HomeMy WebLinkAboutVAIL RIDGE BLOCK B LOT 19 LEGALTOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE FOSTED ON JOBSITE AT ALL TIMES
ADD/ALT SFR BI.JILD PERMIT PETMit #: BO5-0281
Job Address: 2645 DAVOS TR VAIL
Location.....: 2645 DAVOS TRAIL
Parcel No...: 210314203016
Project No : ?r'r of_O filaJ
OWNER OBERTJOI{R, RUPERT
2545 DAVOS TR
VAIIJ
BuildtuU----- > S139.25 Resauarant Plan Rcview- >
Plan Check--> 590.51 DRB Fee----------->
Status...: ISSLJED
Applied. . : Wll4l2005
Issued. .. : Wll4/20O5
Expires. ..: 0311312006
S0.00 Total Calculated F€es-> 9212 .76
S0.00 Additional Fees-----> $50.00s0.00 Total Permit Fee-----> 5282.16
$0. 00 PaFnents---------> F282 .16
09/t4/20os
co 81557
APPITICAI{:r OBERLOHR, RttpERT 09/L4/2005 p}rone:970-476-33!3
2545 DAVOS TRAIIJ
VAII.,
co 81657
License:372-I-'
coNrRAcToR oBERIOHR, RTIPERT O9/L4/2005 phone: 970-47643a3
2545 DAVOS TRAII,
VAIL
co 81657
Lricense: 312-TJ
Descripion:
RE-ROOF-SAII{E FOR SAII{E-CEDAR SITAKES
Occupancy:
Type Construction:
Valuation: $7,m0.00 Add Sq Ft: 0
Fireplac€ Information: Restdcted: Y #of Gas Appliar@s: 0 # ofGas l,ogs: 0 #of Wood Pellet: 0
+}{+++++s++++++:.+a+i++:|+''t+,l,|c+,|,}tt||+i*'***{.*:t***3**,t*******t,|tt*+l.*
Investigation- )
Will Call---->
$0.00 RecreationFer---:-*->
$3.00 CIearFUpDeposit------>
TOTAL FEES-------- > 5222.16 BALANCE DUE-------->$0.00
Approvals:
Item: 05100 BUILDING DEPARTMENI
o9/r4/20os ,Js Action! AP
IIEM: O54OO PI,ANNING DEPARTMENT
Item: 05600 FIRE DEPARTMENI
Item: 05500 PTBIJIC WORKS
,r:.+++++++++|++++++++|+t|+tt+++*++*+++++**+*+*+**itt+'tt:it|ti++ttt|t|
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in frrll the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances ald stat€ laws, and to build this sbucture according to the towns zoning and subdivision codes, design
review approved, Inernational Building and Residential Codes ard other ordinances of the Town applicable tbereto.
REQUESTS FOR INSPECTION SI{ALL BE MADE TWB.rTy-pOun xotsffn't ADv
PM.
TBLEPHONB AT 479-2149 OR AT OIJR OFFICE FROM.8:00 AM - 4
OR CONTRACTOR FOR ANDOWNER,
PAGE 2**,t***:*+********,f***,f*,r*****,**,*******'t't*:F|t'f*{.:**'l*'t*!**'t*'t'*****:f:t.ttl*t*{.:s!r{.*:e:r:**,|.*,r*i.********+++:*+*+:*:|.*****
CONDITIONS OF APPROVAL
Permit #: 805-0281 as of 09-14-2005 Staus: ISSUED**{<,t{.*****.****:l.********:******{.***'t:ti,f*:t*'|:*!***'#*{!'F't.:*:*******!i:|*'|t'Fi**:t+{t'tt'',*!':t*!*********
Permit Type: ADD/ALT SFR BUILD PERMIT Applied: 09fi4t2D5
Applicant: oBERLOHR, RUPERT Issued: w/14/2w597U476-3313 To Expire: 03/t3t2006
Job Address: 2645 DAVOS TR VAIL
Location: 2645 DAVOS TRAIL
ParcelNo: 210314203016
Description:
RE-ROOF-SAME FOR SAME-CEDAR SHAKES
***************:F:t****************:r*****:i*:f:i**r*r** COnditiOns *******'r*****,t ******************************
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQLJIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 16
(BLDG.): (SFR) sMoKE DETECTORS ARE RFQUIRED PER SECTION
R3I3 OF TTIE 2OO3IRC.
t**+f f f,{"1't***{t'l.t}**'lt*!t!t**{.!*******+++*f *+++ t * * ***t+*'tf *,}***+r+f *******ti****f '8't*d.*i({.{.**rr.{.{r{rr.{r*ri
TOWNOFVAIL, COLORADO Statement*{t****ttt++++************************+t*****ff+t+***'}*'t**{r{.**+***********************++++++f
Statement Nr.rmber: R050001519 Amount.: i292,76 09/1,4/2OO5O2:13 pM
Palment Method: Check Init: DDG
Notsation: Oberlohr L449
Permit No: 805-0281 114)e: ADD/ALT SFR BmIrD PERMITParcel No: 2103 -142 -0301-6Site Address: 2645 DAVOS ?R \,AILLocation: 2645 DAVOS TRAIL
Tot,al Fees 3Thia Payment:
BP 00100003111100
CIr 00100003123000
PF 0 01000031123 00
wc 001000031L2800
BUIIJDING PERMIT FEES
COI{TRACTOR IJICENSES
PI,,ATiI CHECK FEES
WII.,IJ EELL INSPECTION FEE
S2B2.7G ToTaI .ALL Pmts:
Balance:
$2e2.76
9282.75
$0.00
Current Pmts
***+******,1*+*t***+i+'i't'*****++++++++tttffffft't't**********{,{.**************++++++++***+++**+tt
ACCOI.JNT ITEM LIST:
Account Code Description
t39.25
50.00
90.51
3 .00
APPLTCATION WLL NOT BE ACCEPTED IF INCOMPLETE OR
Project #:
Separate@
tl
Permit #:G
mvxuFytn
75 S. Frontage Rd.
Vail, Colorado 81657
-ovzd
ins?dat(
l, etc.!
CONTMCTOR TNFORMATION
COMPLETE VALUETIOruS FOR BUILDING P ERMIT & Materials
ELECTRICAL: $OTHER: $PLUMBIN_MECHANtffi
For Parcel # Contact Assessorc Oflfce at 920-32S-g6a 0 or visit
%oRoFFtcEUsEoNLy@
JobAddress: Z6+,
Work Class: New ( )Addition( ) Remodet ( ) Repair Demo( ) Other( )Work Type: Interior ( )Exterior F\ Both ( )Does an EHU exist at this rocation- yeiJl-ffi
Itt" "t"t., a,"t'"*
No. of Existing Dwelling Uniti in tf,i. Uuiffi No. of Accommodation Units in ttris UuitOingJ
qs LogglDd Wooq/peilet ( ) Wood
Oocument2 -H:
05/20t2005
ll
rum'm
Department of Community Development
Project Name:
Project Address:
r' This chsklirtmufibeamolefud beforca Building permitaooticatrbn is
acepte-------------d,
VAll Wges of application is complete
o Has DRB approval obtained (if required) provide a copy of approval formo Condominium Association letter of approval attached if project is a Multi-Family complexo Plan Check tue required at submittal for projects valued over g10O,OOO.00 (See attached
C.onstrudion Fee Schedule for calculations)
o Complete slte plan submitted
tr Publlc Way Permit application included if applicable (refer to Publlc Works checklist)
o Staging plan included (refer to Publk Works drecklist) No dumoster,oartinq or material s,toraoe
allowed on roadwavs and shoulderc without written aooroval
o Asbestos test and results submitted if demolition is occuningo Architect stamp and signature (All Commercial and Multi family)
o Full floor plans including building sections and elevaUons(3 seE of phns for remodel/additions, 4 sets
of plans for new SFR and Duplex, 5 seb of plans for MultFFamily and Commercial Buildings)
a Window and door schedule
o Full structural plans, including design criteria (i.e.loads)
o Structural Engineer stamp and signature on sfuctural plans (All Commercial and Multi Family)
o Soils Report must be submitted prior to foottng inspection
o Fire resistive assemblies specified and penetrations indicated
o Smoke detectors shown on plans
o Types and quantity offireplaces shown
I have read and
Applicanfs Signahrre:
Date of submittal:
Doorment2
Received By:
05t20t2005
ll
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Enginee/s (Public Works)
review and approval, a Planning pepartment review or Health Department review, and a
review by the Building Departmeht, the estimated time for a total review may take up to
six (6) week.
All commercial (large or small) and all multi-fami[ permiE will have to follow the above
mentioned maximum requirements. Residential and small projecb should take a lesser
amount of time. However, if residential or smaller projects impact the various above
mentioned departments with regard to necessary review, these projects may take up to
six (6) week to review and approve.
Every attempt will be
possible.
made by this department to expedite this permit as soon as
I, the undersigned, understand the plan check procedure and time frame. I also
understand that if the permit is not picked up by the expiration date, that I must still pay
the plan check fee and that if I fail to do so it may affect future permib that I apply for.
Agreed to by:
Project Name:
Date:
YEs- No,x.
Is a dlftrent access needed b the sits otrer than the exbting driveway?
Is any dninage work being done that afiec1s he Rpht-of-Way, easernenb, or public property?YES_ NO x.
Is a 'Revocable Right-of-Way Permit" required? YES- NO
'X
Is the Rightof-Way, qasernenb or public property to be rsed for sbging, parking or fencirg?YES_ NO K
If anslver '6 NO, b q parkirg, sbging or tsnclng plan nquired by Publlc Works?YES_ NO x.
If you arswered YES b any of these questions, a '?ublic Way Permif' must be obtalned.
? ubllc Way Permit" applications may be obbined at the Publk Wok's offce or at Community
Developnent (a sample is atbched). If you have any questors please call Leonard Sandonl in Publk
Works at479-2198.
tl
WHEN A "pUBLr WAy pERMfr" E REQUIRED
PIEASE READ AND CHECK OFF EACH OF THE FOIOWING QUESTpNS REGARDTNG THE NEED FOR A
?UBLT WAY PERMI[":
o Is thb a new r.esidence?YEs- Nox
o Does demoliton work being performed require the use of the Rightof-Way, easemenb or
publk property? YES t{O-X_
Is any utility work needed? YES_ NO )<
Are there any impmvements being done b tre ddveway ?
o
o
o
o
YEs- No x
o
Job or Ppject Name:
Dab Sigred:
I)PiANSWERED
AtI rHE ABoVE QUESIIoNS.
Docum6nE
49c6
Company Narne
05f2012005
PRJ #:_
PW#:APPLICATION
F'OR TOWN OF VAIL
PUBLIC WAY PERMIT 20_
l.
Parcel #:
tl
,-m
Bldg. Perrnit #: !
Job Name Street Address
(If unknown call2. 479-2139\
Excavating Conh?clor Name Mail Address TOV Contractor Lir:ense Number - .REQUIRED
Start Date
4. Work is for (circle one)
Other
Compl*ion Date
'Water Se*er Gas Electric Telephone
, (Permit Expiration Date)
CATV Landscaping Temp. Site Access
5.Trench-width t ength Depth
(min. a')
Bond Amount $Permit Fee $
Total SF $
Total LF
Total Permit Fee $
6.ALL MATERIAL, EQUIPMENT, AND TRAFFIC CONTROL DEVICES MUST BE ON THE JOBSITE BEFORE THE JOB IS STARTED.
Rubber out-riggers are required on excavating equipment when working on asphall Asphalt surfaces underneath the bucka and lugs shall
be protected at all times.
A signature below indicates a rcview ofthe area and utility locations and approval. Once all utility company sigmtures are obtained ,
permittee has option of routing application through the Public Works oflice to obtain the trece3sary Town of Yail signatures.
Please allow up to one week to process.
Xcel Enerry / Public Servicc Company (l -800-922-198?)
Xcel Enerry High Pressure ( I -E00-922-1987)
Quest ( I -800-922- 1987)
Comcast Cable (l -800-922- 1987)
Eagle River Water & Sanitation District (970-476-7480, cxt. I 14)
Holy Cross Electric Company ( I -800-922- I
Town of Vail. Electricians (970-479-2158)
Town of Vail lrrigation (970-479-2158)
THERE WILL BE NO TOTAL STREET CLOSURES! A con"struction traliic control plar must be suhnitted and approved by dre Public Works Depamnent
prior to issuance ofdre pennit.
9. All excavation must be done by hand within 18" of urilities - (Senate Bill 172).
10. Pemritte€ must contact the Publis Works Deoamncnt at 476-2198 24 hours priol to comnlencins of work. Failure to Notiry t}re Town will result in
forfeiture ofbond money. Scheduled inspections that are not ready may result in the Town charging the contractor a re-inspection fee.
I t. I certifi tlrat I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility Company agreemcnts, signed
by me, and will abide by the same, and that all utilities have been notified as requircd.
8.
Contracbr's Signature of Aggeernent Print nome cleorly
ATTACH PLAN OF WORIq INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN
Show steet with names, buildings, and location of cuts. USE DASH LINES FOR CUT.
Date of sigaorure
White - Public Works
Yellow - Contractor
.rEllnl.>i <
ll
PUBLT U|oRKSANDTHE PUBLT WAYPERMIT PROCESS
How it relates to Building Permits:
Fill out he atbched check list with the Building Permit Apolication.
If yes was answered b any of the questions tren a 'Public Way" permit is required. you
can pick up an application at eidrer Community Developmenf locabd at 75 Soutr Frcnbge
Road or Public Work, locaEd at 1309 Elkhom Driue.
Notice sign'offs for utility companies. ALL utilities must field verifo (locab) respective
utilities prior b signing application. Some utility companies require up b 48 hour notice b
schedule a locaE.
A consEucton taffic conboly5bging plan must be prepared on a separab sheet of paper.
An approved sib plan may abo be used. This plan will show locations of all traffic control
devices (sigrs, cones, etc.) and tre wod< zone, (area of consfudion, staging, etr.). This
plan will expire on November lst and will need b be resubmitEd for considention for
approval through the winEr. Be awarc that your resubm'ssion for winEr may be denied
depending on $e location of constuction.
Sketh of work being performed must be submitbd indicating dimensions (length, width
and depfi of work). This may be dnwn on the faffic confol plan or a sib plan for the irb.
Submit complebd application b tre Public Work's office br review, If required, locabs will
be scheduhd for the Town of Vail elecUicians and irrigation crew, The locaEs bke place in
the moming, but may require up b 48 hours b perform.
The Public Work's Consbuction hspecbr will review the application and approve or deny
the permil You will be conhced as b fte shhls and any requirements hat may be
needed. Most permits are rcleased wiUrin 48 hours of being received, but please allow up
b one (1) week b prccess.
As soon as he permit is approved, fie BuiHing Departlent will be notified, allowing the
"tsuilding Permif'b be released. Please do not confuse he Yublic Way Permif with a
"Building Permif'.
F NOTE: The abbve process is for raprk in a public way ONLY. Public Way
Permits are valid only until November 15h. A new Public Way Permit is rcquired
each year if ralork is not compleb. Re-application each November 15th does not
mean an aubmatic reneural.
Oocumene 0520i2005
tl
TVWTIOF
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
The Town of Vail BuildingrDepartment has developed the following procedures to ensure that new
construction sites have adequately established proper drainage from building sites along and
adjacent to Town of Vail roads or streets.
The Town of Vail Public WorK Department will be required to inspect and approve drainage
adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at
access points from the road or street onto the construction site. Such approval must be obtained
prior to any requests for inspection by the Town of Vail Building Department for footings,
temporary electrical or any other inspection. Please call Leonard Sandoval at479-2198 to request
an inspection from the Public Works Department. Allow a minimum of 24 hour notice.
Also, the Town of Vail Public Works Department will be approving all final drainage and culvert
installaUon with resulting road patching as necessary. Such approval must be obhined prior to any
Flnal Certificate of Occupancv issuance.
Agreed to by:
Print Name
Project Name:
Date Signed:
Signature
rl
TORI|IOF
Pleae rcad and checkofreach of the iEms below.
(Cop'es of compleE Ext are avaihbh upon request)
CODE 5-2-10: DEFOSITS ON PUBLD WAYS PROHIBITED
q Unlawful deposils: Subject bc subsecdon C trereof. it is unlawful for any pecon b litEr, back or
depcif or cause bc be litbred, hacked or depmibd, sand, gravrel, rocls, mud, di4 snow, ice, or any
oher debrls or maErial upon any sreeq, sidewalk, alley or public place, or any portion thereof.
o Notice; Ababnenil The Direcbr of Publ'rc Work may notiff and requirc any person who violaEs or
causes another to v'lolaE the provbion of subsection A hereof, or who has in he Direcbr/s employment
a peFon who viohbs or causes anotier to violaE the same, bp remove srch sand, gravel, rocks, mud,
dirt, snow, ice or any oher debrb or maErial within twenty four (24) hours after receipt of said notice
by the Direcbr of Public Work. In the event he person so noUffed does rpt comply with the notice
within the period of time herein specified, the Direcbr of Public Works, or oher auhorized agent, may
cause any such sand, gnvel, rock, mud, dir! snow, ice, debrb or any other maErial b be removed
from any sheet or alley at the expense of the notified.
o Sumrnons and Penalty: As an alEmative b the notice br remolal provided in subsection B above,
any person who violaEs or causes another b viohb the sarne, rnay be bsued a summons b appear
before the Municipal Court of the Town for said violaUons, and upon being found guilty of a violation
hereunder be punished as provided in Section 14-1 of th's code.
o Notice and Penalty: It is unlawful for any person to hil or retuse b comply with the notice of the
Direcbr of Public Wod<s as provided in subsection B hereof, and any srch person shall, in addition to
payment of the expense of removal irrurred by the Direcbr of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation lrereunder, be punbhable 6 proviJed in Section L4-I of
thb Code. (1997 Code: Odinarre 6 (1979).
CODES 7-3A.1AND 7-3A.3: PART(NG OBSTRUCTNG TRAFFT & IMPOUNDMEI{TAUT}PRZED
tr No person slnll park any vehhb upon a sFeet or at any oher place within this Munklpallty in such a
manner or under such condiUors as b inErfere with the free movement of vehkular taffic or proper
sBeet or hi'ghway mainbnance. (Ord. 2(1968) 5 1)
o Wheneler any police officer finds a vehhle atEnded or unatEnded, standing upon any portion of a
sEeet or upon any place within th's Munbipality in srch a manner as b corstituE a violation of any
section of this Afticle; or left unatbnded for a pedod of tuenty four (24) hours or more and presurned b
be abandoned under the condiEons prescribed by Colondo Rev'sed SbUtes section 424-1102, as
amended, he officer shall require the vehicle b be removed or cause it b be removed and placed in
sbcrage in he nearest garage or otrer place of safety designaEd or mainbined by ttis Municipality, and
the charges for bwing and shcrage of such vehicle shall be charged b the owner of the vehkle in
addition b a bn dollar ($10) impoundment charge, (Ord. 2(1958) 5 3: Ord. 28(1981) 5 1)
I have read and will corply with &e above code provisions:
Position or Rplationship to Project:
MHgned: ?tl Z :c >
'ttlrUeA
05t20t2005
tl
VaiI 2004
Vail Villagq and Lionshead Village Construction Hours
Information Handout
Problem Statement
The Vail Mllage and Lionshead Mllage are invaluable assets to the community. Thousands of people come to Vail each
year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely
upon our guest to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the construction has as little negative impact on the community and on our guest as
possible, he Town of Vailfinds it
Hourc Handout.
to create and implementthe Vail Village and Lionshead Mllage Construction
It would be inesponsible for the Town of Vail, the Construction Conhactors and the Merchants, to not actively participate
to minimize the impact of construction in the Vail and Lionshead Mllage areas.
New for 2004-2006 will be the VailVillage Streetscape lmprovement Proiect. Work to include all utility related
improvements, streetscape, drdinage, snowmelt systems and landscaping.
A,ll Construction projects and/br remodels within the Vail Village Core Area should contact Scott Bluhm
Town of Vaif Streetscape Goordinator at970477-3418 for further information.
Givens
The following givens are intended to provide the basic foundation by which construction will be completed in the Mllages:
. The public's health, safety anp welfare shall be honored at all times.
. Adequate pedestrian, loadingfdelivery, vehicle, and emergency vehicle access and circulation shall be maintained.
. Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
. All construction deliverieS, equipment, tools and materials entering the Vail Mllage and Pedestrian areas must go
through Check Point Charlie. ,All Lionshead construction activity must go to the Vail Police Department for a
parking permit Do not use dglivery zones for construction parking, refer to approved staging plan or make other
anangements for parking.
. The hours of Outside Constnlction Activity shall be as follows:
- April 15-June 18 &SeptemberT-November 19,7 a.m. until 7 p.m., seven daysaweek.
June 18 thru September 10, work must end by 4:00 p.m. on Fridays,
November 13 - April 1 5, 2005 work allowed within daylight hours only.
- Deliveries shall be restrictbd to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m, to 8:30 a.m. on
Bridge Street.
- Special Construction delivery permits must be requested in advance, from PublicWorks in conjunction with Code
Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June 19 and September 5.
- No outside construction
""{iuity
shall occur on the fotlowing dates:
0F'DODflOS
o0DttttY tElEt IFtEf$
Design Review Board
ACTIOT{ FORiI
Department of Communitl Development
75 South Frontag€ Road, Vail, Colorado 81657
tel:970.{79.2139 faf,:970.479.2.+52
web: www,vallgov.com
Prcject Name: OBERLOHR RE-ROOF
Project DescripUon:
RNAL APPROVAL FOR A RE-ROOF-SAME FOR SAME-CEDAR SHAKES
Participants:
OWNER OBERLOHR, RUPERT
26.15 DAVOS TR
VAIL
co 816s7
APPUCAiIT OBERLOHR, RUPERT
2645 DAVOS TR
VAIL
@ 81657
09lL4l200s
wl14lzoos
ProjectAddrcss: 2645DAVOSTRVAIL Locauon: 2645DAVOSTRAIL
Legat Descdption: l-oh 19 Blodc B Subdivision: VAIL RIDGE
ParcelNumber: 2103-142-0301€
Comments: SEE CONDilONS
DRB t{umber: DRB050492
Motion By:
Second By:
Vote:
Gonditions:
EOARD/STAFF ACTIOI{
Action: SrAFFAPR
Date of Approvab 091 14 I 2005
Condr 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the approprlate rs/iew commlttee(s).
Condr 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vall Building personnel prior to construction activiUes.
Cond:201
DRB approval shall not become valld for 20 days following the date of approval.
Oond:202
Apprwal of thls proJect shall lapse and become void one (1) year following the date
of final approval, unless a buildlng permlt ls lssued and construction is commened
and is diligently pursued toward completion.
Joe Suther DRB Fee Paid: $20.00Planner: