Loading...
HomeMy WebLinkAboutDRB140033 Acton Form and Photos0, JJN17'Y 07-EYEDWYAMENT �';estg �view Boar; ��n Re ` I 71 F 0 S IV IIDepai'lment a iii n iit IIDevelopment", i 75 South ii ,'0 n a , Vail, CoilbiraAaii 816111,57" t : 970.479.2.139 fax 970.479.24-52, web: www. iiiil Project Name: Vail Village Welcome Center DRB Number: DRB140033 Project Description: CONSTRUCTION OF NEW PULL -OFF /PARKING LANE IN FRONT OF VAIL VILLAGE INFO CENTER. INCLUDES REMOVAL OF SOD AREA, ADDITION OF CONCRETE PARKING LANE, SIDEWALK, ADA RAMP & STEPS. Participants: OWNER TOWN OF VAIL 75 S FRONTAGE RD VAIL, CO 81657 APPLICANT TOWN OF VAIL 75 S FRONTAGE RD VAIL, CO 81657 Project Address: 241 E MEADOW DR VAIL 02/11/2014 02/11/2014 Phone: 970 - 479 -2235 Location: CDOT ROW - S. FRONTAGE ROAD Legal Description: Lot: 6 -C Block: 5D Subdivision: VAIL VILLAGE FILING 1 Parcel Number: 2101 - 082 - 2700 -2 Comments: Motion By: Gillette Second By: Maio Vote: 5 -0 -0 Conditions: BOARD /STAFF ACTION Action: DENIED Date of Approval: Planner: Warren Campbell DRB Fee Paid: $0.00 DRB140033 Vail Village Visitor Center Pull -off Topics for discussion: The new sidewalk is shown to be concrete. Projects such as the Sebastian, Vail Village Inn Phase III, and Solaris were required to install pavers. Can the ADA accessible route be combined with the route for capable guests? Can the route for capable guests be reduced in width to pick up softscape areas? What is the stone material proposed for the new dry -stake wall? Does this material match what will be proposed on the base of the redesigned visitor center? How will this stone architecturally integrate with the existing stone planter walls (river rock). "t- a7�r" ta4��- Ila - - _1V 4- � /-%-\ L44 C-2(v�- oull',& XL�OA, "- ,.tea a V�O� A