HomeMy WebLinkAboutB13-0033 B13-0034 Blower door and rado test Department of Community Development
75 South Frontage Road
TOWN OF VAIl. ' va�i, co $�ss7
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of$110 will be cha�ged upon reissuance of the permit.
_ . _ _
ApplicationlPermit#(s) information applies
to: Attention: ( ) Revisions
� I 7 � ���� � �' � __���[� ( ) Response to Correction Letter
J � attached copy of correction letter
� ( ) Deferred Submittal
��� � �� ( ) Other
. _ , _ . _ . . .
Project Street Address:
�� �o ��( ��s' ,C�"�
(Number) (Street) (Suite#)
Building/Complex Name: Description of Transmittal/List of Changes, Items Attached:
� — �L-��,<J� J�z�� � �T�
Applicant Information ;
t � ����r� ���G�2��"
(architect, contractor, owner/owner's rep) _- •
,� / �
xContact Name: �C—� �t�y�V� 3
i
� Address: (��� ����L��
City State: Zip:
�Contact Name: �� ���'i����_
r-d (use additional sheet if necessary)
,. .., ._.., . .. , _.. ,_.. _. _ . _. , ..
Contact Phone: Building Permits:
"���y��� �,Q�` (" t� �� Revised ADDITIONAL Valuations (Labor&Materials)
Contact E-Mail: rr� ��qf�_���DO NOT include original valuationj
I hereby acknowledge that I have read this application,filled out Building: $
in full the information required,completed an accurate plot plan,
' and state that all the information as required is correct. I agree to ;Plumbing: $
' comply with the information and plot plan,to comply with all Town ;
ordinances and state laws, and to build this structure according °Electrical: $
to the town's zoning and ubdivision codes, design review ap-
' proved, International il ing an Residential Codes and other Mechanical: $
ordinances of the wn I' I reto. ^ ,
X Total: $ ��—
Owner/Owner's e s nta e Si ature(Required)
Date Received:
.e_______�
� � �'G, I� � �II�
Fo�o�r�e Use o��y JUN 2 5 2014
Fee Paid: 0
Received From: _�
� Cash Check# °�"�W� ��'� ��'�
CC: Visa/MC Last 4 CC# exp.date:
Authorization #
I�i� �� �.i��'���.�' ��%: �.� � �_�'; �'��"�
������_ ����� ������.
� � �
. , �
� w � ! � . � ;.,
�F�i�� ��� �1����
���� I��� :
��1�.��� : �'�1�—���� �� �.1:�Qi� �m.
�����1 : ��14 ��— �� ��. 1�._�.� p�
�.�� : ?'�1�—��-��� �t �':�!�� �.
��i���'"���`��'`� . �.�� �1��`� �_!��`j'r� ����
�.i.� �: �����' '�',� �'��:]�'�: �_� � �_� ��a'��
I����i��: ����� �'�.���it
��� ���,-��
��!�� �v��.F�� �����
���:� �,'� ������
.�►f�:�.�'��'����� ':
�,'i�,��� : �'�'�.����—�� �.t �,���� c'�.
�t��� : ?,���—��-1� �� �.�� �
��.�1� _ ��►���—�i��—�;1 �� ���� �.
��ta��.'����� : 11� :���� �_���� ����'
y�ir��I�_ 1��j6�u�t],er���,d, � � �:i��-� �,3`��'8,���=��� Ph�: ����6��� F�.�: �I�`�5���S�—�f���
_
�1C:,�1'I�'L
����.c.:����,��.
3078 Booth Creek Falls Ct. Residence Final Air Leakage Report
Test Date: June 19, 2014
Builder: Coastal Construction
Contact: Peter pobyns
Site Address: 3078 Booth Creek Falls Ct, Vail CO
Site Visit By: Kristen Hartel
Report By: Kristen Hartel
Back�round
Active Energies conducted a final blower door test on the residence at 3078 Booth Creek Falls
Ct. in Vail on Thursday, June 19, 2014, from 12 pm to 1 pm. Construction was completed with
only finishing interior touches remaining.
The Town of Vail requires that all new homes must meet or exceed the requirements of the 2012
International Energy Conservation Code (IECC),which requires that air leakage within the home
does not exceed 3 ACH50.
Air leaka�e Results
The home was depressurized to the standard -50 Pa of pressure, and a leakage of 1,680
CFM@50 was projected.
The ACH50,the rating used by the Town of Vail building code and requirements, was calculated
to be 2.15.
The natural air change per hour rate was calculated to be 0.17.
n�egaw c,��v�,aw
.�, l./^�
MeU a v�,C�?ftctCve�werc+Ces.covu.
Page 1 of 1 6/19/2014
P.O.Box 7627,Avon,CO 81620 � P: 970.306.4233 � F: 866.403.3485 � www.activeenergies.com
.��ta'�l�I�'L
L���c���.:���.
3�080 Booth Creek Falls Dr. Residence Final Air Leakage Report
Test Date: June 19,2014
Builder: Coastal Construction
Contact: Peter pobyns
Site Address: 3080 Booth Creek Falls Dr,Vail CO
Site Visit By: Kristen Hartel
Report By: Kristen Hartel
Background
Active Energies conducted a final blower door test on the residence at 3080 Booth Creek Falls
Dr. in Vail on Thursday, June 19, 2014, from 11 am to 12 pm. Construction was completed with
only finishing interior touches remaining.
The Town of Vail requires that all new homes must meet or exceed the requirements of the 2012
International Energy Conservation Code (IECC), which requires that air leakage within the home
does not exceed 3 ACH50.
Air leaka�e Results
The home was depressurized to the standard -50 Pa of pressure, and a leakage of 1,020
CFM@50 was projected.
The ACH50,the rating used by the Town of Vail building code and requirements,was calculated
to be 1.32.
The natural air change per hour rate was calculated to be 0.10.
Megaw c,��w�.aw
«_ C.i'_
Mec�a v�.C�.4ct�ve�wer��es.ccw�.
� �
Page 1 of 1 6/19/2014
P.O.Box 7627,Avon,CO 81620 � P: 970.306.4233 � F: 866.403.3485 � www.activeenergies.com