HomeMy WebLinkAboutB14-0060 Scope of Work Geyer Construction LLC
Scope of Work - Contract Exhibit "A"
Own�rs Daryl & Pippa Schofield
2/11/2014
Entrvwav
[� � L� Od [�
D �
��� �w� � ����
TOWN OF VAIL
• Demo existing flooring, trim and doors
• Light texture on walls ' � � �
• Light texture over existing popcorn ceiling
• Paint walls and ceilings (2 colors TBD)
• Install new floating hardwood floors (color and type TBD)
• New Decora switches and receptacles
• New switches to be dimmable
• Install 2 art lights
• Install new entry door to bedroom #1 (knotty alder)
• Install new 4" case around door to bedroom #1 (knotty alder)
• Install new 6" base (knotty alder)
• Install new bi-fold closet doors (knotty alder)
• Install new 4" case around closet doors (knotty alder)
Kitchen
• Demo existing flooring, trim, cabinets, counters, backsplash, appliances, soffit, and wall
between kitchen and dining room to make a knee wall
• Light texture on walls
• Light texture over existing popcorn ceiling
• Paint walls and ceilings (2 colors TBD)
• Install new floating hardwood floors (color and type TBD)
• Install new base board
• New Decora switches and receptacles
• New GFI receptacles to code
• New switches to be dimmable
• New can lighting LED (allow for 5 cans)
• Install 3 pendant lights over bar (owner supplied fixtures)
PO Box 2496
Edwards, CO 81632
970-926-1344 Office, 970-926-1342 FAX
'� �� �
�
. New LED under cabinet lights
. New kitchen cabinets (layout and design TBD)
. New slab tops (layout and selection TBD)
. New tile back splash (layout and selection TBD)
• New plumbing fixtures, sink, faucet, air switch and garbage disposal
. New appliances, dishwasher, slide in stove, refrigerator, OTR microwave
. New water line shut off under sink base for ice maker in refrigerator
• Install new 4" case around windows (knotty alder)
. Install new 6" base as needed (knotty alder)
Livinq room
• Demo existing flooring, trim and fireplace tile surround and hearth
. Light texture on walls
• Light te�ure over existing popcorn ceiling �� � �
. Paint walls and ceilings (2 colors TBD)
• Install new floating hardwood floors (color and type TBD)
• Install new base board, stop at hall to bedrooms
• New Decora switches and receptacles
• New switches to be dimmable
• New can lighting 4" LED on 3 way switch bedroom hallway and entryway (allow for 6 cans)
. Two new ceiling can art lights, wall on right walking back to bedrooms
• Option for new stone on fireplace all 4 sides including a new mantel or replace tile surround
and hearth-TBD
. Custom cabinet at fireplace
. Wine refrigerator for new cabinet @ fireplace
. Wire for power and CAN to mount a N and arm on outside wall
. Wire for power on fireplace wall facing N area (under cabinet light )
• Install new drywall on wood wall backing up to the bedroom
• Install new 4" case around windows (knotty alder)
• Install new 6" base as needed (knotty alder)
Dininq Room
• Demo existing flooring and trim
. Light texture on walls
• Light te�ure over existing popcorn ceiling
. Paint walls and ceilings (2 colors TBD)
. Install new floating hardwood floors (color and type TBD)
• Install new base board
. New Decora switches and receptacles
• New switches to be dimmable
. New can lighting 4" LED (allow for 4 cans)
. Install new 4" case around windows (knotty alder)
PO Box 2496
Edwards, CO 81632
970-926-1344 Office, 970-926-1342 FAX
.
• Install new 6" base as needed (knotty alder)
8.� � '� :i s;:
PO Box 2496
Edwards, CO 81632
970-926-1344 Office, 970-926-1342 FAX