HomeMy WebLinkAboutB13-0188 Plan Insp 04-16-2014 Inspection Request Reporting Page 1
10'23 am Va�I�CO Citv Of
Requested Inspect Date: Thursday,April 17, 2014
Assigned To: GRUTHER
Inspection Type: PLAN
Site Address: 1150 SANDSTONE DR VAIL
UNIT B
AIP/D Information
Activity: B13-0188 Type: COMBO Sub Type: AMF Status: FINAL
Const Type: Occupancy: Use: R-3 Insp Area:
Owner: FRIEDMAN, KENNETH O.
Applicant: MASTIFF DEVELOPMENT Phone: 970-390-5827
Contractor: MASTIFF DEVELOPMENT Phone: 970-390-5827
Description: ADDITION OF 100 SQUARE FOOT UNDER THE 250 GRFA ADDITION RULE. EXPANSION OF EXISTING
DECK REPLACEMENT OF ALL WINDOWS.
Notice: Final �lannin� Inspection was approved by Shane when it should not have been. Window trim was added on
the Friedman s duplex and does not match the other half.Trim should have been added to the other duplex,
at the very least on the north facade. -JBATCHELLER
Comment: SCANNED TRANSMITTAL FORM. ROUTED TO B-5. - DRHOADES
Comment: REV2 RECEIVED. SCANNED TRANSMITfAL FORM AND PLAN PAGE. ROUTED TO G-1.- DRHOADES
Comment: PAPER TRANSMITTAL W PLANS FOR HELICAL PIERS TO CONCRETE FOOTERS SCANNED TO
LASERFICHE AND ROUTED TO D-4-CGODFREY
Comment: emailed contractor rev 4 read for pick u - MHAEBERLE
Comment SCANNED TRANSMIT�AL,ROUTED TO B5,JOE BATCHELLER LSB�LLMNNER). - DRHOADES
Requested Inspection(s)
Item: 542 PLAN-FINAL ���_ '(� Requested Time: 08:00 AM
Requestor: MASTIFF DEVELOPMENT N � Phone: 970-390-5827
Assigned To: Entered By: JMONDRAGON K
Action: Time Exp:
Comment: in ow rim eeds to match on both up�—
Inspection History
Item: 120 ELEC-Rough "Approved*"
07/30/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 200 MECH-Rough '"`Approved"`
06/25/13 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: top floor only
07/29/13 Inspector: JRM Action: AP APPROVED
Comment: BOILER FLUES
BATH FANS
DRYER DUCT
Item: 220 PLMB-Rough/D.W.V. *�Approved'`"
06/25/13 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: top floor only
07/29/13 Inspector: JRM Action: AP APPROVED
Comment:
Item: 230 PLMB-Rough/Water "Approved`"
06/25/13 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: top floor only
07/29/13 Inspector: JRM Action: AP APPROVED
Comment:
Item: 240 PLMB-Gas Piping "Approved*"
07/29/13 lnspector: JRM Action: AP APPROVED
Comment: 10#AIR
Item: 310 MECH-Heating `*Approved"'
07/29/13 I�nspector: JRM Action: AP APPROVED
Comment: BASE BOARD APPROVED
08/19/13 Inspector: sgremmer Action: DN DENIED
Comment: fire place-need to fire block top of chase
08/21/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 30 BLDG-Framing *"Approved"'
07/30/13 Inspector: sgremmer Action: AP APPROVED
Comment:
09/23/13 Inspector:, sgremmer Action: AP APPROVED
Comment: Deck framing*complete **
Item: 50 BLDG-Insulation Approved
REPT131 Run Id: 14813
04-16-2014 Inspection Request Reporting Page 2
10:23 am Vail G� - Citv Of
08/01/13 Inspector: sgremmer ' Actio AP APPROVED
Comment:
Item: 60 BLDG-Sheetrock Nail '*Approved""
08/06/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 70 BLDG-Misc. **Approved"*
08/21/13 Inspector: sgremmer Action: AP APPROVED
Comment: fire block at fireplace
Item: 190 ELEC-Final "Approved"
10/07/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 290 PLMB-Final **Approved"'
10/07/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 390 MECH-Final **Approved`"'
10/07/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 90 BLDG-Final `*Approved"'
10/21/13 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: Phase one and two complete, still need to see solar panel install
11/18/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 542 PLAN-FINAL
01/02/14 Inspector:. JB Action: CR CORRECTION REQUIRED
Comment: Window tr�m needs to match on both duplexs.
Item: 10 BLDG-FOOTING "Approved"`
08/19/13 Inspector: sgremmer Action: AP APPROVED
Comment: deck piers
REPT131 Run Id: 14813
04-16-2014 Inspection Request Summary Page 1
10:23 am Vail, GO=Gitv pf
Address: 1150 SANDSTONE DR VAIL Re uested Inspect Date: 04/17/2014
Activity: B13-0188 Type: COMBO Sub Type: AM� Status: FINAL
Item: 542 PLAN-FINAL Requested Time: 08:00 AM
REPT131 Run Id: 14813
04-16-2014 Selection Criteria Page 1
10'23 am Vail, C� Citv Of
Totals
A/P/D's Selected: 1
Selection Criteria
Report.ld: REPT131
Site: Vail CO-City Of
User ld: JMdNDRAGON
Run Id: 14813
Inspection Date: 04/17/2014
Inspector Area: `ALL*
Office: `ALL"
Department: 'ALL'
Division: `ALL*
Types: `ALL*
SubTy pes: 'ALL'
Const Type: *ALL`
Date Printed: 04-16-2014 10:23:06 AM
Report Notation:
REPT131 Run Id: 14813