HomeMy WebLinkAboutB12-0229 inspection 02-28-2014 Inspection Request Reporting Page 5
4:03 pm Vail, CO - City O f 079(7-
e
Requested Inspect Date: Monday,March 03,2014
Site Address: 68 E MEADOW DR VAIL
VAIL VILLAGE INN BUILDING 1 PARKING GARA
A/P/D Information
Activity B12-0229 Type: COMBO Sub Type: AMF Status: ISSUED
Const Type Occupancy: Use: S-1 Insp Area:
Owner VILLAGE INN CONDOMINIUM ASSOC
Contractor: NEDBO CONSTRUCTION INC Phone: 970-845-1001
Description: INSTALL ENCLOSED 2 STOP VERTICAL PLATFORM WHEELCHAIR LIFT BETWEEN PARKING LEVEL
ONE AND PARKING LEVEL TWO OF THE VAIL VILLAGE INN BUILDING ONE. ELEVATOR IS TO BE
ENCLOSED IN MASONRY STRUCTURE PER ATTACHED PLANS AND SPECIFICATIONS.
Requested Inspection(s)
Item 90 BLDG,.�j al Requested Time: 02:00 PM
Requestor NEDBO '1 STRUCTION INC Phone: 970-845-1001
Comments 977-0 �►
Assigned To S - $ '�■ Entered By: JMONDRAGON K
Action •d►�� Time Exp:
3 b)1
Inspection History
Item: 10 BLDG-FOOTING **Approved**
08/23/12 Inspector: sgremmer Action: AP APPROVED
Comment: Need si report-for 4000 psi concrete
09/19/12 Inspector: mdenney Action: AP APPROVED
Comment: Masonry block to 1st bond beam
Item: 20 BLDG-Foundation/Steel *Approved**
09/20/12 Inspector: mdenney Action: AP APPROVED
Comment: block wall to 2nd bond beam
09/27/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: CMU to 3rd bond beam
10/02/12 Inspector: JRM Action: AP APPROVED
Comment: FINAL BOND BEAM
Item: 120 ELEC-Rough **Approved**
10/18/12 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 30 BLDG-Framing **Approved**
10/18/12 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 60 BLDG-Sheetrock Nail **Approved**
11/06/12 Inspector: JRM Action: AP APPROVED
Comment:
Item: 190 ELEC-Final **Approved**
02/13/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 420 Special Inspect-final rept **Approved**
02/13/13 Inspector: sgremmer Action: AP APPROVED
Comment: NA
Item: 90 BLDG-Final
REPT131 Run Id: 14750