TOWN OF VAIL PUBLIC WORKS DEPARTMENT
VAIL TRANSPORTATION CENTER PARKING LANE
INTERSTATE 70 MILEPOST 176.3
VAIL, COLORADO
VICINITY MAP
NOT TO SCALE
11-1111110156-761 1 1_ V-
A TOWN OF VAIL PUBLIC WORKS DEPARTMENT TOM KASSMEL 970 - 479 -2235
B EAGLE RIVER WATER AND SANITATION DISTRICT ROBY FORSYTH 970 - 476 -7480
C ELECTRIC (HOLY CROSS ENERGY) JEFF VROOM 970 - 945 -5491
D PHONE (CENTURYLINK) SAM TOOLEY 970 - 468 -6860
E HIGH PRESSURE GAS RICH SISNEROS 970 - 371 -9677
F GAS SERVICE (XCEL) KIT BOGERT 970 - 262 -4024
G CABLE TV (COMCAST) MICHAEL JOHNSON 970- 930 -4713
H C.D.O.T. DAN ROUSSIN 970- 683 -6284
This application
unanimously
denied by the DRB
on March 5, 2014
PROJECT DESCRIPTION
LOCATION: SOUTH FRONTAGE ROAD MILEPOST 176.3
TOWN OF VAIL, EAGLE COUNTY, COLORADO
PROJECT GENERALLY CONSISTS OF SHORT TERM
PARKING INCLUDING CONCRETE PAVING, SIDEWALK,
CURBS, AND GUTTERS.
SHEET INDEX
C0.0
H70 EXIT 176
l N T E R S T SPRADD�E CREEK ROAD
A T f
�0
C0.1
PROJECT LOCATION
0
C0.2
J_
Q
C0.3
VAL ATION CENTER
AST MEADOW
C1.0
DRIVE
C2.0
AST MEADOW DR.
I N T
r
C3.1
EK
C4.0
GR
$ GORE
C5.0
LANDSCAPE PLAN
C6.0
p m ORF
C7.0
GO v
CR K DRIV mDR�F�
WILLOW ROgO
OR�Ii
p
A
y�A'S
void
R 4 • d
SHEET NO.: CO.O
VICINITY MAP
NOT TO SCALE
11-1111110156-761 1 1_ V-
A TOWN OF VAIL PUBLIC WORKS DEPARTMENT TOM KASSMEL 970 - 479 -2235
B EAGLE RIVER WATER AND SANITATION DISTRICT ROBY FORSYTH 970 - 476 -7480
C ELECTRIC (HOLY CROSS ENERGY) JEFF VROOM 970 - 945 -5491
D PHONE (CENTURYLINK) SAM TOOLEY 970 - 468 -6860
E HIGH PRESSURE GAS RICH SISNEROS 970 - 371 -9677
F GAS SERVICE (XCEL) KIT BOGERT 970 - 262 -4024
G CABLE TV (COMCAST) MICHAEL JOHNSON 970- 930 -4713
H C.D.O.T. DAN ROUSSIN 970- 683 -6284
This application
unanimously
denied by the DRB
on March 5, 2014
PROJECT DESCRIPTION
LOCATION: SOUTH FRONTAGE ROAD MILEPOST 176.3
TOWN OF VAIL, EAGLE COUNTY, COLORADO
PROJECT GENERALLY CONSISTS OF SHORT TERM
PARKING INCLUDING CONCRETE PAVING, SIDEWALK,
CURBS, AND GUTTERS.
SHEET INDEX
C0.0
COVER SHEET
C0.1
TOWN OF VAIL GENERAL NOTES
C0.2
CDOT GENERAL NOTES
C0.3
STANDARD PLANS LIST
C1.0
PARKING LAYOUT PLAN
C2.0
DEMOLITION & REMOVALS PLAN
C3.0
GRADING & DRAINAGE PLAN
C3.1
GRADING & DRAINAGE PLAN -RAMP & STAIR
C4.0
EROSION CONTROL PLAN
C5.0
LANDSCAPE PLAN
C6.0
TRAFFIC CONTROL PLAN
C7.0
DETAILS
DRB140033
PEAK LAND CONSULTANTS, INC. ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. PRIOR TO BEGINNING ANY
CONSTRUCTION, THE CONTRACTOR SHALL CONTACT ALL APPROPRIATE UTILITY COMPANIES FOR LINE LOCATIONS. HE
SHALL
BEBRO GHT LOCATE UTILITIES
T E ATTE TIONOF (INCLUDING CONFLICTS I SHALL
PEAK LAND CONSULTA TS, INC. SO THAT AT L NE OR GRADE CHANGES CAN BE MADE
TO ELIMINATE ANY CONFLICTS WITH THESE UTILITIES. ALL EXISTING UTILITIES SHALL BE PROTECTED FROM DAMAGE BY
THE CONTRACTOR. DAMAGED UTILITIES SHALL BE REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER.
RECEIVED
By Shelley Bellm at 2:27 pm, Feb 11, 2014
PEAK LAND CONSULTANTS, INC.
(�
970 - 476 -8644 FAX 970 - 476 -8616
1000 LIONS RIDGE LOOP VAIL CO 81657
DATE
REVISIONS
As Constructed
COVER SHEET
DESIGNED BY RAB
PROJECT NO.: 1799
No Revisions:
DRAWN BY.• RAB
DATE ISSUED: 7-16— 2012
BID PACKAGE SPECIAL USE PERMIT #3120213-S PRELIMINARY
VAIL TRANSPORTATION CENTER PARKING LANE NOT FOR CONSTRUCTION
7/16/2012 SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657
Revised:
REWEWED BY RAB
SCALE: N/A
void
SUBSET SHEETS: —
SHEET NO.: CO.O
s
w
0
m
N
Cl)
N
0
N
E,
N
N
0
z
O
E-
C;
0
U
P4
O
U
a_
U
ai
rn
N
137
rn
N
° 0
o �
a. a
1. Obtain a Public Way permit from the Town of Vail Department of Public Works, (970) 479 -2158. Obtain all required building permits through the Town
of Vail Department of Community Development, 75 S. Frontage Road, Vail, CO, 81657.
2. All contractors shall be licensed to perform work within the Town of Vail. Obtain and pay for contractor's license at the Town of Vail Department of
Community Development, 75 S. Frontage Road, Vail, CO 81657.
3. The contractor shall obtain all necessary standards, specifications, permits, bonds, etc. from all applicable agencies prior to commencement of
construction.
4. The Public and the Town of Vail will have the right to occupy the Public Right of Way and adjacent facilities during the entire period of construction.
Perform site work operations to minimize conflicts and to facilitate use of the premises and conduct of normal operations.
5. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Town of
Vail Code, Development Standards Handbook, Construction Details and applicable state and federal regulations. Where there is conflict between these
plans and the specifications, or applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the Town
of Vail.
6. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise.
7. The Engineer who has prepared these plans, by execution and /or seal hereof, does hereby affirm responsibility to the Town of Vail, as beneficiary of
said Engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the Town of Vail Engineer shall not relieve
the Engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the Engineer hereby agrees to hold
harmless and indemnify the Town of Vail and its officers and employees from and against all liabilities and damages which may arise from any
negligent errors and omissions contained in these plans.
8. All sanitary sewer, storm sewer, and water line construction, as well as power and other "dry" utility installations, shall conform to the local utility
entities standards and specifications current at the date of approval of the plans by the Town of Vail.
9. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of
the Contractor to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The
Contractor shall be responsible for unknown underground utilities.
10. These drawings represent only the approximate location of utilities and are included only for the convenience of the Contractor. The Contractor shall
be responsible for locating all utilities, pipes and structures. Contact The Utility Notification Center of Colorado (800)- 922 -1987 to locate
underground facilities. Contact the Town of Vail for additional locates (970) 479 -2158. Contact the Eagle River Water and Sanitation District for
additional locates (970)- 476 -7480 ext. 114. Utility locates are to be performed at least 72 hours prior to any construction activity. The Contractor
shall ensure that work preformed in the proximity of utilities shall be according to the requirements of these agencies. The contractor shall notify the
Owner's Representative of any existing utilities which may interfere with the proposed work prior to any construction. The Contractor shall repair all
existing utilities to remain which are damaged during construction at no additional cost to the Owner.
11. The Contractor shall comply with Article 1.5 of Title 9, CRS ( "Excavation Requirements ") when excavation or grading is planned in the area of
underground utility facilities. The Contractor shall notify all affected utilities at least two (2) business days, (NOT INCLUDING THE DAY OF NOTICE OR
THE DAY OF EXCAVATION) prior to commencing such operations. Contact the Utility Notification Center of Colorado (UNCC) at 811 or 1- 800 - 922 -1987
to have locations of UNCC registered lines marked by member companies. All other underground facilities shall be located by contacting the respective
company. For CDOT owned utility facilities the Contractor shall call the Region 3 Traffic Section at 970 - 683 -6271 to request locates. CDOT is not
contacted when locates are requested through the UNCC. Utility service laterals shall also be located prior to beginning ANY excavation or grading.
12. The Contractor shall coordinate and cooperate with the Town of Vail, and all utility companies involved, assuring that the work is accomplished in a
timely fashion and with a minimum disruption of service. The Contractor shall be responsible for contacting in advance, all parties affected by any
disruption of any utility service as well as the appropriate utility companies.
13. A State Construction De- watering Wastewater Discharge Permit is required if de- watering is required in order to facilitate construction or if any water
is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States.
14. The Contractor shall comply with all terms and conditions of; The Colorado Permit for Storm Water Discharge (Colorado Department of Health, Water
Quality Control Division, at (303) 692 -3590) and also the Storm Water Management Plan, and the Erosion Control Plan.
15. The Contractor shall provide and maintain approved erosion and sediment control "Best Management Practices" (BMP) for the project duration. The
Contractor shall inspect BMP's weekly and after every precipitation event. The Contractor shall document inspection and make reports available upon
request. Accumulated sediment and debris shall be removed from a BMP when the sediment level reaches one half the BMP's height or, at any time
that the BMP functionality is adversely impacted. All necessary maintenance and repair shall be completed within 48 hours of identification, unless
otherwise agreed upon.
16. The Town of Vail shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of on site drainage
facilities shall be the responsibility of the Owner.
17. The Town of Vail shall not be responsible for any damage or injuries sustained as a result of the construction of this project as a result of
groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage.
18. The Contractor shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must
be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front -end loader, etc.) or as approved by the
Town of Vail Construction Inspector.
19. Prior to placement of Hot Bituminous Pavement (H.B.P.) or concrete within the Public Right of Way, a mechanical "proof roll" will be required. The
entire sub -grade and /or base material shall be rolled with a heavily loaded vehicle having a minimum single axle weight of at least 18,000 lbs. Any
sub - grade /base section exhibiting excessive pumping or deformation as determined by the Construction Inspector shall be reworked, replaced or
modified to form a non - yielding surface. The Town of Vail Construction Inspector shall be notified 24 hours prior to a "proof roll ".
20. The Contractor shall furnish electronic and hard copy reproducible As -Built Record Drawings showing horizontal locations and vertical locations and
elevations of constructed improvements including all utilities, and drainage appurtenances prior to acceptance of the project.
21. The Contractor shall video camera (TV) all installed public storm sewer pipes prior to final paving and /or other final surface treatment completion. A
copy of the video taping shall be provided to the Town of Vail for review, approval and record keeping.
22. The Contractor shall be responsible for all aspects of safety, including but not limited to excavation, trenching, shoring, traffic control, and security.
Refer to OSHA Publication 2226 for Excavating and Trenching.
23. The Contractor shall submit and have approved a Construction Traffic Control Plan, in accordance with the Manual of Uniform Traffic Control Devices
(MUTCD), to the Town of Vail Construction Inspector, prior to any construction activities within, or affecting, the Right of Way. The Contractor shall be
responsible for providing any and all traffic control devices as may be required by the construction activities.
24. The Contractor shall submit to the Town of Vail Construction Inspector and gain approval for a construction staging plan, schedule and phasing plan
prior to the start of construction.
25. Construction sites and staging areas must be fenced and maintained in a secure condition at all times. Keep fencing and surrounding areas clear of
trash and debris. Any construction debris or mud dropped into manholes, pipes, or tracked onto existing roadways shall be removed immediately by the
Contractor. The Contractor shall repair any excavations or pavement failures caused by construction within or in the vicinity of the limits of
construction. The Contractor shall be responsible for damage due to construction at no additional costs to Owner. The Contractor shall remove all
sediment, mud, and construction debris that may accumulate in the flow lines, on private property, and in public right of ways of the Town as a
result of this construction project. Removal shall be conducted within 48 hours. Return all construction staging sites to their original condition upon
completion of the construction project.
26. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for
clarification, and annotate the dimensions on the as -built record drawings.
27. The Contractor shall have, onsite at oil times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications
and a copy of any permits and extension agreements needed for the job.
28. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the
Contractor shall contact the Owner, the Design Engineer and the Town of Vail Construction Inspector immediately.
gr L 67=
29. The Designer shall provide in this location on the plans the location and description of the nearest survey benchmarks for the project as well as the
basis for bearings. The information shall be as follows:
BENCHMARK: Town of Vail Survey Control
PROJECT BENCHMARK: HARN CONTROL POINT "SPRADDLE ". ELEVATION = 8287.82' (NAVD 88).
PROJECT DATUM SCALE FACTOR: 1.00041186
BASIS OF BEARING: COLORADO CENTRAL ZONE (HARN) NAD 1983/92 AND TOWN
OF VAIL MAPPING PROJECT OCTOBER 1996, STATIONS SPRADDLE N 1660652.671
E 2753950.797 AND WOODMAN N 1652148.916 E 2727065.360, SPRADDLE TO
WOODMAN BEARS S 72.26'53" W.
30. The Contractor shall locate, protect, and maintain benchmarks, monuments, control points and project engineering reference points. The Contractor
shall re- establish disturbed or destroyed items at the Contractor's expense.
31. The Contractor shall be responsible for the replacement of any existing materials that are damaged during construction within the limits of
construction or in the vicinity of the limits of construction, at no additional cost to the Owner.
32. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. Patching shall
be done in accordance with the Town of Vail Street Repair Standards. The seams of the asphalt patches shall be infrared unless otherwise instructed
by the Town of Vail Engineer.
33. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction,
or to the grades and conditions as required by these plans.
34. Standard Handicap ramps are to be constructed at all curb returns as identified on these plans. The construction of these handicap ramps shall be
in accordance to ADA current standards.
35. After acceptance by the Town of Vail, public improvements depicted on these plans shall be guaranteed to be free from material and workmanship
defects for a minimum period of two years from the date of acceptance.
36. The Contractor shall be solely and completely responsible for the conditions on and adjacent to the job site, including safety of persons and property
during performance of the work. The Contractor shall provide lights, signs, barricades, flag men, or other devices necessary to provide for public
safety, pedestrian access and vehicular access as needed. This requirement shall apply continuously and not be limited to normal working hours.
37. The Contractor shall not willfully proceed with construction as designed when it is obvious that previously unknown obstructions and /or grade
differences exist that may not have been known during the time of design. Such conditions shall be immediately brought to the attention of the
Designer and the Owner's Representative for a decision. The Contractor shall assume full responsibility for all necessary revisions and repairs due to
failure to give such notification at no additional cost to the Owner.
38. At the end of each working day, the Contractor shall be responsible for connecting any existing storm drainage pipes to a newly installed storm
drainage system. All drainage systems within the construction limits shall be maintained by the Contractor for the entire duration of the construction
project. The Contractor shall be responsible for the maintenance of all drainage within the construction site and offsite drainage which is directly
affected by construction.
39. The Contractor shall be responsible for maintaining the operation of the existing Town street lights within the project limits. The Contractor may
provide temporary street lighting that is approved by Town of Vail when existing street lights are removed.
40. The Contractor shall be responsible for maintaining the operation of existing Town irrigation lines within the project limits less otherwise approved by
the Town of Vail.
41. It is the responsibility of the Contractor to protect and preserve all trees, bushes, shrubs and cover in a manner acceptable to the Owner. All areas
of the Town of Vail Right of Way, disturbed during construction, shall be well graded to drain, covered with a minimum of 4" of top soil, fertilized,
mulched and re- seeded according to the Town of Vail Standard Specifications.
42. The Contractor shall maintain access to Fire Department hydrants and connections and they shall be maintained throughout construction unless
otherwise approved by the Town of Vail Fire Department.
43. The Contractor shall not cross the existing 1 -70 Barrier Line and shall not install any permanent structures within 5 -feet of the Barrier Line.
44. In soft or wet areas, the subgrade may require drying or stabilization prior to fill placement. A geogrid and /or subexcovation and replacement with
aggregate base soils may be needed for the stabilization. The subgrade should be proofrolled. Areas that deflect excessively should be placing
pavement materials. The subgrade improvements and placement of compaction of base and asphalt materials should be monitored on a regular basis
by a representative of the geotechnicol engineer.
1. All storm drains and culverts shall be constructed in accordance with the Manufacturers Technical Specifications.
2. Types of structures refer to the Colorado Department of Transportation M & S Standards, COOT Specifications, or are included in the details.
3. Peak Land Consultants, Inc. assumes no responsibility for utility locations. It is the Contractor's responsibility to field verify the location of all utilities
prior to commencement of any construction.
4. All drain pipes shall be installed with the required bedding.
5. Elevations shown are at pipe invert unless otherwise shown.
6. All standard storm drain structures are subject to modification by the Engineer to meet field requirements.
7. Where any part of the storm drain system is located in a fill section, provide fill material compacted to 95 % AASHTO T99 density from the original
undisturbed ground up to structure bottom slabs and pipe bedding.
8. Contractor to provide Culvert Outlet Protection (see detail) at storm drain and culvert outfalls unless otherwise noted.
9. All storm drain and culvert outfalls to have End Sections or Endwalls unless they are to be extended in the future.
10. Inlet boxes to be oversized to accommodate pipe size where necessary. Provide AASHTO HS -20 truck load rated top slab to accommodate grate and
frame for oversized boxes.
11. All Reinforced Concrete Pipe Joints shall utilize Type R -4 Rubber Gasket Joints which shall be in accordance with AASHTO M198 and ASTM C443
(standard specs. for joints for circular concrete pipe using rubber gaskets)
12. Pipe lengths indicated are horizontal lengths measured along the centerline of pipe from inside face of box to inside face of box.
PEAK LAND CONSULTANTS, INC.I DATE I REVISIONS I As Constructed TOWN OF VAIL GENERAL NOTES
No Revisions: B
ID PACKAGE SPECIAL USE PERMIT #3120213 -S
970 - 476 -8644 FAX 970- 476 -8616 Revised: VAIL TRANSPORTATION CENTER PARKING LANE
1000 UONS RIDGE LOOP VAIL, CO 81657 7/16/2012 INTERSTATE 70 MILEPOST 176.3
Void: SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657
DESIGNED BY RAB
PRELIMINARY DRAWN BY RAB
NOT FOR CONSTRUCTION I REWEWED BY RAB
SUBSET SHEETS: -
PROJECT NO.: 1799
DATE ISSUED.-7-16-2012
SCALE: N/A
SHEET NO.: COA
s
a
cfl
0
LO
N
co
N_
O
N
N
Ul
N
0
Z
F
O
A
U
N
0
U
aT
3
P4
O
U
a
U
ai
rn
N
O
rn
N
°
O o
N
a a
CDOT GENERAL NOTES
1. ALL MATERIALS AND WORKMANSHIP SHALL BE IN CONFORMANCE WITH THE COLORADO DEPARTMENT
OF TRANSPORTATION 2011 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2006
M & S STANDARD (WITH THE SUBSEQUENT REVISIONS) AND THE PROJECT CONTRACT BID
DOCUMENTS. EXCEPT WHERE OTHERWISE PROVIDED FOR IN THESE PLANS AND SPECIFICATIONS. THE
COLORADO DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS LATEST EDITION, SHALL
APPLY.
2. THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF
DISTURBANCE AND /OR TOES OF SLOPES AN SHOWN ON THE PLANS AND CROSS SECTIONS. ANY
DISTURBANCE BEYOND THESE LIMITS SHALL BE RESTORED BY THE CONTRACTOR AT HIS OWN
EXPENSE, INCLUDING REGRADING, SEEDING AND MULCHING. CONSTRUCTION ACTIVITY IN ADDITION TO
NORMAL CONSTRUCTION PROCEDURE SHALL INCLUDE THE PARKING OF VEHICLES OR EQUIPMENT,
DISPOSAL OF LITTER AND ANY OTHER ACTION WITCH WOULD ALTER THE EXISTING CONDITIONS.
3. THE CONTRACTOR SHALL CALL THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT
1- 800 - 922 -1987 FOR UTILITY LOCATIONS AT LEAST THREE (3) BUSINESS DAYS, NOT INCLUDING
THE DAY ACTUAL NOTIFICATION, PRIOR TO ANY EXCAVATION ACTIVITIES.
4. THE CONTRACTOR SHALL CAREFULLY COORDINATE ALL DEMOLITION, TEMPORARY LIGHTING AND
PERMANENT LIGHTING WITH HOLY CROSS ENERGY. IT IS THE INTENT OF THESE PLANS THAT ALL
TRAFFIC LANES IN THE VICINITY OF THE PROJECT THAT ARE CURRENTLY ILLUMINATED (IF ANY) BE
LIT BY TEMPORARY OR PERMANENT LUMINARIES DURING ALL PHASES OF CONSTRUCTION
5. AREAS OF RESEEDING /RESTORATION SHALL BE IN ACCORDANCE WITH SECTION 212 OF THE CDOT
STANDARD SPECIFICATIONS AND THE ASSOCIATED PROJECT SPECIFICATIONS SEED MIX SHALL
CONFORM TO SEEDING TABLE SHOWN IN PLANS.
6. THE CONTRACTOR IS FULLY RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES AND AVOIDING
THEM AS NECESSARY. CONDUIT RUNNING LINE ALIGNMENT MAY BE MOVED TO AVOID EXISTING
UTILITIES WITH THE APPROVAL OF THE ENGINEER. CONTRACTOR SHALL NOTIFY ENGINEER
IMMEDIATELY OF ANY UTILITY CONFLICT WHICH CANNOT BE READILY RESOLVED AND WHICH MAY
REQUIRE REDESIGN OF ANY PART OF THE PROJECT.
7. PERMITTEE SHALL DESIGNATE A CERTIFIED TRAFFIC CONTROL SUPERVISOR (TCS) TO MANAGE
CONSTRUCTION SIGNAGE AND SAFETY OF OPERATIONS DURING ACTIVITIES WITHIN CDOT RIGHT OF
WAY. THE TCS SHALL BE AVAILABLE WHENEVER WORK IS IN PROGRESS.
8. ACCESS CONSTRUCTION SHALL NOT NEGATIVELY IMPACT PRIVATE PROPERTY OR THE STATE HWY
ROW.
9. ALL EXCESS MATERIAL AS A RESULT OF OF THIS PROJECT SHALL BECOME PROPERTY OF THE
CONTRACTOR AND DISPOSED OF OFF —SITE.
10. THE USE OF REBAR, STEEL STAKES, OR STEEL FENCE POSTS TO STAKE DOWN
STRAW OR HAY BALES; OR TO SUPPORT SILT FENCING USED AS AN EROSION
CONTROL MEASURE IS PROHIBITED.
11. NO FUELS, LUBRICANTS, OR OTHER HAZARDOUS MATERIALS MAY BE STORED
ALONG THE PROPOSED ROUTE.
12. THE CONTRACTOR IS REQUIRED TO RESET, ADJUST OR REPLACE ITEMS THAT ARE AFFECTED BY
CONSTRUCTION AND DESIGNATED TO REMAIN. THIS INCLUDED LANDSCAPE, SPRINKLER SYSTEM,
SIGNS, SIDEWALK, AND OTHER ITEMS AS MAY BE IDENTIFIED BY THE ENGINEER. UNLESS
SPECIFICALLY NOTED ON THE PLANS. THE CONTRACTOR WILL NOT BE COMPENSATED FOR WORK
OUTSIDE THE PROJECT LIMITS.
13. THE CONTRACTOR SHALL REMOVE ALL SEDIMENT, MUD AND CONSTRUCTION DEBRIS THAT MAY
ACCUMULATE IN THE FLOWLINES AND PUBLIC RIGHT OF WAYS AS A RESULT OF THIS WORK.
SEDIMENT REMOVAL SHALL BE CONDUCTED IN A TIMELY MANNER AND DIRECTED BY THE ENGINEER.
14. EROSION CONTROL MEASURES MUST BE IMPLEMENTED BEFORE CONSTRUCTION AND GRADING
OPERATIONS BEGIN.
15. UTILITY INFORMATION SHOWN IS APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR
OWN DETERMINATION AS TO THE TYPE AND LOCATION OF UTILITIES AS MAY BE NECESSARY TO
AVOID DAMAGE THERETO. CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO AT
1- 800 - 922 -1987 FOR UTILITY LOCATES AT LEAST 48 HOURS PRIOR TO EXCAVATING. CONTRACTOR
SHALL COORDINATE WITH UTILITY OWNERS FOR ANY UTILITIES THAT NEED TO BE RELOCATED.
PEAK LAND CONSULTANTS, INC.
D
970 - 476 -8644 FAX 970 - 476 -8616
1000 UONS RIDGE LOOP VAIL, CO 81657
DATE I REVISIONS I As Constructed
17. ALL MATERIALS, EQUIPMENT, INSTALLATION AND CONSTRUCTION WITHIN THE STATE HIGHWAY
ROW SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE FOLLOWING STANDARD
REFERENCES AS APPLICABLE:
A. COLORADO STATE HIGHWAY ACCESS CODE, 2 CCR 601 -1
B. CDOT ROADWAY DESIGN MANUAL
C. CDOT FIELD MATERIALS MANUAL
D. CDOT CONSTRUCTION MANUAL
E. CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION
F. APPLICABLE CDOT SPECIAL PROVISIONS
G. CDOT STANDARD PLANS (M &S STANDARDS)
H. FHWA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) FOR STREETS AND HIGHWAYS
AND THE COLORADO SUPPLEMENT THERETO
I. AASHTO POLICY ON GEOMETRIC DESIGN OF HIGHWAYS AND STREETS
J. AASHTO ROADSIDE DESIGN GUIDE
K. CDOT UTILITY CODE
18. THE CONTRACTOR SHALL HAVE ONE SIGNED COPY OF THE CDOT APPROVED PLANS
AND SPECIFICATIONS AT THE JOB SITE AT ALL TIMES. IN ADDITION, THE CONTRACTOR
SHALL MAINTAIN ONE SET OF APPROVED PLANS ON SITE AS AN AS —BUILT SET IN WHICH
THE CONTRACTOR RECORDS ALL CHANGES TO THE APPROVED PLANS.
19. THE CONTRACTOR SHALL NOTIFY TOWN OF VAIL AND CDOT A MINIMUM OF 72 HOURS
AND A MAXIMUM OF 96 HOURS PRIOR TO STARTING CONSTRUCTION.
CDOT GENERAL NOTES
No Revisions: BID PACKAGE SPECIAL USE PERMIT #3120213 -S PRELIMINARY
Revised: VAIL TRANSPORTATION CENTER PARKING LANE NOT FOR CONSTRUCTION
7/16/2012 INTERSTATE 70 MILEPOST 176.3
Void: SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657
DESIGNED BY RAB PROJECT NO.: 1799
DRAWN BY RAB DATE ISSUE1 : ? -16 -2012
REWEWED BY RAB SCALE: N/A
SUBSET SHEETS: - SHEET NO.: CO.2
N
N
M
N
0
N
t'
N
a
a
ri
0
U
P4
W
0
U
a
U
ai
rn
N
rn
N
° o
o �
6
a a
PLAN
NUMBER
= M -100 -1
= M -203 -1
= M -203 -2
O M- 203 -11
= M- 203 -12
O M -206 -1
= M -206 -2
M -208 -1
= M -210 -1
M -214 -1
M -412 -1
M -510 -1
M -601 -1
O M -601 -2
M -601 -3
O M- 601 -10
M- 601 -11
M- 601 -12
O M- 601 -20
M -603 -1
O M -603 -2
M -603 -3
M -603 -4
M -603 -5
O M- 603 -10
M- 604 -10
M- 604 -11
O M- 604 -12
O M- 604 -13
M- 604 -20
M- 604 -25
M -605 -1
M -606 -1
M- 606 -13
M- 606 -14
NEW
OR M STANDARD
PAGE
REVISED TITLE
NUMBER
NUMBER
STANDARD SYMBOLS (3 SHEETS) ...............................
1 -3
-86
APPROACH ROADS .................... ..............................4
CHAIN LINK FENCE (3 SHEETS) .... ..........................87
-89
DITCH TYPES ......................... ..............................5
BARRIER FENCE ....................... .............................90
CLASS I SIGNS .......................... ............................138
SUPERELEVATION CROWNED AND ... ............................6
-8
-92
DIVIDED HIGHWAYS (3 SHEETS)
PICKET SNOW FENCE ................ .............................93
S -614 -4
SUPERELEVATION STREETS (2 SHEETS) ......................9
-10
-102
EXCAVATION AND BACKFILL FOR STRUCTURES .............J1
-12
. ....... . ... },g3- }gG
(2 SHEETS)
M CURBS, GUTTERS, AND SIDEWALKS (4 SHEETS)
EXCAVATION AND BACKFILL FOR BRIDGES (2 SHEETS)
....13 -14
M
TEMPORARY EROSION CONTROL (12 SHEETS) Jay229,2011)
... "Q`}
-115
MAILBOX SUPPORTS (2 SHEETS) ... ..........................22
-23
-118
PLANTING DETAILS ................. ...............................
24
M
29, 2'011) ......
CONCRETE PAVEMENT JOINTS (5 SHEETS) ff D
EMBANKMENT PROTECTOR TYPE 3 ...............................
121
STRUCTURAL PLATE PIPE H -20 LOADING .......................30
EMBANKMENT PROTECTOR TYPE 5 ... ............................122
O
SINGLE CONCRETE BOX CULVERT (2 SHEETS) .............
31 -32
MARKER ASSEMBLY INSTALLATIONS ... ............................152
DOUBLE CONCRETE BOX CULVERT (2 SHEETS) .............33
-34
=
TRIPLE CONCRETE BOX CULVERT (2 SHEETS) .............35
-36
S- 614 -12
HEADWALL FOR PIPES ............... .............................37
FIELD OFFICE CLASS 1 .............. ............................126
O
TYPE "S" SADDLE HEADWALLS FOR PIPE .......................38
FIELD OFFICE CLASS 2 .............. ............................127
FLASHING BEACON AND SIGN INSTALLATIONS (3 SHEETS) .154 -156
HEADWALLS AND PIPE OUTLET PAVING ......................
39
-129
WINGWALLS FOR PIPE OR BOX CULVERTS ......................40
=
METAL PIPE (4 SHEETS) (REMSED ON FEBRUARY 25, 2010) .................
1.4 -+�
=
REINFORCED CONCRETE PIPE ........................ ...........
43
=
PRECAST CONCRETE BOX CULVERT (REVISED ON JULY 29, 2011)
........ �}
=
CORRUGATED POLYETHYLENE PIPE (AASHTO M294) (REV. ON FEB. 25, 2010)
=
POLYVINYL CHLORIDE (PVC) PIPE (AASHTO M304) (NEW ON FEB. 25, 2010)
CONCRETE AND METAL END SECTIONS (2 SHEETS) ........
45 -46
S- 614 -40A
INLET, TYPE C ..................... ...............................
47
INLET, TYPE D ..................... ...............................
48
(5 SHEETS)
CURB INLET TYPE R (2 SHEETS) . ..........................49
-50
CONCRETE INLET TYPE 13 ...............................
....... 51
S -627 -1
MANHOLES (3 SHEETS) ............. ..........................52
-54
VANE GRATE INLET (5 SHEETS) ... ..........................55
-59
=
SUBSURFACE DRAINS (REVISED ON JULY 09, 2009) ........................_0@_
=
GUARDRAIL TYPE 3 W -BEAM (18 SHEETS) (REVISED ON MAY 05, 2011) 0 - Wg.-
M
GUARDRAIL TYPE 7 F -SHAPE BARRIER (4 SHEETS) .......77
-80
BARRICADES, DRUMS, CONCRETE BARRIERS (TEMP) ................203
PRECAST TYPE 7 CONCRETE BARRIER (3 SHEETS) ..........81
-83
PLAN
NEW OR M STANDARD
PAGE
NUMBER
REVISED TITLE
NUMBER
= M -607 -1
WIRE FENCES AND GATES (3 SHEETS) ......................84
-86
O M -607 -2
CHAIN LINK FENCE (3 SHEETS) .... ..........................87
-89
= M -607 -3
BARRIER FENCE ....................... .............................90
CLASS I SIGNS .......................... ............................138
O M -607 -4
DEER FENCE AND GATES (2 SHEETS) .......................91
-92
= M- 607 -10
PICKET SNOW FENCE ................ .............................93
S -614 -4
O M- 607 -15
ROAD CLOSURE GATE (9 SHEETS) ...........................94
-102
M -608 -1
M CURB RAMPS (6 SHEETS) (REVISED ON MAY 05, 2011) ...
. ....... . ... },g3- }gG
M -609 -1
M CURBS, GUTTERS, AND SIDEWALKS (4 SHEETS)
= M -611 -1
CATTLE GUARD (2 SHEETS) ......... ........................110
-111
M M -613 -1
ROADWAY LIGHTING (4 SHEETS) ..... ........................112
-115
O M -614 -1
RUMBLE STRIPS (3 SHEETS) ......... ........................116
-118
O M -614 -2
SAND BARREL ARRAYS (2 SHEETS) .........................119
-120
= M -615 -1
EMBANKMENT PROTECTOR TYPE 3 ...............................
121
O M -615 -2
EMBANKMENT PROTECTOR TYPE 5 ... ............................122
O
M -616 -1
INVERTED SIPHON ..................... ............................123
MARKER ASSEMBLY INSTALLATIONS ... ............................152
O M -620 -1
FIELD LABORATORY CLASS 1 ........ ............................124
=
O M -620 -2
FIELD LABORATORY CLASS 2 ....... ............................125
S- 614 -12
M- 620 -11
FIELD OFFICE CLASS 1 .............. ............................126
O
O M- 620 -12
FIELD OFFICE CLASS 2 .............. ............................127
FLASHING BEACON AND SIGN INSTALLATIONS (3 SHEETS) .154 -156
0 M -629 -1
SURVEY MONUMENTS (2 SHEETS) .. ........................128
-129
THE STANDARD PLAN SHEETS INDICATED HEREON BY A
MARKED BOX ARE TO BE USED TO CONSTRUCT THIS
PROJECT.
ALL OF THE M &S STANDARD PLANS, AS SUPPLEMENTED
AND REVISED, APPLY TO THIS PROJECT WHEN USED
BY DESIGNATED PAY ITEM OR SUBSIDIARY ITEM.
PLAN NEW
OR S STANDARD PAGE
NUMBER REVISED TITLE NUMBER
As Constructed
S -612 -1
DESIGNED BY RAB
DELINEATOR INSTALLATIONS (6 SHEETS) (vm. ALY 01, 20) i
M
S -614 -1
No Revisions:
GROUND SIGN PLACEMENT (2 SHEETS) .......................136 -137
0
S -614 -2
Revised:
CLASS I SIGNS .......................... ............................138
O
S -614 -3
CLASS II SIGNS ......................... ............................139
S -614 -4
SUBSET SHEETS: —
CLASS III SIGNS (3 SHEETS) 0"Sm. OmEMOR 29. M) ............1'4- �
O
S -614 -5
BREAK -AWAY SIGN SUPPORT DETAILS ........................143 -144
FOR GROUND SIGNS (2 SHEETS)
=
S -614 -6
CONCRETE FOOTINGS AND SIGN ISLANDS ....................145 -146
FOR CLASS III SIGNS (2 SHEETS)
S -614 -8
O
TUBULAR STEEL SIGN SUPPORT DETAILS (5 SHEETS) �) -4 5*
O
S- 614 -10
MARKER ASSEMBLY INSTALLATIONS ... ............................152
S- 614 -11
=
MILEPOST SIGN DETAIL FOR HIGH SNOW AREAS (NEW, ,NNE 22, 2009)
O
S- 614 -12
STRUCTURE NUMBER INSTALLATION ... ............................153
O
S- 614 -14
FLASHING BEACON AND SIGN INSTALLATIONS (3 SHEETS) .154 -156
=
S- 614 -20
TYPICAL POLE MOUNT SIGN INSTALLATIONS ......................157
S- 614 -21
O
CONCRETE BARRIER SIGN POST INSTALLATIONS 000011 JIM 24, 2011) 459•
=
S- 614 -22
TYPICAL MULTI -SIGN INSTALLATIONS . .. ............................159
O
S- 614 -40
TYPICAL TRAFFIC SIGNAL INSTALLATION DETAILS .........160 -166
(7 SHEETS)
O
S- 614 -40A
ALTERNATIVE TRAFFIC SIGNAL INSTALLATION DETAILS .... 167 -171
(5 SHEETS)
O
S- 614 -50
MONOTUBE OVERHEAD SIGNS (14 SHEETS) ...................172 -185
S -627 -1
M
PAVEMENT MARKINGS (5 SHEETS) (REMSED ON OCTOBER 01, 2010) .... NWr }9
S -630 -1
=
TRAFFIC CONTROLS FOR HIGHWAY CONSTRUCTION 6E'�ON
(-44 19 SHEETS)
M
S -630 -2
BARRICADES, DRUMS, CONCRETE BARRIERS (TEMP) ................203
AND VERTICAL PANELS
S -630 -3
=
FLASHING BEACON (PORTABLE) DETAILS (10Sm ON NNE 27.2019 .........
S -630 -4
=
STEEL SIGN SUPPORT (TEMPORARY) INSTALLATION DETAILS • • L1nRC11 22, 2010)
S -630 -5
=
PORTABLE RUMBLE STRIPS (TEMPORARY) ................ (NEW, MAY 9e, 2011)
S -630 -6
O
EMERGENCY PULL -OFF AREA (TEMPORARY) .............. (NEW, MAY 05, 2011)
S -630 -7
=
ROLLING ROADBLOCKS FOR TRAFFIC CONTROL .......... (NEW, MAY a 2011)
COLORADO
DEPARTMENT OF TRANSPORTATION
STANDARD PLANS LIST
M&S STANDARDS
July 04, 2006
Revised on July 29, 2011
PEAK LAND CONSULTANTS, INC.
C�
970 - 476 -8644 FAX 970- 476 -8616
1000 UONS RIDGE LOOP VAIL, CO 81657
DATE
I REVISIONS
As Constructed
STANDARD PLANS LIST
DESIGNED BY RAB
PROJECT NO.: 1799
No Revisions:
BID PACKAGE SPECIAL USE PERMIT #3120213-S PRELIMINARY
VAIL TRANSPORTATION CENTER PARKING LANE NOT FOR CONSTRUCTION
7/16/2012 INTERSTATE 70 MILEPOST 176.3
SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657
DRAWN BY RAB
DATE ISSUED.-7-16-2012
Revised:
REWEWED BY RAB
SCALE: N/A
Void:
SUBSET SHEETS: —
SHEET NO.: CO.3
O
N
0
N
N
a
a
U
ai
N
�1
8)
rn
M
N
0 0
0 m
i
a rx°
WB THRU
WB THRU /A CCEL
�WB LEFT TURN
EB THRU
SIGN "SHORT TERM PARKING ONLY"
PROVIDED BY TOWN OF VAIL
O
SOUTH
FRON Tel GF ROAD
PARKING LINE
SINGLE WHITE,
SOLID, 4" WIDE, L =8'
r PARALLEL PARKING (5 SPACES)
�) EB THRU /ACCEL/DECEL EDGE LINE 17
MATCH –i cikirli r 1Aiul TC n 1 w I - A' IAL.
OT
tp
ADA ACCESSIBLE RAMP
LIGHT POLE (TYP.)
I a
`J
e w a
e
11 o
CONCRETE SIDEWALK a ° °
c TAXIS
G
J ,
p n v
CONCRETE SIDEWALK
TAXIS & CHARTER BUSES °
a
0
o # o #
VAIL TRANSIT CENTER
INSTALL STANDARD TOV RAIL PER 2011 IBC (TYP.)
ILE-
d qJ n a°
, a °
d d
# O
11
d t4°d
d °
# O
O #
o.
1
o
PEAK LAND CONSULTANTS, INC.
mti4zNo
970 - 476 -8644 FAX 970 - 476 -8616
1000 LIONS RIDGE LOOP VAIL CO 81657
DATE
REVISIONS
As Constructed
PARKING LAYOUT PLAN
DESIGNED BY RAB
PROJECT NO.: 1799
p c
°
DRAWN BY.• RAB
DATE ISSUED: 7-16— 2012
TAXIS & CHARTER BUSES °
a
0
o # o #
VAIL TRANSIT CENTER
INSTALL STANDARD TOV RAIL PER 2011 IBC (TYP.)
ILE-
d qJ n a°
, a °
d d
# O
11
d t4°d
d °
# O
O #
o.
1
o
PEAK LAND CONSULTANTS, INC.
mti4zNo
970 - 476 -8644 FAX 970 - 476 -8616
1000 LIONS RIDGE LOOP VAIL CO 81657
DATE
REVISIONS
As Constructed
PARKING LAYOUT PLAN
DESIGNED BY RAB
PROJECT NO.: 1799
Revisions:
DRAWN BY.• RAB
DATE ISSUED: 7-16— 2012
BID PACKAGE SPECIAL USE PERMIT #3120213-S PRELIMINARY
VAIL TRANSPORTATION CENTER PARKING LANE NOT FOR CONSTRUCTION
7/16/2012 SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657
Revised:
REWEWED BY RAB
SCALE- 1 " =20'
Void
SUBSET SHEETS: —
SHEET NO.: C1.0
P.
N
O
N
Ch
03
N
N
W
Q
a
U
N
�1
rn
N
0 0
0 m
i
a rx0
/ELECTRIC MANHOLE
TRIM ELEVATION = 8199.0
SOU TH FfRGV Tel GE ROA D
as 8S, / SEWER MANHOLE
as p.�RIM ELEVATION = 8199.4
WATN N WATN N WATN
N WATN N WATN— N WATN N
WATN N WATN N
C
SAWCUT ASPHALT & PATCHBACK
REMOVE CURB RELOCATE LIGHT POLES
A
LIMITS OF DISTURBANCE
SEE LANDSCAPE PLAN
FOR IRRIGATION,
REVEGETATION, AND
COORDINATION WITH TOV �a
am I i
REMOVE CONCRETE SIDEWALK
0 t —
�� II
- � r.}
0 0 _
/ PROTECT TREES (TYPICAL)
HAND DIG AROUND EX. PARKING GARAGE VENTS /EQUIPMENT
TREE ROOTS. NOTIFY TOWN ° (CROSS° HATCH'Ea AREAS): a
ONCE EXPOSED AND PRUNE (TYPICAL
6 ° d
TAXIS & CHARTER BUSES a
N
RELOCATE SIG
a
a �
TELEPHONE MAI
RIM ELEVATION
N WATN N WA TN N WA T— WA TN N WATN-
INLET
///—GRATE ELEVATION = 8197.9
REMOVE CONCRETE SIDEWALK
/ STORM MANHOLE
f RIM ELEVATION = 8198.7
�� --
� JNCRETE WALK ,
C
0
e d
AREA INLET
VAIL TRANSIT CENTER (TYPICAL)
o
a
d
a
� e
a .
a- I
PEAK LAND CONSULTANTS, INC.
mti4zNo
970 - 476 -8644 FAX 970 - 476 -8616
1000 LIONS RIDGE LOOP VAIL CO 81657
DATE
REVISIONS
As Constructed
DEMOLITION & REMOVALS PLAN
DESIGNED BY RAB
PROJECT NO.: 1799
Revisions:
DRAWN BY.• RAB
DATE ISSUED: 7-16— 2012
BID PACKAGE SPECIAL USE PERMIT #3120213-S PRELIMINARY
VAIL TRANSPORTATION CENTER PARKING LANE NOT FOR CONSTRUCTION
7/16/2012 SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657
Revised:
REWEWED BY RAB
SCALE- 1 " =20'
Void
SUBSET SHEETS: —
SHEET NO.: C2.0
7
P.
LO
N
N
0
N
Iml
i
A
a
U
N
rn
m
N
O 0
CD
a rx°
— — _
�
_8799__ E \
SOU TH FROV Tel GE Ri D
0
U L V I yy0
a� -
TAXIS
°
DRY STACKED WALL WITH MORTAR BACKING (1.27) (1.21) 1.18 (1. 1)(1.11) 0
HEIGHT VARIES 6" TO 18"
TAXIS & CHARTER BUSES
0
VAIL TRANSIT CENTER
PEAK LAND CONSULTANTS, INC. DATE REVISIONS
mti4z 970- 476 -8644 FAX 970 - 476 -8616
1000 LIONS RIDGE LOOP VAIL, CO 81657
GRADING ELEVATION LEGEND
7505—
EXISTING CONTOUR
X(18.01)
EXISTING GRADE
2.49
EXISTING SLOPE
7496
PROPOSED CONTOUR
X18.66
PROPOSED FINISHED GRADE
1.8%
PROPOSED FINISHED SLOPE
— R1 On
:-0
ST
INLET
GRATE ELEVATION = 8197.9
STORM MANHOLE 81
RIM ELEVATI0�988)198.
81
a
C .. e
e
1
V � — 8200 /
_ - �9 :7z I
�. �� �_ _ —8777---
_(3) 5.5" RISERS, 16" TREAD
SEE SHEET C3.1 FOR DETAILED RAMP AND STAIR GRADING
0
#
AREA INLET
(TYPICAL)
8202 =� —J
VAIL INFORMA TION
As Constructed GRADING & DRAINAGE PLAN DESIGNED BY RAB
No Revisions: BID PACKAGE SPECIAL USE PERMIT #3120213 -S PRELIMINARY DRAWN BY.• RAB
Revised: VAIL TRANSPORTATION CENTER PARKING LANE NOT FOR CONSTRUCTION REl/IEWED BY RAB
7/16/2012 INTERSTATE 70 MILEPOST 176.3
Void: SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657 SUBSET SHEETS.° —
-n(��
PROJECT NO.: 1799
DATE ISSUED: 7-16— 2012
SCALE- 1"=20'
SHEET NO.: C3.0
a
N
0
N
N
Cl)
0
N
N
U
3
a
U
ai
rn
N
rn
N
° o
o �
a. a
Q L\ FIZ
•
PEAK LAND CONSULTANTS, INC.
DATE
REVISIONS
As Constructed
GRADING & DRAINAGE PLAN - RAMP & STAIR GRADING
DESIGNED BY RAB
�.
PROJECT NO.: 1799
9.44 9�P. 43 :< 99.42
a
No Revisions:
BID PACKAGE SPECIAL USE PERMIT #3120213-S PRELIMINARY
° a
0.4%
9 9
a 99.37
/
v
970 - 476 -8644 FAX 970- 476 -8616
Revised:
499.35
°
° 4
%
99.24
° p
a _
N
1000 UONS RIDGE LOOP VAIL, CO 81657
a
INTERSTATE 70 MILEPOST 176.3
99.65
°
(VI
<
Void:
a
SUBSET SHEETS:• -
°
SHEET NO.: C3.1
_ _ -
99.54
a 99.48
0.37TW
99.54 99.53
°99.50 °
99.46
X99.36
a
a }
a
99.60 99.60 99..60
/
\
1.3%
/
9.39 0-62
55: I
°� _ °
0.37
\ 0.98 0�8
0.97
\
^
/
0.51 0.47
7.6� a 1 140 d
tl
1.10
(1.27)
-
1.18
(1.21)
(1.11) (1.11)
a
- -
Q L\ FIZ
•
PEAK LAND CONSULTANTS, INC.
DATE
REVISIONS
As Constructed
GRADING & DRAINAGE PLAN - RAMP & STAIR GRADING
DESIGNED BY RAB
PROJECT NO.: 1799
No Revisions:
BID PACKAGE SPECIAL USE PERMIT #3120213-S PRELIMINARY
DRAWN BY RAB
DATE ISSUED.-7-16-2012
970 - 476 -8644 FAX 970- 476 -8616
Revised:
VAIL TRANSPORTATION CENTER PARKING LANE NOT FOR CONSTRUCTION
7/16/2012
REWEWED BY RAB
SCALE.- 1 " =5'
1000 UONS RIDGE LOOP VAIL, CO 81657
INTERSTATE 70 MILEPOST 176.3
Void:
SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657
SUBSET SHEETS:• -
SHEET NO.: C3.1
i
P4
00
N
N
N
M
O
N
\
O
W
a
U
N
/
rn
/
N
0 0
0 m
a rx0
O
e
TAXI
e °
TAXIS & CHARTER BUSES
°
AREA INLET
VAIL TRANSIT CENTER (TYPICAL)
°
VAIL INFORMA TION
PEAK LAND CONSULTANTS, INC. DATE REVISIONS As Constructed EROSION CONTROL PLAN DESIGNED BY RAB PROJECT NO.: 1799
(� No Revisions: BID PACKAGE SPECIAL USE PERMIT #3120213-S PRELIMINARY DRAWN BY.• RAB DATE ISSUED: 7-16— 2012
970 - 476 -8644 FAX 970 - 476 -8616 Revised: VAIL TRANSPORTATION CENTER PARKING LANE NOT FOR CONSTRUCTION REWEWED BY RAB SCALE.- 1 " =20'
1000 LIONS RIDGE LOOP VAIL CO 81657 Void 7/16/2012 SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657 SUBSET SHEETS: — SHEET NO.: C4.0
ic
P.
N
IR
N
N
N_
O
N
h
1
�F
a
U
ai
N
�1
rn
N
O 0
O
i
w rx°
LANDSCAPE NOTES - - - - - - - -
1. Existing perennials to be removed by TOV prior to start of work.
2. New irrigation to be completed by TOV.
3. All planting areas to be restored by TOV. O — — — — — — — — — — — — — — — — — — _ —
4. Protect all existing planting areas that remain. S
5. Coordinate with TOV landscapers and irrigation supervisors prior to start. —
6. Hand dig around existing tree roots. Notify Town once exposed and prune.
/ g,9g
0
G
SOU TH FRON Tel GE ROA D
— — PROTECT SOD AREA 8199
- -- -M
\\ T —
_8199_
—
a
Q ' 1, • �. -T� • N —�. G
R� g 3 SLEEVE I
- A e d d _\ � . '•. .` } •a' J. 'I d' .d J: .:yam. p. ..d.
a a
\ I df �4) 3.
SLEEVES L
I"
8200
�— —8201—
Ro
5
G
a �.
O�
TAXIS
IR
DRY STACKED WALL WITH MORTAR BACKING
HEIGHT VARIES 6" TO 18"
MOW, .
0 L— IRRIGATION MAIN / i � 1
O
o ST o/i — k - - --�4-
�\ a e
e e
a a
8200 /
VAIL TRANSI T CENTER
t
X20101 --- i
VAIL INFORMA TION
8202
PEAK LAND CONSULTANTS, INC.
(�
970 - 476 -8644 FAX 970 - 476 -8616
1000 LIONS RIDGE LOOP VAIL CO 81657
DATE
REVISIONS
As Constructed
LANDSCAPE PLAN
DESIGNED BY RAB
PROJECT NO.: 1799
No Revisions-
DRAWN BY.• RAB
DATE ISSUED: 7-16— 2012
BID PACKAGE SPECIAL USE PERMIT #3120213-S PRELIMINARY
VAIL TRANSPORTATION CENTER PARKING LANE NOT FOR CONSTRUCTION
7/16/2012 SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657
Revised:
REWEWED BY RAB
SCALE.- 1 " =20'
Void
SUBSET SHEETS: —
SHEET NO.: C5.0
we
P.
c+i
N
ri
N
0
N
N
L)
3
a
U
ai
rn
N
3
z�
rn
rn
N
°
o o
N
a. a
TRAFFIC CONTROL GENERAL NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL TRAFFIC CONTROL DEVICES THROUGHOUT THE COURSE OF
CONSTRUCTION ACTIVITIES WITHIN THE HIGHWAY RIGHT OF WAY.
2. THE TRAFFIC CONTROL PLAN SHOWN HEREIN IS AN EXAMPLE OF BASIC TRAFFIC CONTROL COMPONENTS. THE CONTRACTOR AND TRAFFIC CONTROL
CONSULTANT ARE RESPONSIBLE FOR MEETING TRAFFIC CONTROL AND METHODS OF HANDLING TRAFFIC PER APPLICABLE MUTCD AND COOT
REQUIREMENTS. TRAFFIC CONTROL SHALL CONFORM TO THE LATEST EDITION OF THE MUTCD AND CDOT M &S STANDARDS. TEMPORARY TRAFFIC
CONTROL SHALL CONFORM TO CHAPTER 6 OF THE MUTCD.
3. THE CONTRACTOR IS RESPONSIBLE FOR ASSURING THAT ALL THE REQUIRED PERMITTING IS IN PLACE PRIOR TO AND DURING ANY CONSTRUCTION
ACTIVITY.
4. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AN APPROVED TRAFFIC CONTROL PLAN TO THE TOWN OF VAIL DEPARTMENT OF PUBLIC WORKS
AND THE COLORADO DEPARTMENT OF TRANSPORTATION PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY WITHIN THE HIGHWAY RIGHT OF WAY.
5. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A SAFE AND CONTROLLED ENVIRONMENT IN AND AROUND THE CONSTRUCTION SITE PRIOR TO
AND DURING ALL CONSTRUCTION ACTIVITIES.
6. WORK HOURS ARE RESTRICTED BY THE TOWN OF VAIL DEPARTMENT OF PUBLIC WORKS CONSTRUCTION STANDARDS. FULL TRAFFIC MOVEMENT WITH
LIMITED RESTRICTION WILL BE MAINTAINED OUTSIDE OF THE NORMAL WORKING HOURS FOR ALL WORK ALONG THE SOUTH FRONTAGE ROAD.
210'
LADVANCE
WARNING
AREA
LONGITUDINAL LONGITUDINAL a
BUFFER BUFFER rSHIFTING TAPER �
1 1613'
ROM
IRM E 50 VARIES -50'- 4' LATERAL aosEO a10t"DQtos�o ,u"
I WORK SPACE �BUFFER
— �-------- - - - - -- ' -------- - - - -�— — — LSAWCUT LINE
-1 163' SINGLE LANE CLOSURE SHOULDER CLOSURE
ao�o ar wr SHIFTING TAPER RM
<9> ao�o
ADVANCE
WARNING
FAREA
210'
O TRAFFIC
CONTROL
PLAN
SYMBOL
DRUM
ROAD woRK 500 FEET
FOLLOWING ROAD ONE
G20 -2a LANE WORK
CLOSURE AHEAD ROAD
1,350' 1,000' 350 FEET FLAGGER AT / / / FLAGGER AT 350 FEET
PRIOR TO PRIOR TO PRIOR TO 280 FEET / / 280 FEET PRIOR TO
LANE LANE FLAGGER PRIOR TO / / PRIOR TO FLAGGER
CLOSURE CLOSURE WORK ZONE / / / WORK ZONE
WORK
ZONE
'PORTABLE
;S WITH
.IGHTS AT
iuu w4iERVALS
INSTALL NEW
JERSEY BARRIERS
AS REQUIRED AT
WORK ZONE
/ 500 FEET GND
ROAD WORK
ONE ROAD FOLLOWING
LANE WORK LANE G20 -2a
ROAD AHEAD CLOSURE
1,000, 1,350'
PRIOR TO PRIOR TO
LANE LANE
CLOSURE CLOSURE
PEAK LAND CONSULTANTS, INC.
970 - 476 -8644 FAX 970- 476 -8616
1000 UONS RIDGE LOOP VAIL, CO 81657
DATE
REVISIONS
As Constructed
TRAFFIC CONTROL PLAN
DESIGNED BY RAB
PROJECT NO.: 1799
No Revisions:
BID PACKAGE SPECIAL USE PERMIT #3120213-S PRELIMINARY
VAIL TRANSPORTATION CENTER PARKING LANE NOT FOR CONSTRUCTION
7/16/2012 INTERSTATE 70 MILEPOST 176.3
SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657
DRAWN BY RAB
DATE ISSUED.-7-16-2012
Revised:
REWEWED BY RAB
SCALE.- N/A
Void:
SUBSET SHEETS:• —
SHEET NO.: C6.0
a
10
M
N
Cl)
N
0
N
N
a
H
w
A
U
>T
v
a
rn
N
a�
3
rn
/
N
° o
o �
a a
41/2„ 11/2"
2'
A C
6'
P` O
D
1 A
FL 6„
CLASS 6 6.
BASE COURSE �
COMPACTED (I-
SUB- GRADE -,III , I I[ r III ;III -�
�-
CURB AND GUTTER TYPE 2
(SECTION IIB)
(6" BARRIER — 2' GUTTER)
"W" VARIABLE (SEE PLANS)
W/2 W/2
W/2 (INCHES)
i SLOPE 1 " /FT. MAX. LOPE 1 " /FT. MAX.
s" A : 77 L
T_ r
CLASS 6 / /
BASE COURSE COMPACTED SUBGRADE
GUTTER TYPE 2
SAWCUT LINE
GROUT /MORTAR 12.0'
DRYSTACKED WALL EB LANE
W/ MORTAR BACKING MILL 2.0' LANDSCAPED AREA
�4.0' 8.0' 2.5' 5.5' LANDSCAPED AREA
1
2
WIDE & .0
6„ CL6 " DEEP
BASE VARIES PATCH BACK MATC
yv� v v'vv�\��vvv/v• �- i.n�
LANDSCAPE WALL
EXISTING ASPHALT i\ is�/� 6° CONCRETE SIDEWALK
(ASSUMED 12 ") 4" CL6 ABC BASE
NOT TO SCALE EXISTING ROADBASE 8" CONCRETE PAVING SUITABLE, COMPACTED SUBGRADE
EXISTING SUBGRADE 6" CL6 ABC BASE CURB & GUTTER TYPE 2, SEC. IIB
MATCH EX. PAVEMENT SECTION REFER TO GEOTECHNICAL REPORT
CONCRETE GUTTER TYPE 2 FOR PAVEMENT SECTION DESIGN
AND COMPACTION REQUIREMENTS.
SHORT TERM PARKING WITH ATTACHED SIDEWALK
NOT TO SCALE
SEE PLANS FOR WIDTH ♦ SEE GEN. LEGEND
2% MAXIMUM SLOPE NOTES FOR RADII
—
A = 1 /s" TO 1/4„
6 �- B = 1" SAWCUT LINE
T_ 4" EXISTING ASPHALT
C = 11/2"
SEE PLANS FOR
I- D = 11/2" TO 2" EXISTING ROADBASE
CURB & GUTTER 4" CLASS 6 CO PACTED SUBGRADE r EXISTING SUBGRADE
TYPE BASE COURSE / *MILL 2" DEEP x 2' WIDE r
A TOOLED JOINT IS REQUIRED WHEN
THE CURB & SIDEWALK ARE POURED
SEPARATELY OR MONOLITHICALLY.
CONCRETE SIDEWALK
GENERAL NOTES
1. ON CURVES 3 DEGREES OR SHARPER, CURBS AND /OR GUTTERS ARE TO BE
PLACED ON THE ARC OF THE CURVE UNLESS OTHERWISE NOTED ON THE PLANS.
A MAXIMUM CHORD LENGTH OF 10 FEET MAY BE USED WHEN THE DEGREE OF
CURVE IS LESS THEN 3 DEGREES.
2. CONCRETE SHALL BE CLASS P OR D.
3. TOOLED CONTROL JOINTS SHALL BE INSTALLED AT 10' INTERVALS IN CURB AND
GUTTER AND EQUIVALENT TO WIDTH IN SIDEWALKS (IE: 5' WALK = 5') U.O.N.
4. GUTTER CROSS SLOPES MAY BE ADJUSTED TO FACILITATE DRAINAGE FOR PROFILE
GRADES AS SHOWN ON THE PLANS.
5. THICKNESS OF CURB AND GUTTER SECTION SHALL MATCH CONCRETE PAVEMENT
THICKNESS IF SHOWN ON THE PLANS. CURB AND GUTTER SHALL BE CLASS P
CONCRETE IF PLACED MONOLITHICALLY WITH CONCRETE PAVEMENT.
6. EXPANSION JOINTS SHALL BE INSTALLED PER CDOT STANDARD PLAN M- 412 -1.
A EXPANSION JOINTS SHALL BE INSTALLED WHEN ABUTTING EXISTING CONCRETE OR
FIXED STRUCTURE. EXPANSION JOINT MATERIAL SHALL BE 1/2 IN. THICK
AND SHALL EXTEND THE FULL DEPTH OF CONTACT SURFACE.
NOTES:
*ROTO -MILL 2" THICKNESS. APPLY TACK COAT TO MILLED SURFACE.
BITUMINOUS PAVEMENT IN FINAL OVERLAY LIFT.
REPLACE WITH HOT
* *EXISTING PAVEMENT SECTION MAY VARY. IT IS ASSUMED THE EXISTING SECTION IS AT LEAST 12"
ASPHALT ON 8" ROADBASE.
STREET CUT - ASPHALT PATCHBACK DETAIL
NOT TO SCALE
OGUTTER CROSS SLOPES SHALL BE 1/2 IN. /FT. WHEN DRAINING AWAY FROM CURB AND
11N. /FT. WHEN DRAINING TOWARD CURB.
WHEN TIE BARS ARE REQUIRED, THE GUTTER THICKNESS SHALL BE INCREASED TO
THE PAVEMENT THICKNESS T. BARS SHALL BE EPDXY— COATED #4 CONFORMING TO
AASHTO M 284M AND SPACED 2 FT. -6 IN. THEY SHALL BE INSERTED T/2 AND 1/2
LENGTH INTO THE GUTTER.
PEAK LAND CONSULTANTS, INC.
DATE
REVISIONS
As Constructed
DETAILS
DESIGNED BY RAB
PROJECT NO.: 1799
Revisions:
BID PACKAGE SPECIAL USE PERMIT #3120213-S PRELIMINARY
DRAWN BY RAB
DATE ISSUED.-7-16-2012
flL,zNo
970 - 476 -8644 FAX 970- 476 -8616
1000 LIONS RIDGE LOOP VAIL, CO 81657
VAIL TRANSPORTATION CENTER PARKING LANE NOT FOR CONSTRUCTION
7/16/2012 INTERSTATE 70 MILEPOST 176.3
SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657
Revised:
REWEWED BY RAB
SCALE: N/A
Void:
SUBSET SHEETS: —
SHEET NO.: C7.0