HomeMy WebLinkAboutB14-0180 Inspection Items for B14-0180 10:23 08/20/2015
Sec Item Id Descri tion A r Re Items Action Inheritable
120 ELEC-Rou h Yes R 1 AP No
200 MECH-Rou h Yes R 2 AP No
* 220 PLMB-Rou h/D.W.V. Yes R 1 AP No
* 230 PLMB-Rou h/Water Yes R 1 AP No
* 240 PLMB-Gas Pi in Yes R 1 AP No
* 30 BLDG-Framin Yes R 2 AP No
* 50 BLDG-Insulation Yes R 2 AP No
60 BLDG-Sheetrock Nail Yes R 1 AP No
* 190 ELEC-Final Yes R 2 AP No
' 290 PLMB-Final Yes R 1 AP No
390 MECH-Final Yes R 1 AP No
* 90 BLDG-Final Yes R 2 AP No
" 542 PLAN-FINAL Yes R 2 AP No
* 410 S ecial Ins ect- ro ress re t Yes R 2 AP No
* 420 S ecial Ins ect-final re t Yes R 1 AP No
Total Rows: 15
Page 1
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
mwNO iv
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B14 -0180
Project #: PRJ13 -0738
Job Address: 68 E MEADOW DR VAIL Applied.....: 05/14/2014
Location......: Village Inn Plaza Units #110 & #111 Issued...: 08/08/2014
Parcel No....: 210108254010
OWNER COLANDO CO 05/14/2014
PRIV ANTONIO CHEDRAUI CARAM
248 COL ENCINAL 91180 XALAPA VERACRUZ
MEXICO, 0
APPLICANT GIES ARCHITECTS 05/14/2014
PO BOX 2195
EAGLE
CO 81631
CONTRACTOR HEID CUSTOM BUILDERS, INC 05/14/2014 Phone: 970 - 390 -2674
RIK HEID
PO BOX 4909
EDWARDS
CO 81632
License: C000003204
Description:
Combine Units 110 & 111 into one unit - New dormer,
kitchen, patio doors, windows, pwder room, lighting.
Occupancy: R -2 Type Construction: IB
Valuation: $612,000.00
f} fRf} ffR*}* f} } } } }yfww!lwfYR!lfffwflfff **ff *l fff} wwwRRRRf »Rwf!!R *!R!*flffYRRRwfR FEE SUMMARY RRRRRwRRRYlR!!!f!* flfffflfffY* iirwifwwRRRRwlfff !!lifff *fiYRw}RRw!!RwlR! * **
Building Permit ------ - - - - ->
$3,765.75
Bldg Plan Check - - -- ---- >
$2,447.74
Use Tax Fee -- ------ ---
- ->
$12,040.00
Electrical Permit - - - - ->
$172.50
Elec Plan Check - - - ->
$112.13
Restuarant Plan Review - --->
$0.00
Mechanical Permit - - - - - ->
$400.00
Mach Plan Check - - - - ->
$100.00
Additional Fees------------
----->
$2,033.22
Plumbing Permit -- - - - - ->
$165.00
Pimb Plan Check - - ->
$41.25
Recreation Fee-- ---- --
->
$174.00
Investigation------ - - - -
->
$0.00
Will Call- - - - - --
->
$20.00
TOTAL PERMIT FEES—
>
$21,801.59
Payments----- ---- --
- - ->
$21,801.59
Re fw* f* wf} wwrrR:* R! r! w! f» RtlfffRtfffff******
fwfiYRwY}
fYf!!! Y! r!! lRrRNfff***** frfYwwfwxfR»
Rflf!*** ff} fffwwwwRfwiirwwRRRRRwlwwwwwwwwwwwwxrwwrrwrrrrwwwwwwwwwwwwwwwwwwwwwrrw
BALANCE DUE ---
- ->
$0.00
*wwwwwwww!
DECLARATIONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM.
combination permit - 012811
li�il�lil
x»» wwwr» wwwxwxtxwwrr» wr» wwwxw wxwxxxwwwrrxrw: xxxxwxwx» wwwwxwwwww» xxxxxxwwrw» w: wwrrrwww» rwxwxrrwrw» xxxxxr* r* rrwrrwxwwwwrxxwrrxr» wwwxwrxxww » »xxwrrxrw »xxx »x :rxrrww :ww »»
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit #: B14 -0180 Address: 68 E MEADOW DR VAIL
Owner: COLANDO CO Location: Village Inn Plaza Units
#110o
wxxxxxrw wrwr: rrwrwxx: xwwr* rrwr rwwwwxxwxxrwwrrwrrwxrwrwrww» xxxrxwwwrw» xxrxxxxrx» wrrrrwrr: rwwwrxxx» wrrmrwrwwrxx»» wwrrwrwrrwwxrwxx» r» r» wwww »rwrrxxrr : »rrwww » » » »ewwwrxxr
combination permit-012811
TOWN OF VAIL V
Permit #: B14 -0180
Owner: COLANDO CO
Plaza Units #110 & #111
REQUIRED INSPECTIONS AND STATUSES
Address: 68 E MEADOW DR VAIL
Location: Village Inn
Item: 00120 ELEC -Rough
Item: 00200 MECH -Rough
07/09/2014 By: sgremmer Action: PI Comments:
infloor heat only
Item: 00220 PLMB- Rough /D.W.V.
Item: 00230 PLMB- Rough/Water
Item: 00240 PLMB -Gas Piping
Item: 00310 MECH- Heating
Item: 00030 BLDG - Framing
Item: 00050 BLDG - Insulation
07/24/2014 By: JRM Action: PI Comments: NEW
DORMER CEILING ONLY
Item: 00060 BLDG - Sheetrock Nail
Item: 00070 BLDG -Misc.
Item: 00190 ELEC -Final
Item: 00290 PLMB -Final
Item: 00390 MECH -Final
Item: 00090 BLDG -Final
Item: 00542 PLAN -FINAL
combination permit-012811
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
0
mww CFva
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B14 -0180
Project #: PRJ13 -0738
Job Address: 68 E MEADOW DR VAIL Applied.....: 05/14/2014
Location......: Village Inn Plaza Units #110 & #111 Issued...: 05/30/2014
Parcel No....: 210108254010
OWNER COLANDO CO 05/14/2014
PRIV ANTONIO CHEDRAUI CARAM
248 COL ENCINAL 91180 XALAPA VERACRUZ
MEXICO, 0
APPLICANT GIES ARCHITECTS 05/14/2014
PO BOX 2195
EAGLE
CO 81631
CONTRACTOR HEID CUSTOM BUILDERS, INC 05/14/2014 Phone: 970 - 390 -2674
RIK HEID
PO BOX 4909
EDWARDS
CO 81632
License: C000003204
Description:
Combine Units 110 8111 into one unit - New dormer,
kitchen, patio doors, windows, pwder room, lighting.
Occupancy: R -2 Type Construction: IB
Valuation: $612,000.00
..,,, r««««« rrrr» rrrr, r««r r» rrrrrrrrr
r» r» r »rrrr »
« « « « »rrrr » « « » » «rrrrrrrrr
FEE SUMMARY «« r« rrrrrr,»«
rr« rrrrrr» rrrrr«r rr«» rrrr , « « « »rrrrrrrrrr
» » « « « « »rrrr ». ».»
Building Permit – - ->
$3,765.75
Bldg Plan Check - - ->
$2,447.74
Use Tax Fee - - ->
$12,040.00
Electrical Permit - - - ->
$172.50
Elec Plan Check --
> $112.13
Restuarant Plan Review - ->
$0.00
Mechanical Permit —>
$400.00
Mach Plan Check -
> $100.00
Additional Fees ----- ->
$2,033.22
Plumbing ermit - - - - ->
g
$165.00
Plmb Plan Check - - ->
$41.25
Recreation Fee---- - - - - ->
$174.00
Investigation - - - - -- —>
$0.00
Will Call - - -- >
$20.00
TOTAL PERMIT FEES --- >
$21,471.59
Payments --- -- - - - - ->
$21,471.59
rrr »rrrrrr« «rrr«« rrr »rrw : »r « « « «r
» :► :rr «xr »« « «r»
rrr«» rr««» rrrr» r» r» wwwr»
BALANCE DUE - ->
rrrr» rrrr»«« r«« rrrrr« r«« rr» rr» rr«* v««» rrrr: rrrr»« rrrrrr: rr » « » « »wrrrrrrrrr
$0.00
»r « « « »r :rr » «rr
DECLARATIONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM.
� combination permit - 012811
_1�1�1 I
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit #: B14 -0180 Address: 68 E MEADOW DR VAIL
Owner: COLANDO CO Location: Village Inn Plaza Units
#110o
combination permit-012811
TOWN OF
Permit #: B14 -0180
Owner: COLANDO CO
Plaza Units #110 & #111
REQUIRED INSPECTIONS AND STATUSES
Address: 68 E MEADOW DR VAIL
Location: Village Inn
Item: 00120 ELEC -Rough
Item: 00200 MECH -Rough
Item: 00220 PLMB- Rough /D.W.V.
Item: 00230 PLMB- Rough/Water
Item: 00240 PLMB -Gas Piping
Item: 00310 MECH- Heating
Item: 00030 BLDG - Framing
Item: 00050 BLDG - Insulation
Item: 00060 BLDG - Sheetrock Nail
Item: 00070 BLDG -Misc.
Item: 00190 ELEC -Final
Item: 00290 PLMB -Final
Item: 00390 MECH -Final
Item: 00090 BLDG -Final
Item: 00542 PLAN -FINAL
combination permit-012811
TOWN Of VA
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970 -479 -2128
www.vailgov.com
Development Review Coordinator
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
Pro ect Street Address:
Pr 6, D 2. lib -a 1
(Number) (Street) )) (Suite #)
Building /Complex Name: V/��%�L I Alill (Ld 27
Project #
DRB #: J �"r� �Q1O G 35
Building Permit #: 4 D�Oy
Contractor Information �1 I Lot #: Block # Subdivision:
Business Name: 611 n C U S -1
�O Work Class: New ( ) Addition ( ) Alteration (x )
Business Address: I i Q 't I Q 2
City F &JijrZO S State: c Zip: ( 1 (0 J �, Type of Building:
,r� „C Hilo Single - Family ( ) Duplex( ) Multi-Family(X)
Contact Name: '` /
Commercial( ) Other(
q)
Contact Phone: 176 _3 L y _a b7 _
Contact E -Mail: r4 K ®(-( &n0 00 S iavr► 15 01 L P f,/? 5. �'o
Work Type: Interior (?<) Exterior (
) Both �K )
I hereby acknowledge that I have read this application, filled out
Work Included Plans Included
Valuation of
Work
in full the information required, completed an accurate plot plan,
G ,
and state that all the information as required is correct. I agree to
q g
--w- -°
Yes
:Electrical ( )Yes ( )No (jc) (
) No / 000
comply with the information and plot plan, to comply with all Town
to
Ov
ordinances and state laws, and to build this structure according
Mechanical O)Yes ( )No (x )Yes (
)No
the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other
Plumbing (1C)Yes ( )No ( )<)Yes (
)No
ordinances of the To plicable thereto.
`
Building ()( )Yes ( )No (x)Yes (
)No O
Nalue of all work being performed: $
vU
Owner /Owner's Representative Signature (Required)
(value based on IBC Section 109.3 & IRC Section 108.31
Footage
1.,300
Electrical Square
_._ .,
Applicant Information
_...__.._.._._....__..... _......_ ...__.....a_._._.___... _.__..- ...._._... -.
Detailed Scope and Location of Work: N
_ .,_, ._.. __ _....._.._.....
w DO/Z14 ,Q
Applicant Name:
Applicant Phone:
Applicant E -Mail:
Project Information �Gl n,� ,��
Owner Name:I p(��-•� fv��/ I " d
Parcel #: a2 `� — dnL J T " i% I � Y O / O
(For Parcel #, contact Eagle County Assessors office at (970- 328 -8640 or visit
www.eaglecounty.us/patie)
For Office Use Only:
Fee Paid:
Received From:
Cash Check #
CC: Visa / MC Last 4 CC # exp date:
Auth #
(use additional sheet if necessary)
Date Received:
D IE CrF oWE
MAY 14 2014
C 6. I � •ae fw\
TOWN OF VAIL
2013-Feb
01
P.9f70 4)nd,2
5�W ley%2yLr/�
PoW
/1 2cntrh
L!4 &7'S1v(v
G ,
(use additional sheet if necessary)
Date Received:
D IE CrF oWE
MAY 14 2014
C 6. I � •ae fw\
TOWN OF VAIL
2013-Feb
01
TOWN OF VAL
ock""ry MVELOP NT
Design Review Board
ACTION FORM
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www.vailgov.com
Project Name: DRB ADDITION DRS Number: DRB140039
Project Description:
Addition of GRFA "250" - Combine Units 110 & 111 into one unit
Participants:
OWNER COLANDO CO 02/24/2014
PRIV ANTONIO CHEDRAUI CARAM
248 COL ENCINAL 91180 XALAPA VERACRUZ
MEXICO, 0
APPLICANT GIES ARCHITECTS 02/24/2014
PO BOX 2195
EAGLE
CO 81631
Project Address: 68 E MEADOW DR VAIL Location: Village Inn Plaza Units #110 & #111
Legal Description: Lot: Block: 5D Subdivision: VILLAGE INN PLAZA
Parcel Number: 2101 - 082 - 5401 -0
Comments: See Conditions
BOARD /STAFF ACTION
Motion By: Kjesbo Action: APPROVED
Second By: Forstl
Vote: 3 -1 -0 (Pierce opposed) Date of Approval: 04/16/2014
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and /or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
(PLAN): DRB approval shall not become valid for 20 days following the date of
approval, pursuant to the Vail Town Code, Chapter 12 -3 -3: APPEALS.
Cond:202
(PLAN): Approval of this project shall lapse and become void one (1) year following
the date of final approval, unless a building permit is issued and construction is
commenced and is diligently pursued toward completion.
Cond: CON0013698
The applicant shall submit plans showing the chimney (and fireplace) relocated
within the exterior east wall of the dormer, so that there is an 18" reveal of the
roof plane (plans submitted on 04/25/2014).
Planner: Joe Batcheller DRIB Fee Paid: $300.00
PROJECT: Village unit 110/11
PROJECT #:
MOUNTING: RECESSED
TYPE: 00 RESIDENTIAL
PANEL -1 (existing)
ENGINEER: MH -BW
VOLTAGE: 120/208V, 1P, 3W
MAINS: 200A MLO
AIC: 10K
-
PH SE
PHASE
DESCRIPTION
A
B
BKR
P
CIR
CIR
P
BKR
A
B
DESCRIPTION
Lighting
Lighting
Lighting
700
1260
1260
20
20
20
1
1
11
1
3
5
2
4
6
1
1
1
20
20
20
1260
900
1260
Recept
Recept
Recept
Lighting
680
20
1
7
8
1
20
720
Recept
Lighting
Lighting
700
1300
20
20
1
1
9
11
10
12
1
1
20
20
1260
1260
Recept
Recept
Lighting
900
20
11
113
14
1
20
1720
Recept
Lighting
900
20
1
15
16
1
20
1080
Recept
Lighting
1200
20
1
117
18
1
20
720
Recept
0
19
20
1
20
1260
Recept
0
121
22
1
20
1080
Recept
Refg drawersn Ex hood
920
20
1
23
24
0
SPACE
Oven
4500
50
2
25
26
0
SPACE
4500
27
28
0
SPACE
Refig
1500
20
1
29
30
0
SPACE
Refig
11500
20
1
31
32
0
SPACE
Freezer
1250
20
1
33
34
0
SPACE
Dishwasher
1450
20
1
35
36
0
SPACE
Dryer
2250
30
2 137
38
0
SPACE
2250
39
40
0
SPACE
SPACE
0
41
42
0
SPACE
NOTE: PROVIDE ARC -FAULT CIRCUIT INTERRUPTER PROTECTION @ BEDROOM RECEPTACLE CIRCUITS.
CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMAND AMPS
APPLIANCES
LIGHTING & RECEPT.
MECHANICAL
KITCHEN OVEN & DRYER
TOTAL 40540 98 V27M86277
5/12/2014
TOWN OF VA
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of $110 will be charged upon reissuance of the permit.
Application /Permit #(s) information applies
to:
El q —
Attention: Revisions
T Response to Correction Letter
.�1 0-attached copy of correction letter
Q Deferred ,gVbmittal I ,(
()Other L-nui necr:S k4vy')
Pro treet A
- ss-
��P��w r, J 1
(Number) (Street) l (Suite #)
Building /Complex Name: / 4
Applicant Information
(architect, contractor, owner /owner's rep)
Contact Name: cGl Cf
Address:
City I L 1.1 State: Cio zip:
Contact Name: C ' _x_41V �.l GCr1 Gt
Contact Phone: —1 K —) — —7 / /
Contact E -Mail:
I hereby acknowWdge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances a d state laws, and to build this structure according
to the toDIn ' I ng and subdivision codes, design review ap-
proved, rnnal Building and Resi ntial Codes and other
ordinan of Town aDDIZable t o.
Rep;eontative Signature (Required)
For Office Use Only:
Fee Paid:
Received From:
Cash
CC: Visa / MC Last 4 CC #
Authorization #
Check #
exp. date:
Building Permits:
Revised ADDITIONAL Valuations (Labor & Materials)
(DO NOT include original valuation)
Building:
$
Plumbing:
$
Electrical:
$
Mechanical:
$
Total:
$ 0
Date Received:
D ��c�udr�
AUG 2 0 2014
N OF VAIN
KRMCONSULTANTS, INC. RECORD
P.O. Box 4572 • Vail, Colorado 81658 • 970 - 949 -9391
TO: Chris Hutto, Josh Bash (Ground Engineering)
Rik Heid, Guy Cuccia (Rik Heid Custom Builders)
DATE: 8/18/2014 JOB NUMBER: 1303 -10
PROJECT: Vail Village Plaza 110 -111 Remodel
❑ RFI ❑ MEETING NOTES RESPONSE ❑ CLARIFICAT ION /CHANGE
KRM Consultants Inc. was asked to visit the above mentioned site on August 18, 2014 to review the
structural steel items number 6,7,8, and 11 on the Outstanding Structural Steel Discrepancy Log; Job
Number:14 -6531 written by Ground Engineering Consultants. KRM Consultants Inc. has responses
below in italics.
Item #6) Column to new beam at grid A.2/4 has added shim plate and two bolts instead of four and is
welded. KRM Consultants Inc. has reviewed the added shims, welded connection with two bolts and
has found the connection adequate.
Item #7) HSS beam at grid A/1 -4 has non - compliant flare bevel groove welds not filled flush per AWS
D1.1 -10 clause 2. KRM Consultants Inc. has reviewed the flare bevel welds along the HSS beam and
find the existing welds adequate.
Item #8) HSS column base plate to sloping HSS at grid A/2 and A/3 has non - compliant flare bevel
groove welds not filled flush per AWS D1.1 -10 clause 2. KRM Consultants Inc. has reviewed the flare
bevel welds at the HSS column base plate to sloping HSS and find the existing welds adequate.
Item #11) Inspected the welded connections 7X5 HSS beam to beam at grid A -C /1. These are non-
compliant for flare bevel groove welds not filled flush per AWS D1.1 -10 clause 2. KRM Consultants Inc.
has reviewed the flare bevel welds at the 7x5 HSS beam to beam at grid A -C 11 and find the existing
.welds adequate.
Please contact KRM Consultants Inc. with any questions. Attached is the second page of this record,
showing the framing plan with grids which Ground Engineering Consultants created.
SIGNED: COPY TO.
�� `r &(,-,
Mark T. Newman, Project Engineer I
ftEnG+"!6 TF9
o ti F
REVIEWED:
34167
Tim D. Hennu
o��s8 /0t!A1.�C .
Comments
Date: August 7, 2014 Location: Site
Additional Comments or Photos:
Job Number, 14-6531
All
In j 'LOOP fz
'jvw,
M LIEU OF BOLTS 0 CAP &
sa BASE PLAIES., CONNECT
PLATES TO
STRUCTURE 34
FUv YIELD x 3" EACH SIOE.
rM ALL LOCATIONS
4
it
.. ..... .. . .
N 1! C
I xa
WORIn
... ROOF FRAMING PLAN
KRMCONSULTANTS, INC. RECORD
P.O. Box 4572 • Vail, Colorado 81658 • 970 -949 -9391
TO: Chris Hutto, Josh Bash (Ground Engineering)
Rik Heid, Guy Cuccia (Rik Heid Custom Builders)
DATE: 8/18/2014 JOB NUMBER: 1303 -10
PROJECT: Vail Village Plaza 1 10 -11 1 Remodel
❑ RFI ❑ MEETING NOTES ® RESPONSE ❑ CLARIF ICAT ION /CHANGE
KRM Consultants Inc. was asked to visit the above mentioned site on August 18, 2014 to review the
structural steel items number 6,7,8, and 11 on the Outstanding Structural Steel Discrepancy Log; Job
Number:14 -6531 written by Ground Engineering Consultants. KRM Consultants Inc. has responses
below in italics.
Item #6) Column to new beam at grid A.2/4 has added shim plate and two bolts instead of four and is
welded. KRM Consultants Inc. has reviewed the added shims, welded connection with two bolts and
has found the connection adequate.
Item #7) HSS beam at grid A/1 -4 has non - compliant flare bevel groove welds not filled flush per AWS
D1.1 -10 clause 2. KRM Consultants Inc. has reviewed the flare bevel welds along the HSS beam and
find the existing welds adequate.
Item #8) HSS column base plate to sloping HSS at grid A/2 and A/3 has non - compliant flare bevel
groove welds not filled flush per AWS D1.1 -10 clause 2. KRM Consultants Inc. has reviewed the flare
bevel welds at the HSS column base plate to sloping HSS and find the existing welds adequate.
Item #11) Inspected the welded connections 7X5 HSS beam to beam at grid A -C /1. These are non-
compliant for flare bevel groove welds not filled flush per AWS D1.1 -10 clause 2. KRM Consultants Inc.
has reviewed the flare bevel welds at the 7x5 HSS beam to beam at grid A -C 11 and find the existing
.welds adequate.
Please contact KRM Consultants Inc. with any questions. Attached is the second page of this record,
showing the framing plan with grids which Ground Engineering Consultants created.
SIGNED: COPY TO:
�1��- --� &�"
Mark T. Newman, Project Engineer I
o ?0() REG�S�F9
REVIEWED:
i
34167
.. ,;' os/ I g/) y
Tim D. Henno-r_'�� ���FSSID� ?111.
Comments
Date: August 7, 2014 Location: Site
Additional Comments or Photos:
Job Number: 14 -6531
(xaeis srr,,.r fRSwai�a a• 'vya ! �icA� sa SCx Tae !tlyArwC _�
I•
e
.cEp ak .ukrn U,
IN UEU Of DOLTS O CAP & i
w �t BASE PLATES; CONNECT
�` L014 pY I' i t PLATES TO STRUCTURE w/ 44
FUET YIELD x 3' EACH SME. S
M. ALL LOCA11ONs <
� Yj
ZJ
(;fwS +fk.�C A'AAuUrE ��, �f\ • "� ; ;I { � .� �r
....._ ..... _ _ .. ............. _ _ Y!
�i . � fpKltxriws Y:yr `T C
f• t y 9 t
b V
r
' 1 ... .... .. ...
;l .. •..ysu wy/ awrc
IuO��
ROOF FRAMING PLAN c:gr 1r4' V—O. ' 01-1
vv, oaw 1a ._.
p�jR CO�IY� p P: Lfl NO if S ;O�_. Pii, w :'a Ala N:,, V/
Department of Community Development
75 South Frontage Road
j�Q�/� [�� �/�(t� Vail, CO 81657
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or buiiding permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of$110 will be charged upon reissuance of the permit.
_ _.. _. ._... ..__ .. .......__._._ ___ ...._.._ .... _. . _ .
Application/Permit#(s)information applies
to: �� ��i-" t�'-- Attention: Q Revisions
� � � /"�� �Response to Correction Letter
.L L �attached copy of correction letter
�� �� —v�� � �Otherred ubmitta r
r_.._.�4._�_.....�._._._____._r..__.._.._... ,..._........ _......
C7 _..�-�i
Project�treetA ress:
� � � �'� G, ���1 ��
(Number) (Street) (Suite#) _ . _._. ._ __.__ _ _ _.
Building/Complex Name: � C + Description of TransmittaU List of Change , Items Attached:
_
__ . _ :. :. __ _ . _.._. _, � )C�, � �
Applicant Information
{architect,contractor,ownerlowner's rep �� �� �
Contact Name: � GG)C' � �
Address: ��� .��x_ .�j�j�
City State: �� Zip:_�`ZLLd1�
Contact Name: �(./l�����"_C�) Gi (use additional sheet if necessary)
�7D- �f�l � `��� _ __ _
Contact Phone:_� �� ;Building Permits:
�Revised ADDITIONAL Valuations(Labor&Materials)
Contact E-MaiL• � v1h ' S ,��- ;(DO NOT include original valuation)
I hereby acknowledge that I have read this application,filled out Building: $
in full the information required,completed an accurate plot plan,
and state that ail the information as required is correct. I agree to 'Plumbing: $
comply with the information and plot plan,to comply with all Town
ordinances nd state laws, and to build this structure according Electrical: $
to the tow ing and subdivision codes, design review ap-
proved, I rnati nal Buildin and Residential Codes and other Mechanical: $
ordina es of th Town app ica le o.
Total: $�
Own Ow s Repr nta ive Signature(Required)
/ .. _ . _ __ . . _.._. .. .._....-- – . Date Received:
For O�ce Use Only: � � � � � �
Fee Paid: D
Received From:
Cash Check# r�
CC: Visa/MC Last 4 CC# exp,date: �t"��`� ;� � ''���
Authorization#
TOWN OF VAIL
t
�
1V����LUL�.i
FINAL REPORT OF SPECIAL INSPECTIONS
Project: Villaqe Inn Plaza, Units-110&111PermitNumber: B14-0180
Project Location: 68 E st Meadow ive Units 110 & 111
� J
Owner Csc ;) C:1 VY�
Addres " Gc� � City: ` �r: � ���[�
Special nspections Agency �
-Desigr�Pr-c�#essier+al4�t-Gl�c�e�-. GROUND Engineering Consultants, Inc .
Address: PO Box 464
��ty, Gypsum State: c� Zip: g1637 Phone: (970) 524-0720
Fax: (970} 524-0720 E-mail: ChrisH@groundeng. cam CarlHC�groundeng. com
To the best of my information, knowledge, and belief; the speciai inspections and/or testing required for
this project, have been completed in accordance with the contract documents.
Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be
considered an integral part of this final report. Any discrepancies that were noted in all interim reports
have been corrected. *Please see 14-6531 Final Summary 141101*
Prepared by:
���t����
Carl Henderson, P.E. �� c�`��,���'4`'.�+
�,���
T pe or Print N e �,tr'`' sn:�
'�;� �$882 s�;
�s� �.,.'�u
�:,
Signature ��� �
'��tAL. �
11-Q1-2014
Date
Preparer's Seai and Signature Required
-12-
_
.. ♦ �. G.��„F,ORAT/,1C
Y�ARS
E N G I N E E R I N G November 3��, 2014
Subject: Summary of Materials Testing Services and
Special Inspection Services, Village Inn Plaza, Units
110& 111 Remodel,Vail, Colorado
Ground Engineering Job Number: 14-6531
TOV Permit Number: B14-0180
Mr. Guy Cuccia
Rik Heid Custom Builders
PO Box 4909
Edwards, Colorado 81631
Attn: Mr. Cuccia,
This letter summarizes the special inspection and materials testing services GROUND Engineering
Consultants, Inc. (GROUND) performed during construction of the Vail Transportation Light Pole Upgrade
Project in Vail, Colorado. The special inspection and materials testing services were performed at times
scheduled by the Contractor and/or Subcontractors between June 12`h, 2014 and September 26�h, 2014
and according to GROUND's proposal# 1406-0859 dated June 5t'', 2014.
During construction, structural steel welded and/or bolted connections were periodically observed during
construction by a certified welding inspector (CWI). These observations were completed at times
scheduled by the Contractor or Subcontractor.
Based on the field observations to date, RFI's received and/or project documentation received from the
design team, it is our opinion that the materials observed for the structural steel were in general
accordance with project plans, specifications, and/or applicable RFI's.
The observations and materials testing as indicated above were performed periodically to provide data to
the Owner, Contractor and Subcontractors to assist them in evaluating the general compliance of the
materials and/or work with the contract documents at the times of our observation and testing. We did
not supervise, direct nor have any control over any of the Contractor's or Subcontractor's work. We were
not responsible for the Contractor's or Subcontractor's scheduling of our services, means, methods,
procedures, techniques, or sequences of construction, nor responsible for ensuring that any Contractor or
Subcontractor performed or completed the work in accordance with the contract documents or
construction industry standards.
If you have any questions concerning this letter, please contact our office.
Sincerely,
GROUND Engineering Consultants, Inc.
�"'fi� �j�;���+�����
� . y��,� R6
�r°�TM :: �°��,:'��
'�•.� ��C��� �;�'�
'C?� .�.�
����l��r�� �k���* �
�
Chris Hutto, C.E.T. Reviewed by Carl Henderson, P.E.
GYPSUM OFFICE PO Eox�64 � 10':.A Airpark Drive, Unit 9 � Gypsum, C�81637 � (970} 524-072G � wwrw.groundeng.com
ENGLEW00� � COMMERCE CITY � LOVELAND � GRANBY � GYPSUM � CASPER
Glient: Mr.Guy Cuccia
Rik Heid Custom Buiiders
PO Box 4909
����������� ������..r��..�..� Edwards,CO 81632
Vail Village Piaza - Units 110-111
Structural Steei Cover Report
[)�$�: September26,2014 L.qC�fip►1; �1Jb EVUI`Ttb�t': 14-6531
As scheduled, a representative arrived to perform special inspection services. The following is a summary of
services provided on this date. �
1}GROUND received and reviewed Town of Vail Stamped Approved Engineer of Record dated$!18(14 in regards to discrepancy item's
6,7,8 and 11 and these connections were found adequate. These discrepancies are ciosed on this date.
Guy was E-mailed a copy of this report and updated discrepancy list.
YP.S NO
Outstanding Discr�pancies Report�d this CDat�'? � �-.�,'
No. of Pages Attached: o
Field Represent�tiv�vw�r��a�i`1er�g.com
Er�glewood,Commerce�ity, Love(ar�d,Granby, Gypsum, Grand Junctio��,Caspar
~ Client Mr.Guy Cuccia
Rik Heid Custom Builders
• PO Box 4909
����������� �������..��.�..� Edwards,C081632
Vail Village Plaza - Units 110-111
FieldlF2b. ShOp? Field ��� ������ Vaii Village Inn Plaza
F�bt"IC�YICaCi ShO�: �1�b NuCP1f�E;r: 14-6531
General Contractor: Rik Heid
Outstanding Structural Steei Discrepancy Log
f�ate i€em CW( Ds�t�; F'erPla�i?
F�i;��<>rteci Nurriber initi�ls U�scriptior��af L3iscrepan�;y F2esc,lve�: F'er RFl
Bridge Plate to HSS,to wide flange beams at A/3.8 and C/3.8.connections Per plan
6/12/14 1 JB were found to have a added plate on top of the 518"plate with it butt welded all 8/14/14
around and the plate weided to the NSS all around,not per detai{(8/S3)
6 angle clips from existing W8x10 beam to new W18x35 sioping beam at grid Per plan
6/12/14 2 JB C/1-3.8.will remain non-compliant due ta the connection schedule does not 8l14/14
have a weided detaii,GROUND is requesting clarification from the EOR.
1/2"plate,angied and vert at purling beam af grids Al1-4 end C/1-4.,no weld Per plan
6/12/14 3 JB detail is provided,GROUND is requesting clarification from the EOR. 8/14/14
GROUND is requesting stamped approved from Town of Vail for SK1-SK2-SK3 Per pian
6/12/14 4 JB dated 6/4l14 8/14/14
GROUND is Requesting stamped epproved from the Town of Vail drawings Per plan
6/12114 5 JB dated 5/30/14 8/14/14
column to new beam at grid A.2/4 has a added shim plate and two bolt instead Per EOR
6/17/14 6 JB of four and is welded,not per detail 9/S3,picture#1 is attached to the third 9/26l14 letter dated
page of the daily report. 8/18/14
HSS beam at grid Al1-4 has non-compiiant flare bevei groves welds not fiiled Per EOR
6/17/14 7 JB flush perAWS D1.1-10 ciause 2 g/2g/�4 letter dated
8118/14
HSS column base plate to slopping HSS at grid A/2 and A!3 has non-compliant Per EOR
6117/14 8 JB flare bevel groves welds nat filled flush perAWS D1.1-10 dause 2 g/26)14 letter dated
8/18/14
clips to existing beam and clips to c-channei have fuil length welds and is not Perplan
6/17/14 9 .1B per details 3/S3 and 7lS3 8/14/14
column cap pates to bottom of beam at grids Al2 and A/3 do not have all four Per plan
6/17/14 10 JB sides welded per note on pians 8/14/14
� Inspected the welded connections 7x5 HSS beam to beam at grid A-C/1.These Per EOR
,!� 6/23/14 11 NB are non-compliant for fiare bevel groves weids not filled flush perAWS D1.1-10 g/2g)�q letter dated
U cfause 2(2nd leve1,817/14) 8/18/14
The welded connections of the clip to C channel at grid A/1-3 are non-compliant Per Plan
6/23/14 12 NB for undercut and porosity perAWS D1.1-10 Clause 6. 6/24/14
It is the responsibility of the contractor to schedule our office to perform retesting once the necessary corrective
action has been made or provide our office with documentation that resolves the discrepancy.
www.yralmdeng.com
Englewood, Commerce Gity, Loveland, Granby. Gypsum,Grand Junction,Casper
• ��� Client: Mr.Guy Cuccia
Rik Heid Custom Buiiders
PO Box 4909
E hJ C I N E E R I N� C�I t��U t�°T'!�1'�lT� Edwaras,co ai ss2
Vaii Village Plaza - Units 110-111
Fi21dIF�b. ShC7p? Field ��� 1����� Vaii Village Inn Plaza
Fabrication Shap: ��� �+�����r �a-sesl
Genera( Contractor. Rik Heid
Outstanding Structural Steel Discrepancy Log
Date lie€n CWI Date Pe.rPf�n:
��Y��c�rl.ed Nurrtber i��itials Clesr,ripiion of Uiscre��ar�t�v Restalvet� Per RFI
There are no details for these welded connections of the clip to C channel at Per plan
� 6123/14 13 NB gridsA/1-3.GROUND is requesting clarification from EOR. 8/1�1/14
Inspected the Hilti Pins on decking at grids 1A-26lA-C.At the time of inspection Per plan
6/24/14 14 NB the Hilti Pins were placed every 12"in each low hat around the perimeter of the g/�4/�q
deck.GROUND is requesting clarification from EOR for the use of Hilti Pins.
Shear plates only have one side welded and not all around,missing welds from Per plan
712/14 15 JB the top and bottom plates to cross beams and HSS as required all around per 8l14l14
detail 6/S3 and 11S3.
Column base plate and column cap plate only have 2 sides welded and not per Per plan
7!2/14 16 JB note af 3"each side,grids C.5/4 and B.314 8l14l14
It is the responsibility of the contractor to schedule our office ta perform retesting once the necessary corrective
action has been made or provide our office with documentation that resolves the discrepancy.