Loading...
HomeMy WebLinkAboutB13-0491 PLANS approved B13 - 0491 Mechanical Specifications AGCESSORIES ��� � � I I � � � �'� I � � � �� ` �� � I - HICsN ALTITUDE KIT 4 - 3m�'o PROP1'LEN� C�LI'COL � N �f I �l � 2 - CSD-1 CONtROLS 5 - NOt USED � � � General 15. Boiler Condensate shall be neutralized via a neutralization basin before 3 - ,�sM� R,4tED CN-St,4MP� � - NoT us�D w discharge into building drainage system. Condensate piping shall be PVC or F— N ° S�I�Et D�SGRIPTION S1'M. T1'PE S.L. INPUT ALt OUTPUT �UEL DELTA �'� ELEG. MANU�AGTURER A�UE AGGESSORIES �1 ^ `Q ll-[� 1. Immediately notify the engineer of any discrepancies. other approved material suitable for pH levels of 3. CSERVES) MBN MBN T � � � MODEL � � ^ � MI.O M�GI-IANIGAL SGI-IEDUL�S, SPECI�IGATIONS AND 'Q u►1 � � S�QUENGE OF OP�RATION 2. Do not scale drawings. Verify dimensions in field prior to commencement of 16. Gas Piping - Schedule 40 black steel pipe, 150 lb. malleable iron screwed � � , � MI.I MEGHANICAL PLAN AND SCHEMATIGS work. fittin s on above round i e welded fittin s with all i in coated and �-�, 2, � 3 ST,4INLESS 1�,4T. '�I �2�/� LOC�fN�/,4R �, 2, 3, 4 C�C g g p p � g p p g 399 3�(0 3f� '� 95% ` O � wrapped on buried pipe. CR�SI) COND�NSINC� C�AS � 2 A UJ�-IN 399 � � � � 3. It is the intent of these drawings and specifications to establish a standard of 8-�. ST,4INL�SS N,4T. 12�/1 LOCNfN�l�4R �, 2, 3, 4 � � � � quality. The engineer reserves the right to take exceptions to approve methods 17. Gas Valves - Lubricated plug valve 175 lb. W.O.G. iron screwed or flanged. CGOMM) COND�NSINC� 28� 22� C�,4S 3� \�� 2 ,4 l.Ul-IN 28� g��� U ���� � ����� and materials not reflected herein. � 0 � 18. Copper pipe Valves and Specialties: � ,� � x z 4. Failure to order, or release order, for materials and/or equipment will not be � �� ���� � ��� ������ � accepted as a reason to substitute alternate materials, equipment, ar installation Gate Valves: Bronze, Class 125, 2001b. W.O.G. � � � w methods. Ball Valves: Bronze, Class 125, 2001b. W.O.G. �I ���� W � � � � Check Valves: Bronze, Class 125, 2001b. W.O.G. �'k � O TI-I�RMOSTAT � � � � 5. Work shall be performed in a workmanlike manner to the satisfaction of the Balancing Valves: 125 psig w.p. for 250F service tight shut-off, _ � � F � �IUMIDIStAt engineer. Illinois dual-purpose, balancing/shut-off valve, SYM. C�PM TDN NP VOLT/PH MANUFAGTURER DESGRIPTION SPEED REMARKS/ � � C�T.� � MODEL NO. SET7INC� AGGESSORIES � � X � � �S sEt�soR Hoffman, Sarco, or equivalent. W 6� z 6. Labor, materials, and equipment shall conform to the latest applicable editions �Q 0 � O B-1 BOILER I, 5 � � c� � POINt O� DISGONN�GtION of local, State of Colorado, and National Codes and ordinances. If conflict 19. Support pipe with rod and clevis or clamps. No pipe tape allowed. C�RUND�OS ,,,,u„� � � between those publications exists, the most stringent requirement shall apply. F'-1 23 5 1/� 115�1 ��S 2�-99 �C 2 �� � � � e POINT OF N�UJ CONNECTION O � �/ 20. Dielectric Unions - Furnish and install a dielectric union at all connections C�RUND�OS B-2 BoIL�R I, 5 �� � � O FLOOR DR41N 7. Provide record drawings to owner. Drawings shall include all addendum where non-ferrous material is in contact with ferrous material and fluid in not �'-2 23 5 1/(0 115/1 2 �- Ui=S 2�-99 �C �`# � z 0 �LOOR SINK items, change orders, alterations, re-routings, etc. protected with corrosion inhibitors. �� Q7 �u C�RUND�OS e-s eoi��R i, � �- � �I HORIZON7AL CLEANOUT 8. The drawings show the intent of the mechanical systems but do not show all Ductwork P-3 23 5 1/(0 115�� �{�S 2�-99 �C 2 Seal � details required. It is the responsibility of the contractors to install complete & ,7�� � ;�, � � OR � v�RtICAL lOR SLAB) GLEANOUt RESIDEN7IAL SPAG� I, 4 , ���' . � o erable s stems which conform to the manufacturers' installations 21. Provide 1/4" galvanized mesh screen on all combustion air ducts or openings. C�RUND�OS � . -•r.. .,, p � I instructio s & industry standards. F''�' 8� 32 `.�f�� UJ 23��1 1„��4C�NA �O5_�2� � NEATINC: - - �.i,,,••r,� .i i�, .,•.y*,� � � f � f l�� ��� I �l� 22. Seal all ductwork �oints and va or barrier enetrations at all exterior walls. ;� 10/18/13 `x�, � � p p C�RUND�OS B-� Boi��R i 9. Systems s ha l l be teste d for proper operation. I f tests s how wor k is de fective, F'-5 l�0 1 2 1/�0 1 1 5/1 2 : �� : W contractor shall make corrections necessary at no cost to owner. Boiler Flue & Combustion Air Piping ��S 2�O-�� � �� '• ,� :� . �, � ������ � , R�MARKS/,4GGESSORIES �"�f'i.• ,• ...•�,��'�`�' � .�� �1V A�. �i; � �� 10. It is the contractors' and manufacturers' responsibility to assure themselves that 23. Boiler flue piping shall be CPVC, complying with ASTM F441. ` '" � �� OR �� CxAT� vALvE I - 30°ro PROP1'L�NE C�LI'COL 4 - YARIABLE SPEED 6 - tIMER � the code authorities will approve any product to be installed on the project. 2 - 5mqo PROP1'LEN� C�L1'GOL PUMPINCx COMPATIBLE � - AG2UASTAT Z = �� OR � CI��GK vALvE 24. Boiler combustion air piping shall be PVC, complying with ASTM D 1785. 3 - 1mm�o WATER 5 - INt�C�RAL GH�CK VAL1� 8 - BRONZ� p � 11. Systems shall be professionally labeled. Piping shall be labeled with color � � �� oR � BALL 1�ALvE coded commercial grade labels indicating piping service and flow direction. Controls m O � ButtE��`r vA�vE Pumps and valves shall be labled with engraved plastic or metal tags and a `n � U � oR �� PLUCx vAL1/� pump/valve schedule shall be provided and mounted on the mechanical room 25. See Sequence of Operation for additional control information. � 0 �� wall. Equipment shall be labeled with engraved plastic or metal tags. � rT1 � � � CIRGUIT SETT�R WITN CsPM 26. Install emergency gas shutoff switch inside mechanical rooms containing � ^ � (L � cxLOBE vALv� 12. Offset piping, ductwork, etc. as necessary to accommodate structure, beams, boilers. Switch plate shall be red in color and labeled "GAS BURNER �ON���l����� N��l����� f ��� f ON� ��N��� Z � � (k columns, and existin e ui ment. EMERGENCY SWITCH". Switch shall be compliant with Section 1006.8 of � �q � � oR � StRAIN�R Cl'-t3'PE) IUIT�4 BLOLU-DOU1N g � p the 2012 IMC. SER�/ES MAXIMUM MAXIMUM PIPE � � � w 13. Contractor must carefull verif electrical service volta e and hase available S�M� MBH C�PH GONN. SIZE M,4 N U�. � M O D E L R E M A R K S � � � � � OR �T� 71U0-UJAY AU70MA71C CONTROL YALV� Y Y g p � � � prior to ordering equipment. Balancin� FURNISN WITH � � � � OR TI-IR�E-IUAI' AUTOMATIG DI1/�RTINCs VALV� rTl � o�z �� SOLENOID YALI� Piping 27. Air and water flows must be balanced, and pumps adjusted as required. CN�_� RESf. � GOMM. � ��� �.5 �„ NPT ,4XIOM N�UTRALIZINCs M�DIA w SOIL�i� S�'STEMS NT 2� A � o � � � OR �i PRESSUR� RE�UL,4TOR lOR R�DUGING vALvE) � � Insulation � � � � m 1 4. H e a t i n g W a t e r p i p i n g - F o r n o n-b u r i e d p i p m g, t y p e L c o p p e r, w r o u g h t c o p p e r � � ❑I�f-$ T U J O-U 1 A 1' M O D U L A t I N G G O N t R O L v A L v E fi t t i n g s, a n d n o l e a d s o l d e r. �� � � � 0 28. Insulate all heating water piping in mechanical room with 1/2 closed cell AP � z M�� THR�E-WAY MODULATING MIXIN� vALvE Armaflex (or equal)pipe insulation. � � � ���������� � � � � � � DP DI�FERENTIAL PR�SSURE YALI/� � r , � F Z V � � S¢r oR S}~ PRESSURE RELIEF v,4LYE SERVES RECOMM�NDED C�PM P.D. O •� � � V MANUAL AIR �N7 ' S�M� MAX C�PM ��T� MANUF. � MODEL REMARKS � Q Se uence of O erat�on Notes W � a Z � q p � � o � AUtOMATIC AIR VENT � v ' ' ' 1. Provide add alternate rice to re lace all existin zone valves with new for ,45-1 fi��Sl. S�'STEM �� V,4RI�S � SPI�OTI-f��l„I II � � _ � V A G U U M B R E A I G�R R e s i d e n t i a l B o i l e r S y s t e m p p g U s�-2 5� �2-�i 2 � � [--� � � � both the residential & commercial boiler systems. Zone valve end switches r� � �-- O R �-{� P R E S S UR E G A UG� I U I T+� G A I.I�� GOG K will need to be wired. �C�U A L S: S P I R O T N�R M, t A G O, B E L L 4 G O S S E T t. rT1 V 1 W z �■■1■■� 4 1. Boilers (B-1 B-2 & B-3) � �.0 � PRESSURE SENSOR ' ' z � a. Boilers shall be staged, modulated, and rotated by integral Lochinvar 2. Provide add alternate price to install a second P-4 pump in lieu of using the � � � � '�` P R E S S U R E / t E M P�R A t U R E t�S t P O R t con tro ls to m ai n tain H W S s e tpoin t a t t e mpe ra ture sensor TS-1. existing pump as backup. Include price for automatic pump changeover. � _ ��� � f � � O �� �.0 � �r b. HWS setpoint shall be reset based on outdoor temperatures (180°F @ � � � �� � TEMP�RATURE SENSOR New or exis ting resi den tia l zone va lve en d swi tc hes wi l l no t nee d to be �� _ � � -20°F to 100°F @ 70°F, adj). wired. � � TNERMOMEtER UJELL c. P-1, P-2, or P-3 boiler pumps shall start whenever associated boiler is � � called to fire. Sl'M. DESGRIPTION GAPAGIT`�' ELEGTRIG MANUF. � MODEL REMARKS � � � � 0- T�IERMOMET�R 3. Contractor shall inspect existing expansion tanks. If they are not ASME w � d. HWS setpoint shall be ramped up to 180°F (adj) during a call for rated contractar will be required to replace with ASME rated expansion � � � �� BTU MET�R I�LOIU k t�MP�RAtURE DIFFERENCE) domestic hot water heating. tanks�of equal capacity. B1'-P�4SS Ff LT�R 2 C�ALLONS, 11 C�ALIC�� NEPTUN� INGLUD� 2m-MICRON � � � FLOW MEt�R Bfi�F-1 ST��L TANK E N��4D, FT�-2 D 8 FILTER BACz 3/4 �NPt GONNEGtIONS W � Fs 2. Space Heating 4. Provide alternate price to repair (E) B-4 commercial boiler and make z w �LOW SWITG�I a. Upon a call for heating, associated zone valve shall open and P-4 Issued �or operation in order to pass the state boiler inspection. � 0- � AQUAStAt pump shall start. Pump shall be set to run in constant pressure No. Date Comment � � AutoADAPT mode. Contractor will need to wire zone valve end 1 8/2�0/13 GONStRUCTION w p- �000� OR --��� �L�XIBL� PIPE CONN�CtOR switches. � I � PIPE UNION � 2 1m/18/13 R�VISION I � � � _ Commercial Boiler S stem m � �� QUIGK GONNEGT CCsAS) OR NOS� BIB CIUATER) Y � � Q � OR � R4DIANT OR SNOUJMELT MANI�OLD UJITH ACG�SS � Q 1. Boilers (B-4) � � � PIPE UP oR PIPE UP k DOUJN a. Boilers shall be modulated and controlled by integral Lochinvar p- � � — � OR � PIPE DoWN controls to maintain HWS setpoint at temperature sensar TS-3. '4 (Y b. HWS setpoint shall be reset based on outdoor temperatures (180°F @ � � �O GOMPRESS�D AIR OUTLET -20°F to 100°F @ 70°F, adj). � 0 c. P-5 boiler pump shall start whenever boiler is called to fire. � � ���� ������ � � � � 2. Space Heating p z � WET ROtOR GIRCUL�4tOR a. Upon a call for heating, associated zone valve shall open and existing � � Reviewed for Code Compliance pump shall start. Contractor will need to wire zone valve end switches. � WET ROTOR CIRCULATOR (W/ INTECzR4L CNECK) COd@: 2012 International Building Code (IBC) � O z U f��� �f �,�1L d w IN-LIN� CIRCULAtOR (� � MEC�,4NIC�4L SCNEDULES i.0 w SPECIFfC,4TfONS, ,4ND � � u � END SUCTION CIRCULATOR � � ? SEG2UENC� O� � OPER�4Tf ON o � z � f � f�� ��� f���� f ��� � � � Emergency Replacement O � � I-IUJS/R I-IEATINCa LUATER SUPPLY/RETURN � � Z SMS/R SNOUJMELt SUPPLI'/REtURN } �X � GD GONDENSAT� DR41N W , � CE) ExISTINC-� Project No. Scale: � Z Q 13f��8.�� N/�4 O � � ������f �� f ��� m Drawn By: Ghecked By: � � 0 N e BoiL�R J�4N JDR � z = � GA GOMBUSTION AIR � W � �7R EXISTINC� t0 REMAIN P PUMP RECEI VED � � o M . o � By David Rhoades at 8:54 am, Oct 25, 2013 � �O ��� � N � � � � � u� p � W cv �� ^` � Z � � �4 �-[� Reviewed for Code Com liance � � � �Q � � � Code: 2012 Internationa Building Code (IBC) � � � �� � 1-�lal � f�W� �� u�,i W� W� � USE ON� OF tH� �XISTINC� � � O � O � O =� DU,4L C�RUND�OS UPS � C� � � �� �� 5m-16m PUMPS ,4S BAGKUP. � � � �' � O �1 INSTALL UJITH AT LEAST lm PIPE � � �` x � DIAMEtERS O� StRAIC�Nt PIPE ON l7 � � � ? SUGtION AND DISGN,4RCzE SIDE O� PUMP. � � � Z lTl'P) � � w W � � \ Lll z � � � � 3/4 II S S S � � x � � D�MO EXISTINCx 3�4�� W ° DI��ER�NTIAL PRESSUR� �4 O � o Bl'PASS VALV� 0 0 � � � � � c(j �� � � ,.�. �� O � w NEUJ CHEGK YALVES CTl'P) �_3 �_2 �_� �� � � A- t��-r 01 � ' Sea I � �' fL fL ��� — — — — — — _t��«t� r ,,�� � (� Lll Lll _ , ,�R...,.+ W,; p �, �, ._ ��•"�,;�1 .I. y • ":�, Z • ��,,•. �1 � ���2�� �i�2�� ���2�� :`:.10/18/13 �.�': � N � 3�} : w c�l — °�� � • c� ��_� (�I (�1 (�� r) Lfi � 1L 1J- +� �'�r' •: `'�' 1L T ° �� ° "�`+����rv n���a�'. � TS-1 � ��F-, 2��2�� 1 Q z W Nws 2�,Z�� � 1/2" GOPP�R tUBINC� I � � �OR PR�SSURE G,4UC�� � 2��Z�� � � 2��2" ��R ROUTE BOILER GONDENSATE 2m-MIGRON �ILtER BAC� I 3�4�� THROUC�H GNT-1 NEUTR4LIZATION `n v INSIDE O� StAINLESS N.G. FROM DGLU GLOSELI' SP,4GED TEES tANK PRIOR TO DISCH,4RC�E INTO � p StEEL BASKEt I � I � FLOOR DR41N UJItN ,41R C�,4P. � p p� � L� � W � ,4UtOM,4tIG BOILER �ILL � STATION WITN �ILL VALV� � � � O N.C. ,4ND BAGKFLOUJ PR�V�NtER. A � CGALE��I 5�3 OR EG2UAL) � — — _ _ _ _ _ � � � � � � Z U ~ � L� � BOILER GOND�NS,4TE �ROM B-4. DRAIN U � (K � p� W � ua A � o � U � � W �� � f � ��� f � �� f � � ������ � f � f �� ������� f � � � � m NO SC,4LE � � � m o O � z � A � � O � � a ZU � � � � � � � � � 4" GP1/G BOILER �LUES. 4" GPYG BOILER �LUES. O � Q SLOPE MINIMUM I/4" PER L� SLOPE MINIMUM 1/4" PER L� � ~ � Z � � � � � o BAGK TO BOILER lT1'P O� 4) BAGK TO BOIL�R. CTl'P O� 3) cn � � � � � � � � �IRE AL,4RM PANEL FIRE ALARM P�4N�L Z � � � ROUT� FLUES THROUCxN ROUT� BOILER �LU�S � rTl � � Uj EXISTINC� GNASE. � THROUCxN EXISTINCx GHASE. � `!� Z w w � T�RMINAt� ABOVE ROOF. tERMINAtE �4801/� ROOF. W Q � z � SUPPORT AS REQUIRED. GOMM�RGIAL ZON� YALI/ES SUPPORT AS R�G2UIRED. GOMM�RGIAL ZONE V,4LYES p u.� S �7 � W i i � _ � ~ W � r-�`-, � O O � � B=, «� e-�. o p 0 PROVID� ROUCxN IN �OR NEUJ � � � � � �UTURE B-4 BOILER �LUE. GAP W � PIP� IN MEGH,4NIGAL ROOM. �-� � � lm � GOMMON B-VENt � � B- �r � PROVID� ROUCxH IN �OR NEUJ 1 w � �UTURE B-4 BOILER G,4 PIP�. G,4P p- Issued �or ? W PIP� IN MECH,4NIGAL ROOM. � - - � EL�GtRIGAL P�4N�LS � OC,4T SI Ntl,4 ON � OGAt SI NtIA ON �' No. Date Comment � � REL E R� DE L Z � R�L E R� D� L Z � � „ 1 8/26/13 GONStRUCTION w p- AND MET�RS I I �� 1/AL1/ES AND PIPINCx ON WALL TO V,4LV�S AND PIPINC� ON UJALL TO ¢ _ �r � ,4LLOUJ ROOM FOR B=1 BOIL�R �L�GtRIGAL PAN�LS � ALLOUJ ROOM �OR B=1 BOILER � 2 lm/18/13 R�1/ISION I � � � ,4ND M�TERS � � I � lE) R�SID�NtIAL ZON� vALVES � � C�) RESID�NtIAL ZONE Y,4LvES ��� Ac.J � � � � � � � T q � I I lE) CaAS-�IRED LU,4T�R NEATER I I I TS-3 `' � Q I � GONTRAGTOR TO INSTALL N�UJ 4"� � � C�) C�AS-FIR�D IUAtER N�,4T�R. HLUS Q ii � _ I � B-1/�NT ,4ND TERMINATE ABOV� I � 4�� I I ROO�. I I d (X NUJR� ���4�� � � � � � � I � lE) UJATER TR�,47M�NT TANK � � C�) UJAT�R TREATMENt T,4NK � � I I I I �ROM DGUJ GLOS�LY SPAG�D tEES � � � � I UJAT�R TREATMENT TANK I UJ,4TER TR�ATM�NT TANK � � � � I �� I CE) WN ROUTE BOILER GOND�NSATE TO Z C�) Et GNt-I N�UtRALIZAtION tANK � � CsAS BURN�R SHUT-OF� � C�AS BURNER SHUt-OF� � R�:MI.m/,4 �OR GONtINUAtION. � O S W I tC H E S CGO M M ERG I A L � S W I TG H E S CGO M M�RG I A L � z U RESIDENtIAL�. LOGAtE RESIDENtIAL). LOGAt� d W N�AR DOOR CE) St NEAR DOOR. lE� St � � M�G�,4N I G�4L i.0 w �L,aN ,4ND ? w z I I SCNEM�4T f CS � �" PVG BOILER GA PIPES. / 4" PVC BOILER GA PIPES. u.� � GO�/ER OPENINCa IUItN IUIRE � GOVER OPENINCx IUItN UJIRE p (Y Z MESN. C71'P O� �� M�SN. CTYP OF �) � � I I � � w z z i CzAS M�tERS i C�AS MEtERS � � Z L - � L - � �' 111 I� ffff ffff o � o P r o j e c t N o. S c a l e: Z Q �� l� � _ � ��� f ��l NOizTN � � � � _ � ��� f �l� NORT�-I ����i� �� f � �� f �� ������ � f � f�l� ������� f � ,3��8.�� ��� o � � �/�" _ ��-�" � �/�" _ ��-�" � 1�0 SC,4�� � Drawn By: Ghecked By: � W Nl O O J�4N JDR � z = zz � qw � _ (K �- M • " p � � � �o