HomeMy WebLinkAboutB14-0040 REV2 permit NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
.�
1YJW7V(JF VAII. .
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B14-0040
Project #: PRJ13-0733
Job Address: 521 E LIONSHEAD CR VAIL Applied.....: 03/18/2014
Location......: COMMON ELEMENT: VAIL 21 CONDOMINIUM ASSO Issued. . . : 06/17/2014
Parcel No....: 210106403001
OWNER SUSAN WONDRIES CATALANO TRUS 03/18/2014
4612 VINETA AVE
LA CANADA, CA
91011
CONTRACTOR G.E. JOHNSON CONSTRUCTION CO 03/18/2014 Phone: 970-845-0272
ANDY SANDOVAL
PO BOX 8809
� AVON
CO 81620
License: C000003321
Description:
Common Element-Vail 21 - NEW WINDOWS 8� PARTIAL RE-SKIN
New Windows and sliding doors at all residential units. New
entry features trellis and sunshades. New siding, new
Corten metal paneling at elevator tower. New snowmelt at
loading zone. Replacement of light fixtures in exterior
corridors.
Occupancy: R-2 Type Construction: IB Valuation: $1,500,000.00
.................«<..>_......,,..�......,_........,.�....>...._...>.....>.,.,,,.,. FEE SUMMARY .....,......,.>........................��......,...,.,..,......,..,.....,,.._„_
Building Permit-----------> $7,433.75 Bldg Plan Check----------> $4,831.94 Use Tax Fee-----------------------> $29,800.00
Electrical Permit---------> $1,983.75 Elec Plan Check-----------> $1,289.44 Restuarant Plan Review--------> $0.00
Mechanical Permit------> $500.00 Mech Plan Check---------> $125.00 Additional Fees--------------------> $0.00
Plumbing Permit--------> $0.00 Plmb Plan Check---------> $0.00 Recreation Fee--------------------> $0.00
Investigation-----------------------> $0.00
Will Call------------------------------> $15.00
TOTAL PERMIT FEES--------------> $46,198.88
Payments-------------------------------> $46,198.88
BALANCE DUE------------------------> $0.00
......................................�...,...._....,..,__...>........�.....,..,...__....,_..,,..,,...............,....,,....»>..,,......,,..,__._.......,.............,.,,...,,,.,.,
DECLARATIONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
OR AT OUR OFFICE FROM 8:00 AM -4:00 PM.
combination permit_012811
1
. �
�_.• : �
��11� F�T1L 1
.,.�................,...,..,..,,,..,..>...,.�.,......,,....>..>........,t.........,...........,...,....,,...,,.,......,.x<...,x.,....,.,,,,.,.,...,..,,..............,.................
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
�
Permit#: B14-0040 Address: 521 E LIONSHEAD CR VAIL
Owner: SUSAN WONDRIES CATALANO TRUST Location: COMMON
ELEMENT: VAIL 21 CONDOMINIUM ASSO
................................<.,.....,......,.,.,......,...<.......,.�.,...................,.�........�...,...,,,,.,,.,....x,x,....,.,.....,,,,.,.,,.,.,..,..,,.........,....,....
Cond: CON0013661
Notified Building Dept on 3/24/14.
Code determination needed by Building Department:
Comments to CBO:
I have looked at the code analysis they provided.
I note it does not meet the 2009 IBC. I thought we were
using the 2012 edition now.
There is a plan note that the 2009 and 1979 review under
Incidental Use Areas shows a 1 hr rating or automatic fire
extinguishing system but only for the Mechanical Room.
Section III Allowable Area & Height .proposes 6 stories,
allows for 4 stories and an increase for area or number of
stories is not allowed. Under the 1979 edition, he counts
the number of stories above the B Occupancies as "4 over 2"
for a total of 8.
I don't think the analysis adequately addresses the
basement issue.
I am of the opinion that the fire sprinkler system should
be extended throughout the basement level.
Michael McGee
Deputy Chief
Entry: 04/21/2014 By: McGee Action: AP
Cond: CON0013693
Fire Alarm Rebuild
Entry: 05/15/2014 By: McGee Action� AP From:
John Lang [mailto:jlang@min-chem.com]
Sent: Friday, May 9, 2014 3:41 PM
To: 'sls'
Cc: 'Geoffrey Wright'; 'Bruce Zivic';
linda.malaby@gmail.com; 'John Halloran'
Subject: Vail 21-Fire department letter
Attention: Mike Mcgee
Deputy Chief, Fire Department
The Homeowners'Association Board of Directors for
the Vail 21 Condominiums agrees to complete the scope
of work as outlined in the May 7th, 2014 letter from
Shaner Life Safety (see attached). The fire alarm
system will be upgraded in phases as outlined in the
combination permit_012811
�
letter. We will complete the work in the noted
timeline. The board has retained the services of
Deborah Shaner, P.E., Fire Protection Engineer to
facilitate completion of this project.
John Lang
President, Vail 21 Condominium Association
PO Box 1073, Frisco, CO 80443
970.409.9082; fax 970.797.1898
May 7, 2014 (Revised)
Deputy Chief Mike McGee
Vail Fire and Emergency Services
2399 N. Frontage Road W.
Vail, Colorado 81657
Dear Mike,
This letter will outline a proposed plan for
upgrading the fire alarm system at Vail 21. The
project will be completed in Phases. Phase 1 of this
work is being conducted concurrently with a Building
Permit project. The associated fire protection and
life safety scope was outlined in a separate letter
dated April 10th, attached for your reference.
The following outlines a phased approach to upgrading
the fire alarm system at Vail 21. This work is
currently in design and will be documented with
drawings and other submittal information at the time
of permit. The purpose of this letter is to establish
the scope of work, phases and a schedule for
completion.
Phase 1: One for One replacement of
existing fire alarm system
Schedule: July 1, 2014 — November 1, 2014
This phase will include a one-for-one replacement of
existing fire alarm devices. The existing fire alarm
panel is a Mircom FX-2000, which is a current,
addressable, UL listed fire alarm panel. This panei
may or may not be replaced depending on the chosen
fire alarm contractor. All existing detectors, pull
stations, modules, horns and strobes will be replaced
with new devices. Existing conventional zones will be
converted to addressable. No new functions or devices
will be added to the system outside of addressable
modules as needed.
In early June, we will submit a formal fire alarm
permit application which will include drawings,
calculations, wiring diagrams, a points list and
equipment data sheets.
Phase 2: Installation of one smoke/heaUcarbon
monoxide detector per unit
Schedule: Spring/Summer, 2015
This phase will include the installation of one
combination smoke/heabcarbon monoxide detector with
integral sounder into each unit. We propose to
install the device approximately
May 8, 2014 Vail 21
Page 2 Shaner Life Safety letter
15'-20' into the unit from the front door, which will
place it centrally in the Hallway/Living Area.
This detector wili initiate a general alarm condition
upon activation of the heat detector element. Carbon
monoxide detection will sound a local alarm, but call
the fire department. Smoke detection will be a local,
combination permit_012811
supervisory condition only This device will have an
integral sounder base for occupant notification,
temporal 3 pattern for smoke or heat detection, and
temporal 4 pattern for carbon monoxide.
Phase 3: Addition of smoke detectors to sleeping
rooms in units
Schedule: Completed by end of 2016
In this phase, each unit will have smoke/heat
detectors installed within the sleeping rooms. These
wili be addressable, combination smoke and heat
detectors with sounder bases. Activation of the heat
detector will cause a general alarm and activation of
the smoke detector wiil initiate a supervisory
condition.
Phase 4: Ongoing maintenance of system;
upgrade of commercial units as tenant finishes
occur
The expected life of the new fire alarm system
will be 20 -25 years. Phase 4 will be an ongoing
maintenance plan to ensure this system meets its life
expectancy. Annual testing and inspections will be
performed. As commercial units are remodeled, they
will be evaluated for cornpliance with current fire
department standards
We believe that this plan provides a reasonable
approach to upgrading the fire alarm system�. At Vail
21. Please advise if this plan is acceptable. Of
course, the Vail 21 management, HOA and Boa�d of
Directors understand the commitment made in this
letter and will follow through on future phases.
Phasing will be further outlined in the upcoming
permit submittal. Please let me know if you have any
questions.
Sincerely,
Deborah L. Shaner, PE
Fire Protection Engineer
combination permit_012811
;
1
�
����� �1�, 1
**,*.,��.���*��...�*��..,.�.�.����......���..�.,.*�..*****�*******,,,,,,,,*********�.*w**.,*�..***.,.,.,.,,,***********.,...**,**,,.*****.,*.,***,*��.....�...<,,.
REQUIRED INSPECTIONS AND STATUSES
1
Permit#: B14-0040 Address: 521 E LIONSHEAD CR VAIL
Owner: SUSAN WONDRIES CATALANO TRUST Location:
COMMON ELEMENT: VAIL 21 CONDOMINIUM ASSO
*.««**�*,�.******���.*�*���«,�����.�*������.*,...�*��*****************************�,.***.***.****�********�***�*******************.�*******..,.,**#*.**
Item: 00010 BLDG-FOOTING
Item: 00020 BLDG-Foundation/Steel
Item: 00120 ELEC-Rough
Item: 00200 MECH-Rough
Item: 00030 BLDG-Framing
Item: 00050 BLDG-Insulation
Item: 00060 BLDG-Sheetrock Naii
Item: 00070 BLDG-Misc.
Item: 00190 ELEC-Final
Item: 00390 MECH-Final
Item: 00090 BLDG-Final
Item: 00542 PLAN-FINAL
Item: 00543 PW FINAL
combination permit_012811
i
*****+*******************�**********************************�***�***************************
TOWN OF VAIL, COLORADO Statement
**************�***************�******************************************************+******
St_atement Number: R.140000820 Amount : $110.00 06/17/201911:39 AM
Payment Method:Credit_ Crd Init: CG
Notation: visa john
halloran
Permit No: I314-0040 Type: COMBINATION BLDG PERMIT
Parcel No: 2101-064-0300-1
Site Address : `21 IJ LIONSHFAD CR VAIL
I�ocatior�: COMMON ELEMENT: VAIL 21 CONDOMINIUM ASSO
Total Fees: $46, 198. 88
This Payment: $110. 00 Total ALL Pmts: $46, 198.88
Balance: $0.00
***********�*********�*****�***�******�**********�******************************************
ACCOIJNT [TrM LIS'C: �
Account Code Descripti.on Current Pmts
Pr 00100003112300 PLAN CHECK FEES 110. 00
',