Loading...
HomeMy WebLinkAboutDRB140065 Plans ApprovedREUSSWIG REMODEL &ADDITION 2985 (WEST) & 2995 (EAST) BOOTH (REEK DRIVE, EAST VAIL, COLORADO GENERAL NOTES: 2. VERIFY ALL DIMENSIONS, CONDITIONS, AND UTILITY LOCATIONS PRIOR TO BEGINNING ANY WORK OR ORDERING ANY MATERIALS. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES IN THE DOCUMENTS IMMEDIATELY. 3. AREAS OF CONFLICTS OR DISCREPANCIES MUST BE FULLY RESOLVED WITH WRITTEN APPROVAL FROM THE ARCHITECTS BEFORE CONSTRUCTION CONTINUES IN THESE PARTICULAR AREAS. 4. PLAN DIMENSIONS ARE TO FACE OF STUD, CENTERLINE OF STEEL, TIMBER, STUD COLUMNS, OR FACE OF CONCRETE UNLESS OTHERWISE NOTED. SECTION AND ELEVATION DIMENSIONS ARE TO TOP OF CONCRETE, TOP OF PLYWOOD, OR TOP OF WALL PLATES OR BEAMS UNLESS OTHERWISE NOTED. 5. PROVIDE ALL NECESSARY BLOCKING IN STUD WALLS AND CEILINGS. LOCATIONS INCLUDE BUT ARE NOT LIMITED TO CEILING AND WALL MOUNTED FIXTURES, TOILETS, TOILET ACCESSORIES, CABINETRY, COUNTERTOPS, SHELVES, CLOSET RODS AND FALSE BEAMS. 6. REFER TO FLOOR PLANS FOR DOOR LOCATIONS. REFER TO DOOR SCHEDULE FOR DOOR TYPES. 7. REFER TO FLOOR PLANS FOR WINDOW LOCATIONS. REFER TO WINDOW SCHEDULE FOR WINDOW TYPES. 8. COORDINATE ALL ELECTRICAL AND MECHANICAL FIXTURES TO FIT WITHIN CEILING FLOOR AND WALL SPACES. VERIFY WITH ARCHITECT WHEN DIVERTING FROM DRAWINGS. 9. IN THE EVENT THAT ADDITIONAL DETAILS OR GUIDANCE IS NEEDED BY THE CONTRACTOR FOR CONSTRUCTION OF ANY ASPECT OF THE PROJECT, THEY SHALL IMMEDIATELY NOTIFY THE ARCHITECT. FAILURE TO GIVE 10 DAY NOTICE TO ARCHITECT SHALL NOT CONSTITUTE A DELAY IN THE PROJECT. 10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ALL APPLICABLE CODES AND OBTAINING ALL PERMITS AND REQUIRED APPROVALS. THIS PROJECT IS GOVERNED BY THE INTERNATIONAL BUILDING CODE AND THE INTERNATIONAL RESIDENTIAL CODE. COMPLIANCE IS MANDATORY. THE CONSTRUCTION DOCUMENTS SHALL NOT PERMIT WORK THAT DOES NOT CONFORM TO ALL RELEVANT CODES INCLUDING IN IBC AND ALL LOCAL AND REGIONAL CODES. 1 I. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL FIELD COORDINATE AND OBTAIN APPROVALS FROM THE ARCHITECT /ENGINEER BEFORE ANY CUTTING, NOTCHING, OR DRILLING OF ANY CAST -IN -PLACE CONCRETE, STRUCTURAL FRAMING, OR ANY OTHER STRUCTURAL ELEMENTS WHICH MAY AFFECT THE STRUCTURAL INTEGRITY OF THE CONSTRUCTION. 12, THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING GRADES AND SCALE OUT THE BUILDING FOOTPRINT FOR OWNER AND ARCHITECT APPROVAL PRIOR TO BEGINNING ANY SITE WORK. 13. THE OWNER HAS BEEN ADVISED THAT DUE TO HARSH WINTER CONDITIONS, ROOF & DECK SURFACES MUST BE MAINTAINED REASONABLE FREE OF ICE & SNOW TO ENSURE MINIMAL PROBLEMS WITH THESE SURFACES. 14. SUBSTITUTIONS OF "EQUAL" PRODUCTS WILL BE ACCEPTABLE WITH ARCHITECT'S WRITTEN APPROVAL. 15. IT IS THE INTENT AND MEANING OF THESE DOCUMENTS THAT THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR PROVIDE ALL LABOR, MATERIALS TRANSPORTATION, SUPPLIES, EQUIPMENT, ETC. TO OBTAIN A COMPLETE JOB WITHIN THE RECOGNIZED STANDARDS OF THE INDUSTRY. 16. ALL CONSTRUCTION IS TO FIT WITHIN THE BUILDING ENVELOPE AND /OR OUTSIDE SETBACKS WITHOUT CREATING EASEMENTS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. 17. THE GENERAL CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES. ALL UTILITIES SHALL BE LOCATED TO MINIMIZE EXCAVATION AND VEGETATION IMPACTS TO THE SITE. 18. THE GENERAL CONTRACTOR SHALL MINIMIZE THE LIMITS OF EXCAVATION AND TAKE ADEQUATE MEASURES TO PROTECT ALL VEGETATION BEYOND THE LIMITS OF EXCAVATION. ALL AREAS OF DISTURBANCE SHALL BE RE- VEGETATED TO BLEND WITH THE NON - DISTURBED LANDSCAPE EXCAVATION. ALL AREAS OF DISTURBANCE SHALL BE RE- VEGETATED TO BLEND WITH THE NON - DISTURBED LANDSCAPE. 19. THE SOILS REPORT IS AVAILABLE FROM OWNER'S SOILS ENGINEER. 20. GENERAL CONTRACTOR SHALL VERIFY ALL SITE DEVELOPMENT WITH LANDSCAPE CONSTRUCTION DOCUMENTS. THE SITE PLAN IS FOR GRADING AND LANDSCAPE PLAN IS FOR LAYOUT; ANY DISCREPANCIES VERIFY WITH ARCHITECT. PROJECT SUMMARY: SYMBOLS: Code: A4 "A INTERNATIONAL RESIDENTIAL CODE 2009 A4.00 I E C C 2009 Section Cut Reference Detail Area Reference 1 Zoning: A3 -0 EE: 0,_0„ SINGLE - FAMILY RESIDENCE Elevation Reference Elevation Symbol Occupancy Classification: 0 r TYPE R DIV. 3 A� Detail Cut Reference Large Area Detail Reference Al2/31/1999 Revision Cloud Revision Symbol PROTECT TEAM: A r). L"ITC/`T. K.H. WEBB ARCHITECTS P.C. 710 W. LIONSHEAD CIRCLE, UNIT A VAIL, CO 81657 PH. 970.477.2990 CONTACTS: KYLE H. WEBB LAUREN FORD GENERAL CONTRACTOR: NEDBO CONSTRUCTION INC. P.O. Box 3419 Vail, CO 81658 PH. (970) 845 -1001 CONTACTS: MARK DOYLE STRUCTURAL ENGINEER: REI STRUCTURAL PO BOX 8009, AVON, CO 81620 (970) 748-0711 (510) 899 -0877 FAX CONTACTS: SEAN MOLLOY SURVEYOR: EAGLE VALLEY SURVEYING, INC. 41199 HWY 6 & 24, EAGLE -VAIL P.O. BOX 1230 EDWARDS, COLORADO 81632 PH. 970.949.1406 O 0 Grid Bubble Material Tag DRB changes 03/10/14 DRAWING INDEX PROPOSED WORK: ARCHITECTURAL A 001 1:10 PROPOSED SITE /GRADING /RE- PLANTING PLAN A 002 LANDSCAPE PLAN A 004 EXTERIOR LIGHTING PLAN A 100 3/1611 ENTRY LEVEL FLOOR PLAN A 101 3/16" MAIN LEVEL FLOOR PLAN A 102 3/1611 LOFT LEVEL FLOOR PLAN A 200 3/16" PROPOSED ELEVATIONS A 20 1 3/16" PROPOSED ELEVATIONS Design Review Staff Approval TOWN Of VAIL By Warren Campbell at 1:25 pm, Apr 10, 2014 Z� 2 3 CE 9 0 Z 03.02.11 PERMIT SET V 00 ® V 0� N N • J Q O n H , t� -1— V Q W �_ O` Q, N J 1� • � V CC O O� � O V Q j J O V W S W oC � C> J V O W O ~ O CE 9 0 Z 03.02.11 PERMIT SET 05.12.11 TOV DRB CHANGES 09.01.11 PERMIT REVISIONS 10.19.11 WEST PROGRESS z Q t� TOV DRB CHANGES z_ J W D � O ® j J O J � J W oC ^' n �/� V O CO «1 ~ O 4 J W PROJECT: DRAWN BY: LJF D A T E : 12.10.10 REVISIONS: DRB 03.02.11 PERMIT SET 05.12.11 TOV DRB CHANGES 09.01.11 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 TOV DRB CHANGES 06.19.12 TOV DRB CHANGES 02.18.14 COVER A000 0 0 I A m 100 YR. FLOOD PLAIN I I CONCRETE ABUTMENT FOUND PIN & WASHER TV PED. 06 / 15 �� =ET � W � c �0 0 r IG) � 1� n 1� n I� \ 06, \ �N O N \ O I 156 5 E N OS 1 A BUILDING OUTLINE ROOF OUTLINE ENCROACHMENT INFO SEE NOTE 4 NEW SAAS FIREPIT 100 sf Pa CS 66 BOULDER \ WALL, TYP. I ON I WATER FEATURE o EDGE LANDSCAPING ELECT. O� \ METER I ✓� - PHONE PIED.\ \ FOUND PIN & �� 03 YELLOW PLASTIC CAP DOUBLE C/ SLOPE TO 1 STEEL C CI FRAME W/ CORNERES BRONZE STONE VEP TAPERED 8" CMU OR WALL PER PROVIDE P LIGHT, PRC FOR DRIP II I 06 / >�14 SLOPER '.O. PARAPET mo (4) PARKING SPACES REQUIRED @ WEST UNIT ROOF DN SPOUT DRAIN TO DAYLIGHT, TYP. EXISTING GAS METER LOCATIONS TO REMAIN; PROVIDE LANDSC. SCREENING AS NECESS. SNOW STORAGE EQUAL TO,:' 30% OF DRIVEWAY AREA TRASH ENCLOSURE- IN GARAGE, BOTH UNITS X587° 0'49,,E 180 !L\ —_� 00 TRASH PARKING.// PARKING SPACE,,/ENCL. SPACE, ENCL. 18' -0" 9' -0" X 18' -0" SPACE, 8338'-2" SPACE, T.O. SHEATHING @ RI 7 LOT 4 9' -0" 25,038.3 SQ. 9' -0" X 0.5748 ACRE PARKING 3E \_ 83 5 - PARKING PA ING /j SPACE, SPA E, NON -ENCL. NO -ENCL. % T-011 X 9' -0' X ti 19' -0" 191- \ % S OPE UP PAVER DRIVE 04 8304' - 1`1/2" 6% S OPE UP hx� I 83 .1 /2_!�– STONE PILLAR I \ 1" RON PIPE WEST GA! EAST GAS T 00 1 -70 CORR1pOR (3) PARKING SPACES REQUIRED @ EAST UNIT LINE OF SITE DISTURBANCE LINE OF EROSION CONTROL FENCING EXTENT OF WETLANDS TO BE IMPACTED PROPOSED CONTOUR LINES *06 EXTENT OF WETLANDS, TYP. SNOW STORAGE EQUAL TO 30% OF DRIVEWAY AREA % -PA�G SPACE, ENCL. 9' -0" X 18' -0" PARKING SPACE, �o SPACE, NON -ENCL. NON -ENCL. 9' -0" X 9' -0" X 19'- 19' -0" PARKING 3E \_ 83 5 - PARKING PA ING /j SPACE, SPA E, NON -ENCL. NO -ENCL. % T-011 X 9' -0' X ti 19' -0" 191- \ % S OPE UP PAVER DRIVE 04 8304' - 1`1/2" 6% S OPE UP hx� I 83 .1 /2_!�– STONE PILLAR I \ 1" RON PIPE WEST GA! EAST GAS T 00 1 -70 CORR1pOR (3) PARKING SPACES REQUIRED @ EAST UNIT LINE OF SITE DISTURBANCE LINE OF EROSION CONTROL FENCING EXTENT OF WETLANDS TO BE IMPACTED PROPOSED CONTOUR LINES *06 EXTENT OF WETLANDS, TYP. SNOW STORAGE EQUAL TO 30% OF DRIVEWAY AREA % -PA�G SPACE, ENCL. 9' -0" X 18' -0" PAR G SPACE, ENCL. �o 9' -0' X 18'-0" z Q � 9 0" X / PARKING 19' -0" / PACE, 0 NOW �5 BUILD .0' 1 / ING S ETgq CK i PRKING_- ON- ENCL.. 9' -0" X - - - -- 19' -0 2% SLOPE DN I— 1 37 5 10 i� �� // / - - -- - - - -- / !�. / EROSION CONTROL / / / - 03 SEE NOTE 5 / / PROPOSED *0 FLAGSTONE -- / / / i ASPHALT �> / SLOPE 1/4 � sLOPE1 /4^ PA — DRIVE PER FT., TYP. PER FT.. TyF1. *03� �T ss i / / 3% SLO� T. I VERT DRAIN 01.6' 3'61 8305 • EXTENT OF WETLANDS EXISTING DECK TO BE IMPACTED / / j/ / i 3.4' 165 sf Deck 3% SLOPE D *04 \ / GS /G/ W 43 \OWN WETLANDS - / V BOUNDARY / / INVERT DRAIN / 01.6' FIRE HYDRANT 129'19 / br W ER ALVE- °19`�� "� all '6 W SEWER MANHOLE DENOTES TREE TO BE REMOVED; REPLACE/ RELOCATE WITH SAME SPECIES & TRUNK DIAMETER (38 CONIFEROUS TREES REMOVED) E X.X DENOTES CONIFEROUS TREE WITH APPROXIMATE TRUNK DIAMETER X.X DENOTES DECIDUOUS TREE WITH APPROXIMATE TRUNK DIAMETER DENOTES (38) NEW ASPEN (POPULUS TREMULOIDES) TREES TO BE ADDED DENOTES (3) NEW ROCKY MOUNTAIN JUNIPER (JUNIPERIOUS SCOPULORM) TREES TO BE ADDED NEW STONE PIERS AT EITHER SIDE OF BOTH DRIVEWAYS NEW 4' CONCRETE PAN NEW ASPHALT DRIVEWAY OVER FILL NEW 18" DIA. CMP CULVERT WITH RIP RAP AROUND OPENING EXTENT OF WETLANDS, TYP. GENERAL NOTES: 1. THE SURVEY DATA, TOPOGRAPHY, & WETLANDS INFORMATION WAS TAKEN FROM A SURVEY BY EAGLE VALLEY SURVEYING DATED 10 -23 -09 2. THE WORK TO BE COMPLETED IN THE WETLANDS AREA WAS APPROVED BY THE ARMY CORPS OF ENGINEERS, SEE REGULATORY DIVISION APPROVAL REFERENCE # SPK- 2010- 00395. FOLLOW ALL GUIDLINES PER THE "NATIONWIDE PERMIT SUMMARY ". 3. PRIOR TO THE START OF EXCAVATION FIELD VERIFY ALL UTILITY LOCATIONS. 4. THE ENCROACHMENT INTO THE 15' SETBACK AT THE WEST SIDE OF THE LOT WAS APPROVED IN 1987 WHEN THE 10' BUILDING SETBACK WAS ESTABLISHED. THE ENCROACHMENT INTO THE 10' SETBACK WAS DONE AT THAT TIME. ALL NEW WORK MUST HONOR THE 15' SETBACK. 5. PROVIDE EROSION CONTROL WHICH WILL INCLUDE DEBRIS FENCING AND STACKED BALES OF HAY ALONG THE EXTENT OF THE WETLANDS TO BE IMPACTED ON EACH SIDE OF THE EAST DRIVEWAY. 6. ALL DISTURBED SOFTSCAPE AREAS TO BE RESTORED BACK TO THE ORIGINAL PLANTING PLAN, UNLESS OTHERWISE NOTED. 7. ALL DISTURBED HARDSCAPE AREAS TO BE RECONSTRUCTED AS SHOWN /LABELED ON THIS SITE /GRADING PLAN, UNLESS OTHERWISE NOTED. SITE & GRADING PLAN Design Review Staff Approval �� � � � ��� � By Warren Campbell at 1:25 pm, Apr 10, 2014 0 • • PROJECT: DRAWN BY: LJF D A T E : 12.10.10 REVISIONS: DRB 03.02.11 PERMIT SET 05.12.11 QTOV DRB CHANGES 09.01.11 1 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 2 TOV DRB CHANGES 06.19.12 73\ TOV DRB CHANGES 02.18.14 SITE GRADING RE- PLANTING PLAN wfIf� �o �n z Q � C0 0� Ll W v ^ J O ® � J O J o • Q ^ S2O J 4.– Q o J o� W W O� ^ 6., ^ i� J 0 ^ v of _ 1I V c Q V W 2 l/f � z o_ J W 0 r� PROJECT: DRAWN BY: LJF D A T E : 12.10.10 REVISIONS: DRB 03.02.11 PERMIT SET 05.12.11 QTOV DRB CHANGES 09.01.11 1 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 2 TOV DRB CHANGES 06.19.12 73\ TOV DRB CHANGES 02.18.14 SITE GRADING RE- PLANTING PLAN wfIf� ® z Q � Ll W ( ° Q ® J O ® � J O J V Q � W/ CC= a ^j v S2O J ° J W PROJECT: DRAWN BY: LJF D A T E : 12.10.10 REVISIONS: DRB 03.02.11 PERMIT SET 05.12.11 QTOV DRB CHANGES 09.01.11 1 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 2 TOV DRB CHANGES 06.19.12 73\ TOV DRB CHANGES 02.18.14 SITE GRADING RE- PLANTING PLAN wfIf� FOUND PIN & WASHER ' V TV PED. 100 YR. FLOOD PLAIN j f III II CP � s 01 z N N 6 rn N N EROSION CONTROL FENCING LIMIT OF DISTURBANCE PROPOSED ASPEN TREES TO BE PLANTED FALL 2011, FEATHER INTO EXIST. VEG. FINAL WALK THRU W/ OWNER EXISTING GAS METER LOCATIONS; RELOCATE ACCORDING TO XCEL REQUIREMENTS 7o 0'49,,E 180,00, 1 BUILDING OUTLINE 06 8338' -2" T.O. SHEATHING @ RIDGE I ROOF OUTLINE LOT 4 25,038.3 SQ. F' 0.5748 ACRES A5 �m 1 7A SLOPE 114" SLOPE 1/4" PER FT., NP. PER F _.,TYP. 5 e NEW GAS FIREPIT 1 \ - BOULDER WALL, TYP. I \ 63 sf Water Feature 268 sf Boulder Walls i Total Hardscape = 989 f otal Softscape = 14,03 sf 0 I EDGE CONCRETE LANDSCAPING ABUTMENT 0 - -- -_ - ® \ ------- - - - - -- PHONE PED. ------------------ FOUND PIN & YELLOW PLASTIC CAF RESTORE EXISTING LANDSCAPING & PATIO TO EXISTING CONDITIONS, TYP. REDIRECT \ FLAGSTONE PARAPET mo "V4 �A I 8305` < 1 100 sf Patio PAX/FP ■ 0) ELECT. \ METER 03 - EXISTING LANDSCAPED AREA, RETURN TO EXISTING CONDITIONS INCREASE SCOPE OF IRRIGATION PER OWNER ELECTRICAL METERS LOCATION WEST EAST V� iF 06, N PROPOSED GAS METER LOCATIONS, V.I.F. EXTENT OF WETLANDS TO BE IMPACTED EXTENT OF WETLANDS, TYP. PROPOSED CONTOUR LINES *06 � = 5, UI = 5.0' DING ET= K 04 O / 37 s io / / \ 03 \ WETLANPS AREAS TO BE R VEGETATED 79—NATURAL CONDITION, TY m6 / *05 ' i ' // / ' / // PROPOSED A *04 FLAGSTONE / ' ' / ASPHALT SLOPE I/4" SLOPE I/4" WALK ,/ // / , - -- DRIVE, / / / PER FT., T P. PER FT., TyFy, *03 / , / / / / / , / / , \ \ 02 �A 33 3 % SLOP T. R 3:6' --------- E ENT OF WETLANDS T BE IMPACTEb�i / / ' / 3.4' ,5 sf Deck - - - -- - I *04 rn co WETLANDS / / BOUNDARY WETLANDS AREAS BE REVEGETATED / / TO NATURAL CO ITION, TYP. FIRE HYDRANT W E ALV 0 j / i SEWER MANHOLE DENOTES TREE TO BE REMOVED; REPLACE/ RELOCATE WITH SAME SPECIES & TRUNK DIAMETER (38 CONIFEROUS TREES REMOVED) E X.X DENOTES CONIFEROUS TREE WITH APPROXIMATE TRUNK DIAMETER X.X DENOTES DECIDUOUS TREE WITH APPROXIMATE TRUNK DIAMETER DENOTES (38) NEW DECIDUOUS TREES TO BE ADDED, VERIFY FINAL SELECTIONS WITH OWNER DENOTES (3) NEW ROCKY MOUNTAIN JUNIPER (JUNIPERIOUS SCOPULORM) TREES TO BE ADDED 8305 EXTENT OF WETLANDS, TYP. TREE PROTECTION: - ORANGE FENCE -NO MATERIAL STORAGE -WATER 1X WEEK - PROTECT EXPOSED ROUTS W/ PLASTIC OR FABRIC REVEGETATION PLAN: - RESEED ALL DISTURBED AREAS W/ SEED MIX TO MATCH EXISTING - HYDOMULCH -PLANT NEW TREES TO REPLACE REMOVED TREES IN NEW LOCATIONS, SEE PLAN - IRRIGATE TO ESTABLISH & MODIFY EXISTING 1 LANDSCAPE PLAN Design Review Staff Approval TO W N OF VAI L By Warren Campbell at 1 :25 pm, Apr 10, 2014 S87o33 / Z� 2 3 V 4— v a� -F. --- V W -1 EWE 0 • • r— 00 0� N o v r_ J O Q Q � W Q� F— PV W C J V O� V D Q W d., z 0 J W PROJECT: DRAWN BY: LJF D A T E : 12.10.10 REVISIONS: DRB 03.02.11 PERMIT SET 05.12.11 TOV DRB CHANGES 09.01.11 PERMIT REVISIONS 10.19.11 Q Z Q � TOV DRB CHANGES Z L.j O Q ID J O O j J O J � J W oC ^' ( � V CO O W PROJECT: DRAWN BY: LJF D A T E : 12.10.10 REVISIONS: DRB 03.02.11 PERMIT SET 05.12.11 TOV DRB CHANGES 09.01.11 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 TOV DRB CHANGES 06.19.12 TOV DRB CHANGES 02.18.14 LANDSCAPE PLAN A002 03 O O rn //1"", a N', 0 q 0 N I N W N 1 I I Imo\ I OB OB II' '"4C EXTERIOR ELECTRICAL KEY S= '4g„ \ - 180.00, n NEW RECESSED DOWN- LIGHTS IN CAR PORT PROVIDE POWER FOR X -MAS LIGHTS- (2) LOCATIONS NEW RECESSED DOWN - LIGHTS IN BLDG OVERHANG A C I O O_ /6D�-_x B B *D-x \ / C d0 LOT 4 / uc 1 ' 25,038.3 SQ. FT. 0.5748 ACRES l / / / b .. 55 'bo / C W H-) I 1 EXTERIOR LIGHTING PLAN 1" =10, Design Review Staff Approval �fA�� � By Warren Campbell at 1:25 pm, Apr 10, 2014 TOWN OF A 2 3 V H V N -F. -4-- V L 0 Iii_J • • POVP �.4 n W W oC Sri �f W oC PROJECT: DRAWN BY DATE: �o �n N v J O Q � Q o cl W Q, F— N 1� W C J V O� V D Q W S V9 Z 0 Lon J W I� z J W O a J O � J a O J REVISIONS: LJF 12.10.10 DRB TYPE QTY. MANUF. / MODEL # NAME LAMP WATTAGE COLOR / FINISH NOTES A WALL- MOUNTED SCONCE 2 HINKLEY/ 1325BK "DWELL" 100w MED. BASE BLACK DARK SKY, WET LOCATION, TYP. B EXTERIOR RECESSED DOWN -LIGHT 12 B -K LIGHTING / B- VS- MR- 9- BLP- 10 -11 -TP "VERSA- STAR" MR -16 BLACK ADJ. AT SOFFIT LOCATIONS C WALL MOUNTED STEP -LIGHT 6 B -K LIGHTING / B- SQ -MR -I- BLP -TP "SQUARE STEP - STAR" MR -16 BLACK LESS THAN 18" D -x LANDSCAPE PATHWAY LIGHT 3 HINKLEY / 1518HE "HEMATITE" 18w wedge base HEMATITE LESS THAN 18" F LANDSCAPE PATHWAY LIGHT 6 HINKLEY / 1547 "SHELTER" LED LED/ DARK SKY, LESS THAN 18" H WALL MOUNTED STEP -LIGHT 12 HINKLEY/ 1528 CO WEDGE 12 COPPER LESS THAN 18" S= '4g„ \ - 180.00, n NEW RECESSED DOWN- LIGHTS IN CAR PORT PROVIDE POWER FOR X -MAS LIGHTS- (2) LOCATIONS NEW RECESSED DOWN - LIGHTS IN BLDG OVERHANG A C I O O_ /6D�-_x B B *D-x \ / C d0 LOT 4 / uc 1 ' 25,038.3 SQ. FT. 0.5748 ACRES l / / / b .. 55 'bo / C W H-) I 1 EXTERIOR LIGHTING PLAN 1" =10, Design Review Staff Approval �fA�� � By Warren Campbell at 1:25 pm, Apr 10, 2014 TOWN OF A 2 3 V H V N -F. -4-- V L 0 Iii_J • • POVP �.4 n W W oC Sri �f W oC PROJECT: DRAWN BY DATE: �o �n N v J O Q � Q o cl W Q, F— N 1� W C J V O� V D Q W S V9 Z 0 Lon J W I� z J W O a J O � J a O J REVISIONS: LJF 12.10.10 DRB 03.02.11 PERMIT SET 05.12.11 TOV DRB CHANGES 09.01.11 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 TOV DRB CHANGES 06.19.12 TOV DRB CHANGES 02.18.14 EXTERIOR LIGHTING PLAN A004 GAS FIREPIT 1 I BEDROOM 1 BATH 1 104 105 I' DECK 102 IT.O. PLYWOOD EL. +/- 306' -8" C I o� 1 I IARY -------- - - - - -- % 72NDLVL OFF ING TANK FILLED W/ PEA Q 3 GRAVEL I 0 I 1 BAR 103 0 ENTRY 1o0 PA BT'TH 106 i MUD ROOM log ■ T.O. SLAB EL. +/- 306' -0" UP GARAGE 109 h T.O. SLAB EL. +/- 306' -0" STAI R 1os ------ - - - - -- 8305 l 04 o \ o / 0 o� o 0 BATH 3 109 0 I❑ BEDROOM 3 108 - EAST UNIT BEDROOM 2 105 IC EO. PLYWOOD � +/- 306' -8" BATH 1 104 u DECK 111 EL. +/- 306' -0" MUD RM. UP 102 ENTRY 100 WHIM oil= !lid ±� III1� GARAGE 101 N T.O. SLAB EL. +/- 305' -8" A / / / / / / / / / / i / / N FIRST LEVEL FLOOR PLAN 3/16" = 1' -0" Design Review Staff Approval �� ,� �� ,��jl� By Warren Campbell at 1:25 pm, Apr 10, 2014 E a 2 3 CD • Z O �o Ln z Q kz; 0o c, k-., o -I V n _ oc J O ® ' J O J O Q n O, � k-n � CO Q O 011 O W Q, W �C Lu 0 V O� • � CC V Q V W S V9 � J v1 W O 1� CD • Z O z Q kz; Z „JO Q a ® _ oc J O ® ' J O J V W a V J � CO d� v1 O W �C PROJECT: DRAWN BY: LJF D A T E : 12.10.10 REVISIONS: DRB 03.02.11 PERMIT SET 05.12.11 TOV DRB CHANGES 09.01.11 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 TOV DRB CHANGES 06.19.12 TOV DRB CHANGES 02.18.14 FLOOR PLANS FIRST LEVEL A100 I 1 I 1 I 1 I 1 1 I I / / / / / / / / / / / / ' N / / W ' E S.......... SECOND LEVEL F R PLAN 1 _ 3/16 - 1 0 -- — — Design Review Staff Approval TOWN OF OVAILBy Warren Campbell at 1:24 pm, Apr 10, 2014 A 2 3 [_J • mI �o LA- Ln V CO O V 0� N • J Q O N Cn , 06.19.12 V W O� Q� N J_ W a..n n w— J V O O, � V p Q ' J O v i "' x W a o J r Lon W O CO [_J • mI PROJECT: DRAWN BY: LJF D A T E : 12.10.10 REVISIONS: DRB 03.02.11 O 05.12.11 TOV DRB CHANGES 09.01.11 l� 10.19.11 Q O Z Q 06.19.12 TOV DRB CHANGES Z J_ W J LLJ O O ' J O J V � J W oC r � CO t�f ~ O f.000i J W oC PROJECT: DRAWN BY: LJF D A T E : 12.10.10 REVISIONS: DRB 03.02.11 PERMIT SET 05.12.11 TOV DRB CHANGES 09.01.11 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 TOV DRB CHANGES 06.19.12 TOV DRB CHANGES 02.18.14 FLOOR PLANS MAIN LEVEL A101 I 1 1 I 1 1 I I I I I I 1 1 I I I 1 1 I I I 1 I 1 I 1 I I I I I 1 I I I 1 WEST UNIT 3/16" - -0" Design Review m Staff Approval By Warren Campbell at 1:24 pm, Apr 10, 2014 TOWN OF VAIL) Z� 2 3 1417E 9 �o L., V 00 ® V 0� N N • J Q O n H , v 4-- V Q W �_ O` Q� N J W • � LLJ1� V CC O O� J O V Q j J O V W S W oC � C> J V O � W O 1� O 1417E 9 PROJECT: DRAWN BY: LJF D A T E : 12.10.10 REVISIONS: DRB 03.02.11 PERMIT SET 05.12.11 TOV DRB CHANGES 09.01.11 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 TOV DRB CHANGES v TOV DRB CHANGES 02.18.14 J W D J O ® j J O J � J W oC ^' ( `/ � V O � CO %ri O W oC PROJECT: DRAWN BY: LJF D A T E : 12.10.10 REVISIONS: DRB 03.02.11 PERMIT SET 05.12.11 TOV DRB CHANGES 09.01.11 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 TOV DRB CHANGES 06.19.12 TOV DRB CHANGES 02.18.14 FLOOR PLANS THIRD LEVEL A102 RIDGE T.O. SHEATHING 338' -2" UPPER LEVEL T.O.PLYWD. 326' -1/2" MAIN LEVEL T.O.PLYWD. Q 316' - 31/2" ENTRY LEVEL T.O.PLYWD. 306' -8" 0 60 J- 500 SOUTH ELEVATION 3/16" = 1' -0" 8 0 0 500 8o ma `tea E s r WOOD SIDING EXPOSED STEEL Q COLUMN 1 6 STUCCO IDING NORTH ELEVATION NEW STONE VENEER & CLASS A ASPHALT �RROOF, Q(CORTEN STANDING SEAM) 3/16" = 1' -0" Design Review Staff Approval TOWN By Warren Campbell at 1:24 pm, Apr 10, 2014 OF VAIL CEDAR FASCIA/ SUB FASCIA BOARD, TYP. 0 m N Z DRB O PERMIT SET LL- D DRB CHANGES o Z Q 10.19.11 00 0� V ® N 06.19.12 02.18.14 V N J O ® j J O J O • Q n � CO H , '- 0 -!� Q O` W Q, V �_ N 1� 6/9 +� Ljj J O V O� CC V Q V W S V9 L Z O � J W O 1� N Z DRB O PERMIT SET 05.12.11 D DRB CHANGES o Z Q 10.19.11 Z WEST PROGRESS 12.06.11 2 3 W 06.19.12 02.18.14 D J O ® j J O J � J W ( `/ � V O � CO %/1 '- 0 V> J W oC PROJECT: DRAWN BY: LJF D A T E : 12.10.10 PERMIT SET 10.16.09 REVISIONS: PROPOSED ELEVATIONS A200 DRB 03.02.11 PERMIT SET 05.12.11 QTOV DRB CHANGES 09.01.11 1 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 2 3 TOV DRB CHANGES TOV DRB CHANGES 06.19.12 02.18.14 PROPOSED ELEVATIONS A200 EAST ELEVATION 3/1611 = 11 -011 ASPHALT TYP. DING, TYP. =NEER, TYP. TYP. STEEL FOUNTAIN SPOUT & CATCH BASIN Design Review Staff Approval By Warren Campbell at 1:24 pm, Apr 10, 2014 TOWN OF VAIL V H V N -F. -4-- V L J • III I i Ln �O Ln 00 0� N V J O Q Q O O� Lu Q� F— N 1� en W O J V O� V D Q W S V9 Z O J W Z DRB O PERMIT SET 05.12.11 D DRB CHANGES p Z Q � Z WEST PROGRESS J 2 3 W 06.19.12 02.18.14 D JO ® j J O J � J W oC ^' ( `/ � V O � CO `1/1 '- O 4.0001 J W oC PROJECT: DRAWN BY: LJF D A T E : 12.10.10 PERMIT SET 10.16.09 REVISIONS: n n n n n n r n L L L V M I IV I I a A201 DRB140065 DRB 03.02.11 PERMIT SET 05.12.11 QTOV DRB CHANGES 09.01.11 1 PERMIT REVISIONS 10.19.11 WEST PROGRESS 12.06.11 2 3 TOV DRB CHANGES TOV DRB CHANGES 06.19.12 02.18.14 n n n n n n r n L L L V M I IV I I a A201 DRB140065