HomeMy WebLinkAboutOTC14-0029NOTE; THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
mwwO VVAQ.
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
OVER THE COUNTER PERMIT
OVER THE COUNTER Permit #: OTC14 -0029
Job Address: 4946 JUNIPER LN VAIL
Location......: #A
Parcel No....: 210113102027
Valuation.....: $14,000.00
OWNER COFSKY, ROBERT A. 06/24/2014
820 NEPONSET ST
NORWOOD, MA
2062
CONTRACTOR A4S CONSTRUCTION SOLUTIONS
AKA A4S LLC
PO BOX 2184
VAI L
CO 81658
License: C000003634
Description:
Re -roof
Project #: PRJ14 -0303
Applied.....: 06/24/2014
Issued...: 06/24/2014
06/24/2014 Phone: 970 - 977 -0200
+ ww: w► w+ wxwwxxxwxwwrww+++ wwwwxww. wxxw+. w++++++ ww+ wwwwxwxwrr +++ ++r +wwwr + +rxwxwwwww
FEE SUMMARY wxr www+ wwwwm
ww wx wwwwr rwwwwwwwwwwrxwwwwxxwwwwwxr + + + + +w +wwmrwwvwxwwwwwxwxxxe+
Building Permit - - ->
$237.25
Bldg Plan Check - - ->
$154.21
Use Tax Fee - -- -- >
$80.00
Electrical Permit >
$0.00
Elec Plan Check —
> $0.00
Mechanical Permit - ---- ->
$0.00
Mach Plan Check - ----
> $0.00
Additional Fees----- - - - - ->
$20.00
Plumbing Permit ---- ->
$0.00
Plmb Plan Check - ->
$0.00
Investigation -- ---- ---- ->
$0.00
Will Call ----- >
$5.00
TOTAL PERMIT FEES --- - ->
$496.46
Payments ---- .--->
$496.46
+ xrw+» wwx+ xwxrrrrwwwwwwwww+ wwwwwxwwwrwr++++
BALANCE DUE ->
x+ x+ wwww: xxwxxrwwr+++ x+ r+++ rwwwwwxwrx+ newwwxxwrwwww::++ rwxxx: xww+ x+++++++ rrwxwxxx► wxw+ xxxr+++++ wrw+ xxxxxwwrrrrw +ww +r++wrwwwr +wwwwr►x
$0.00
:wwxxwr
DECLARATIONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.21.49
OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM.
combination permit 012811
TOWN OF VAILV
wwr» rrrr»» xx» rrrw» w» x» rrrw» rrrr» r» w» rrrr» rwwwrrrr+ r» rwxw» w» r»» xx» wrrr»»»» wrrr»++ ww» rrrrrrrw+ wrrrrrr+» rwxwxrrrr+ rrwwwrxxrrrrrw »x »rrr►rr »xw »xrrrrrxrrw »»
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit #: OTC14 -0029
Owner: COFSKY, ROBERT A.
Address: 4946 JUNIPER LN VAIL
Location: #A
rrr» r+ rw». ewwr»+» r» r+ rm+ rrw»» rr» wwrr» r»+» rwrr» rr+++ xxwrr»:» rrwwwwr» rr:: r+» wr» rrrr» xrrr» rrrr» wwx+» r+ r:» wrrrrrrrrr» xrrr» rrrw »wwww »rr :r+v »wwxrrrrr :rr +rrww»
Cond: 8
(PLAN): No changes to these plans may be made without the
written consent of Town of Vail staff and /or the
appropriate review committee(s).
Cond: 201
(PLAN): DRB approval shall not become valid for 20 days
following the date of approval, pursuant to the Vail Town
Code, Chapter 12 -3 -3: APPEALS.
Cond: 202
(PLAN): Approval of this project shall lapse and become
void one (1) year following the date of final approval,
unless a building permit is issued and construction is
commenced and is diligently pursued toward completion.
I combination permit-012811
TOWN OF PAIL V
REQUIRED INSPECTIONS AND STATUSES
Permit #: OTC 14 -0029
Owner: COFSKY, ROBERT A.
Address: 4946 JUNIPER LN VAIL
Location: #A
Item: 00542 PLAN -FINAL
Item: 00090 BLDG -Final
1 r'.
I combination permit 012811
TOWN OF VAIL
Community Development
Department
Community Development Department
75 South Frontage Road West
Vail, CO 81657
Tel: 970 - 479 -2128
www.vailgov.com
Development Review Coordinator
RE -ROOF PERMIT APPLICATION
(This permit is applicable to one and two family dwelling units, multifamily buildings)
(Permit fee = standard building fees and design review fee)
Project Information
Owner Name:
Parcel #:
(For Parcel #, contact Eagle County Assessors Office at (970- 328 -8640 or visit
www.eaglecounty.us/patie)
Proje t Street A�c ress:
bpma
(Number) (Street) (Suite #)
Contractor Information
Business Name: 11 J y✓
Business Address: �p gC) 249
City A-VV ti State: ('0 izip: V ��
Contact Name: �(r(�f°I'+ rtiJ6 14" 7
Contact Phone: l�l 3' 3ZI
Contact E -Mail: G o AV d
Applicant Information (fill in if diff9ent from contractor)
Applicant Name:
Applicant Phone:
Applicant E -Mail:
I hereby acknowledge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according to
the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other
ordinances of the pplicable thereto.
X C
Owner /Owner's resentative Signature Required (typed or digital
signature)
( )) Checking this box indicates you are electronically signing
this application and agree to the above statement.
Type of Building:
Multifamily ( ) One Family( ) Two Family (Duplex)
Submittal Requirements
• Joint Property Owner Written Approval Letter (duplex or
multi - family HOA)
• �wo (2) plan. sets indicating:
• ',� Site plan 'showing location of balconies, decks, stair-
�J ways, 'sidewalks, pedestrian and vehicular exits from
the building and utility meters
Roof plan showing pitch and slope
• Snow retention method and location. Multi- family
\� building snow retention is required to be designed,
s signed and sealed by a IicQnsed engineer -
• If heat tape is to be used as snow retention, load cal-
culations must be provided
MateLi3t type (i.e. Composite Shingles Class A) and
colgr
• Full view roof photos of the entire building
. • Note: Roofs with a horizontal dimension less than 48"
are exempted from snow retention
Detailed Scope and Location of Work:
//V,S,T n rTVI / �1 N tol.K S LL'�S i7
(use additional shP?,Y n ess5s6j j
Valuation of
Work Included Plans Included Work
Electrical ( )Yes (,d )No ( )Yes ( )No
Building ( )Yes (V/)No ( )Yes ( )No
Value of all work being performed: $ 1 31`10 f. bD
(value based on IBC Section 109.3 & IRC Section 108.3)
Electrical Square Footage
Date Received
JUN 2 3 2014
TOWN OF VAIL
For Office Use Only: Project #: 0
Fee Paid:
Received From: Building Permit #: Q —(c `j QV�
Cash Check #
CC: Visa / MC Last 4 CC # Auth #:
Lot #: Block #_s Subdivision:
13 -Jan 18
Jun 20 2014 12:47PM Streamside
Dental
1(970)4797903
page 1
JUN /20 /2014 /FRI 10:29 AM
LJBTC
Front Desk Res
.,AY N,,.358- 459-3805 P.001 /001
74ilIN OF V
!yp}N APPROVAL :.
ai tqr ,�gtio�t , • � �
rt� �� l a�tt. trst bt�ait wrst►em4� i d c�� w ':t1t4�6 � ' ab�uuin�dei�r � • '�''� ! fcrrn. ctr SIrtkei n Owl" s n . On' •
un1'tc�wrae► or tha swihorized agern 4f' the i~�a_ }� � °
•,il�triiniurn 06 rr�cltfl�eixat�t bv�t�9 .R�cam�letad- �rxtns must be�s►bm� tat:
o ss b
Slat ate,
� PtQRP� cam €ad �a� • : ..., - ; •
�'!t rvfi ;o lv s�l•�a!�'r�urt'�t'pbu�laC� r1R A.
pru abed ifnproKer+►ent k� tse C t +ie�ed. M ID ac�diass not•
• � � 3 � farts.ovec tha co�.of RMe rev�.wr protess.� e�'fstJGS+�omptle� the ! uf�dt*rtestt�! iSiildilCalioris• 3Se mecJ;te the :P Int
+ 1d� tt Taw.r�s ►�a1G��te co. �3Dg;;a�d reg emu, a toe ks
haremt aM g a � 18 aetd i SO MICA df al
P ov�v..c�!�,eraAVE�$ed ofauny�ct " ,
awlicatir�r? f4w"On. the, P r►t agreeing to th1 - statemar :
'.�•tkit;i!ta�e
Ze�;�
4
Cc 65
� rcf� �LPrrl
412
3'
4' 12— V2,00F ATt4t
���®
� S'Nnw
F I E LD
%I
cc, p
-''s of
, 0 Pi La
at b
By: -
I S PD w Wb -'70^j
W�E
5
O`
D
fll
I
c�
a�
c
c�
m
n.
v
rn
5J
Y
e
s
Q
�7
r-
g
ALPINE289 Harrel Street
Morrisville, VT 05661
Toll Free Phone 1.888.766.
SNowGUARDs®
Toll Free Fax 1.888.766.9994 9994
www.alpinesnowguards.com e-mail info @alpinesnowguards.com
#40 Snow Guard Specification Sheet
Snow Guards
PART 11 —GENERAL
1.1 SUMMARY
A. WORK INCLUDES
1. #40 Gusseted snow guard that attaches directly to the roof deck.
2. Coordinate with the installation of the roof to assure proper placement of the
snow guards.
3. Provide appropriate snow guard and fasteners for the roof system.
B. RELATED SECTIONS
1.
Section 07600:
Flashing anc
2.
Section 07310:
Shingles
3.
Section 07320:
Roofing Tiles
4.
Division 7:
Thermal and
1.2 SYSTEM DESCRIPTION
Sheet Metal MasterFormatTM
MasterFormatTM
MasterFormatTM
Moisture Protection.
2004 07 60 00
2004 07 31 00
2004 07 32 00
A. COMPONENTS:
1. #40 Gusseted snow system consists of individual metal snow guard.
2. Fasteners
a. To be of metal compatible with snow guards.
b. Fasteners should be selected for compatibility with the roof deck.
c. Fastener strength should exceed or be equal to that of the snow guard
system.
3. Sealant (if required by roof manufacturer).
a. To be roof manufacturer approved.
B. DESIGN REQUIREMENTS:
1. Bracket spacing to be recommended by manufacturer or building engineer.
2. Minimum 2 fasteners per snow guard.
3. It is important to design new structures or assess existing structures to make
sure that they can withstand retained snow loads.
A Division of Vermont Slate & Copper Services, Inc. Made in Vermont USA ,�`
We keep snow In its place. From Recycled Materials
14 OW
ALPINE289 Harrel Street
Morrisville, VT 05661
SNowGuAiwsO Toll Free Phone 1.888.766.9994 Toll Free Fax 1.888.766.9994
www.alpinesnowguards.com e-mail info @alpinesnowguards.com
1.3 SUBMITTAL
A. Submit manufacturer's specifications, standard detail drawings, recommended layout
and installation instructions.
1.4 QUALITY ASSURANCE
A. Installer to be experienced in the installation of specified roofing material and snow
guards for no less than 5 years in the area of the project.
1.5 DELIVERY / STORAGE / HANDLING
A. Inspect material upon delivery. Notify manufacturer within 24 hours of any missing or
defective items. Keep material dry, covered and off the ground until installed.
PART 2 — PRODUCTS
2.1 MANUFACTURER
A. Alpine SnowGuards. A division of Vermont Slate & Copper Services Inc., 289 Harrel
St. Morrisville, VT. 05661, (888) 766 -4273, www.alpinesnowguards.com.
2.2 MATERIALS (choose one):
A. Copper - Strap, hood and gusset are 16 oz copper.
B. Lead - Coated Copper - Strap, hood and gusset are 16 oz lead coated copper.
C. Galvalume - Strap, hood and gusset are 26 gauge galvalume.
D. Aluminum - Strap, hood and gusset are .032 aluminum.
E. Freedom Grey - Strap, hood and gusset are 16 oz. coated copper.
F. Rhein Zinc - Strap, hood and gusset are 24 gauge.
A Division of Vermont Slate & Copper Services, Inc. Made in Vermont USA �'
We keep snow in its place. From Recycled Materials 40
ALPINE289 Harrel Street
Morrisville, VT 05661
SNowGuARDs,ll Toll Free Phone 1.888.766.
Toll Free Fax 1.888.766.9994 9994
www.alpinesnowguards.com e-mail info @alpinesnowguards.com
2.3 FINISH (choose one):
A. Mill Finish —standard
B. Powder Coated — available at additional cost
C. Kynar® 500 pre - painted sheet - aluminum only
PART 3 — EXECUTION
3.1 EXAMINATION
A. Substrate
1. Inspect structure on which snow guard system is to be installed and verify that
it will withstand any additional loading that it may incur. Notify general
contractor of any deficiencies before installing Alpine SnowGuards.
2. Verify that roofing material has been installed correctly prior to installing snow
guards.
3.2 INSTALLATION
A. Comply with architectural drawings and snow guard manufacturer's recommendations
for location of system. Comply with manufacturer's written installation instructions for
installation and layout.
Document Version 03.10.2011
07 72 53 Snow Guards
A Division of Vermont Slate & Copper Services, Inc. Made in Vermont USA
We keep snow in its place. From Recycled Materials
ALPINE289 Harrel Street
Morrisville, VT 05661
SNowGuARDso Toll Free Phone 1.888.766.9994 Toll Free Fax 1.888.766.9994
www.aIpinesnowguards.com e-mail info @alpinesnowguards.com
%1 KS % ) �-
2 X 4 Layout less t o 75 psf
Ground Snow Load and less _a `
than 24112 roof pitch using 12
snow guards per square.
Top ten feet of rafter does not
generally require snow guards
except in extreme snow load
areas.
2 X 4 Supplemental Pattern
(Alpine standard layout)
This pattern is for installations
using 12 snow guards per square
including the standard three -row
pattern. Space rows 2' vertically
and 4' horizontally to within 10' of
the ridge.
Standard Three -Row Pattern —
For All Roofs.
Three rows 24" on center
horizontally with the middle row
staggered 12 ".
A Division of Vermont Slate & Copper Services, Inc. I
Made in Vermont USA
We keep snow In Its place. From Recycled Materials
ALPINE289 Harrel Street
Morrisville, VT 05661
Toll Free Phone 1.888.766.
SNowGuARDsO
Toll Free Fax 1.888.766.9994 9994
www.alpinesnowguards.com e-mail info @alpinesnowguards.com
Three -Row Pattern
The three -row pattern uses 17 snow
guards for every 10' of eave (eave
length (in feet) X 1.7 = qty. needed).
Standard Three -Row Pattern
24" on center horizontally, 2 courses of
shingles vertically, with the second row
offset 12"
? V
A Division of Vermont Slate & Copper Services, Inc. Made in Vermont USA ` 1A
We keep snow In its place. From Recycled Materials WO
A OW
Cut Sheet - #40
1. Installation to be completed in accordance with manufacturer's written specifications and installation instructions.
2. See spec sheet or contact manufacturer for detailed material, finishes, and configuration options.
3. Contact manufacturer for detailed layout.
4. Do not scale drawings.
5. Subject to change without notice.
23/811
1
ALPINJ
SNOWC-
www.alpinesn
ALPINE 289 Harrel Street
Morrisville, VT 05661
SNOWGuARDS® Toll Free Phone 1.888.766.
Toll Free Fax 1.888.766.9994 9994
www.alpinesnowguards.com e-mail info @alpinesnowguards.com
Layout for Extreme Snow Areas Greater Than 75 psf Ground Snow Load
Most snow guard installations will use 12 snow guards per
square with our standard 2 X 4 layout. If your project is in
an extreme snow area, greater than 75 psf you will need to
use one of these layouts. If your Ground Snow Load is
between 75 psf and 110 use the 2 X 3 layout. If your
Ground Snow Load is from 111 psf to 150 psf use the 2 X
2 layout.
Installation
1. The third row of shingles is fastened to the roof in the usual manner.
2. The snow guard is placed on the shingle with the up slope end of the strap resting on
the roof deck above the shingle.
3. The snow guard pad should be placed low enough on the shingle so that the next
course of shingles (course 4), lays properly over the top of the snow guards, and the
pad is set 3 times the
thickness of the shingle (or 5/8 ", whichever is great) below the
next course.
2 x 3 Pattern . for tools 75 psf to 110 psi, 2 x 2 Pattern -tor roofs 111 psf to 150 psf•
Horizontal spacing
12 to 21 snow guards per square. 22 to 27 snow guards per sguars.
should be 24" on
center for the first
Ridge . Ridge— °"" ��
three courses.
_-
22_27
17-21
4. Two nails o r screws
For If the Ground Snow Load is Jill roofs - the ttC ten if the Ground Snow load is
between 25 s 110 par and the t0 feet � rafter dces not re- to between i 11 a 150 psf and tl
of the same or
roof pitch is kss than 24 %12. gtlirf In s s ttrcem in roof pitch is less than 2412,
'1 cxtremey, „rt irti5- butmolethan6+12.youwill
but more than 52, you will
compatible material
need 17 -21 snow guards per need 222r snow guards pe,
square using the 2 X 2layou
as the snow guard���
square using the 2 x 3layout
are inserted through
spaco,tarasz°-t drYsnut 2' x ?
the two holes at the
vertically and 'ixu° paxerrto ta`
top of the strap to
secure the snow
eon ?Ply to 10' of ridgy, Of ridoc.
x'
guard to the roof
deck.