Loading...
HomeMy WebLinkAboutB13-0538 PLANS.pdf LILT QL Go x MIi "PEOPLE&PRODUCTS YOU CAN COUNT ON" PO BOX 810 825A CHAMBERS AVENUE EAGLE,CO 81631 800.543.9365 www.randhmechanical.com EXISTING 600 GALLON DIESEL FUEL ,■.�„�„ STORAGE TANK. FIELD VERIFY SIZE AND LOCATION. CONTRACTOR SHALL PROVIDE ALL NECESSARY PIPING CONNECTIONS, GAUGES, ALARMS, ETC. FOR A COMPLETE INSTALLATION. SEAL.: 2" Wo*E- -,I F. F42812 SEE GENERAL NOTE 3. ROUTE NEW 2" DIESEL FUEL LINE PIPING UP TO SPILL CONTAINER ABOVE. SPILL CONTAINER TO BE �ONAIL MOUNTED ABOVE JUST ABOVE GRATING. 2" LL B13 - 0538 0 2" J LL NO. DATE SEE GENERAL NOTE 3. DFL DFL DFL 2" 2" 2" NORTH 1 CONSTRUCTION SET 11/27/13 Partial Lower Level Mechanical Plan NO. ISSUANCE DATE SCALE: 1/4" = 1'0" w C LO NEW POMECO/OPW 6221AST DIRECT FILL 0 0 0 0 0 0 0 0 co ABOVE GROUND STORAGE TANK SPILL CONTAINER. r ° W 100 r., � o � obod o e � o t SEE PARTIAL LOWER LEVEL _ o 0 0 0 0 0 O o o 0 o MECHANICAL PLAN (THIS SHEET) Z Q FOR WORK IN THIS AREA. - -� oo 0o P r SEE PARTIAL FIRST LEVEL EXISTING GRATING LOCATED AT GRADE LEVEL. MOUNT NEW ° ° - MECHANICAL PLAN (THIS SHEET) SPILL CONTAINER UNIT ABOVE GRATE. FIELD VERIFY AND 0 FOR WORK IN THIS AREA. Q U) ry COORDINATE FINAL LOCATION OF CONTAINER WITH EXISTING O PIPING IN WELL. NORTH NORTH � � J Lower Level Vicinity Plan First Level Vicinity Plan p No Scale No Scale o U F LO MECHANICAL SPECIFICATIONS: GENERAL NOTES: � 1. CODES AND PERMITS: 1. COORDINATE DIESEL FUEL LINE INSTALLATION WITH EXISTING a. ALL PLUMBING EQUIPMENT, PIPING, INSTALLATION, ETC., SHALL CONFORM MECHANICAL EQUIPMENT, PIPING, AND BUILDING STRUCTURE. TO THE 2012 IMC, APPROPRIATE CODES, AND ORDINANCES AS INTERPRETED BY THE TOWN OF VAIL BUILDING DEPARTMENT. 2. PROPOSED PIPING LAYOUT IS DIAGRAMMATIC AND DOES NOT SHOW b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS. ALL NECESSARY PIPING OFFSETS. ACTUAL ROUTING (ABOVE AND c. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED BELOW EXISTING CEILING SYSTEMS)SHALL BE CAREFULLY TO THE ARCHITECT. COORDINATED WITH THE EXISTING MECHANICAL SYSTEMS. 2. DIESEL FUEL LINE PIPING: 3. FIRE CAULK ALL PENETRATIONS THROUGH FIRE RATED WALLS a. 2" SHALL BE THREADED STANDARD WEIGHT SCHEDULE 40 (ASSEMBLIES)AS REQUIRED. SHEET TITLE: BLACK STEEL PIPE WITH SCREWED MALLEABLE IRON FITTINGS. T b. ALL OUTDOOR EXPOSED PIPING SHALL BE PAINTED WITH OUTDOOR Lower Level el & ENAMEL. 3. PENETRATION IN WALLS REQUIRING PROTECTED OPENINGS SHALL BE First Floor Level l I° FIRE-STOPPED. FIRE-STOPPING SHALL BE AN APPROVED MATERIAL SECURELY INSTALLED AND CAPABLE OF MAINTAINING ITS INTEGRITY WHEN SUBJECTED TO Diesel Fuel Line TEST TEMPERATURE FOR SPECIFIC WALL OR PARTITION. 4. PROVIDE HANGERS AND SUPPORTS MEETING THE REQUIREMENTS SPECIFIED IN Piping Plan FC(. THE 2012 IPC SECTION 308. 5. ALL PLUMBING LINES SHALL BE CONCEALED WITHIN THE BUILDING STRUCTURE PROJECT NUMBER: 131121 TO THE GREATEST EXTENT POSSIBLE. ALL LINES NOT CONCEALED SHALL BE NORTH SECURED 6" OFF FLOOR AND 3/4" FROM WALL AND CEILINGS USING OFFSET PROJECT MANAGER: BFW BRACKETS. DRAWN BY: WJM Partial First Level Mechanical Plan CHECKED BY BFW SCALE: 1/4" = 1'0" RECEIVED SCALE: 1/4"=V-0" By David Rhoades at 10:23 am, Dec 04, 2013 SHEET NUMBER 1 ,90 CONSTRUCTION DRAWINGS 1 of 1 ®2014 R&H ENGINEERING,LLC, ALL RIGHTS RESERVED . � www.opwglobal.com POMYMECO/OPW 332AST Features & 6221 AST Direct-Fill ♦ Easy Installation-4"NPT threaded FRB Above Ground Storage base screws directly to the tank riser pipe. No further adjustments CER �,p Tank Spill Containers are needed. POMECO/OPW Direct-Pill AST Spill ♦ Integral Drain Valve-allows high- Containers are designed to prevent speed drainage of spilled product , spilled product from entering soil near back into the tank. the fill and vapor return riser connections ♦ Capacity-available in 7-gallon o (26.5 liter)container capacity.Larger n an above ground storage tank during 331AST 7-gallon capacity spill containers provide � �,, normal tank filling operation. The spill additional clearance for 61f STOP containers catch spillage to help prevent Overfill Prevention Valves soil contamination and groundwater (3.5 gallon-221 only). pollution. POMECO/OPW Direct-Fill AST ♦ Rain-Shedding Cover Design- 6221AST Spill Containers thread on the top of an hooded cover design helps prevent above ground tank and allow for drainage water or snow entry by extending the lip of the cover over the body of the of spilled product back into the tank, spill container. ♦ 6211 AST Heavyweight,Welded Base B ♦ Welded-Hinge,Lockable Hatch-the Design-Thick,welded steel base cover includes a provision for a padlock and 12-gauge steel walls provide solid and a welded-hinge assembly for strength for heavy-duty applications. 17-01 added security. 0 All Models Are ULC Listed-clearly ♦ 12 Gauge Epoxy-Powder Coated labeled to identify the listing. A Construction-heavy-duty materials. p CARB EVR Certified compatible with hydrocarbons,for long service life and added security ♦ 332AST Spun Steel Design-spun 332AST Spill Containers steel construction provides a lightweight, Instruction Sheet Order Number 203168 332AST one-piece design for easy installation and a clean,sleek appearance on 6211-AST Spill Containers B above ground tanks. Instruction Sheet order Number:202207 Ordering Specifications: CARB APPROVED AST EQUIPMENT ' Product No. Description Liters lbs. kg A 332-ASTW74 7 gallon App ovedT 26.4 liter,4.0"NPT 38 17.23 6221-ASTW32 3.5 gallon,10"NPT White 13.2 liter,4.0"NPT 18 8.16 6221-ASTW34 3.5 gallon,4.0"NPT White 13.2 liter,4.0"NPT 19 8.61 6221 AST 6221-ASTW72 7 gallon,2.0"NPT White 26.4 liter,2.0"NPT 20 9.07 Dimensions 6221-ASTW74 7 gallon,4.0"NPT White 26.4 liter,4.0"NPT 25 11.33 Capacity A B 6221•ASTW76 7 gallon,6.0"NPT White 26A liter,6.0"NPT 25 11.33 Model# gal, liter in, cm in, cm 7 gallon,AST Stainless 6221SS-AST74 Steel Spill Container 26.4 liter,4.0"NPT 25 11.33 7 26.5 1411, 37 17 43 6221 3.5 13.2 91h 24 17 43 Listings and CARB Certified AST Phase 1 Enhanced Vapor Recovery(EVR) System 332 7 26.5 14 35 17 43 Certifications EO-VR 401-6 246 9393 Princeton-Glendale Road• Hamilton,Ohio USA 45011♦ Phone:(800)422-2525 a Fax:(800)421-3297 2013 OPW Fueling Components Od -rES R_ E Nip m do f } I i f 1 �- "�'� rr�i xr �xxrryrrxx#rrx �� *rYiw� ��.ti�<•:� �r f■l��j11' �'r,`x`x[[x'l[['+ r�l 'ti r�'�!'�'4k'�11`�`t. ►► 'tom r►ti �-.._ ...:.. .. ..... _ � ! ilii[ itY�rrs�rr�[i�rf�lrl�tl►1.�rrrrrrr#ra4'k��'�l�l��.�fllYi�E^►Y,.u�rvbaar•..�.rr.r.,�r�a*iti.*e.`�\\��':