HomeMy WebLinkAboutDRB140088 Summary Letter PYLMAN
& ASSOCIATES
Apri19, 2014
Mr.Warren Campbell
Town of Vail Community Development Director
75 South Frontage Road
Vail, CO 81657
Re: Timber Ridge
Dear Warren:
Thank you for taking the time to meet with Hans and I this afternoon to discuss the proposed
revisions to the Timber Ridge (Lions Ridge) approved DRB plans.
The attached redlined and annotated plans indicate the proposed changes in graphic format.
In summary the following are the revisions proposed by this application:
• A slight shift of the roof height transition to align with the building firewalls.
• Moved meters from the eastern dumpster to the north elevation of Building 1.
• Split the meter banks from one end of Building 2, 3 and 4 to place meters at both ends of the
buildings to eliminate pipes crossing multiple fire walls. A few windows were removed to
accomplish this.
• Shifted landscaping south of Building 2 parking to create more functional snow storage.
• Added shrubs to the area above boulder retaining wall in front of Buildings 3 and 4.
• Added a small amount of lawn area west of Building 4.
• Substituted the re-vegetation seed mix from Mountain Mix to Native Dry Mountain Mix.
This information and application form has been submitted via efile. Please call if you have any
questions.
On behalf of Gary Gorman,Jen Wright and the project design team we thank you for all of your
assistance on this exciting project.
Sincerely,
�� �yc��
Rick Pylman
Copy: Gary Gorman, Gorman and Company
Jen Wright,Wright and Company
Hans Berglund
Dennis Anderson
137 Main Street, Suite C107W Edwards, Colorado 81632
Phone: (970)-926-6065 Fax: (970)-926-6064 Email: rick@pylman.com