Loading...
HomeMy WebLinkAboutB13-0207 REV2 Special Inspection Report � � � INDEPENDENT TESTING & � , INSPECTION SER�'ICES INC. 12084 VASEEN CT. CONIFER, COLORADO 80433 � 303-674-7560 FAX 303-674-7560 � � � � n Page 1 of 2 � � OBSERVATION REPORT ; a � � Client: Cook's Welding ITIS Job No. 051914 Date: 5/19/14 " R Project: 174 Gore Creek DrivelThe Lodge @ Vail Location: Vail, CO k � u c Inspector: David L. Sturgeon � � This report package contains information concerning specific tests and inspections of ;I structural steel welding, structural boiting, structurai sprayed fireproofing, and/or � nondestructive testing. � � � The specific criteria utilized in judging the degree of conformance for each area of < inspection are contained on each individual inspection form. E F E Also included may be ITIS' "List of Outstanding Discrepancies" (O. D. List). The O.D. List ; will be consecutively numbered for each page issued throughout the duration of the ; project. Each individual item listed will also be consecutively numbered. If there are any questions regarding the content of this report, please feel free to contact ' ITIS at your convenience. ` t � David L. Sturgeon 4 President ICBO Certified Inspector #1138247-85 I AWS QC-1 #82122691 Resident Level III � i I i � I INDEPENDENT TESTING & INSPECTION SERVICES INC. � 12084 VASEEN CT. p CONIFER, COLORADO 80433 € 303-674-7560 � FAX 303-674-7560 � Page 2 of 2 G � e � 6 INITIAL VISUAL INSPECTION OF WELDING ; FIELD REPORT FORM � � � Inspector: David L. Sturaeon Job No. 051914 Date: 5/19/14 ° Field Made Welds X Shop Made Welds Type of Welds Inspected: Fillet X Groove _ Other � Type of Component (i.e.: Column, beam girder, moment weld, etc) As Recorded = Applicable Code or Standard: AWS "'s # AREASOFINSPECTION ( � LEVEL OR ELEVATION: Unit 412 New HSS Deck Support � GRID LINE LOCATON(S): & CONDITIONS OF NONCONFORMANCE / INSPECTION RESULTS : The installation of the sub-floor supports was inspected and found properly welded. All anchorages had been installed � and found conforming. All welds were made with low-hydrogen elecfrodes. The work was found conforming � a � i LEVEL OR ELEVATION: GRID LINE LOCATION(S): 3, CONDITIONS OF NONCONFORMANCE / INSPECTION RESULTS: i E 3 s i !t i LEVEL OR ELVATION: f GRID LINE LOCATION(S): � CONDITIONS OF NONCONFORMANCE / INSPECTION RESULTS: � r � I I