFA, an increase in the number of dwelling units from 1 to 2, and the reduction of the number of fractional fee units from 50 to 49. On June 19, 2012, the Vail Town Council approved Ordinance No. 7, Series of 2012, which resulted in an increase in the number of allowable dwelling units to 2 and a decrease in the number of fractional fee units to 49. On August 26, 2013, the Planning and Environmental Commission held a work session on the proposal to add approximately 691 square feet of GRFA to the penthouse unit. The Commission offered comment on the proposal with regard to the need to evaluate Town of Vail Page 3 the proposal pursuant to the criteria, the north elevation, and the limited visibility of the proposed expansion. On September 9, 2013, the Planning and Environmental Commission held a public hearing on the request for a recommendation on a major amendment to add GRFA to the existing penthouse unit. A motion for approval failed and a subsequent motion to table the request was approved. The Commission gave direction to review the roof forms and address the concerns stated in the staff memorandum with regard to staff's response to Criterion 1. IV. APPLICABLE PLANNING DOCUMENTS A. Title 12, Zoning Regulations, Vail Town Code CHAPTER 12 -1, TITLE, PURPOSE AND APPLICABILITY (in part) Section 12 -1 -2: Purpose: A. General: These regulations are enacted for the purpose of promoting the health, safety, morals, and general welfare of the Town, and to promote the coordinated and harmonious development of the Town in a manner that will conserve and enhance its natural environment and its established character as a resort and residential community of high quality. B. Specific: These regulations are intended to achieve the following more specific purposes: 1. To provide for adequate light, air, sanitation, drainage, and public facilities. 2. To secure safety from fire, panic, flood, avalanche, accumulation of snow, and other dangerous conditions. 3. To promote safe and efficient pedestrian and vehicular traffic circulation and to lessen congestion in the streets. 4. To promote adequate and appropriately located off - street parking and loading facilities. 5. To conserve and maintain established community qualities and economic values. 6. To encourage a harmonious, convenient, workable relationship among land uses, consistent with Municipal development objectives. 7. To prevent excessive population densities and overcrowding of the land with structures. 8. To safeguard and enhance the appearance of the Town. 9. To conserve and protect wildlife, streams, woods, hillsides, and other desirable natural features. 10. To assure adequate open space, recreation opportunities, and other amenities and facilities conducive to desired living quarters. 11. To otherwise provide for the growth of an orderly and viable community. Town of Vail Page 4 ARTICLE 12 -9A, SPECIAL DEVELOPMENT DISTRICT (in part) 12 -9A -1: Purpose and Applicability. A. Purpose: The purpose of the special development district is to encourage flexibility and creativity in the development of land in order to promote its most appropriate use; to improve the design character and quality of the new development with the town; to facilitate the adequate and economical provision of streets and utilities; to preserve the natural and scenic features of open space areas; and to further the overall goals of the community as stated in the Vail comprehensive plan. An approved development plan for a special development district, in conjunction with the property's underlying zone district, shall establish the requirements for guiding development and uses of property included in the special development district. B. Applicability. Special development districts do not apply to and are not available in the following zone districts: hillside residential, single - family residential, two - family residential and two - family primary/secondary residential. 12- 9A -10: AMENDMENT PROCEDURES: B. Major Amendments: 1. Requests for major amendments to an approved special development district shall be reviewed in accordance with the procedures described in section 12 -9A- 4 of this article. 2. Owners of all property requesting the amendment, or their agents or authorized representatives, shall sign the application. Notification of the proposed amendment shall be made to owners of all property adjacent to the property requesting the proposed amendment, owners of all property adjacent to the special development district, and owners of all property within the special development district that may be affected by the proposed amendment (as determined by the department of community development). Notification procedures shall be as outlined in subsection 12 -3 -6C of this title. V. SURROUNDING LAND USES Land Uses Zoning North: 1 -70 right -of -way Not Zoned South: Mixed Use Public Accommodation East: Mixed Use SDD #39 (Solaris) West: Multiple Family Public Accommodation and SDD #21 (Gateway) Town of Vail Page 5 VI. ZONING ANALYSIS Development Standard Approved/ Existing Proposed Change Density - Dwelling Units 2 DU 2 DU No change - Fractional Fee Units 49 FFU 49 FFU No change - Accommodation Units 100 AU 100 AU No change Gross Residential Floor Area (GRFA) -AU & FFU ( >70 %) 97,788 sq ft (94 %) 97,788 sq ft (93.3 %) No change -DU ( <30 %) 6,136 sq ft (6 %) 6,975 sq ft (6.7 %) +839 sq ft TOTAL 103,924 sq ft 104,763 sq ft +839 sq ft Parking 212.39 spaces 212.39 spaces required (round to required (round to No change 213 spaces) 213 spaces) 218 spaces existing 218 spaces existing VII. SPECIAL DEVELOPMENT DISTRICT AMENDMENT REVIEW CRITERIA Before acting on a major amendment to a special development district amendment application, the Planning and Environmental Commission and Town Council shall consider the following factors with respect to the proposal: 1. Compatibility: Design compatibility and sensitivity to the immediate environment, neighborhood and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, identity, character, visual integrity and orientation. In response to the application to increase the allowable GRFA for the penthouse in The Sebastian, staff researched the documents on file with regard to the initial review of the Vail Plaza Hotel (The Sebastian). Staff was interested in gaining an understanding of the influences on the approved bulk, mass, and height of the existing structure. Upon conducting this research staff obtained an understanding of the bulk, mass, and height relationships sought between the Vail Plaza Hotel and the adjacent properties. Those relationships can be seen on the approved elevation drawings which include the adjacent Gateway and Vail Village Inn Phase III structures (Attachment B). The inclusion of the adjacent structures on the elevations illustrates the goal of having elements such as roof forms which step down to create a relationship with the adjacent structures. Additionally, it can be seen that the alignment of eaves and a general compatibility with regard to bulk, mass, and height was sought and achieved. As discussed previously, the proposal includes several changes to the roof form in the northeast corner of the existing structure. The proposed changes include the raising of the existing roof form by 2 feet and the expansion of the roof mass south by approximately 26 feet. Staff has a concern with the proposal's impacts on the existing Town of Vail Page 6 roof form's relationships with adjacent structures. Furthermore, staff believes there are impacts on the perceived bulk and mass from the perspective of a pedestrian. While the change to reduce the southern roof extension by 6 feet had a positive impact on this concern, staff believes the overall proposal still has a negative impact on the pedestrian view perspective as seen in the photo rendering. Staff's concern is best illustrated by a comparison of the existing and proposed east and south elevations (Attachment B). The expansion of the second floor of the penthouse unit to the south by approximately 26 feet (reduced from 32 feet) continues to eliminate an intermediate stepping of the roof forms which was intended to establish a rhythm of incremental decreasing height from north to south. This existing stepping of the roof forms results in the southern portion of The Sebastian having a compatible bulk, mass, and height relationship with the existing structures within the SDD. The proposal to eliminate the intermediate step has a negative effect on the intended design. Staff further believes the proposal will have a negative impact on the pedestrian perception of bulk, mass, and height from the southern perspective looking north. The current design allows for the pedestrian perception of height to stop at the eaves of the lowermost roof form which results in the feeling of appropriate and compatible scale between structures. The proposal (reduced by 6 feet from previous proposal) would extend a roof form which is largely unseen currently from this perspective thus altering the perceived height of the structure. The photo rendering provided in the submitted plans illustrates this concern (Attachment B). Staff believes there are alternative designs which would address staff's concerns while maintaining the intent to step the height of the structure down from the north to the south. Staff's concern is with the expansion of the addition to the south and its impacts to the architectural rhythm and the pedestrian view impacts. Staff suggests that pulling the upper floor addition back to a distance where it was minimally perceived from the pedestrian perspective within Vail Village Inn and the incorporation of a roof form which maintained the established architectural rhythm would address these concerns. Further, staff believes a solution to capture additional GRFA would be to enclose the existing lower floor penthouse patio and create a upper floor patio on the lower floor expansion. In reviewing the proposal for compliance with this criterion, staff considered the entirety of The Sebastian structure. Staff did not simply focus on the changes to the northeast corner of the top floor of the structure. This was done in order to determine if staff would have found the structure, as currently proposed, to be of an appropriate scale, bulk, mass, height, character, and relationship to adjacent properties. Staff does not believe the proposed changes would have met this criterion during the entitlement process and therefore cannot find the proposed changes to be in compliance with this criterion. Staff finds the proposal does not comply with this criterion. Town of Vail Page 7 2. Relationship: Uses, activity and density which provide a compatible, efficient and workable relationship with surrounding uses and activity. The proposal does not propose to change any of the uses, activity, or densities which are currently constructed within the project. The uses, activities and density of The Sebastian were evaluated during the entitlement process and found to be compatible as currently operated and constructed. The proposal to increase the allowable GRFA within the SDD requires mitigation of the impacts to employee generation pursuant to Chapter 12 -24, Inclusionary Zoning, Vail Town Code. The applicant has stated in their written materials that the pay -in -lieu option would be selected if the proposal were approved. An increase in the allowable GRFA by 839 square feet results in a pay -in -lieu fee of $11,297.14 (83.9 sf x $134.65). Staff finds the proposal complies with this criterion. 3. Parking and Loading: Compliance with parking and loading requirements as outlined in chapter 10 of this title. The proposal to add approximately 839 square feet of GRFA to the existing penthouse unit does not change the required parking or loading and delivery requirements for the development. Staff finds the proposal complies with this criterion. 4. Comprehensive Plan: Conformity with applicable elements of the Vail comprehensive plan, town policies and urban design plans. Staff has reviewed the Vail comprehensive plan and found the following documents and associated goals, objectives, statements applicable to this proposal. Vail Land Use Plan (in part) 1. General Growth / Development 1.1 Vail should continue to grow in a controlled environment, maintaining a balance between residential, commercial and recreational uses to serve both the visitor and the permanent resident. 1.12 Vail should accommodate most of the additional growth in existing developed areas (infill areas). 4. Village Core / Lionshead 4.1. Future commercial development should continue to occur primarily in existing commercial areas. Future commercial development in the Core areas needs to be carefully controlled to facilitate access and delivery. Town of Vail Page 8 4.2. Increased density in the Core areas is acceptable so long as the existing character of each area is preserved through implementation of the Urban Design Guide Plan and the Vail Village Master Plan. 4.3. The ambiance of the Village is important to the identity of Vail and should be preserved. (Scale, alpine character, small town feeling, mountains, natural settings, intimate size, cosmopolitan feeling, environmental quality.) 5. Residential 5.1. Additional residential growth should continue to occur primarily in existing, platted areas and as appropriate in new areas where high hazards do not exist. Vail Village Master Plan (in part) V. GOALS, OBJECTIVES, POLICIES AND ACTION STEPS GOAL #1 ENCOURAGE HIGH QUALITY, REDEVELOPMENT WHILE PRESERVING UNIQUE ARCHITECTURAL SCALE OF THE VILLAGE IN ORDER TO SUSTAIN ITS SENSE OF COMMUNITYAND IDENTITY. Objective 1.1: Implement a consistent development review process to reinforce the character of the Village. Policy 1.1.1: Development and improvement projects approved in the Village shall be consistent with the goals, objectives, policies and design considerations as outlined in the Vail Village Master Plan and Urban Design Guide Plan. Objective 1.2: Encourage the upgrading and redevelopment of residential and commercial facilities. Policy 1.2.1: Additional development may be allowed as identified by the Action Plan and as is consistent with the Vail Village Master Plan and Urban Design Guide Plan. VII. VAIL VILLAGE SUB -AREAS A major goal of this Plan is to address the Village as a whole and at the same time be sensitive to the opportunities and constraints that may exist on a site specific basis. To facilitate long range planning unique to each area of the Village, ten different sub -areas are delineated in this Plan. Sub -areas were determined based on a number of different considerations. Foremost among these were: • design and site characteristics Town of Vail Page 9 • geographic or physical boundaries • land uses and ownership patterns Each of the ten sub -areas have been evaluated relative to the overall goals, objectives, and policies outlined for Vail Village. The potential improvement projects, referred to as sub -area concepts, which have emerged from this evaluation are graphically represented on the Action Plan. These sub -area concepts are physical improvements intended to reinforce the desired physical form of the Village as outlined in the various elements of the Master Plan. The 10 sub -areas (which follow), provide detailed descriptions of each sub -area concept and express the relationship between the specific sub -area concepts and the overall Plan. The applicable goals and objectives are cited for each of the sub area concepts at the end of each description under "special emphasis. " The sub -area concepts described in this Section are meant to serve as advisory guidelines for future land use decisions by the Planning and Environmental Commission and the Town Council. Compliance with the sub -area concepts does not assure development approval by the Town. It is important to note that the likelihood of project approval will be greatest for those proposals that can fully comply with the Vail Village Master Plan. The Urban Design Guide Plan includes additional design detail that is to be used in conjunction with the Vail Village Master Plan sub -area concepts. MIXED USE SUB -AREA Town of Vail Page 10 The Mixed -Use sub -area is a prominent activity center for Vail Village. It is distinguished from the Village core by the larger scale buildings and by the limited auto traffic along East Meadow Drive. Comprised of five major development projects, this sub -area is characterized by a mixture of residential /lodging and commercial activity. There is a great deal of potential for improvements to both public and private facilities in the area. Among these is the opportunity to develop gateway entries to the Village at the 4 -way stop and at the intersection of Vail Road and Meadow Drive. It is also a long term goal to strengthen the connection between this area and the Village core area by reinforcing the established pedestrian linkages. Pedestrianization in this area may; benefit from the development of retail infill with associated pedestrian improvements along East Meadow Drive and the development of public access to Gore Creek. A significant increase in the Village's overnight bed base will occur in this sub -area with the development of the final, phase of the Vail village Inn project. In addition, commercial and residential /lodging development potential is identified in sub -area concepts 3, 4, 6 and 8. The completion of these projects will essentially leave the sub -area "built out ". f x159.4 1 -1c ..a +eU� aei+ #1 -1 Vail Village Inn Final phase of Vail Village Inn project to be completed as established by development plan for SDD #6. Commercial development at ground, level to frame interior plaza with greenspace. Mass of buildings shall "step up" from existing pedestrian -scale along Meadow Drive to 4 -5 stories along the Frontage Road. Design must be sensitive to maintaining view corridor from 4 -way stop to Vail Mountain. Special emphasis on 1. 2, 2.3, 2.4, 2.6, 3.2, 4.1, 5.1, 6.1. Town of Vail Page 11 The review of The Sebastian during the entitlement process determined that the project was in compliance with the elements of the Vail Comprehensive Plan. There have been no changes to the Vail Comprehensive Plan with regard to the documents which address this site. Staff believes the proposed change does not have an overall negative impact to the intent of stepping building height up from the pedestrian oriented East Meadow Drive to the South Frontage Road East. As stated in the response to Criterion 1 staff is concerned about the visual impacts on the south side of the structure in the pedestrian plaza. Staff believes there are designs which would permit for some expansion and eliminate the proposal's impact on the pedestrian. Staff finds the proposal complies with this criterion. 5. Natural and /or Geologic Hazard: Identification and mitigation of natural and /or geologic hazards that affect the property on which the special development district is proposed. The Sebastian is not located within any identified geologic hazard. The property during construction identified an impact with ground water and implemented a mechanical system to mitigate the impacts of the ground water on the structure. Staff finds the proposal complies with this criterion. 6. Design Features: Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community. The proposal does not include any changes to the site plan, building footprint design or location, or open space provisions. Staff finds the proposal complies with this criterion. 7. Traffic: A circulation system designed for both vehicles and pedestrians addressing on and off site traffic circulation. The proposal does not include any changes to the pedestrian or vehicular circulation on or off site. Staff finds the proposal complies with this criterion. 8. Landscaping: Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and function. The proposal does not include any changes to the landscaping or open space on the site as identified on the approved development plan. Staff finds the proposal complies with this criterion. Town of Vail Page 12 9. Workable Plan: Phasing plan or subdivision plan that will maintain a workable, functional and efficient relationship throughout the development of the special development district. The proposal is intended to be constructed in one phase. Staging for any construction related activity will be reviewed by the Town of Vail staff to ensure impacts are minimized to public rights -of -way and adjacent properties. It is anticipated that the use of the South Frontage Road East right -of -way will be necessary. This right -of -way is controlled by the Colorado Department of Transportation (CDOT) and will require all appropriate review and permits from CDOT should the project move forward. Staff finds the proposal complies with this criterion. 10. Public Benefit: The proposed deviations provide benefits to the town must outweigh the adverse effects of such deviations. The initial entitlement approval for The Sebastian included provisions for the inclusion of public benefits. Staff does not believe this proposal warrants any additional public benefits, beyond the codified provisions for the mitigation of employee housing. VIII. STAFF RECOMMENDATION The Community Development Department recommends the Planning and Environmental Commission forwards a recommendation of denial, to the Town Council on a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for an addition to an existing dwelling unit, located at 16 Vail Road, (The Sebastian) /Part of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. Staff's recommendation is based upon the review of the criteria described in Section VII of this memorandum and the evidence and testimony presented. Should the Planning and Environmental Commission choose to forward a recommendation of denial for this request, the Community Development Department recommends the Commission pass the following motion: "The Planning and Environmental Commission forwards a recommendation of denial to the Town Council for a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for an addition to an existing dwelling unit, located at 16 Vail Road, (The Sebastian) /Part of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto." Should the Planning and Environmental Commission choose to forward a recommendation of denial for this request, the Community Development Department recommends the Commission makes the following findings: Town of Vail Page 13 "Based upon the review of the criteria outlined in Section Vll this Staff memorandum to the Planning and Environmental Commission dated September 9, 2013, and the evidence and testimony presented, the Planning and Environmental Commission finds: 1. That the special development district amendment does not comply with the standards listed in Article 12 -9A, Special Development District. 2. That the special development district amendment is not consistent with the adopted goals, objectives and policies outlined in the Vail comprehensive plan and is not compatible with the development objectives of the town; and 3. That the special development district amendment is not compatible with and suitable to adjacent uses and is inappropriate for the surrounding areas; and 4. That the special development district amendment does not promote the health, safety, morals, and general welfare of the town and does not promote the coordinated and harmonious development of the town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality." Should the Planning and Environmental Commission choose to forward a recommendation of approval for this request, the Community Development Department recommends the Commission pass the following motion: "The Planning and Environmental Commission forwards a recommendation of approval to the Town Council for a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for an addition to an existing dwelling unit, located at 16 Vail Road, (The Sebastian) /Part of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. " Should the Planning and Environmental Commission choose to forward a recommendation of approval for this request, the Community Development Department recommends the Commission makes the following findings: "Based upon the review of the criteria outlined in Section Vll this Staff memorandum to the Planning and Environmental Commission dated September 9, 2013, and the evidence and testimony presented, the Planning and Environmental Commission finds: Town of Vail Page 14 That the special development district amendment complies with the standards listed Article 12 -9A, Special Development District, or that a practical solution consistent with the public interest has been achieved. 2. That the special development district amendment is consistent with the adopted goals, objectives and policies outlined in the Vail comprehensive plan and compatible with the development objectives of the town; and 3. That the special development district amendment is compatible with and suitable to adjacent uses and appropriate for the surrounding areas; and 4. That the special development district amendment promotes the health, safety, morals, and general welfare of the town and promotes the coordinated and harmonious development of the town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality. " Should the Planning and Environmental Commission choose to forward a recommendation of approval for this request, the Community Development Department recommends the Commission applies the following conditions: "I. This SDD major amendment approval is contingent upon the applicant obtaining Town of Vail approval of the associated design review application. 2. The applicant shall mitigate the employee generation impact created by the addition of 839 square feet of GRFA in accordance with the provisions of Chapter 12 -24, Inclusionary Zoning, Vail Town Code. 3. The applicant shall receive and submit in conjunction with the building permit, all applicable Colorado Department of Transportation approvals for all impacts to the South Frontage Road East, including construction staging. 4. The applicant shall amend the recorded condominium map to reflect the increase in floor area and space designation, prior to requesting a planning certificate of occupancy inspection." IX. ATTACHMENTS A. Written Request dated September 17, 2013 B. Proposed Plans dated September 17, 2013 Town of Vail Page 15 THE SEBASTIAN VAIL VILLAGE INN, PHASE IV MAJOR AMENDMENT TO SPECIAL DEVELOPMENT DISTRICT #6 To allow for an addition to the Penthouse Unit at the Sebastian Submitted to the Town of Vail: June 24, 2013 RevisedAugust 12, 2013 Revised September 17, 2013 17 THE ,ebart ion V A I L A rl4 ®E9} �[�}Q�j}` i90TCL b Rciio�'IL 5, ld:•I> IVU I ;k(I Mauriello Planning Group PEC130021 RECEIVED By David Rhoades at 11:12 am, Sep 17, 2013 I. Introduction The owners of Sebastian, the Marti family, represented by Timbers Resorts, are requesting a major amendment to Special Development District No. 6 (SDD #6) to allow for an addition to the penthouse unit (parcel #: 2101- 082 -85 -051). The addition increases the GRFA by 839 sq. ft., and includes exterior changes to the building, which include changes to the existing secondary roof forms. According to Section 12 -9A -2: Definitions, Vail Town Code, an increase in GRFA is considered a Major SDD Amendment. Based on input from the September 9, 2013, Planning and Environmental Commission, the building forms have been modified in order to reduce the apparent bulk and mass of the addition. The following changes were made: • Roof overhang on the south elevation was reduced from 6 ft. to 18 inches. • Shed dormers flanking the east and west sides have been converted to traditional gable forms • Dormers below the addition on the east and west (fourth floor) have been clipped • Roof form has been brought down on the south elevation to make the addition appear as a dormer, lowering the eave line • Addition is set well back from the pedestrian level view plane The existing penthouse, constructed in 2007, at the Sebastian has never been finished. At this time, the owners would like to complete the penthouse. The penthouse is a 2 -story unit of approximately 5,150 sq. ft. (as indicated on the original approval). When completed, the penthouse unit will be a 5- bedroom unit of approximately 5,989 sq. ft. Oddly designed originally, the head - height in some areas of the existing unit make the floor area unuseable, and to improve the existing layout, the owners are requesting some modifications to the roof form. The location of the change is difficult to photographic due to the existing building and surrounding properties. The addition is therefore essentially not visible from pedestrian areas within the village. The best location to view the proposed locations is from the road leading to the Spraddle Creek neighborhood as indicated in the photo below: 1 Floor plans are provided below, and a reduction of the complete set of plans has been included in the appendix of this submittal. �iIEXISTING MAIN LEVEL �.,�PROPOSED MAIN LEVEL The Sebastian -Vail Penthouse .... ..... ,, ,,,,, 0 SCHEMATIC DESIGN Main Level Fit, Plane i i �\ EXISTING UPPER LEVEL � \PROPOSED UPPER LEVEL The Sebastian -Vail Penthouse C.o do ,,.,, _ O SCHEMATIC DESIGN Upper Level F,1 rPlans II. Background The Sebastian is located at 16 Vail Road. The property is part of Phase IV of Special Development District No 6, Vail Village Inn. This SDD has an underlying zoning of Public Accommodation (PA). SDD #6 was adopted by - Ordinance No. 7, Series of 1976, and has been amended .. numerous times since its -'y ti_u.�V original adoption. Ordinance No. 16, Series of 2004, amended SDD #6, to allow for y changes to the approval of the Vail Plaza Hotel (now known as " the Sebastian) and to extend the expiration date of the project. The Vail Plaza Hotel subsequently lost in a bankruptcy filing by its original owner. hotel to Ferruco Vail Ventures LLC in January of 2010 for a purchase price of $46.5 million. Since then, the current owners have invested millions in improvements and the hotel has become a major success, with guests such as the First Lady, Michelle Obama and a feature on the Today Show. The Sebastian has become a major asset to the Town of Vail, and annual tax collections from the property have continued to increase each year. The approval for the Sebastian currently includes two whole ownership condo units, consisting of a total of 6,136 sq. ft. of dwelling unit GRFA. The remaining 97,778 sq. ft. of GRFA is within 100 accommodation units and 49 fractional units. One of the two existing whole ownership condo units is the penthouse unit. However, the interior of this unit has never been completed. At this time, the owners are requesting to finish the interior of this unit, along with some exterior modifications which will allow the space to be more useable. The original approval identifies the penthouse unit as having 5,150 sq. ft. of GRFA. The Sebastian currently deviates from the maximum height limitation of the Public Accommodation zone district, which limits height to 48 ft. The maximum height of the Sebastian is 77.25 ft., with the height of the tower element opened in December of 2007 and was A federal bankruptcy court awarded the Q o T ,o 3 at 99.75 ft. The proposed addition to the roof, which is at a maximum of 72.75 ft., does not effect the approved maximum building height and no additional deviation from the approved maximum building height is required. There is no additional parking requirement for this proposal, as parking for the unit has already been assessed. There is an incremental increase to the employee housing requirements as a result of the addition of 839 sq. ft. of GRFA, which is addressed in Section III of this application. The proposed addition will generate an employee housing payment in lieu fee of $1 1,310.60. The property continues to meet the definition of a lodge, with greater than 70% of the floor area dedicated to accommodation units or fractional fee club units and the property remains compliant with all other zoning standards. South Elevation: Existing Proposed: -X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 u , a ' �L ILI II. Zoning Analysis Due to the nature of the addition, only GRFA and employee housing are affected by the project. Below is an analysis of the proposal with regard to these development standards. Parking, height and density have also been included, though these standards have not changed as a result of this proposal. All other standards remain as approved by Special Development District #6. Standard Existing Proposed Density Fractional Fee Units 49 No Change Accommodation Units 100 Dwelling Units 2 (13.6 du /acre) GRFA 103,924 sq. ft. 104,763 sq. ft. In AU and FFU (Required >70 %) 97,788 sq. ft. (94 %) 97,788 sq. ft. (93.4 %) In DU (Required <30 %) 6,136 sq. ft. (6%) 6,975 sq. ft. (6.6%) Parking Required 211.69 spaces (rounds to 212) No Change Provided 218 spaces Height 77.25 ft. (sloping roof) No Change 99.75 ft. (tower) Employee Housing Approved prior to Inclusionary 84 sq. ft. (pay -in -lieu) Requirement III. Criteria for Review for the Major Amendment to a Special Development District Section 12 -9A -8: DESIGN CRITERIA AND NECESSARY FINDINGS, Vail Town Code, provides the criteria for review of a Major Amendment to a Special Development District. These criteria have been provided below, along with an analysis of how this proposal complies with these criteria: I. Compatibility: Design compatibility and sensitivity to the immediate environment, neighborhood and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, identity, character, visual integrity and orientation. Applicant Response: The architectural design, scale, bulk, buffer zones, identity, character, visual integrity and orientation of the hotel remain largely unchanged as a result of the proposed major amendment. The proposed changes to the roof do not effect the overall maximum building height of the Sebastian. The proposed roof plan is provided below: R., .... ; ......... .................. O �pDE - - --------------- �- - -- n The Sebastian -Vail Penthouse SCHEMATIC DESIGN: P %posed RO&Plan IN U The changes to the area of the south side of the penthouse unit roof are not visible from many locations within the Village, as indicated in the photos below: Photo I: Taken approximately from in front of A Secret Garden. Photo 2: Taken from deck area of VVI. The changes to the north side of the penthouse roof are visible from the Frontage Road, as indicated in the photo below: Photo 3: Taken from north side of South Frontage Road An analysis of the building stepping of the building is provided below: BUILDING STEPPING T q q Q q q 4 q q 4 4 4 EXISTING EAST ELEVATION PROPOSED EAST ELEVATION EXISTING PROPOSED I As indicated in the analysis, the proposed addition remains true to the character of the existing architecture and is compatible with the character of the neighborhood. Since the original approval of the Sebastian, the character of the Village has changed dramatically, with many projects approved with greater height than was approved here. The additions to the building do not alter the overall character of the building which remains compatible with the immediate environment. 2. Relationship: Uses, activity and density which provide a compatible, efficient fcient and workable relationship with surrounding uses and activity. Applicant Response: The Sebastian is a mixed -use type of development, including commercial, lodging, recreational, and residential uses. There is no change in use or activity, along with no change to the number of dwelling units for the property. The addition of GRFA to an existing dwelling unit remains consistent with the intended purpose of the underlying zoning of Public Accommodation and the intent of Vail Land Use Plan. Adjacent properties include a similar mix of uses. The density and uses proposed for The Sebastian do not conflict with the compatibility, efficiency, or workability of the surrounding uses and activities on adjacent properties. 3. Parking And Loading: Compliance with parking and loading requirements as outlined in chapter I 0 of this title. Applicant Response: Parking for the penthouse unit was assessed with the original development of the property. The addition of GRFA does not increase the parking requirement for this unit. Currently, the property is required 212 parking spaces and there are 218 parking spaces provided. All parking and loading requirements have been met. 4. Comprehensive Plan: Conformity with applicable elements of the Vail comprehensive plan, town policies and urban design plans. Applicant Response: The Sebastian is within the boundaries of the Vail Village Master Plan. The following general objectives are applicable to this application: Objective 1.2: Encourage the upgrading and redevelopment of residential and commercial facilities. Objective 2.2: Recognize the importance of Vail Village as a mixed use center of activities for our guests, visitors and residents. Objective 2.5: Encourage the continued upgrading, renovation and maintenance of existing lodging and commercial facilities to better serve the needs of our guests. In addition to the general objectives of the Vail Village Master Plan, the Sebastian is located within Mixed Use Sub -Area #1 as indicated in the following map: MIXED USE SUB -AREA The Vail Village Master Plan offers the following with regard to this property: #1 -1 Vail Village Inn Final phase of Vail Village Inn project to be completed as established by development plan for SDD #6. Commercial development at ground, level to frame interior plaza with greenspace. Mass of buildings shall "step up" from existing pedestrian -scale along Meadow Drive to 4 -5 stories along the Frontage Road. Design must be sensitive to maintaining view corridor from 4 -way stop to Vail Mountain. Special emphasis on 1.2, 2.3, 2.4, 2.6, 3.2, 4.1, 5.1, 6.1. 5. Natural And /Or Geologic Hazard: Identification and mitigation of natural and /or geologic hazards that affect j`ect the property on which the special development district is proposed. Applicant Response:The proposed addition has has no effect on the above criterion. 6. Design Features: Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community. Applicant Response:The proposed addition has no effect on the above criterion. There are no changes proposed to the site plan and all open space provisions remain as originally approved. 10 7. Tra f f ic: A circulation system designed for both vehicles and pedestrians addressing on and off site traffic circulation. Applicant Response:The proposed addition has no effect on the above criterion. 8. Landscaping: Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and function. Applicant Response:The proposed addition has no effect on the above criterion. 9. Workable Plan: Phasing plan or subdivision plan that will maintain a workable, functional and efficient relationship throughout the development of the special development district. Applicant Response:The proposed addition has no effect on the above criterion. 11 IV. Adjacent Addresses JOHN D GOODMAN PO BOX 1886 0105 EDWARDS VILLAGE BLVD, STE D -201, EDWARDS, CO 81632 9VAIL RD,ASSOC 9VAIL RD. VAIL, CO 81657 JOSEF STAUFER 100 E MEADOW DR #31, VAIL, CO 81657 ARTHUR ANDREW ABPLANALP JR. POST OFFICE BOX 2800, VAIL, CO 81658 -2800 SLIFER MANAGEMENT CO. C/O MS. SALLY HANLON, 385 GORE CREEK DRIVE - R -2, VAIL, CO 81657 MCNEILL PROPERTY MANAGEMENT 2077 N. FRONTAGE RD. #300, VAIL, CO 81657 KEVIN DEIGHAN 12 VAIL ROAD, SUITE 600 VAIL, CO 81657 VAIL HOTEL 09 LLC GENERAL COUNSEL 745 SEVENTH AVE NEWYORK, NY 10019 MAURIELLO PLANNING GROUP PO BOX 4777 EAGLE, CO 81631 CDOT 4201 E.ARKANSAS AVENUE DENVER, CO 80222 SOLARIS PROPERTY OWNER LLC 141 E MEADOW DR 211 VAIL, CO 81657 FIRSTBANK OFVAIL FIRSTBANK HOLDING CO PO BOX 150097 LAKEWOOD, CO 80215 -0097 SONNENALP PROPERTIES INC 20VAIL RD VAIL, CO 81657 VILLAGE INN PLAZA - PHASEV CONDOMINIUM ASSOCIATION CROSSROADS REALTY LTD PO BOX 1292 VAIL, CO 81658 TALISMAN CONDOMINIUM ASSOCIATION PTARMIGAN MANAGEMENT 62 E MEADOW DR VAIL, CO 81657 ONE WILLOW BRIDGE ROAD CONDOMINIUM ASSOCIATION, INC. CORPORATION SERVICE COMPANY 1560 BROADWAY STE 2090, DENVER, CO 80202, ONE WILLOW BRIDGE ROAD CONDOMINIUM ASSOCIATION 4148 NORTH ARCADIA DRIVE, PHOENIZ,AZ 85018 -4302 VAIL GATEWAY PLAZA CONDOMINIUM ASSOCIATION, INC. VAIL TAX &ACCOUNTING P. O. BOX 5940 AVON, CO 81620 TOWN OFVAIL FINANCE DEPT 75 S FRONTAGE RD VAIL, CO 81657 ONEVAIL ROAD PRIVATE RESIDENCE OWNERS' ASSOCIATION, INC. BALLARD SPAHRANDREWS & INGERSOLL LLP 1225 17TH ST., SUITE 2300, DENVER, CO 80202 ONEVAIL ROAD PRIVATE RESIDENCE OWNERS ASSOCIATION, INC. I VAIL ROAD VAIL, CO 81657 THE RESIDENCES AT SOLARIS CONDOMINIUM ASSOCIATION P.O. BOX 5450 AVON, CO 81620 ONE WILLOW BRIDGE COMMERCIAL, LLC 141 EAST MEADOW DRIVE, SUITE 211 VAIL, CO 81657 ONE WILLOW BRIDGE ROAD ASSOCIATION INC I WILLOW BRIDGE RD VAIL, CO 81657 VAILVILLAGE PLAZA CONDOMINIUM ASSOCIATION PO BOX 2264, C/O SLIFER MANAGEMENT COMPANY, EDWARDS, CO 81632 STEPHEN L STAFFORD 0105 EDWARDSVILLAGE BLVD, SUITE G206, EDWARDS, CO 81632 12 Appendix: Plans for the Proposed Penthouse Unit at the Sebastian 13 EXISTING MAIN LEVEL 'ACING ,ALL -ION TO IELD %PPROX. PEC130021 PROPOSED MAIN LEVEL k . Approved by the Planning & Environmental Commission TOWN Of VAI L By Warren Campbell at 7:53 am, Nov 25, 2013 RECEIVED By David Rhoades at 9:32 am, Sep 18, 2013 The Sebastian -Vail Penthouse Vail, Colorado POSS ARCHITECTURE +PLANNING S C H E M A T I C DES I G N Main Level Floor Plans ( T ) E A S T M A I N S T R E E T A S P S N, C O L O R A D O 8 1 6 1 1 0 4 8 16 0 2013 ARCHITTECTUREAND PILAANNING, P.C. September 17, 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 NORTH POSS ARCHITECTURE + PLANNING 605 EAST MAIN STREET ASPEN, COLORADO 8 16 11 (T) 970 / 925 4755 (F) 970 / 920 2950 EXT. F.O. FR, EXT. F.O. EXISTING UPPER LEVEL 0 4 8 16 NORTH HIS DRESS POWDER r LJ 0 0 LL I -U II L= 7T -- - II BALCONY LIBRARY/ I I I I I I I I I I I UP ■ 1.1 ■ ■ + HERS i tU t l\ DRESS INS 91 GUEST/ MASTER BDRM KITCHEN -A 1I-1, BALCONY (BALCONY BELOW) PROPOSED UPPER LEVEL Approved by the Planning & Environmental Commission TOWN Of VAIL 11 By Warren Campbell at 7:53 am, Nov 25, 2013 11 �yI J III II II I The Sebastian -Vail Penthouse Vail, Colorado SCHEMATIC DESIGN Upper Level Floor Plans 0 2013 ARCHITTECTURUEANDGPLANNING,P.C. September 17, 2013 +17 8') + ( +1 72') RADIUS = 1,6' - 1" BA BS(] 735� - - - - - - - - -7 NOTE: 51<YLIGHT DIMENSIONS I - , , f, 4 , A 72-. (+ 173') (-�l 74'y,� (+ 175') (-�176') (+177') (+179'), '0801) 174.3' x B17'2-B \A BI 7 3.6 - -------- e)A76.1 7F- '-�* 12% S1( I II PR TW(178.25') RADIUS - 16' - E-] L AND HEIG\�--- TS(174.5') 17.53. ? F� E� F (170') - - - - - - - 0.9 8170-9 FLAT DS 001B 4' BA73.B x (169.0') BIL� EJ (181.0) - - - - - - - -- - - - -- B 8171 .3\ 1 5:12 1 SK' -GH YP 4� 170.0'x 2.5% Slope 169.0'x x T.1>(��' .......... D 11L _j L' - --- ;�� 71 1 L - - - - -- - - - - - - -L- -ter - -- I TW(I 84.5) EXB2 BELOW WALL 3:1 1 II I I i CRICKET \ \ it - I� I, - - - � ' I I , � � _ V � \ \ \ \ \ V \ � \ \ �� I - - - - - - -- - BELOW O a O BELOW --'jI EAVE,TYP, \A BI-71 4% Slope DS _j S- C8169-0 \/\B170,5 I BELOD' 170.0'x 3:12 3:12 EXB4 kf , I __j I I , I I > EXB5 TW(185.0')x 111-T 4:12 4:12 170.0'x 4:12 4:1 AUNDRY 8168.9 00F, LUE (+170') xT`W(195.U) -F- 4 171.35'x Qp\�\GE x 17135' 171 35'x > (+179') ?)16B.9 F- > S F - - - - - - - - - a L LL w TW (185') x 7W(188.75') A, ------- - --- -1 - - - - - - - 3i 12 F xTW(185.0) DS -- - - - - -- DS RADIUS D3 )S t- (+169') 4 x TV(185.0') N : I kf -(+178') B. -'7j B16 x (169.0') CHB1 7 5f� OPEN TO GRADE- S 1 11- 1 - = L, , \ r- 1 -- BELOW BI 66. ;' - I If > 170.0'x 170.9! 70.0' D! f S -KITCHEN F S 1.11,11ST DS DS J EXI37 DS r, 6--J ( +177') - - - -( +168') x )6.9 ------------ - 5166.3 5.3 (+167') 164.7 8164'3 (+170.01)x, X816;4.9 B164.B (+165') 8164.1 \8164.2 ( +164') BA63-0 X8 \3'3 \ \ ( 1 +163') X V (+I 74.0')'' TV A63-5 B� 5 (+162') TW(+174.0') 8162- TW(+167.0')x BS (+16, TOW ( +164.0') x 163.1 (160 OT) BS (160.0') x FIN B FLO B160T�W 166.0') x \X BI 64. 816 2� TOW (1162.5')-- (+161') x (t68.7) X. 81 59.8 x(162.2') (162.2') x 62-0 x TOW (� 1625) ( +160') TOW (+1625) li I � 164.0') x X 59.1 x (+160.0') 1 ( +159') 815 B (8 B� I II I III EXISTING ROOF PLAN P SS ARCHITECTURE+ PLANNING 605 EAST MAIN STREET ASPEN, COLORADO 81611 (T) 970 / 925 4755 ( F) 970 / 920 2950 0 8 16 32 NORTH n 8160.1 )(BI 6B-7 KITCHEN -- EXHAUST 8169 B169� (+176') - ( +174') X 8171 0 -(+173') 5.9 \A BIV -0 (+172') X8170.8 -(+170')- 6 -9 X8170. )(BI7C) 1-69.3- ( --- B 69.3 1-70.B +169') - B A 69.2 (+168') n 167') (+166') - -(+165')- _ (+ < X81622 161.6 0 8160.4 Approved by the Planning & Environmental Commission TOWN OF VAIL By Warren Campbell at 7:53 am, Nov 25, 2013 - ( +163') � ( +162') , "'I, \(+161') The Sebastian -Vail Penthouse Vail, Colorado SCHEMATIC DESIGN : Existing Roof Plan BILL POSS AND ASSOCIATES (D 2013 ARCHITECTURE AND PLANNING, P.C. September 17, 2013 J \ 174.3' x ` ' Y +174') ^ � +175') (+176') ( +1 77) ^ � +1 70) RADIUS ---15' - 1' '+1 <'S�.� ' , _ +7.00) \ 9172• �,\ \ _ 173.6 �- ( +172') �- - - X 8 \ X 817 6 • ' \ xBSp 73.5) r / - -� -__ - - -�} NOTE YL DIMENSIONS V 12% Slope \ I A I PROVIDE ARE IGHT FOR FRAME WIDTF��� �x TW(178.25) �; ' \ _ AND HEIG _J Ds s xTS(1745) � � .� RADIUS _= 16' - � -- -- � � - -- L - - - -� \ (IRI' T W�{1ff45 2 I I 8170' \ I 9 \ X 4% S10 C 3 Q IF -- FLAT 1 _ 8 1 8 v DS O 70.5 �, X 817 x(169.0) 8170 DS - - - , , 1 \ ( ) x(1sLO) - - -s -- r - - - -- 5:iz - - - -- -� - V� -- - - - -= a.s1z I 8 4 % \ 170.0' x 2.5% Slope 169.0' x -- I _ 6- EBBS X 81 \ I 71.3' I xTOW(1 \ �. - - -- �-- -- - 6- _ I JL DJ - - -J - -- - - - - - -- - -- L- __ - _= I a.s:12 � I RIDGE r"r�T- -i .T. EXB21 BELOW -- ( II A I /x� CRICKET 0.5 4�%Slope v \ TW(184s)x D9 - ee�ow -- - - / BELOW D X g171 .4 O II 7 -1 1 - - - -�I - _- �\EAVE,TYP. _ c816g X81 \ Ds__ - - - - -- \ s _ BELOW I \ 170.0'x \ \ t - - \ I I 3:12 3:12 \\ '1 \ \ \ I ETA �I Exe4 \� I F I \ EXB5 �\ \ TW(185.0' ) x LI T \ - I 4:12 170.0'x \ \ I 4:12 4:12 --J -- 68.9 � A NDRY ( +170') - xTW(I85.0') A 1 I : - X 81 GE FLOOR T - � lnssx � \ \ I XB3 I \ I I�II I AOARA x 171.35' 171 35' x \ I \ � � � � I Il i F � I ( +179') / 816B.9 \ I I I III LL TW(185)x I - - - - -- Y12 7 12> I, I xTW (188.75') \ r 1 - - - � - - �- t=- �_. - --- -- - - - - -- -- - DS 1 3:12 (- , r---- - - - - -- xTW(185.0') i \ - DS DS 1 ( +169') - - \ xTW(185.0) 1 D 4' I II_ 9168. \ x(169.0') I II GHB, �� I ' I I III OPEN TO GRADE 1 1 X8166 2 v v A Ds I ii i - - _ ' BELOW n� I \ 1 \_ 170.0' x 170.0 1 x 170.0' \ I I u- I I \ I I 1 F dJ S KITCHEN E S EXHAUST DS- DS 1 EXB7I I I+ CRIOKE S -( +177') I \ DS 1 I - - -- _ -_ - - L - - - -L-= L- - - �- \ ^� Q 1 67 ,U 12 �1 J --'� - - r- ------- - - - - -- U -( +168') x, 'I -� \ 1 -- - - - -- -- 3:1z \ JJ KITCHEN \ - I EXHAUST Q 6g \ \ THRU -WALL \\ I X 8 1 _ 6,9 ( \ \ F� OR SCUPPER OP W LL 1 1 O I- I 1 \ OF CONCRETE _6 I - 6 V f �� TOW(184.5')x \ I ? 1 � FLAT r S r- _ 816 \ X 8166.3 \ V I n I - A i EXBS - ( +176') � -i � �m BELOW xTWp85.0) �II EXB1 I TS(181.0')x r - - - - -- - 8166 3� �� \xTOW(184.5) I I ir- \/ x(170.0') I S 3:12 - - + �- +167 X165 3 � � ( ') v \ I 3:12 3:12 3:1 AV �I � - - (+175') - - \ / 165 g x \ \ \166 3 \ TAL -- \ ' EL LO VER L -- -- - - - - - -- -- - -- - - \ �/ i 8 � / - -- - r r -- r I r - -- r l _ ' - - X 9169 /,. -- - - - -- - - - -- RAT - - -- 1-- - -FLAT - - -- - -- FLAT - - - - - -( +174') 8164'7 816 e \ \ 8166.2 -- �- r Ds / i \ \ Ds FLAT Z )A64.7 \ i� O �� s. BELOw� I �� - - ��/ y3 1 \ FLAT / FAT 3:12 8 - 8 ( +166) 7 TW 1174.0) SLOPE _.. (1 / ,> i \ SLOPE Lps J DLS -J OVE . )(8164.3 - 16 J 5:12 - - SLOPE 41)S' SLOPE +170.0') x SLOPE 5:12 Z 3:12 DS S 5:12 X 871 .0 ' -___.. 16:1 16:1 I ; DS DS:'i \ 16:1 - -- T6:12 a Ds \ -� 8173.5 v � I ;, REF STRUCTURAL REF STRUCTURAL 5.9 \ XB16L� -,9 / F - �_ _,_ - - _ HEIGHT FOR HEIGHTS FOR 16:12 18:1 - - -- - - -� -' r - -- - � - - SLOPE � � � PE - 16 4.8 1 I SLD0 T I I I DS DS s N_ Ili \ 71 .0 7 \ X 8 �� - - s� A I -- -- it -iii �' P� X 81 1 \. --- - - - - -- - - �L - - -� - --- - - - - -� - �--- - - - - --- - - - -- --- - - - - -� - - - - -- -_ -- == - II 3:12 CRICI r I \T- / s \ F� ( +165') I 1 BELOW I \ -- - - - -- J L - - - -- -J - -1 E- -RTD - � - 8 4.1 I - GRIC�( T 8164.2 i- F - A V``. 1 0 8 X I ' I S X817 X8170 4 \ I I \ io E 6 EX� -(+170')- 8 I I X 1 ( +164') I � � 169.3 \168.3 - 1-69.- - _ bS X8169.3 a X8170.8 -- - - - - - -- - ( +169') - I , I FLAT Qq 3• - - - - - -- - r -1I \ IF -1I IF -1I IF - S / 8169 2 1 81 O 1 -IJ LL - - -- - L LL - - - - -- L ,� LL - - - - -- L LJ- TI X X 6 _ 8162 4 yi RAT FLAT FLAT X8 9 - \ - - -- L - - -- - _ III/ FLAT % X813.3 \ ( +163') �- \ r- --------- - - - - -- --- - - - - -- - -- - _ \ - - -- - p I ( xTW ( +174.0) 1 - - - - -� - - - - S \ -___ ( +160' I,I � 'I = DS RADIUS = 16 - 8 DS I I A� \/ � g163 5 x( +170.0') -- I _ 1 � LOB Y IR LACE H T Y - �- � / - \ g R = 1a75�) - ' (2_iy') 4 IDS V A� - - - -- - 99 R = 2 ' O 3:12 S BEL IWHT A' I I �- - - - - +167 Q161x �) VT %) rj ( +162') � Tw (+ 174.0') x X g162 1 s -- -- } - - - - - - - TW( +1670) x`, - BS( +1660)x -- I -I 16 , -'` ( ) TOW ( +164.0') / - --- -- - - - - -- \ - -� -- - 6 QO')x % I /y- CRICKET I I IDS - BS (160.0)x ' I- � / BELOW I Raams-1a' -s -HEADE VA - __ X 8163 1 6 (158.nx 1 1 I x 1 \ I I �D Ds �� 11 - -- - -- - - - - -- FLO _ R 8160m ( +166.0)x I I r -- _ )(BA .8 - -- F1N g164 i I 1 7 _ +165 _ 6 1 1 X 81 4 � � � , ( +161') -' - I, I I - �X8 68 _ _ _ / �; %/ �� ( ) - 6� =s _ .�. - -- Irk 3:12 �� \ /_ x 068.77 X , -. n RIDGE - 6_ J XA2 / (212.7;') I ti 1 ( +164') I I 1 I (162.2') x 8 \ xTOW( 1625. ( ) ) �' 1 ...3:12 r� 0 � -- _ 8162 2 1 1 -� X816 I - - - -- - - -- - - - -a1 r- - - - - -- I�---= = - = -al - - - - - -- - I - _ _ =I 3: ( +160') 915 9 1 - - - - - -- - - - - - -- � L- -- I -12-> I IDs - � (+163') -_ I -- - X Sg 4 �S 1 - - - -- FLAT AT FLAT t I - LLJ _� r - - - - -1 r - - -� r --- - - - - -- J s:1 \ - - - - - -- - d DS -- DSL - -- �l �DS DS b16:1 16:121 _ 1 - -� ( +162 ) \ � -- DS f, 21.75' 1 x TOW (+1623) 8159.5 - - - T O64.0)x 1 n (�,60.e, �, � s - 9 6 B1 59.A -- -- - -- X _ _ - 5 BI 5B.3 ( +i59') _ 8 X 16 ) I I � � 160.2 (+ 1� X- 8158.9 - - - -X X158. X ,; _ X 8160.4 .I I n P0 60 PROPOSED ROOF PLAN Approved by The Sebastian=Vail Penthouse Planning & Environmental Commission TOWN OF VA I L By Warren Campbell at 7:53 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE PLANNING S C H E M A T I C DES I G N Proposed Roof Plan ( 605 E A S T M A I N S T R E E T A S P S N, COLORADO 8 1 6 1 1 0 8 16 32 � 2013 ARCHITECTURE AND PLANNING, P.C. September 17 , 2 013 (T) 970 / 925 4755 (F) 970 / 920 2950 NORTH POSS ARGHITFGTUR + PLANNING 605 EAST MAIN STREET ASPEN, COLORADO 81611 (T) 970 / 925 4755 (F) 970 / 920 2950 EXISTING MAIN LEVEL - GRFA 0 4 8 16 NORTH PROPOSED MAIN LEVEL - GRFA Approved by the 0 ' Planning & Environmental Commission TOWN OF VA I L By Warren Campbell at 7 :53 am, Nov 25, 2013 The Sebastian -Vail Penthouse SCHEMATIC DESIGN Vail, Colorado Floor Plans - Area Calculations O 2013 ARCHITECTURE AND PLLAANNING, P.C. September 17, 2013 POSS ARGHITFGTUR + PLANNING 605 EAST MAIN STREET ASPEN, COLORADO 81611 (T) 970 / 925 4755 (F) 970 / 920 2950 EXISTING UPPER LEVEL - GRFA 0 4 8 16 NORTH PROPOSED UPPER LEVEL - GRFA 0 . Approved by the Planning & Environmental Commission TOWN OF VA I L By Warren Campbell at 7:53 am, Nov 25, 2013 IT AREA SUMMARY: )POSED GRFA MAIN LEVEL PROPOSED GRFA UPPER LEVEL PROPOSED GRFA ADDITION TOTAL GRFA AREA 3284.00 SQ. FT. 1960.18 SQ. FT. 744.71 SQ. FT. 5988.89 SQ. FT. The Sebastian -Vail Penthouse SCHEMATIC DESIGN Vail, Colorado Floor Plans - Area Calculations BILL (D 2013 ARCHITTECTURUEANDPLAANNING,P.C. September 17, 2013 11 10 EXISTING NORTH ELEVATION revel " S�— Datum 170' -0" Approved by the Planning & Environmental Commission The Sebastian=Vail TOWN OF UA j L By Warren Campbell at 7 :53 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE + PLANNING S C H E M A T I C D E S I G N Existing North Elevation (T) EAST MAIN STREET ASPEN, COLORADO 81611 0 4 8 16 02013 ARCHITECTURE ANDPLLAANNING,P.c. September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 p Proposed Ridge Datum 247'-9- Existin Reid ge Datum 245'-9" PROPOSED FORTH ELEVATION September 9, 2013 proposal Level U4 Datum 170' -0" 0 Approved by the Planning & Environmental Commission Sebastmian=Vamil u TOWN OF VA{ L By Warren Campbell at 7:54 am, Nov 25, 2013 'fail, Colorado POSS ARCHITECTURE + PL NNING S C H E M A T I C D E S I G N Proposed North Elevation 505 EAST MAIN STREET ASPEN, COLORADO 81611 4 $ 16 apL nNOrasSgCluE��$, August {�1 IT} 97 01 925 4 755 (F) 9701 920 2 95❑ ( I3 ARCH t+JEiwpPWa#NG,R.C. August 29, 2013 Proposed Ridge Datum 247 —9 Existing Ridge Datum 245'-9" 11 10 PROPOSED NORTH ELEVATION revel u4 S�_ Datum 170' -0" Approved by the 0 . Planning &Environmental Commission The Sebastian=Vail � ��r j By Warren Campbell at 7:53 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE +PLANNING S C H E M A T I C D E S I G N Proposed North Elevation (T) EAST MAIN STREET ASPEN, COLORADO 81611 p 4 g 16 02013 ARCHITECTURE ANDPLAANNING,P.C. September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 i' AREA OF PROPOSEC ADDITION (SHADED) Proposed Ridge Datum 247 —9 Existing Ridge Datum 245'-9" LINE OF EXISTING BUILDING 11 10 Level u4 Datum 170' -0" PROPOSED NORTH ELEVATION Approved by the Planning & Environmental Commission TOWN OF VAIL � By Warren Campbell at 7:54 am, Nov 25, 2013 The Sebastian=Vail e Vail, Colorado POSS ARCHITECTURE +PLANNING S C H E M A T I C D E S I G N North Elevation - Massing Study (T) EAST MAIN STREET ASPEN, COLORADO 81611 p 4 g 16 02013 ARCHITECTURE ANDPLAANNING,P.C. September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 p Q Q Q Q Q Q Q Q Q Q Q Q Y Datum 170 -0"" Datum 170 -0"" Y EXISTING EAST ELEVATION 0i Approved by the ■ ■ Planning & Environmental Commission The a I a a I a o u s e TOWN O F Vii I L By Warren Campbell at 7:54 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE +PLANNING SCHEMATIC DESIGN Existing East Elevation (T) EAST MAIN STREET ASPEN, COLORADO 81611 0 4 8 16 02013 ARCHITECTURE ANDPLLAANNING,P.c. September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 p Ak Ridge WrJ Datum 2.35' -9 Ridge IV Datum 225' -9" Level 08 Datum 210' -0" Level 07 Datum 200` -0" Level 06 Datum 190' -0" Grade Levefi5 atum 180-0, HISTORIC/NATURAL GRADE Level 04 Datum 170 -0" I I I I I I I I I I I I I I I I I I I I I I I I I I I I Datum 170 -0" a I I I I I w PROPOSED EAST ELEVATION September 9, 2013 proposal Approved by the Sebastmian=Vamil Planning & Environmental Commission �� � � By Warren Campbell at 7:54 am, Nov 25, 2013 Vail } olorad+o p0 ARCHITECTURE + PL NNING S C H E M A T I C DESIGN Proposed East Elevation 5T }597 0 EAST 92� 4755 R(F]T970 !920 COLORADO 81611 ii 4 $ 16 0 ?013 ARNIt ANP�+n��ini j# .i:.. ,I'-1ugLisL 2 9} 2013 Ridge Datum 235' -9" Ridge Datum 225' -9" Level 08 Datum 210' -0" Level 07 _ Datum 200' -0" Level 06 Datum 190' -0" Grade 181' -0" Level 05 Datum 180 -0 HISTORIC /NATURAL GRADE Level 04 Datum 170 -0" POSS ARCHITECTURE + PLANNING 605 EAST MAIN STREET ASPEN, COLORADO 81611 (T) 970 / 925 4755 (F) 970 / 920 2950 Q Q Q Q Q Q Q Q Q Q Q Q PROPOSED EAST ELEVATION 0 4 8 16 Datum 170 -0"" Y Approved by the Sebastian=Vail a Planning &Environmental Commission TOWN OF VAIL By Warren Campbell at 7:54 am, Nov 25, 2013 Vail, Colorado SCHEMATIC DESIGN Proposed East Elevation O 2013 ARCHITECTURE AND PLAANNING, P.C. September 17, 2013 L M N P Q R S T U V W X AREA OF PROPOSED ADDITION (SHADED) EXISTING LAUNDRY AND TRASH CHUTE FLUES _ Pro osed Rid e CD Datum 247' -9» j F I T7FI F CI - - - - - Existing Ridge -17 Datum 245 -9 I I I II I - -11 -11 1 FI _I T LINE OF EXISTING Ride EXISTING KItCHEN EXHAUST CHIMNEY BUILDING Datum 235' -9" II ]000 F D - Level 10 Datum Ride FFI n Datum 225' -9» L ��� Level 09 Datum 220' -0» Level 08 U - - j U Level 08 Datum 210' -0" I � -� - � ,_ » _ Datum 210'-0" Level 07 Level 07 Datum 200' -0» s J - -�= - =�T -- -1; - lc Datum 200' -0» Level 06 t 11 EXHAUST FA �_ I - - - I �� Level 06 i - - _ Datum 190'-0" - - - - `= _ - - Datum 190 -0 11' _r -= �� Datum 188 -0» Grade I I -� -II I � I - =- -_ _- Grade 181' -0» _ _ — 181' -0" Level 05 = � Level 05 Datum 180 -0 - ' liI' I j Datum 180 -0" HISTORIC /NATURAL GRADE AlI Level 04 — Level 04 Datum 170 -0" Datum 170 -0» PROPOSED EAST ELEVATION 1 Approved by the a I a n_ a I Penthouse Planning &Environmental Commission The TOWN OF 'VA f L By Warren Campbell at 7:54 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE +PLANNING S C H E M A T I C D E S I G N East Elevation - Massing Study ( 605 E A S T M A I N S T R E E T A S / S N, C O L O R A D O 8 1 6 1 1 p 4 g 16 @ 2013 ARCHITTECTURDEANDDPEANNING,P.C. September 17 2013 (T) 970 / 925 4755 ( F ) 970 / 920 2950 P 11 EXISTING SOUTH ELEVATION Approved by the Planning & Environmental Commission Sebastian=Vail a TOWN OF VAIL A By Warren Campbell at 7 :54 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE + PLANNING S C H E M A T I C D E S I G N Existing South Elevation ( T ) E A S T M A I N STREET A S P S N, C O L O R A D O 8 1 6 1 1 0 4 8 16 0 2013 ARCHITECTURE ANDPLLAANNING,P.c. September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 10 Il I I September 9, 2013 proposal PROPOSED SOUTH ELEVATION Approved by the The Sebastmian=Vamil u Planning & Environmental Commission TOXIN OF VAIL' By Warren Campbell at 7:54 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE + PL NNING S C H E M A T I C D E S I G N Proposed. South Elevation 505 EAST MAIN STREET ASPEN, COLORADO 81611 (I 4 $ 16 RILLPp ANR SOCIU��$g, August I T} 7 0! 9 2 5 $ 7 5 5 ( F) 117 0 1 920 2 95 0 kJ I3 ARRHII f7)F E WR RLWfe�NS, R.C. August L 9, 2013 P 11 PROPOSED SOUTH ELEVATION Approved by the The Sebastian=Vail Penthouse Planning &Environmental Commission TOWN OF VAIL By Warren Campbell at 7:54 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE +PLANNING S C H E M A T I C D E S I G N Proposed South Elevation (T) EAST MAIN STREET ASPEN, COLORADO 81611 p 4 g 16 02013 ARCHITECTURE ANDPLLAANNING,P.c. September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 p P 11 PROPOSED SOUTH ELEVATION Approved by the ■ ■ Planning &Environmental Commission The a I a a I a o u s e TOWN O f VA h L 11 By Warren Campbell at 7:55 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE + PLANNING S C H E M A T I C D E S I G N South Elevation - Massing Study (T) EAST MAIN STREET ASPEN, COLORADO 81611 p 4 g 16 02013 ARCHITECTURE ANDPLAANNING,P.C. Se temeber 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 p 0 0 0 0 0 0 0 Q Q Q Q Q Q Q Level 03 1 . Level 03 IV Datum 160' -0" Datum 160' -0" EXISTING WEST ELEVATION I I I I I I I I I Approved by the The Sebastian=Vail Penthouse Planning &Environmental Commission TOWN OF VA I L" By Warren Campbell at 7:55 am, Nov 25, 2013 Vail l l , Colorado POSS ARCHITECTURE +PLANNING SCHEMATIC DESIGN Existing West Elevation (T) EAST MAIN STREET ASPEN, COLORADO 81611 p 4 g 16 02013 ARCHITECTUREANDOPIANNING,P.C. September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 p (D Proposed Ridge Datum 247' -9" , Existin Rid e Datum 245' -9" Level 10 Datum 230' -4" Level 09 Datum 220' -0" Lik Level 08 Datum 214' -0" Lik Level 07 Datum 200' -0" Level 06 Datum 190' -4" Level 05 Datum 180' -0" Lik Level 04 Datum 170'-0" Lik Level 03 Datum 160' -4" L01 � I � I PROPOSED WEST ELEVATION September 9, 2013 proposal Level 43 Datum 160' -0" I F3 I I I I I 0 Approved by the Planning & Environmental Commission The Sebastmian=Vamil u TOWN OF 'VA f L By Warren Campbell at 7:55 am, Nov 25, 2013 'fail, Colorado p0 ARCHITECTHRE + PLANNING S C H E M A T I C D E S I N Proposed West . Elevation 5T)597DI92� 4755 R(F]T970l920 COLORADO 81611 a 4 $ 16 0 01 AR�HIt�C1i/�EP1l� l�#NG,h:.'. August 29, 2013 Proposed Ridge Datum 247' -9" Existing Ridge Datum 245' -9" Level 10 Datum 230' -0" Level 09 Datum 220' -0" Level 08 Datum 210' -0" Level 07 Datum 200' -0" Level 06 Datum 190' -0" Level 05 IV Datum 180' -0" Level 04 Datum 170'-0" Level 03 IV Datum 160' -0" 0 0 0 0 Q 0 0 0 0 0 0 0 0 0 PROPOSED WEST ELEVATION Level 03 Datum 160' -0" J I F3 2 I 1 I 2 I 0 Approved by the Planning & Environmental Commission Sebastian=Vail Penthouse a TOWN OF VA l L By Warren Campbell at 7:55 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE + PLANNING SCHEMATIC DESIGN Proposed West Elevation (T) EAST MAIN STREET ASPEN, COLORADO 81611 p 4 g 16 02013 ARCHITECTURE ANDPLAANNING,P.C. September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 i' 0 0 0 0 0 0 0 AREA OF PROPOSED ADDITION (SHADED) Proposed Ridge Datum 247' -9" Existing Ridge Datum 245' -9" LINE OF EXISTING BUILDING Level 10 Datum 230' -0" Level 09 Datum 220' -0" Level 08 Datum 210' -0" Level 07 Datum 200' -0" Level 06 Datum 190' -0" Level 05 IV Datum 180' -0" Level 04 Datum 170'-0" Level 03 Datum 160' -0" I I PROPOSED WEST ELEVATION Q Q Q Q Q Q Q I F3 I F3 I I I I I I Level 03 Datum 160' -0" kr Approved by the Planning & Environmental Commission The Sebastian=Vail TOWN OF VA! L � ` By Warren Campbell at 7:55 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE +PLANNING S C H E M A T I C D E S I G N West Elevation - Massing Study ( 605 E A S T M A I N S T R E E T A S P / S N, C O L O R A D O 8 1 6 1 1 p 4 g 16 @ 2013 ARCHITECTURE AND September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 BUILDING STEPPING EXISTING EAST ELEVATION 4 4 4° 4 T ° 4 4 4 4 4 PROPOSED EAST ELEVATION Approximate 48 foot height limit permitted by the Public Accommodation Zone District EXISTING Approximate 48 foot height limit permitted by the Public Accommodation Zone District PROPOSED Approved by the Sebastian=Vail a Planning &Environmental Commission TOWN OF VAIL I By Warren Campbell at 7:55 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE +PLANNING S C H E M A T I C D E S I G N East Elevation - Massing Study ( T ) E A S T M A I N STREET A S P S N, C O L O R A D O 8 1 6 1 1 X 2013 ARCHITTECTURE ANDGPLAANNING,P.G. September 17, 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 ��......b " Gateway Building EXISTING NORTH FRONTAGE ROAD ELEVATION PROPOSED NORTH FRONTAGE ROAD ELEVATION SO %&,■%A■■,5 a, Gateway Building Approved by the Planning &Environmental Commission The Sebast'ianmVa'il TOWN OF 'VAlL 1 By Warren Campbell at 7:55 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE + PLANNING SCHEMATIC DESIGN : Street Section 605 EAST MAIN STREET ASPEN, COLORADO 81611 0 S 16 32 p2013 BILLPOSSAN ANOP TES, C,r�C. September 17, 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 P DU11U1118 o rnase rte EXISTING SOUTH PLAZA ELEVATION PROPOSED SOUTH PLAZA ELEVATION L.P U 11 U 11 16 v r 1 1 C1JC 111 Approved b Planning &Envi ronmental Commission The Sebastmian=Vail TOWN OF V By Warren Campbell at 7:55 am, Nov 25, 2013 Vail, Colorado POSS ARCHITECTURE + PLANNING SCHEMATIC DESIGN Plaza Section (T) EAST MAIN STREET ASPEN, COLORADO 8161 1 0 8 16 32 2013 RCFIRE�CTUR ASHD�PLMN)IG.PX. September 17, 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 p EXISTING VIES!'` FROM NORTH W. r_. ♦ �� h` - _lp r PROPOSE[ VIEW FROM NORTH September 9, 2013 proposal C Approved by the Planning &Environmental Commission Tai WN OF VAIL By Warren Campbell at 7:55 am, Nov 25, 2013 Sebast'ian=Va'il Fail, Colorado POSS ARCHITECTURE + PLANNING SCHEMATIC DESIGN 3D Photo Simulation 605 EAST MAIN STREET ASPEN, COLORADO 81511 0 2013 �Hn AURE o i� hs,R,c. August � of (T) 971)1925 4755 (E) 9701920 2950 , i EXISTING VIEW FROM NORTH PROPOSED VIEW FROM NORTH Approved by the Planning & Environmental Commission TO SUN OF VAIL 11 By Warren Campbell at 7:55 am, Nov 25, 2013 Li. I The Sebastian -Vail Penthouse Vail, Colorado POSS ARCHITFff — � PLANNING SCHEMATIC DESIGN : 3D Photo Simulation ( 605 E A S T M A I N S T R E E T A S P / S N, C O L O R A D O 8 1 6 1 1 � 2013 ARCHITECTURE AND September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 EXISTING VIEW FROM SOUTH September 9, 2013 proposal PROPOSED VIEW FROM SOUTH 05 Approved by the Planning &Environmental Commission Sebast'ian=Va'il TOWN OF VAIL By Warren Campbell at 7:55 am, Nov 25, 2013 Fail, Colorado p0 ARCHITECTURE + PLANNING SCHEMATIC DESIGN SD Photo Simulation 5T }5971)1925 MAIN 75STREET 970192000LORADO 8161 1 02013 ARLHiEGA21"20A4IEPic.pr. A U g U s t 29, 2013 ,P.y�� P � 1 ; e EXISTING VIEW FROM SOUTH r 1 a Tl I -Xtv t L- op PROPOSED VIEW FROM SOUTH Approved by the Planning & Environmental Commission TOWN OF VA j L By Warren Campbell at 7:56 am, Nov 25, 2013 AE } The Sebastian -Vail Penthouse Vail, Colorado POSS ARCHITFff — � PLANNING SCHEMATIC DESIGN : 3D Photo Simulation ( 605 E A S T M A I N S T R E E T A S P / S N, C O L O R A D O 8 1 6 1 1 � 2013 ARCHITECTURE AND September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950 r� PROPOSED VIEW FROM SOUTH Approved by the Planning & Environmental Commission TOWN OF VA j L By Warren Campbell at 7:56 am, Nov 25, 2013 AE } The Sebastian -Vail Penthouse Vail, Colorado POSS ARCHITFff — � PLANNING SCHEMATIC DESIGN : 3D Photo Simulation ( 605 E A S T M A I N S T R E E T A S P / S N, C O L O R A D O 8 1 6 1 1 � 2013 ARCHITECTURE AND September 17 2013 (T) 970 / 925 4755 (F) 970 / 920 2950