Loading...
HomeMy WebLinkAboutDRB130567 PlansVA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 35 9 D E S I G N Existing Site Information  Pg 1 – Existing Conditions  Pg 2‐ Stamped Topographic Survey  Pg3 – Existing Site Plan    Existing Project Background  Pg 4 ‐ Project introduction / Goals  Pg 5 ‐ Existing Conditions Photos  Pg 6 ‐ Existing Conditions Photos  Pg 7 ‐ Existing Conditions Photos Pg 8 ‐ Comparable Context  Site and Floor Plans Pg 9 ‐ Development Data Pg 10 ‐ Site/Landscape Plan Pg 11 ‐ Scope of Proposed Design ‐ Ground Level  Pg 12 ‐ Scope of Proposed Design ‐ Typical Level  Pg 13 ‐ GRFA Plans at 1/64  Pg 14 ‐ GRFA Plans at 1/64    Renderings & Material  Pg 15 ‐ East Elevation Existing and Proposed  Pg 16 ‐ East Proposed Views  Pg 17 ‐ East Proposed Scope  Pg 18 ‐ East Proposed Scope Pg 19 ‐ South Elevation ‐ Existing and Proposed Pg 20 – South Proposed Views Pg 21 – South/East Proposed Scope Pg 22 ‐ West/South Elevation ‐ Existing and Proposed Pg 23 ‐ South Proposed Scope  Pg 24 ‐ West Proposed Scope  Pg 25 ‐ South Aerial View  Pg 26 ‐ North Elevation ‐ Existing and Proposed  Pg 27 ‐ North Proposed Scope  Pg 28 ‐ Material Board  Pg 29 ‐ Material Identification  Pg 30 ‐ Material Identification    Lighting Pg 31 ‐ Lighting Plan ‐ Composite Ground with Internal Corridors Pg 32 ‐ South/West Elevation Lighting  Elevations Pg 33 ‐ East Elevation  Pg 34 – South Elevation  Pg 35 ‐ West Elevation  Pg 36 – North Elevation    Existing Site Information  Pg 1 – Existing Conditions  Pg 2‐ Stamped Topographic Survey  Pg3 – Existing Site Plan    Existing Project Background  Pg 4 ‐ Project introduction / Goals  Pg 5 ‐ Existing Conditions Photos Pg 6 ‐ Existing Conditions Photos Pg 7 ‐ Existing Conditions Photos Pg 8 ‐ Comparable Context  Site and Floor Plans  Pg 9 ‐ Development Data  Pg 10 ‐ Site/Landscape Plan  Pg 11 ‐ Scope of Proposed Design ‐ Ground Level  Pg 12 ‐ Scope of Proposed Design ‐ Typical Level  Pg 13 ‐ GRFA Plans at 1/64  Pg 14 ‐ GRFA Plans at 1/64    Renderings & Material  Pg 15 ‐ East Elevation Existing and Proposed Pg 16 ‐ East Proposed Views Pg 17 ‐ East Proposed Scope Pg 18 ‐ East Proposed Scope Pg 19 ‐ South Elevation ‐ Existing and Proposed Pg 20 – South Proposed Views  Pg 21 – South/East Proposed Scope  Pg 22 ‐ West/South Elevation ‐ Existing and Proposed  Pg 23 ‐ South Proposed Scope  Pg 24 ‐ West Proposed Scope  Pg 25 ‐ South Aerial View  Pg 26 ‐ North Elevation ‐ Existing and Proposed  Pg 27 ‐ North Proposed Scope  Pg 28 ‐ Material Board  Pg 29 ‐ Material Identification Pg 30 ‐ Material Identification  Lighting Pg 31 ‐ Lighting Plan ‐ Composite Ground with Internal Corridors Pg 32 ‐ South/West Elevation Lighting   Elevations  Pg 33 ‐ East Elevation  Pg 34 – South Elevation  Pg 35 ‐ West Elevation  Pg 36 – North Elevation    Vail 21 Condominium Association - East Lionshead Circle DRB 1 -Submittal for Minor Exterior Alteration December 23, 2013 By Shelley Bellm at 9:48 am, Dec 23, 2013 DRB130567 VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 1 35 9 D E S I G N feet meters 200 70 VAIL 21 EXISTING CONDITIONS VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 2 35 9 D E S I G N STAMPED TOPO VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 3 35 9 D E S I G N EXISITNG SITE PLAN VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 4 35 9 D E S I G N GOALS: -- Address the sequence of the user -- Modify entry experience -- Increase Curb Appeal -- Soften the Facade -- Standardize Storefront -- Address On-going maintenance -- Address Branding WHAT SHOULD IT BE -- Inviting -- Comply with Intent of the LMU-1 Guidelines -- Tie in Transportation Center -- Improvements to increase rental rate -- Maintain the investment -- Consistent Base / Pedestrian Attractive -- Identify Entries -- Differentiate Residential from Retail VAIL 21 PROJECT INTRODUCTION - GOALS VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 5 35 9 D E S I G N VAIL SPORTS RETAIL AT EAST LIONSHEAD CIRCLE VAIL 21 EXISTING CONDITIONS VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 6 35 9 D E S I G N VAIL SPORT PERFORMANCE RENTAL SOUTH BIRKSHIRE HATHAWAY / SOUTH ELEVATION VAIL 21 EXISTING CONDITIONS VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 7 35 9 D E S I G N NORTH ELEVATION / ENTRYSOUTHWEST FACADE VAIL 21 EXISTING CONDITIONS VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 8 35 9 D E S I G N COMPARABLE LIONS HEAD RENOVATION CONTEXT LIONSHEAD TRANSPORTATION CENTER VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 9 35 9 D E S I G N DEVELOPMENT DATA - NO CHANGE TO EXISTING Commercial Core 2 LMU‐1 Standard Existing Proposed GRFA 2.5 developable area16,957 No Increase allowed 38,390 ‐21,433 Height 71' Average 50'No increase at  8198 Site Coverage 70%65.4600%No Increase Landscape Coverage 20%6%No increase Units 35 Units per acre 21 Residential No increase 33% increase over exsiting 12.3 allowed EHU Type IV 0 Units No change VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 10 35 9 D E S I G N SITE / LANDSCAPE PLAN New Residential Trellis New Retail Trellis New Residential Trellis New Retail Trellis Replace Current Landscape New Landscape New Landscape New Retail Trellis RETAIL RETAIL RETAIL VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 11 35 9 D E S I G N SCOPE OF PROPOSED DESIGN - GROUND LEVEL GROUND LEVEL - FLOOR PLAN11” = 32’ Remove Existing Canopy, Replace with Siding and Metal Sunshade Clean Existing Stone Base - 2’ Course New Landscape to comply with Lionshead Design Guidelines New Entry Canopy and framed opening New Stone cladding at Residential entry New Stone cladding at Residential entry New Residential Entry Trellis New Elevator Cladding New Entry Canopy and framed opening New Siding and Metal Sunshade New Landscape New Retail Entry Canopy New asphalt and snowmelt New Entry stairs and Entry Canopy New Stone and Wood Cladding Restructured Trash enclosure and Concrete Paint Existing Block - Typ Replace Exiting Glass Roof w/ standing seam Clad Stair Wall in Stone New Entry Trellis New Siding Clad Stair Wall in Stone New Entry Trellis Replace Existing Landscape RETAIL RETAIL RETAIL New Storefront Facade VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 12 35 9 D E S I G N ROOFBELOW ROOFBELOW ROOFBELOW A1.3 1 1/32" : 1`'-0" THIRD FLOOR PLAN A1.3 2 1/32" : 1`'-0" FOURTH FLOOR PLAN A1.3 3 1/32" : 1`'-0" FIFTH FLOOR PLAN A1.3 4 1/32" : 1`'-0" SIXTH FLOOR PLAN A1.3 5 1/32" : 1`'-0" SEVENTH FLOOR PLAN SCOPE OF PROPOSED DESIGN - TYPICAL LEVEL TYPICAL LEVEL - FLOOR PLAN11” = 32’ Stain block uniform color - Typ Wood Siding at Roof line and Balconies New Wood Fascia New Wood Capped Railings New Windows throughout New Elevator Cladding Stain block uniform color - Typ Wood Siding at Roof line and Balconies New Wood Fascia New Wood Capped Railings Stain block uniform color - Typ Wood Siding at Roof line and Balconies New Wood Fascia New Wood Capped Railings New Windows throughout new open corridor carpet New Soffit new sconce fixtures at Entry and Corridors VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 13 35 9 D E S I G N A1.01 1/16" : 1'-0"FIRST FLOOR PLAN A1.11 1/16" : 1'-0"SECOND FLOOR PLAN ROOFBELOW ROOFBELOW ROOFBELOW A1.3 1 1/32" : 1`'-0" THIRD FLOOR PLAN A1.3 2 1/32" : 1`'-0" FOURTH FLOOR PLAN A1.3 3 1/32" : 1`'-0" FIFTH FLOOR PLAN A1.3 4 1/32" : 1`'-0" SIXTH FLOOR PLAN A1.3 5 1/32" : 1`'-0" SEVENTH FLOOR PLAN Lower Level Plan Ground Level Plan 2nd Floor Plan TOWN OF VAIL CODE 12-15-3 - GRFA 1. Gross Residential Floor Area Defined: For residential uses, the total square footage of all horizontal areas on all levels of a structure, as mea- sured to the outside face of the sheathing of the exterior walls (i.e., not in- cluding exterior wall finishes). Floor area shall include, but not be limited to, elevator shafts and stairwells at each level, lofts, fireplaces, bay windows, mechanical spaces, vents and chases, storage areas, and other similar areas. Garages; attics; vaulted or open to below spaces; basements; crawl spaces; and roofed or covered decks, porches, terraces, or patios shall be included as floor area; except the horizontal areas of a structure as set forth herein shall then be deducted from the calculation of GRFA. This garage area deducted from floor area is awarded on a “per space basis” and shall be contiguous to a vehicular parking space. Each vehicular parking space shall be designed with direct and unobstructed vehicular access. Units (inc exterior face of the wall) contributing to GRFA A = 5,310 sq ft GRFA B = 7,940 sq ft GRFA C = 3,707 sq ft GRFA Total = 16,957 sq ft GRFA (There is no modification (increase or decrease) in existing GRFA) Total Existing GRFA (Levels 2-6) Retail (inc exterior face of the wall) contributing to commercial sq ft A = 3,808 sq ft B = 7,287 sq ft C = 3,871 sq ft Total = 14,966 sq ft (There is no modification (increase or decrease) in existing Commercial) Total Existing Commercial Area (Levels LL-2) C101 1,280 sq ft C103 2,474 sq ft C105 1,746 sq ft C201-201 2,285 sq ft C203-C205 3,533 sq ft C206-C207 2,125 sq ft GRFA FLOOR PLANS AT 1/64 A B C A B C C301 801 sq ft 307 781 sq ft A B C C302 722 sq ft 303 796 sq ft 304 773 sq ft 305 793 sq ft 306 791 sq ft VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 14 35 9 D E S I G N ROOFBELOW ROOFBELOW ROOFBELOW A1.3 1 1/32" : 1`'-0" THIRD FLOOR PLAN A1.3 2 1/32" : 1`'-0" FOURTH FLOOR PLAN A1.3 3 1/32" : 1`'-0" FIFTH FLOOR PLAN A1.3 4 1/32" : 1`'-0" SIXTH FLOOR PLAN A1.3 5 1/32" : 1`'-0" SEVENTH FLOOR PLAN ROOFBELOWROOFBELOWROOFBELOW A1.3 1 1/32" : 1`'-0" THIRD FLOOR PLAN A1.3 2 1/32" : 1`'-0" FOURTH FLOOR PLAN A1.3 3 1/32" : 1`'-0" FIFTH FLOOR PLAN A1.3 4 1/32" : 1`'-0" SIXTH FLOOR PLAN A1.3 5 1/32" : 1`'-0" SEVENTH FLOOR PLAN ROOFBELOWROOFBELOWROOFBELOW A1.3 1 1/32" : 1`'-0" THIRD FLOOR PLAN A1.3 2 1/32" : 1`'-0" FOURTH FLOOR PLAN A1.3 3 1/32" : 1`'-0" FIFTH FLOOR PLAN A1.3 4 1/32" : 1`'-0" SIXTH FLOOR PLAN A1.3 5 1/32" : 1`'-0" SEVENTH FLOOR PLAN ROOFBELOW ROOFBELOW ROOFBELOW A1.311/32" : 1`'-0"THIRD FLOOR PLAN A1.32 1/32" : 1`'-0"FOURTH FLOOR PLAN A1.331/32" : 1`'-0"FIFTH FLOOR PLAN A1.34 1/32" : 1`'-0"SIXTH FLOOR PLAN A1.35 1/32" : 1`'-0"SEVENTH FLOOR PLAN 5th Floor Plan ( B Areas inc in 4th Flr)4th Floor Plan (C Areas inc in 3rd Flr)3rd Floor Plan 6th Floor Plan (A Areas inc in 5th Flr) TOWN OF VAIL CODE 12-15-3 - GRFA 1. Gross Residential Floor Area Defined: For residential uses, the total square footage of all horizontal areas on all levels of a structure, as mea- sured to the outside face of the sheathing of the exterior walls (i.e., not in- cluding exterior wall finishes). Floor area shall include, but not be limited to, elevator shafts and stairwells at each level, lofts, fireplaces, bay windows, mechanical spaces, vents and chases, storage areas, and other similar areas. Garages; attics; vaulted or open to below spaces; basements; crawl spaces; and roofed or covered decks, porches, terraces, or patios shall be included as floor area; except the horizontal areas of a structure as set forth herein shall then be deducted from the calculation of GRFA. This garage area deducted from floor area is awarded on a “per space basis” and shall be contiguous to a vehicular parking space. Each vehicular parking space shall be designed with direct and unobstructed vehicular access. Units (inc exterior face of the wall) contributing to GRFA A = 5,310 sq ft GRFA B = 7,940 sq ft GRFA C = 3,707 sq ft GRFA Total = 16,957 sq ft GRFA (There is no modification (increase or decrease) in existing GRFA) Total Existing GRFA (Levels 2-6) GRFA FLOOR PLANS AT 1/64 401 788 sq ft 407 1,068 sq ft A B C 402 768 sq ft 403 795 sq ft 404 774 sq ft 405 796 sq ft 406 1,067 sq ft 501 785 sq ftA B C 502 768 sq ft 503 1,065 sq ft 504 1,074 sq ft 505 1,074sq ft 601 1,067 sq ftA 602 1132 sq ft A B VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 15 35 9 D E S I G N EAST ELEVATION - EXISTING EAST ELEVATION PROPOSED EAST ELEVATION EXISTING AND PROPOSED VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 16 35 9 D E S I G N EAST ELEVATION - PROPOSED VAIL SPORTS EAST ELEVATION PROPOSED - VAIL SPORTS & RESIDENTIAL ENTRY EAST PROPOSED VIEWSEAST PROPOSED VIEWS VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 17 35 9 D E S I G N EAST - PROPOSED SCOPEEAST - PROPOSED SCOPE Remove Existing Canopy, Replace with Siding and Metal Sunshade Paint fin Wall New Stone cladding at Residential entry New Residential Entry Trellis New Elevator Cladding New Wood Capped Railings New Windows throughout New Wood Siding Stain block uniform color, TYPICAL New Wood Siding VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 18 35 9 D E S I G N EAST - PROPOSED SCOPE Remove Existing Canopy, Replace with light wood Trellis Accent surface New Stone cladding at Residential entry New Residential Entry Trellis New Elevator Cladding New Windows throughout Stain block uniform color, TYPICAL Clean Exisiting and feather in Stone at the entry to Vail Sports VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 19 35 9 D E S I G N SOUTH ELEVATION - EXISTING AND PROPOSED SOUTH ELEVATION - EXISTING VAIL SPORTS / BIRKSHIRE SOUTH ELEVATION PROPOSED - VAIL SPORTS & BIRKSHIRE VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 20 35 9 D E S I G N SOUTH ELEVATION - PROPOSED BIRKSHIRE ENTERANCE SOUTH PROPOSED VIEWS SOUTH ELEVATION PROPOSED - VAIL SPORTS & BIRKSHIRE VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 21 35 9 D E S I G N SOUTH/EAST - PROPOSED SCOPE New Retail Trellis New Stone Cladding to Denote Residential Entry New Stone cladding at Retail Entry New Retail Entry Trellis New Windows throughout Stain block uniform color, TYPICAL New Wood Cladding New Metal Sunshade Trellis New Aspens shrubs and xeric landscape Exisiting River Rock Clad Wall New window decals - to be Submitted under a separate Cover VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 22 35 9 D E S I G N WEST / SOUTH ELEVATION - EXISTING AND PROPOSED SOUTH / WEST ELEVATION - EXISTING VAIL SPORTS / BREEZE SKI RENTALS - RESIDENTIAL ENTRY SOUTH ELEVATION PROPOSED - VAIL SPORTS & BIRKSHIRE / BREEZE AND RESIDENTIAL ENTRY VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 23 35 9 D E S I G N SOUTH - PROPOSED SCOPE Stain block uniform color - Typ New Wood Siding, Typ New Windows throughout New Stone Cladding New Metal clad roof New Landscape in Existing Planter New Stone Cladding on Exisiting Wall New Retail Trellis Refinish existing Steps Existing Storefront VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 24 35 9 D E S I G N WEST - PROPOSED SCOPE Reclad Existing Elevator Tower New Wood Siding, Typ Stain Existing Block typical New Stone Cladding New Soffit, Sconce Lights Only, TYP New Landscape in Existing Planter New Stone Cladding on Exisiting Wall New Retail Trellis Refinish existing Steps New Decals on Existing StoreFront VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 25 35 9 D E S I G N SOUTH - AERIAL VIEW VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 26 35 9 D E S I G N NORTH ELEVATION - EXISTING AND PROPOSED NORTH ELEVATION -RESIDENTIAL ENTRY & TRASH ENCLOSURE NORTH ELEVATION PROPOSED - RESIDENTIAL ENTRY & ENCLOSURE VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 27 35 9 D E S I G N NORTH - PROPOSED SCOPE New Wood Siding, Typ Stain Existing Block typical New Metal Clad Roof Metal Frame Gate, Clad with Wood Paint Existing Block New Residential Entry Trellis New Snowmelted Landing and Parking Space New Metal Rail VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 28 35 9 D E S I G N DA T E - 1 0 / 1 7 / 1 3 TE A M M E M B E R - WR H PO BOX 783NIWOT, CO 80544 A4 . 3B : R-1 R-2 S-1 S-2 WD-1 WD-1W-1 WD-2 WD-3 WD-2 WD-3S-1 S-2 ST-1 ST-2 ST - 3 ST-2 ST-1 MATERIALS LEGEND R-1: ROOF ASPHALT SHINGLE R-2: ROOF STANDING SEAM METAL W-1: WINDOW METAL FRAME WD-1: WOOD HEAVY TIMBER, TRIM WD-2: WOOD SIDING HORIZONTAL WD-3: WOOD SIDING HORIZONTAL M-1: Metal CORTEN M-2: STUCCO METAL PANEL ST-1: STONE ACCENT, CUT ST-2: STONE COURSED ASHLAR C-1: CONCRETE FINISHED CONCRETE ST - 3 ST-2 M-2 C-1S-2 M-1 WD-2 PA R K M E A D O W S L O D G E VA I L , C O L O R A D O DE S I G N R E V I E W B O A R D S U B M I T T A L - O C T O B E R 1 7 , 2 0 1 3 DA T E - 1 0 / 1 7 / 1 3 TE A M M E M B E R - WR H PO BOX 783NIWOT, CO 80544 A4.3B : R-1 R-2 S-1 S-2 WD-1 WD-1W-1 WD-2 WD-3 WD-2 WD-3S-1 S-2 ST-1 ST-2 ST - 3 ST-2 ST-1 MATERIALS LEGEND R-1: ROOF ASPHALT SHINGLE R-2: ROOF STANDING SEAM METAL W-1: WINDOW METAL FRAME WD-1: WOOD HEAVY TIMBER, TRIM WD-2: WOOD SIDING HORIZONTAL WD-3: WOOD SIDING HORIZONTAL M-1: Metal CORTEN M-2: STUCCO METAL PANEL ST-1: STONE ACCENT, CUT ST-2: STONE COURSED ASHLAR C-1: CONCRETE FINISHED CONCRETE ST - 3 ST-2 M-2 C-1S-2 M-1 WD-2 PA R K M E A D O W S L O D G E VA I L , C O L O R A D O DE S I G N R E V I E W B O A R D S U B M I T T A L - O C T O B E R 1 7 , 2 0 1 3 DA T E - 1 0 / 1 7 / 1 3 TE A M M E M B E R - WR H PO BOX 783NIWOT, CO 80544 A4.3B : R-1 R-2 S-1 S-2 WD-1 WD-1W-1 WD-2 WD-3 WD-2 WD-3S-1 S-2 ST-1 ST-2 ST - 3 ST-2 ST-1 MATERIALS LEGENDR-1: ROOF ASPHALT SHINGLE R-2: ROOF STANDING SEAM METAL W-1: WINDOW METAL FRAME WD-1: WOOD HEAVY TIMBER, TRIM WD-2: WOOD SIDING HORIZONTAL WD-3: WOOD SIDING HORIZONTAL M-1: Metal CORTEN M-2: STUCCO METAL PANEL ST-1: STONE ACCENT, CUT ST-2: STONE COURSED ASHLAR C-1: CONCRETE FINISHED CONCRETE ST - 3 ST-2 M-2 C-1S-2 M-1 WD-2 PA R K M E A D O W S L O D G E VA I L , C O L O R A D O DE S I G N R E V I E W B O A R D S U B M I T T A L - O C T O B E R 1 7 , 2 0 1 3 W-1 - WINDOW - METAL CLAD WD-1 - NATURAL - RETAIL TRELLIS WD-2 - DARK BROWN - SIDING & RESIDENTIAL TRELLIS M-1 - CORTEN M-2 - METAL RAILS, SUNDHADES & FLASHING M-3 - STANDING SEAM METAL ROOF ST- 1 CLEF CLIFF SIMILAR / TELLURIDE GOLD C-1 - EXPOSED AGGREGATE STEPS W-1 WD-1 WD-2 NA M-1 M-2 ST-1 ST-1 WD-1 WD-2 MATERIAL BOARD C-1 M-3 VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 29 35 9 D E S I G N PHONE: 303.449.8900 FAX: 303.449.3886 WWW.OZARCH.COM ARCHITECTURE URBAN DESIGN INTERIOR DESIGN NORTH DAY LOT VAIL, COLORADO VAIL RESORTS DEVELOPMENT COMPANY | 17030.02 • DRB • 02.18.2009 PAGE9 BUILDING MATERIALS R-1: ROOF ASPHALT SHINGLE R-2: ROOF STANDING SEAM METAL W-1: WINDOW METAL FRAME WD-1: WOOD HEAVY TIMBER, TRIM WD-2: WOOD SIDING HORIZONTAL WD-3: WOOD SIDING VERTICAL S-1: STUCCO BEIGE 1 S-2: STUCCO BEIGE 2 ST-1: STONE ACCENT, CUT ST-2: STONE COURSED ASHLAR W-1 R-1 R-2 S-1 S-2 WD-1 WD-1W-1 WD-2 WD-3 WD-2 WD-3S-1 S-2 ST-1 ST-2 ST - 3 ST-2 ST-1ST - 3 M-2 C-1 M-1 WD-2 STANDING SEAM METAL ROOF. TYPICAL HEAVY TIMBER AND NATURAL DIMENSIONAL MATERIAL CEDAR SIDING 5/4 X RAIN SCREEN CORTEN METAL SIDING CONCRETE AND COATED CONCRETE WALKING SURFACES DECORATIVE METAL MATERIAL - IDENTIFICATION VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 30 35 9 D E S I G N PHONE: 303.449.8900 FAX: 303.449.3886 WWW.OZARCH.COM ARCHITECTURE URBAN DESIGN INTERIOR DESIGN NORTH DAY LOT VAIL, COLORADO VAIL RESORTS DEVELOPMENT COMPANY | 17030.02 • DRB • 02.18.2009 PAGE9 BUILDING MATERIALS R-1: ROOF ASPHALT SHINGLE R-2: ROOF STANDING SEAM METAL W-1: WINDOW METAL FRAME WD-1: WOOD HEAVY TIMBER, TRIM WD-2: WOOD SIDING HORIZONTAL WD-3: WOOD SIDING VERTICAL S-1: STUCCO BEIGE 1 S-2: STUCCO BEIGE 2 ST-1: STONE ACCENT, CUT ST-2: STONE COURSED ASHLAR W-1 R-1 R-2 S-1 S-2 WD-1 WD-1W-1 WD-2 WD-3 WD-2 WD-3S-1 S-2 ST-1 ST-2 ST - 3 ST-2 ST-1ST - 3 M-2 C-1 M-1 WD-2 STANDING SEAM METAL ROOF. TYPICAL HEAVY TIMBER AND NATURAL DIMENSIONAL MATERIAL CEDAR SIDING 5/4 X RAIN SCREEN CORTEN METAL SIDING CONCRETE AND COATED CONCRETE WALKING SURFACES STONE CLADDING DA T E - 1 0 / 1 7 / 1 3 TE A M M E M B E R - WR H PO BOX 783NIWOT, CO 80544 A4.3B : R-1 R-2 S-1 S-2 WD-1 WD-1W-1 WD-2 WD-3 WD-2 WD-3S-1 S-2 ST-1 ST-2 ST - 3 ST-2 ST-1 MATERIALS LEGEND R-1: ROOF ASPHALT SHINGLE R-2: ROOF STANDING SEAM METAL W-1: WINDOW METAL FRAME WD-1: WOOD HEAVY TIMBER, TRIM WD-2: WOOD SIDING HORIZONTAL WD-3: WOOD SIDING HORIZONTAL M-1: Metal CORTEN M-2: STUCCO METAL PANEL ST-1: STONE ACCENT, CUT ST-2: STONE COURSED ASHLAR C-1: CONCRETE FINISHED CONCRETE ST - 3 ST-2 M-2 C-1S-2 M-1 WD-2 PA R K M E A D O W S L O D G E VA I L , C O L O R A D O DE S I G N R E V I E W B O A R D S U B M I T T A L - O C T O B E R 1 7 , 2 0 1 3 MATERIAL - IDENTIFICATION VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 31 35 9 D E S I G N LIGHTING PLAN-COMPOSITE GROUND WITH INTERNAL CORRIDORS Lighting • Down Lights at all Trellis Elements to illuminate Stairs and Denote Entry. • Sconce Lights at Elevator Tower • Common Corridor - Level 1 - Soffit Lighting • Residential Levels - Sconce Lighting 8’ OC - No Soffit Lightning in Corridor • Ambient Lighting from Storefronts **** All Lighting Dark Skies Compliant **** Residential and Retail Trellis Lighting will be on a timer Lighting • Down Lights at all Trellis Elements to illuminate Stairs and Denote Entry. • Sconce Lights at Elevator Tower • Common Corridor - Level 1 - Soffit Lighting • Residential Levels - Sconce Lighting 8’ OC - No Soffit Lightning in Corridor • Ambient Lighting from Storefronts **** All Lighting Dark Skies Compliant **** Residential and Retail Trellis Lighting will be on a timer Existing Site Lighting-To Remain Trellis Lighting Corridor Sconces Existing Site Lighting-To Remain Trellis Lighting VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 32 35 9 D E S I G N SOUTH/WEST ELEVATION - LIGHTING Lighting • Down Lights at all Trellis Elements to illuminate Stairs and Denote Entry. • Sconce Lights at Elevator Tower • Common Corridor - Level 1 - Soffit Lighting • Residential Levels - Sconce Lighting 8’ OC - No Soffit Lightning in Corridor • Ambient Lighting from Storefronts **** All Lighting Dark Skies Compliant **** Residential and Retail Trellis Lighting will be on a timer VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 33 35 9 D E S I G N EAST ELEVATION T.O. FINISH FLOOR - 111'-4" T.O. FINISH FLOOR - 142'-0" T.O. FINISH FLOOR - 122'-8" T.O. FINISH FLOOR- 100'-0" T.O. FINISH FLOOR - 132'-4" T.O. FINISH FLOOR - 151'-8" EAST ELEVATION 1 3” = 32’ Remove Existing Canopy, Replace with Siding and Metal Sunshade Clean Existing Stone Base - 2’ Course New Entry Canopy and framed opening New Stone cladding at Residential entry New Residential Entry Trellis New Elevator Cladding New Siding and Metal Sunshade New Retail Entry Canopy Stain block uniform color - Typ Wood Siding at Roof line and Balconies New Wood Fascia New Wood Capped Railings New Windows throughout New Wood Siding Stain block uniform color - Typ Wood Siding at Roof line and Balconies Stain block uniform color - Typ VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 34 35 9 D E S I G N SOUTH ELEVATION T.O. FINISH FLOOR - 100'-0" T.O. FINISH FLOOR - 88'-8" T.O. FINISH FLOOR - 111'-4" T.O. FINISH FLOOR - 122'-8" T.O. FINISH FLOOR - 132'-4" T.O. FINISH FLOOR - 142'-0" T.O. FINISH FLOOR - 151'-8" SOUTH ELEVATION13” = 32’ New Elevator Cladding New Wood Siding Remove Existing Canopy, Replace with Siding and Metal Sunshade New Match Stone Base - 2’ Course New Windows throughout Stain block uniform color - Typ New Wood Siding New Residential Entry Trellis New Retail Entry Canopy VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 35 35 9 D E S I G N WEST ELEVATION T.O. FINISH FLOOR - 111'-4" T.O. FINISH FLOOR - 122'-8" T.O. FINISH FLOOR - 132'-4" T.O. FINISH FLOOR - 142'-0" T.O. FINISH FLOOR - 151'-8" WEST ELEVATION13” = 32’ Stain block uniform color - Typ New Wood Siding, Typ New Elevator Cladding New Windows throughout New Stone Cladding Decal Existing Storefront New Metal clad roof New Trash Storage Area - Wood/ Block New residential entry Trellis New Stone Cladding New Retail Trellis Stain block uniform color - Typ New Wood Siding, Typ VA I L 2 1 VA I L , C O L O R A D O •D R B 1 A P P L I C A T I O N •21 D E C E M B E R 2 0 1 3 PA G E 36 35 9 D E S I G N NORTH ELEVATION T.O. FINISH FLOOR - 100'-0" T.O. FINISH FLOOR - 88'-8" T.O. FINISH FLOOR - 111'-4" T.O. FINISH FLOOR - 122'-8" T.O. FINISH FLOOR - 132'-4" T.O. FINISH FLOOR - 142'-0" T.O. FINISH FLOOR - 151'-8" T.O. FINISH FLOOR - 161'-4" NORTH ELEVATION13” = 32’ New Elevator Cladding New Wood Siding Remove Existing Canopy, Replace with Siding and Metal Sunshade Clean existing Stone New Windows throughout New Residential Entry Trellis New Wood Gate New Stone Claddig New Metal Clad roof