Loading...
HomeMy WebLinkAboutB14-0060 Scope of Work Geyer Construction LLC Scope of Work - Contract Exhibit "A" Own�rs Daryl & Pippa Schofield 2/11/2014 Entrvwav [� � L� Od [� D � ��� �w� � ���� TOWN OF VAIL • Demo existing flooring, trim and doors • Light texture on walls ' � � � • Light texture over existing popcorn ceiling • Paint walls and ceilings (2 colors TBD) • Install new floating hardwood floors (color and type TBD) • New Decora switches and receptacles • New switches to be dimmable • Install 2 art lights • Install new entry door to bedroom #1 (knotty alder) • Install new 4" case around door to bedroom #1 (knotty alder) • Install new 6" base (knotty alder) • Install new bi-fold closet doors (knotty alder) • Install new 4" case around closet doors (knotty alder) Kitchen • Demo existing flooring, trim, cabinets, counters, backsplash, appliances, soffit, and wall between kitchen and dining room to make a knee wall • Light texture on walls • Light texture over existing popcorn ceiling • Paint walls and ceilings (2 colors TBD) • Install new floating hardwood floors (color and type TBD) • Install new base board • New Decora switches and receptacles • New GFI receptacles to code • New switches to be dimmable • New can lighting LED (allow for 5 cans) • Install 3 pendant lights over bar (owner supplied fixtures) PO Box 2496 Edwards, CO 81632 970-926-1344 Office, 970-926-1342 FAX '� �� � � . New LED under cabinet lights . New kitchen cabinets (layout and design TBD) . New slab tops (layout and selection TBD) . New tile back splash (layout and selection TBD) • New plumbing fixtures, sink, faucet, air switch and garbage disposal . New appliances, dishwasher, slide in stove, refrigerator, OTR microwave . New water line shut off under sink base for ice maker in refrigerator • Install new 4" case around windows (knotty alder) . Install new 6" base as needed (knotty alder) Livinq room • Demo existing flooring, trim and fireplace tile surround and hearth . Light texture on walls • Light te�ure over existing popcorn ceiling �� � � . Paint walls and ceilings (2 colors TBD) • Install new floating hardwood floors (color and type TBD) • Install new base board, stop at hall to bedrooms • New Decora switches and receptacles • New switches to be dimmable • New can lighting 4" LED on 3 way switch bedroom hallway and entryway (allow for 6 cans) . Two new ceiling can art lights, wall on right walking back to bedrooms • Option for new stone on fireplace all 4 sides including a new mantel or replace tile surround and hearth-TBD . Custom cabinet at fireplace . Wine refrigerator for new cabinet @ fireplace . Wire for power and CAN to mount a N and arm on outside wall . Wire for power on fireplace wall facing N area (under cabinet light ) • Install new drywall on wood wall backing up to the bedroom • Install new 4" case around windows (knotty alder) • Install new 6" base as needed (knotty alder) Dininq Room • Demo existing flooring and trim . Light texture on walls • Light te�ure over existing popcorn ceiling . Paint walls and ceilings (2 colors TBD) . Install new floating hardwood floors (color and type TBD) • Install new base board . New Decora switches and receptacles • New switches to be dimmable . New can lighting 4" LED (allow for 4 cans) . Install new 4" case around windows (knotty alder) PO Box 2496 Edwards, CO 81632 970-926-1344 Office, 970-926-1342 FAX . • Install new 6" base as needed (knotty alder) 8.� � '� :i s;: PO Box 2496 Edwards, CO 81632 970-926-1344 Office, 970-926-1342 FAX