HEPWORTH-PAWLAK GEOTECHNICAL F,��„����i y�� ����
:mai I�. h�,�<<en{�i�:;��.��ir�:h.o,in
Apri128, 2014
Transwest Construction
Attn: Mike Scrivens
P. O. Box 8812
Avon, Colorado 81620
�uihcC�cu;�u��s��s�ccn;truciion.e��u�
-- --- -
Job No. 114 106A
Subject: Observation of Excavation and Drain Design, Garage Addition and New
Entryway, Cross Residence, Lot 5, Block 7, Lionshead Second Filing,
126 Forest Road, Vail, Colorado
Dear Mike:
As requested, the undersigned, a representative of Hepworth-Pawlak Geotechnical
observed the excavations at the subject site on April 3 and 10, 2014 to evaluate the
materials exposed for foundation support The findings of our observations and
recommendations for the foundation and underdrain designs are presented in this report.
The services were performed in general accordance with our agreement for professional
engineering services to Transwest Construction, dated April 2, 2014.
Proposed Construction: The existing garage footing bearing level and floor slab are
being lowered about 4 feet in elevation. A new entxyway to the xight (south) of the
garage is being constructed and also lowered about 4 feet in elevation. Ground floor
areas will be slab-on-grade. The new foundations have been designed to be supported
on spread footings assuming an allowable bearing pressure of 2,500 psf. The new
garage foundation walls are to be constructed in phases to reduce the potential for
undermining of and distress to the existing structure. As part of the new entryway
construction, an area of underpinning with a temporary column is also planned.
Site Observations: On April 3, excavation for the new garage area and entryway was
underway. Tl�e garage excavation was along the east wall and had been cut in one level
about 4 feet below the existing floor slab elevation. The new entryway area had only
the existing entryway removed and the excavation was at about the same elevation as
the garage floor slab. The materials exposed in the bottom of the excavations consisted
primarily of hard shale and limestone bedrock. We understand in some of the upper
areas of the entryway there is up to about 4 feet of free draining (minus 3/a inch size)
gravel below the slabs and footings. The bedrock materials were to hard to obtain
l�<ir�.er 303-541-%11�1 � l;ulora�luSE,rin�s �71�)-63i-�56Z • Sil��erthorne 970-468-I)8�)
Transwest Construction
Apri128 , 2014
Page 2
undisturbed samples for swell consolidation testing. Free water was encountered in the
garage addition excavation only and the exposed materials were moist to wet.
Recommendations: Considering the conditions exposed in the excavations and the
nature of the proposed construction, spread footings placed on the undisturbed bedrock
designed for an allowable bearing. pressure of 2,500 psf should be adequate for support
of the proposed additions . There could be some differential settlement with respect to
the existing structure which should be considered in the design. Footings should be a
minimum width of 16 inches for continuous walls and 2 feet for columns. All fill and
loose disturbed materials in footing areas should be removed and the bearing level
extended down to the undisturbed hard bedrock. Exterior footings should be provided
with adequate soil cover above their bearing elevations for frost protection. Continuous
foundation walls should be reinforced top and bottom to span local anomalies such as by
assuming an unsupported length of at least 10 feet. Foundation walls acting as retaining
structures should also be designed to resist a lateral earth pressure based on an
equivalent fluid unit weight of at least 50 pcf for on-site soil and well broken bedrock,
or suitable nnported gravel, as bacl�ill.
A perimeter foundation drain should be provided to prevent temporary buildup of
hydrostatic pressure behind below grade walls and prevent wetting of the lower levels .
A detail of the drain system we recommended behind the below grade basement walls is
attached as Figure 1 . The drain system behind the foundation walls and below the
footings should be collected by an interior 4 inch diameter perforated PVC pipe
surrounded by draining gravel and sloped to a suitable gravity outlet. Structural fill
placed within floor slab areas should consist of imported free draining gravel compacted
in lifts . Exterior backfill placed around the structure should be compacted and the
surface graded to prevent ponding within at least 10 feet of the building.
Additional Site Observation and Recommendations: When we visited the site on
April 10, excavation in the garage area and for the new entryway had continued. The
garage addition had two new foundation wall areas along the east side constructed with
the behind and below foundation drain "system constructed as generally per our
recommended detail. The interior drain had yet been installed and the groundwater,
and water from an existing drain in the southeast corner, was being collected and
discharged by a sump and pump system.
The entryway area had been excavated down about 3 feet from the previous observed
grade with hard shale bedrock continuing to be exposed in the bottom and no free water
observed. The excavation had steepened the 12 to 15 feet high cut slope to the south to
near vertical. There was considerable run-off flow down the excavation cut face from
snowmelt on the slope above and we recommended the slope be shored. We also
Job No. 114 106A
C�UPt@Ch
Transwest Construction
Apri128, 2014
Page 3
recommended the undermined portion of the foundation to the east of the cut slope be
underpinned as soon as possible by designed per the structural engineer.
Limitations: The recommendations submitted in this repart are based on our
observation of the materials exposed within the foundation excavations and do not
include subsurface exploration to evaluate the subsurface conditions within the loaded
depth of foundation influence. This study is based on the assumption that materials
beneath the footings have equal or better support than those exposed. The risk of
fou�idafion movement may be greater than indicated in this report because of possible
variations in the subsurface conditions. In order to reveal the nature and extent of
variations in the subsurface conditions below the excavations, drilling would be
required. It is possible the data obtained by subsurface exploration could change the
recommendations contained in this letter.
Our services do not include determining the presence, prevention or possibility of mold
or other biological contaminants (MOBC) developing in the future. If the client is
concerned about MOBC, then a professional in this special field of practice should be
consulted.
If you have any questions or need further assistance, please call our office.
Sincerely,
HEPWORTH - PAWLAK GEq�'���VICAL, INC.
`��, "'c�. 0 R�9�0s°es
/ • s
°'� y � °io
�. y
' 8 �,' �
� Y �
David A. Young, P.E. �� 32-296 �
��',, Y•2fs-/ �q:
DAY/ksw �'°s��'!pN��_�e�a
attachment Figure 1, Garage Wall Drainage Detail
CC: TT211SW2St �.'ORStCllCt1011 — �JTOgf�IIC1eYSOR � �tCL/t �nl �A;c 1�'�i ,Ei'tlttislIl.i;i1iLI�
Job No. ll4 106A
GeCPteCh
_���?�_No , i�t ,_�IO� �'�os�. >��, J��:c� _ -_ �i -y- r �
I -
I�� ��r���� �� i� ��✓�a�� �a ll� .Dr� � �, �� G �I
� ��vu � e�
I
�,���� ,
i�f"u '
u�tu!
i
c9 N N li
000 �
�noo
�•-� . LXS�00?'E6! i
� NM
V"C G'
C�,'C:'N � .
C I I
i/
� j/ o
i 3 `
-�, I
� �
���'�a,JB� � �'yJ�r�,D('�,�,n
�r��P�,�L Ne+a �=v��
�a � - - -
-�- - 1
l''� `�°'-,rock � � ��
�/lrv�iw. vtW�
�✓�G� � �QIN. I N �
� � � � �� �l.c� Gfa�2( �
�
��?������`°ra�
�� ��
- �rn�3�
nlew FDO�-e� � � � �
�1�z � ��c, P� �c
�`���q086B19f09^gA�� _��c.. �'��?L�Oaj' u..� �¢ `+ v � � ' Il Y ° p � v a'D�d a W ° . ,d.
•„w-.
���4`� '. �, , �
� .���� �� 3�� ,��
�z.��s B �i
'':,�.�ti ��a���
' `� ,�` o N`� yr� �
,,,���`�,�'� y,t
���� !