HomeMy WebLinkAboutDRB130572 Utility Verification UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of VaiL � � ���
Subject Property Address: 1475 Lot� . Block 4 Subdivision: Lions Ridge fil. 3
Primary Contact/Owner Representative: Pavan Krueger Phone: 9�0-390-0968
�'/�`� Plans Dated: 11-12-13
Pr mary Con�act/Owner epresentative Signature
Authorized Siqnature Comments Date
CENTURY LINK
970.328.8288(tel)
970.328.8282(fax)
Contacts: Barb Davis
barb.davisna,centurvlink.com
XCEL HIGH PRESSURE GAS
970.406.1784(tel)
970.468.1401 (fax)
Contact: Remington Baker
reminqton.c.bakerCa�xcelenerqv com
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081 (fax)
Contact:Jeff Vroom
jvroomCa�holvcross.com '
XCEL Energy _ ,
970.262.4039(tel) � ��'� ���X�/����� � �„ ) /� �
970.262.4038(fax) �� �f�J� � � ��
Contacts: Pam McGuire �� ����� ��
pamela.mcquire anxcelenerqy.com
EAGLE RIVER WATER&SANITATiON
DISTRICT � , ��`�
970.477.5449(tel) �
970.845.7218(fax)
Contact: Tug Birk
tbirk(a�erwsd.orq
COMCAST CABLE
970.930.4713(tel)
303.603.1004(fax)
Contact: Michael Johnson
Michael iohnson(a�cable.comcast com i
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact: Dan Roussin
Daniel.roussin a(�.dot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198. i
3. It is the responsibility of the utility company and the applicant to resolve problems identified above. �
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date,
UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail.
Subject Property Address: 1475 Buffehr Creek Road Lot� Block 4 Subdivision: Lions Ridge fil. 3
Primary Contact/Owner Representative: Pavan Krueger Phone: 970-390-0968
�'�_ (�_/\ Plans Dated: 11-12-13
Pr�ry Con act/Owner epresentative Signature
Authorized Siqnature Comments Date
CENTURY LINK
970.328.8288(tel)
970.328.8282(fax)
Contacts: Barb Davis
barb.davis an.centurvlink.com
9 0.4 6I1G784(}el)SURE GAS ���°�.�°°°.._.. �C> �!��, .9°`r���"' ��:%' ��'B" `�r�a,` �
970.468.1401 (faX) ra�";r'
r'j' . �,J �
Contact: Remington Baker �,�.
remington.c.bakerla�xcelenerqy.com �; ,� ��--
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081 (fax)
� Contact:Jeff Vroom
jvroom(c�holycross.com i
XCEL Energy !
970.262.4039(tel) �
970.262.4038(fax) I
Contacts: Pam McGuire �
pamela.mcauireC�xcelenerqy.com '
EAGLE RIVER WATER&SANITATION
DISTRICT
970.477.5449(tel)
970.845.7218(fax)
Contact:Tug Birk
tbirkC�erwsd.orq
COMCAST CABLE
970.930.4713(tel)
303.603.1004(fax)
Contact: Michael Johnson
Michael iohnsonla�cable.comcast.com
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact: Dan Roussin
Daniel.roussin aC�.dot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above. �
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for �
re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date. E
k
�
�
�
UTILITY APPROVAL &VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail.
Subject Property Address: 1475 Buffehr Creek Road Lot� Block 4 Subdivision: Lions Ridge fil. 3
Primary Contact/Owner Representative: Pavan Krueger Phone: 970-390-0968
Plans Dated: 11-12-13
Primary Contact/Owner Representative Signature
Authorized Sianature Comments Date
CENTURY LINK
970.328.8288(tel)
970.328.8282 (fax)
Contacts: Barb Davis
barb.davis(�a.centurvlink.com
XCEL HIGH PRESSURE GAS
970.406.1784(tel)
970.468.1401 (fax)
Contact: Remington Baker
reminqton.c.baker(a�xcelenerqy.com
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081 (fax)
Contact: Jeff Vroom
jvroom(cD.holvcross.com
XCEL Energy
970.262.4039(tel)
970.262.4038(fax)
Contacts: Pam McGuire
pamela.mcquire(a�xcelenerqy.com
EAGLE RIVER WATER&SANITATION
DISTRICT
970.477.5449(tel)
970.845.7218 (fax)
Contact: Tug Birk
tbirk(a�erwsd.orq
COMCAST CABLE
970.930.4713(tel)
303.603.1004 (fax)
Contact: Michael Johnson
Michael iohnson(cD.cable.comcast.com
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact: Dan Roussin
Daniel.roussin a(�.dot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
UTILITY APPFt�VAL 8�VERIFIGATIC3P1
This form serves to verify that th� pr�pos�d improvem�nts will not irnpact�ny existirog or pro�osed utility serkrac�s, and
alsa tr�verify serviee availability and Ic�cation for new cvnstructipn and shc�uld b� us€;d in conjunction with preparing your
utility plan and seh�d�ling installatiorns. A sit� plan, including grading pl�n, floor pl�n, �nd �levations„ shall be submitked
#o#h�f�llowing utiliti�s for approval and verification. PLEA5E ALLOW 4JP TC1 2 WEEK� Ft]R APPRf]1/AL�R C�3M-
IUlENTS �RC]M THE I�T�LIT"Y C�I�APAHIES_ If yau �re unable to obtain cornments wi#hin that timefr�me please ce�ntact
The Town of Vail.
Subject Praperty Address: 1475 BuffEhr Creek Road Lat� Bl�o�k 4 Subdivision: Lians Ridge fil. 3
Prirr�ary Can'fact r Uvvr��r RepresentatiVe, Pavan Krueger Phone: �7Q�390-Q968
�'� ����r Plans Qated: 11-12-13
Pr am ry Gon actfC3wner epre�entative 5ign�#ure
Authorized 5iqnature C�]mments date
CENTURY LONK
97p.3�$.�2�$(#el}
970.328.8282(fax}
G+Sntacts: B�rb aavis
barb.d��ris[a�centvrVlin k.Cqm
XCEL HIGH PRE55URE GAS
97Q.406.17'84{tal)
970.4f$.'1401 �f�x)
Contact: Remington Baker
reminaton.c.bak�rCa�xcelenerav.eom
HQLY CFtC1SS ENERC3Y
979.�47,542�(tel)
970.�45.4081 (f�x}
�qnt�ct;Jeff Vroom
Ivroom(c�hadveross.acam
xG�l��n�rgy — - - —_- _ -
sro.��2.a��s{tei)
s��,2s2�ao���f�x�
�vntact�; Pam MGt3a�ire
oamela.mcc�u ire(a?xeelen�rqy.com
EAGL�RIVER WATER$�Sl�NIYATI�N
DISTRICT � t
��a.a77.��as�t�i} �''� ,�.d CN L
974.845.721�(fax) !�•�� ��`�j i i �1 5� � ��
Contact:Tug Birk
tbirk t_erwsd.orq
GOMC,4ST GABL�
9TQ.B3i1.471'3(tel)
303.6q3.14�4(#�x)
Contacl� Mieh�el Jphnsc]n
Micha�el iohnsanC�cable.c�imcast.c�rrr
C�[7T((�nly in GDOT Right-r�f-v�ay)
570.683.6284(te�l)
Cantact: Dan R�ussin
Daniel.raussin(a?dotstate.co.u�
NOTES:
1. Utility locations must b� �btained aefare digging.
2. A R��ocabl� �tight-of-Way Permi� may be required for any innpro�r�m�nts withar� a street righ�-�f-way. �ontact tMe
Public Warks flepar�men�for veriflcatit�n 9�0.479.2198.
3. It is th� r�sponsi�ility of�he utility comp�ny and khe�pplicant to r�solve prob4ems identifiec� �bovea
4. The Primary Cont�etJOwner Represen�ati�� is r�quir�d tQ submit any revised drawings ta the alaove agencies for
re-�pprcrv�! & re-uerifi�ation if khe st�bmitted plan5 are altered in any way after the authorizeci �ignatur�dat�.
UTILIT'Y APPRQVAL$VERIF1CA7iON
�his forrr3 serves to verify that the proposed impravements will not impact aray existing or proposeci utility services, and
also to vsrify service availability and locatio�for new construction and should be used in conjunction with preparing your
utility plan and scheduling irrstallatior�s. A site plan, including grading plan, floor p1an, arad elevations, shall be submitted
ta the following utilities for appraval and v�rification, P��ASE ALLO{N UP 70 2 VII�EKS FOR APPROVAL OR COM-
MEN�S FROM THE UTILITY'C(]MPANI�S. If you are unabGe to obtain comrr+ents within that#irraeframe please contact
The Town of Vail.
Subject Prcrperty Address: ��75 Buffehr Creek Road Lot� I31ock 4 Subdivision: Lions Radge fil. 3
Rri�nary C�nkact 1 Owner Repres�ntati�e: ��van Krueger pho��; 970-390-�968
f��� ���^� I�lans �ated: 11-12-13
Pr�ary Gan actlOwner epresentative Signature
Autfi�orized Sic�nature Comments Date
CEN'fURY LINK , n . � -
J70.32$.$28$(tel) ��t� � �.. , ' � ' �' , � i� C � ��';'-r � �ti� / r� ,,� �'
f - �-<< ;
970.328.8282(fax) _
Cantacts:�arb Davis
bar6.davis(a?centurvl�nk.eorn
XCEL HIGH PRESSIFRE GA5
970.406.1784(tel)
970.468.140'6 (fax)
Contact: Ramingtan Baker
reminqton.c.bakerCa�xcelenerc��.com
HOLY CRQSS EAIERGY
970.947.5425(tel)
970.945.4081 (#ax)
CQniact:Je€f Vroom
�vroom(`7a holvcross.cam
XCEL Energy
970.2�2.4039(tel)
970.2F2.4a38(fax)
Contacts: Pam McGuire
pamela.mc4uireCa�xceienerqv,com
EAGLE R1VER WATER&SAiVITATION
[7lS�RICT
9741.477.5449(te1)
974.845.7218{fax)
Contact:Tug Birk
tbirk c(�� erwsd.arq
COMCAST CABLE
974.930.4713(tel)
343.603.1004(fax)
Contact:Michael Jahnson
Michael iohnson�acable.comcast.com
CQOT{Only in C�D�T Right-af-way)
97fl.683.6284(tel}
Contact: Dan Roussin
paniel.raussin dot.stafe.co.us
NOTES:
1. Utility lacations must be abtained before digging.
2. A Revoeabl� Right-of-Way 4�ermit may be required for any improver'nents within a street right-af-way. Cflntac'�the
Public Work� Department for veri�eation 970.479.2198.
3. It is th� responsibility of the utility company and the applicant to resolve problems identified above.
4, Yhe Prir�ary ContactJOwner Representativ�ss requir�d tt� submit any revised drawings to the above agencies fc�r
re-approval & re-verification if the submitked plans are altered in any way after the authoriaed signature date.
UTILITY APPROVAL &VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail.
Subject Property Address: 1475 Buffehr Creek Road Lot� Block 4 Subdivision: Lions Ridge fil. 3
Primary Contact/Owner Representative: Pavan Krueger Phone: 970-390-0968
��_ ��_/\ Plans Dated: 11-12-13
Pr mary Con act/Owner epresentative Signature
Authorized Sianature Comments Date
CENTURY LINK
970.328.8288(tel)
970.328.8282 (fax)
Contacts: Barb Davis
barb.davis(�a.centurvlink.com
XCEL HIGH PRESSURE GAS
970.406.1784(tel)
970.468.1401 (fax)
Contact: Remington Baker
reminqton.c.baker(a�xcelenerqy.com
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081 (fax)
Contact: Jeff Vroom
jvroom(cD.holvcross.com
XCEL Energy
970.262.4039(tel)
970.262.4038(fax)
Contacts: Pam McGuire
pamela.mcquire(a�xcelenerqy.com
EAGLE RIVER WATER&SANITATION
DISTRICT
970.477.5449(tel)
970.845.7218 (fax)
Contact: Tug Birk
tbirk(a�erwsd.orq
COMCAST CABLE
970.930.4713(tel)
303.603.1004 (fax) 11-14-1
Contact: Michael Johnson �jG�a�G `J��y�f��
Michael iohnson(cD.cable.comcast.com V
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact: Dan Roussin
Daniel.roussin a(�.dot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.