Loading...
HomeMy WebLinkAboutB13-0554 CR2 plans APPROVEDREF. DW C C B B A A 9 8 6 5 2 15' - 0"23' - 9" 8' - 3 " 18 ' - 9 " 7' - 0 " 21' - 0" 3' - 0 7/8" VERFIY 6' - 6" 6' - 5 1/2"7' - 0 1/2" 4' - 0 " 1' - 0 " 12 ' - 0 " 9' - 6 " + / - CU T O P E N I N G W I T H I N EX I S T I N G C H A S E T O A L L O W FO R T H E I N S T A L L A T I O N O F TH E A U D I O C A B I N E T A N D AS S O C I A T E D W I R I N G EX I S T I N G FL U E EX I S T I N G F L U E T O B E M A I N T A I N E D A N D UN D I S T U R B E D . C O N N E C T N E W F I R E P L A C E AP P L I A N C E W I T H C O A X I A L D I R E C T - V E N T F L U E IN T O D R O P C E I L I N G A N D H O R I Z O N T A L T O EX I S T I N G C L A S S - A C H I M N E Y . P R O V I D E A SI M P S O N C H I M N E Y C O N V E R S I O N K I T W I T H 4 " LI N E A R T O T E R M I N A T I O N T H R O U G H E X I S T I N G CL A S S - A C H I M N E Y . FI R E R A T I N G O F E X I S T I N G F L U E A N D A R O U N D EX I S T I N G S T R U C T U R A L L Y C O L U M N T O R E M A I N . 4' - 9" 6' - 3 7 / 8 " 4' - 0"3'-8" +/- TU B W I T H C E N T E R DR A I N T O A L I G N WI T H E X I S T I N G SH O W E R D R A I N LO C A T I O N FI R E E S C A P E CL O S E T R O D A N D S H E L F CO A T H O O K S SL A B E N T R Y C O U N T E R CO A T S LI N E N W/ D GA S F I R E P L A C E AP P L I A N C E (X T R O R D I N A I R 4 4 1 5 ) 4' - 5 1 / 2 " ALIGN8' - 11" EXISTING DOOR 3' - 0 1/2" SH E L V E S PR O V I D E 1 / 2 " D U R O C K A S A B A C K E R B O A R D T O A L L TI L E W I T H I N S H O W E R NEW CLOSET CABINETRY BUILT-INSCONFIRM SIZE WITH SELECTED APPLIANCES. DRYER DUCT IS TO CONNECT TO EXISTING DUCT AND ROUTING. PROVIDE BOOSTER FAN IF REQUIREDPROVIDE SOUNDBREAK XP GYPSUM BOARD AT WALLS OF W/D CLOSET.PROVIDE INSULATION WITHIN WALLS.PROVIDE WEATHER STRIPPING AT DOOR REVIEW DOOR BOTTOM AND/OR THRESHOLD 30"x80" 30"x80" 32"x80" 32 " x 8 0 " NE W K I T C H E N C A B I N E T S A N D C O U N T E R T O P S 5 S H E L V E S RE V I E W D R Y W A L L NI C H E A N D FR A M I N G D E T A I L WI T H I N T . DE S I G N E R u/ c r e f 5' - 4 3 / 4 " 9' - 6 1 / 2 " 5' - 6 1/2"4' - 6"unit 6 mech closet MA I N T A I N E X I S T I N G 1- H O U R F I R E R A T I N G BE T W E E N U N I T S MA I N T A I N E X I S T I N G 1 / 2 - H O U R FI R E R A T I N G B E T W E E N U N I T AN D C O R R I D O R RE F E R T O D E T A I L S O N T H I S SH E E T new mech within closet MA I N T A I N A L L E X I S T I N G F I R E RA T I N G W I T H I N T H E C L O S E T O N WA L L S , F L O O R A N D C E I L I N G . RE F E R T O D E T A I L S O N T H I S SH E E T UN D I S T U R B E D 2 - H R F I R E RA T I N G O F S T A I R T O W E R METAL MECH. DUCT AND METAL CONDUITS PENETRATING THE FIRE WALL SHALL BE IN ACCORDANCE WITH SECTION 713.3.1 THROUGH PENETRATIONS Through penetrations of fire-resistance-rated walls shall comply with section 3713.3.1.1 or 713.3.1.2.EXCEPTION: Where the penetrating items are steel, ferrous, or copper pipes, tubes or conduits, the annular space between the penetrating item and the fire resistive-rated wall is permitted to be protected as follows:2.The material used to fill the annular space shall prevent the passage of flame and hot gasses sufficient to ignite cotton waste when subjected to ASTM E 119 or UL 263 ...... for a time period equivalent to the fire-resistive rating of the construction penetrated. (1/2 hour rated corridor wall) UL D e s U 4 7 3 1- H o u r F i r e - R a t e d C o n s t r u c t i o n S t e e l F r a m e d Co n s t r u c t i o n D e t a i l D e s c r i p t i o n • f a c e l a y e r 1 / 2 " D u r o c k c e m e n t b o a r d • b a s e l a y e r 5 / 8 " S h e e t r o c k F i r e c o d e C o r e g y p s u m p a n e l s o r sh e a t h i n g , o r F i b e r o c k ® b r a n d p a n e l s – 3 - 1 / 2 " 2 0 - g a u g e s t r u c s t u d s 1 6 " o . c . – 3 " b a t t i n s u l a t i o n • 5 / 8 " S h e e t r o c k F i r e c o d e C o r e o p p o s i t e s i d e existing construction NE W 1 / 2 " D U R O C K A P P L I E D OV E R E X I S T I N G W A L L CO N S T R U C T I O N A T S H O W E R ST A L L A N D A T K I T C H E N BA C K S P L A S H GA F i l e N O . W P 1 3 5 0 1- H o u r F i r e - R a t e d C o n s t r u c t i o n S t e e l F r a m e d Co n s t r u c t i o n D e t a i l D e s c r i p t i o n • O n e l a y e r 5 / 8 " t y p e ' X ' g y p s u m w a l l b o a r d p a n e l s o r g y p s u m v e n e e r b a s e a p p l i e d p a r a l l e l o r a t r i g h t a n g l e s t o e a c h s i d e o f – 3 - 1 / 2 " O R 6 " s t e e l s t u d s wit h 1 " t y p e S d r y w a l l s c r e w s a t 8 " o . c . a t v e r t . j o i n t s a n d 12 " o . c . a t f l o o r a n d c e i l i n g r u n n e r s a n d i n t e r m e d i a t e s t u d s St a g g e r j o i n t s 2 4 " o n o p p o s i t e s i d e s – b a t t i n s u l a t i o n existing construction 3" . 1". PR O V I D E A D D I T I O N A L 3 / 8 " G Y P S U M W A L L BO A R D R I N G A T E A C H O U T L E T . T H I S I S T O CR E A T E T H E 1 " T E S T E D T H I C K N E S S T O H O L D TH E M A N U F A C T U R E R S C L I P A S S E M B L Y 970.328.5151 OFFICE PO Box 1587, Eagle, CO 81631 www.martinmanleyarchitects.com Project number DateConsultantAddressAddressPhoneFaxe-mail Mountain CAD Services PO Box 4358 Edwards, CO, 81632 P (970)331.8658 F (970)926.2727 rob@mountaincadservices.comConsultantAddressAddressPhoneFaxe-mail ConsultantAddressAddressPhoneFaxe-mailREVISIONS 4/8/2014 1:58:47 PM A2.0R Unnamed1252Unit # 6 Phase II Construction Documents 04.08.14-Unit #6 MEADOW VAIL PLACE CONDO 44 Meadow Dive Vail CONo.DescriptionDate PO R T I O N S O F S H E E T A 2 . 0 A R E R E P R O D U C E D O N T H I S S H E E T T O GI V E C L E A R I N F O R M A T I O N R E G A R D I N G F I R E R A T I N G S A N D SE P A R A T I O N S 1/4" = 1'-0"1Copy of Revised Main Level NO T E : 1 AL L W I N D O W S H A V E B E E N I N S T A L L E D U N D E R PH A S E I C O N S T R U C T I O N 2 DI M E N S I O N S S H O W N A R E T O F A C E O F F I N I S H 3 CO N F I R M A L L D O O R S I Z E S W I T H E X I S T I N G CO N D I T I O N S . V E R I F Y H E I G H T W I T H I N T D E S I G N E R 4 ME T A L S T U D W A L L F R A M I N G T O B E U S E D TH R O U G H O U T EX I S T I N G W A L L C O N S T R U C T I O N NE W W A L L C O N S T R U C T I O N LE G E N D 1 2 " = 1 ' - 0 " 2 - F L O O R C E I L I N G F I R E R A T I N G 1 1 / 2 " = 1 ' - 0 " 3 - U L W A L L D E S I G N D E T A I L W / T I L E 1 1 / 2 " = 1 ' - 0 " 4 -T Y P I C A L U L W A L L D E S I G N D E T A I L FO R P E N E T R A T I O N S I N C E I L I N G F O R S P E A K E R S A N D R E C E S S E D C A N L I G H T I N G Th e n e w r e c e s s e d c a n s p e n e t r a t i n g t h e c e i l i n g s h a l l b e i n s t a l l e d w i t h g y p s u m b o x e s / t a p e d a n d sc r e w e d t o m a t c h t h e f i r e r a t i n g o f t h e c e i l i n g a s s e m b ly . T h e B o x s h a l l f u l l y e n c l o s e t h e l i g h t f i x t u r e an d b e c o n s t r u c t e d t o c o m p l e t e t h e c e i l i n g a s s e m b l y . Th e n e w s p e a k e r p e n e t r a t i n g t h e c e i l i n g s h a l l b e i n s t a l l e d w i t h g y p s u m b o x e s / t a p e d a n d s c r e w e d t o ma t c h t h e f i r e r a t i n g o f t h e c e i l i n g a s s e m b l y . T h e B o x s h a l l f u l l y e n c l o s e t h e s p e a k e r a n d b e co n s t r u c t e d t o c o m p l e t e t h e c e i l i n g a s s e m b l y . BU I L D I N G I N F O R M A T I O N Cl a s s i f i c a t i o n : R 2 Co n s t r u c t i o n t y p e : I I A ( F i r e s p r i n k l e r ) f o o t n o t e d . . . a l l o w s f o r s u b s t i t u t e d 1 - h o u r f i r e r a t e d c o n s t r u c t i o n Bu i l d i n g e l e m e n t s St r u c t u r a l f r a m e 1 hr (Fire sprinkler) footnote d...allows for substituted 1-hour fire Be a r i n g w a l l s 1 hr (Fire sprinkler) footnote d...allows for substituted 1-hour fire No n - B e a r i n g w a l l s a n d p a r t i t i o n s 0 hr Fl o o r c o n s t r u c t i o n 1 hr (Fire sprinkler) footnote d...allows for substituted 1-hour fire Fi r e s e p a r a t i o n o f c o r r i d o r 1/2hr construction (WITH SPRINKLER SYSTEM)PER SECTION 1018.1 Th e n e w c o n s t r u c t i o n s h a l l m a i n t a i n / m a t c h t h e e x i s t i n g c e i l i n g / f l o o r 2 - h o u r r a t i n g 6 " = 1 ' - 0 " 5 RA T E D D I F F U S E R O U T L E T