HomeMy WebLinkAboutB11-0496 REV01 Narrative Letter � ARCHITECTURE
URBAN DESIGN
. INTERIOR DESIGN
July z1, zo14
Martin Haeberle
Town of Vail
4z W. Meadow Drive
Vail, CO 81657
RE: Reference : Bis-o496 Strata Vail Permit Drawings
Dear Martin:
• We are submitting to the TOV supplemental drawing and specification information that is being
provided to PCL Construction Company to be incorporated into the approved contract
documents for construction. See attached summary ASI_001 Construction Set Clarifications.
• The Following information is for the issuance of 'FOR CONSTRUCTION DOCUMENTS' to be
included in the permit set of drawings dated 3/31/2014. This summary ASI is to capture several
items outlined in Addenduml dated 01/24/2014, Addendum 2 dated 02/06/2014, Pre-
construction RFI's, some current construction RFI's and VE items that were included in the GMP
but not included in the 3/31/2014 permit set.
• There are also other identified in OAC meetings , MEP/FP meetings and team discussions which
are included in this ASI Narrative.
Sincerely,
���� ��
�� �������
� ��������� �
� �� �� �
�� ��� �� �
�
� � ���
� ��
o�izsizol4
OZ Architecture, Inc.
.�. . ����� � ��.� . ` '`�'�-� � -�'�- � � DENVER PHONE: 303.861.5704
3003 LARIMER STREET FAX: 303.861.9230
DENVER BOULDER COLORADO SPRINGS DENVER,COLORADO 80205 WWW.OZARCH.COM
� ARCHITECTURE ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS
�� URBAN DESIGN
INTERIOR DESIGN
PROJECT NAME: Strata Vail ASI#: oos �OWNER
�ARCHITECT
�CONSULTANT
�CONTRACTOR
PROJECT#: 1]004.15 DATE OF ISSUANCE: 07/i5/20i4 ❑ FIELD
❑
OWNER: Lionshead Inn, LLC ARCHITECT: OZ Architecture, Inc.
Patricio Burillo
Rodrigo Cortina TO CONTRACTOR: PCL
705 West Lionshead Circle CONTRACT FOR: Construction
Vail, CO 81657
CONTRACT DATED: Mdy 20iy
The work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract
Documents without change in Contract Sum or Contract Time. Prior to proceeding in accordance with these instructions, indicate your
acceptance of these instructions for minor change to the Work as consistent the Contract documents and return a copy to the Architect.
DESCRIPTION:
The Following information is forthe issuance of'FOR CONSTRUCTION DOCUMENTS'to be included in the permit set
of drawings issued 3/31/ZO14.This summary is primarily to capture several items outlined in Addendum i dated
01/�4/zoiy,Addendum z dated oz/o6/zoiy, Pre-construction RFI's and current construction RFI's and VE items that
were included in the GMP that were not included in the 3/3i/zoi4 permit set to keep that separate from these items.
There are also other items in this list that were identified in OAC meetings, MEP/FP meetings and team discussions
which are summarized in this Narrative.
CIVIL:
• Sheet Ci.o3:
i. Added profile for Enzian transformer wall.
z. Revised grading behind wall to add swale and inlet.
3. Revised wall profile.
4. Added boulderwall behind sidewalkwestoftransformerwall.
5. Expanded boulderwall on each side of existing phone pedestal south ofthe Enzian driveway.
• Sheet Ci.o3B:
6. Added inlet and subdrain piping behind Enzian transformer wall.
• Sheet Ci.o4:
7. Revised phone conduit alignment and entry location.
8. Revised alignment of CATV service to the building at the NW corner.
• Sheet C1.o8:
9. Added wall subdrain and drainage board detail.
,�_�;.,
>,����:,�
`,� . ��.- '�` ". .. _�'� �� �� "�"�` DENVER PHONE: 303.861.570A
� 3003 LARIMER STREET FAX: 303.861.9230
DENVER BOULDER COLORADO SPRINGS DENVER,COLORADO 80205 WWW.OZARCH.COM
�
��
LANDSCAPE:
• Sheet Li:
1. Revise per civil plan.
z. Additional boulderwalls&concrete walk.
• Sheet L6:
i. Revise per civil plan.
z. Additional boulder walls&concrete walk.
3. Revised per RFI#oz6 Dimension Light Pole Locations per PCL& Ludvik Electric Recommendations
y. Revised per RFI#oz6Ri Dimension(y)Light Poles to be 9'0"from Back of Curb per PCL& Ludvik Electric
Recommendations.
5. Revisions to planting in area of placement ofthe additional boulder walls.
IRRIGATION:
• Sheet IR-1:
i. Revised civil plan.
z. Additional boulderwalls&concrete walk.
• Sheet IR-3:
z. Detail i6 Revised per RFI o005
ARCHITECTURAL:
• Sheet Ti.i:
i. Revised applicable IBC year to zoiz, Project Team and Title to For Construction Set dated July i5tn zoi4
z. Deleted Dewatering sheet Dz.o
• Sheet Ti.z:same as T1.i
• Sheet Az.oP-zA:
z. Eliminated wing wall at elevator APzi4. RE: RFI o063.
z. Added step into telecomm room APzi4 and Storage APzig. Elevation targets are correct.
• Sheet Az.oP-iA:
i. Laundry area was eliminated and created a storage space.
z. Access Ramp to now storage area was redesigned.
3. CMU walls were added in orderto enclose the ramp,stair and bike storage.RE: RFI ooio and sections
4,5�A5.i8A. Ramp section markers were added.
4. The pinch point forthe mechanical duct appears to have been resolved.
5. Added door on north side of elevator A-3 for access to controls within the elevator core per Otis Elevator.
�-��,�>�, ,�
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
• Sheet AZ.oP-iB:
i. Moved South wall ofthe emergency electrical room BPsi6 i'in orderto accommodate electrical gear in
the main electrical room. Re: RFI 6i.
• Sheet Az.oi:
z. Updated Site plan to show additional sidewalk and transformer locations. Re: RFI ooiR and RFI 79.
• Sheet Az.olA:
i. Plan was modified to reflect widening the chase wall along gridline i3.5 between telecom Aio7 and
Elevator A-3 by 4".Wrap around column A8/ic,was minimized in orderto maintain a 5'clearance in
accessible stall and z'-io"in smaller stall.Telecom room Aio7 shifted down in order to keep the original
size. RE: RFI ooz.
• Sheet Az.oi-B:
i. Mop sink location was changed in MopBi3o; based upon MEP coordination meeting.
• Sheet Az.o�A:
z. Revised window sizes at ends of building A, units Azo3 and Azo4 from z'6"to 4'6". Re:A8.iz.
z. Added lock off locations.
3. Revised window sizes at end of building A, units Azo3 and Azo4 from z'6"to 4'6". Re:A8.iz.
• Sheet Az.oz-B:
i. Revised window size at end of building B, unit Bzoz from z'6"to 4'6". Re:A8.iz.
z. Added lock off location.
• Sheet A�.o3A:
i. Added wall type 73F at missing demising wall locations.
z. Added lock off locations.
3. Omitted column wraps where not required in unit A3o3 and A3�4•
4. Revised window sizes at end of building A, units A3o3 and A3o4 from z'6"to 4'6". Re:A8.iz.
• Sheet Az.o3B:
i. Added reference to detail 8/A8.z4.
z. Added lock off locations.
3. Revised window size at end of building B, unit B3o�from z'6"to 4'6". Re:A8.iz.
• Sheet Az.oyA:
i. Corrected door entry into lock off of unit A4oy.(door was missing).
z. Added lock off locations.
3. Omitted column wraps where not required in unit A4o3 and Ayo4.
4. Revised window sizes at end of building A, units A4o3 and A4o4 from z'6"to c,'6". Re:A8.iz.
• SheetAzo4.B:
i. Added lock off locations.
z. Revised window size at end of building B, unit B4oz from z'6"to 4'6". Re:A8.i�.
• Sheet Az.oSA:
i. Corrected door entry into lock off of unit A5o4(door was missing).
z. Added lock off locations.
�-��,�,�;�a
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
3. Omitted column wraps where not required in unit A5o3 and ASoy.
4. Revised window sizes at end of building A, units A5o3 and A5o4 from z'6"to 4'6". Re:A8.1z.
• Sheet Az.oSB:
i. Added lock off location
z. Omitted column wrap where not required in unit BSoz.
3. Revised window size at end of building B, units BSoz from z'6"to 4'6". Re:A8.iz.
• Sheet Az.o6A:
i. Modified column wrap and dimensions at exterior wall of unit A6oz,gridline A5115•4•
• Sheet Az.o6B:
i. Omitted column wraps where not required units B6o1 and B6oz.
z. Revised window size at end of building B, units B6oi from�'6"to y.'6". Re:A8.i�.
• Sheet Az.o7B:
i. Revised unit names to include sheet locations.
• Sheet Az.3i:
i. Revised column wraps in ski lockers in orderto accommodate pipe locations. RE: RFI oo3z.
• SheetA3.zz:
i. Added separation line between the 7'-6"ceiling and the 9'-i"ceiling in the kitchen. Re: RFI Poii.
• SheetA3•23:
i. Detail z:Added 9'-1"soffit to secondary bedroom in order to conceal structural kicker.
• Sheet A3.25:
z. Revised ceiling in living/stair area. RE:3/A3.z5, RFI o004
• Sheet A3.3i:
i. Revised ceiling heights in the Vestibule area Asoz. Re: RFI Poz3
z. Added humidifier access panels.
• Sheet A3•3z:
i. Added reference tag 7/Aio.o4. Re: RFI Poz4 and PoiS
z. Revised ceiling heights in the Great Room area. Re: RFI 66
3. Humidifier access panels were added in the Men'room A23o as well as adjacent to corridor Ai�3.
• Sheet A3.33�
z. Added tongue and groove ceiling adjacent to Exit Biio. Re: RFI Po18.
• Sheet A4.oi:
i. Modified Material legend note z to indicate asphalt single in lieu of conc.tile roof(typ.all exterior sheets).
z. Modified Flag note 1 to show asphalt single in lieu of concrete tile roof(typ.all exterior sheets).
3. Detail i—added flag note 3 at level 3 balcony of unit A3o8.
4. Detail z-Added flag note zz for louvers.Typ.
�iz��za�4
Paye,of i8
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so�A51_om Narrative For Construction Documents zoiy_o7i5.docx
�
��
• Sheet A4o2:
i. Detail z—modified D type windows and M type window to D.1 and M.1 to increase from z'6"to 4'6"at
levels z-5.
• Sheet A4.o3:
z. Detail�—modified window types(right of gridline 4.6)D and M to D.i and M.i.
• SheetA4.o4:
i. Detail i/A4.o4 doortypes BBB at level i right of gridline B3 and left of gridline B6 were modified to show
one swing door.
• Sheet AS.oiA,AS.ozA:
i. Revised flag note 35 and foundation detail to show hydrocoil drainage and pipe(typ.all foundation
details).
z. Revised flag notes 7,3z typ all exterior sheets. Re:A9.zi for revised details.
• Sheet A5.o3A,A5.o4A,A5.o5A,A5.o6A,A5.o7A,A5.o8A,A5.o9A,AS.ioA,AS.iiA,AS.i�B,A5.i3B,AS.iy B,
A5.i5B,A5.16B:
1. Changed flag note 35 to reference foundation detail. Re:ASoiA for hydrocoil location.
• Sheet A5.i8A:
i. Added ramp sections. Re: RFI ooio.
• Sheet A6.oz:
i. Details 5,6 extended core wall dimension on north wall.
• Sheet A6.o3:
i. Switched door swing of door A24�B
z. Revised south wall of exit A14�to type y.8F. Re: RFI o065.
• Sheet A6.o6:
z. Modified ceiling overthe stair in unit MB. RE:8/A6.o6 and RFI o004.
• Sheet A6.io:
i. Elevator cab A-1 was modified to match the size of Elevator cab A-z.
2. Two way communication system was added at all floors except level i.
3. Sump pit size was modified to z'-o"x z'-o"x z9.5"deep; Re:Structural.
4. Detail 8/A6.10 was modified to eliminate the concrete wall at the front of the elevators. RE:wall type 56G
and detail i5/A8.oz.
5. B.O. Hoistway beam elevation was changed to i3'-7". Direction of hoistway beam was modified to run
parallel to long side of elevator shaft.
6. Counter weights are shown of elevator sides.
• Sheet A6.ii:
i. Elevator cab B-i was modified to match the size of Elevator cab B-z
z. Two way communication system was added at all floors except level i.
3. Sump pit size was modified to z'-o"x z'-o"x z9.5"deep; Re:Structural.
y. Detail g/A6.ii was modified to eliminate the concrete wall at the front of the elevators. RE:wall type 56G and
detail i5/A8.oz.
P�,��S o�;,a
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
5. Direction of hoistway beam was modified.
• Sheet A6.iz:
z. Door was added on North side of shaft at Level P1.
z. Elevator hoistway beam was raised 4". Bottom of beam was modified to iz'-8".
3. Sump pit size was modified to z'-o"x z'-o"x z9.5"deep.
• Sheet A7.o.iB:
i. Added tile at pool interior.
• Sheet A7.i.3:
i. Elevator cab elevations revised(fabric no longer used, mirror added).
• Sheet A7.i6:
i. Great Room Elevation C, z'io"h countertop.
• SheetA7.zo-A7.z5:
z. Kitchen island to have shaker-style panels at back and metal laminate base(at island only),stainless steel
reveal removed. Unit Types added to plans for clarification. 48"Wide Refrigerators shown at Penthouse
units.
• Sheet A7.3.00-A7.3.Zg:
i. Unit types added to plans for clarification. No other changes.
• Sheet A7.3.oi:
i. Added finish note i�typ: refer to specifications for tile pattern.
• Sheet A7.y.o:
z. Unit fireplace Elevations and Details. Mantle is full width of fireplace.
• Sheet A8.oi.1:
z. Modified door type ST to a 7'-0"door with 3/8"clear tempered glass with an aluminum frame.
• Sheet A8.oz.z:
i. Moved title`Door Types and Frames'
• Sheet A8.oz:
i. Modified detail zo and added detail i5(a stud wall is shown in lieu of concrete at front of elevator cabs)
z. Detail i7 was omitted as the code no longer requires slammer doors.
• Sheet A8.o4:
i. Detail 6:was modified to show 7x5x3/8"H55 at 118'-0"per structural drawings.
z. Detail 8:jamb was modified to show cement board trim.
3. Detail g:stone veneer was modified to align at corner.
• Sheet A8.iz:
i. Added window type C.i with an operable panel opposite to window type C.
z. Added window type D.i to be used at south ends of buildings A and B.
3. Added window type M.1 to be used at south ends of buildings A and B.
��,����;,�
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
4. Window type notes-added note 8 typ.
• SheetA8.1y:
z. Window type TT—added mullion to floor line.
• Sheet A8.zo:
�pical all exteriorwall detail sheets:
i. Stone veneerwall details:changed drystack stone veneerfor stone set in mortarwith 3/8"joints max and
include notation forventilation mat. Re:3/A9.zi.
z. Stucco wall details:added notation for 1/z"air gap and double D asphalt paper under stucco. Re:1/A9.zi.
3. Screen wall:added notation forvapor permeable air barrier. Re:5/A9.�i
• SheetA8.zz:
i. See notes A8.zo
z. Omitted nested metal stud track with stone wool insulation at windowjambs and sills typ. Replaced with
zx4 FRT surround with FRT plywood strip where required.
• Sheet A8.z4:
i. Omitted nested metal stud track with stone wool insulation at windowjambs and sills typ. Replaced with
zx4 FRT surround with FRT plywood strip where required.
• Sheet A8.z5:
i. Omitted nested metal stud track with stone wool insulation at windowjambs and sills typ. Replaced with
zx4 FRT surround with FRT plywood strip where required.
• Sheet A9.oi:
i. Changed 1.5"xps foam board to i.5"stone wool insulation board. Re notes for sheet A8.zo.
• Sheet Ag.oz,Ag.o3,Ag.o4:
i. Re: Narrative notes sheet A8.zo
z. 5/Ag.o4:sloped concrete at stem wall,added'L'flashing.
• Sheet Ag.zo:
s. Detail i: removed peel and stick membrane
z. Detail 9: removed stone wool insulation.
• SheetA9.zi:
s. Details i,3,4:ihour rated exterior wall;Added HW-D-o6i8(see attached)at slab undersides and deleted
reference to CW-S-0003 elastomeric spray fire barrier over top and side of mineral wool.
• Sheet Ag.zz,Ag.z3,Ag.z4,Ag.zS:
i. Re:narrative notes sheet A8.zo
• Sheet A9•35�
i. Detail 4,7—added backer rod and sealant at capstone
z. Detail 5—removed back board
3. Detail io—added mtl closure at bottom ofsoffit.
4. See narrative notes A8.zo.
��,.�:,�ot�a
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Documents zoiy_o7i5.docx
�
��
• Sheet A9.4o:
i. Detail i—added note for asphalt shingles.
z. Details z,5—updated graphic to show asphalt paper.
3. Detail 6—added zinc metal closure section.
• Sheet Ag.43�
i. Detail i4:was revised perstructural drawings; based upon Re: RFI 44
• Sheet Ag.45�
i. Deleted unused detail numbers
Sheet Aio.oi:
z. Wall type z3, z6, z8:added notation to provide z5 ga. Metal studs z4"O.C.,eliminated STC rating note.
z. Referto RFI oi5 regarding unit interiortypical wall types.
3. Wall type z3, z6,Acoustical wall: Revised STC note for z3C to 45 and z6C to 46.
4. Wall type 43� 46,48:Corridorwall-added notation to provide z5 ga. Metal studs zc,"O.C.
5. Wall type 43,Acoustical wall :changed STC note to read SCT=55�
6. Wall type 73: Revised STC rating to 65; Revised studs to be staggered and batt insulation depth to 3"in
each stud wall cavity as indicated on the graphics of the wall type.
• Sheet Aio.o3:
i. Changed applicable ANSI year to zoo9.
• Sheet Aio.o6:
i. Detail i4 no longer used,detail zz: Bronze satin stainless steel reveals.
• Sheet Aio.ii:
i. Detail 6 Base Cabinet at Island—Metal Laminate Base at Island only,stainless steel reveal removed.
STRUCTURAL:
• Sheet Si.o:
1. Updated Detail 7, per RFI-oo43
• Sheet Sz.i:
i. Added section cut i7/Si.ito Detail z.
z. Added Detail i7 to sheet to reflect deeper sump pump pits than previously anticipated.
3. Added Detail i8 for tower crane footing requirements.
• Sheet Sz.oP-3A:
i. Added tower crane footing and deleted/modified other footings in same vicinity.
z. Deleted wing wall next to Elevator A3, per RFI-oo63
• Sheet S�.oP-3B:
i. Added tower crane footing and deleted/modified otherfootings in same vicinity.
ra,e�o,a
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
• Sheet Sz.oP-zA:
i. Deleted wing wall next to Elevator A3, per RFI-oo63
z. Updated elevator divider beam for Elevator Ai/Az
3. Updated Section callouts at cores and exterior walls with slab keyway detail per PCL request.
• Sheet Sz.oP-zB:
i. Updated elevator divider beam for Elevator Bi/Bz.
�. Updated Section callouts at cores and exterior walls with slab keyway detail per PCL request.
• Sheet Sz.oP-iA:
i. Updated elevator divider beam for Elevator Ai/Az
z. Updated laundry ramp area per RFI-ooio.
3. Deleted wing wall next to Elevator A3, per RFI-oo63
4. Moved access door on Elevator A3 to opposite wall.
5. Updated Section callouts at cores and exterior walls with slab keyway detail per PCL request.
• Sheet Sz.oP-1B:
i. Updated elevator divider beam for Elevator Bi/Bz.
z. Updated Section callouts at cores and exterior walls with slab keyway detail per PCL request.
• Sheet Sz.oi-A:
i. Updated Steel Column and Base Plate Schedule, per RFI-oo35
z. Rectangular HSS column size and orientation updated per RFI-ooi8
3. Updated Section callouts at cores with slab keyway detail per PCL request.
• Sheet Sz.oiSS-A:
i. Rectangular HSS column size and orientation updated per RFI-ooi8
• Sheet Sz.oi-B:
1. Updated HSS column size near loading dock per RFI-oo39
z. Rectangular HSS column size and orientation updated per RFI-ooi8
3. Updated Section callouts at cores with slab keyway detail per PCL request.
• Sheet Sz.oi55-B:
1. Rectangular H55 column size and orientation updated per RFI-oos8
z. Updated slab step location per RFI-oo37
• Sheet Sz.oz-A:
1. Updated old Wzi beam sizes that no longer exist to Wz4 beams, per RFI-oo38
z. Rectangular HSS column size and orientation updated per RFI-ooi8
• Sheet Sz.oz-B:
1. Updated W36 beam size, per RFI-oo38
z. Added dimensions/beam profiles per RFI-ooi7
3. Rectangular H55 column size and orientation updated per RFI-ooi8
• Sheet S�.o3-A:
1. Rectangular HSS column size and orientation updated per RFI-ooi8
�-��,�ti��;,�
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
• Sheet Sz.o3-B:
i. Updated W36 beam size, per RFI-oo38
z. Added dimensions per RFI-ooi7
3. Updated W36 beam size, per RFI-oo46
4. Re-framed beams and added section cut per RFI-oo45
5. Rectangular HSS column size and orientation updated per RFI-oo18
• Sheet Sz.oy-A:
i. Rectangular HSS column size and orientation updated per RFI-ooi8
• Sheet Sz.o4-B:
i. Rectangular H55 column size and orientation updated per RFI-ooi8
• Sheet S�.oS-A:
s. Rectangular H55 column size and orientation updated per RFI-ooi8
• Sheet Sz.oS-B:
i. Rectangular H55 column size and orientation updated per RFI-ooi8
• Sheet Sz.o6-A:
i. Added full width opening to Elevator Ai/Az
z. Rectangular HSS column size and orientation updated per RFI-ooi8
• Sheet Sz.o6-B:
i. Rectangular HSS column size and orientation updated per RFI-ooi8
• Sheet Sz.o7-A:
1. Deleted full width opening to Elevator As/Az
z. Added embed plates to Stair A North per RFI-oo55
3. Rectangular HSS column size and orientation updated per RFI-ooz8
• Sheet Sz.o7-B:
i. Added full width opening to Elevator Bi/Bz
z. Rectangular HSS column size and orientation updated per RFI-ooi8
• Sheet Sz.o8-B:
i. Deleted full width opening to Elevator Bi/Bz
z. Rectangular HSS column size and orientation updated per RFI-ooi8
• Sheet 53.0:
i. Updated Concrete Beam Schedule
• Sheet 53•5�
i. Updated Detail 3 per RFI-ooio
z. Updated Detail g per RFI-oo36
• Sheet 53.6:
i. Added new sheet
z. Added Detail i per PCL request for keyway slab-to-wall detail
��zsizo�4
Paye io ot i8
G:\mo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
3. Added Detail z per RFI-ooio
4. Added Detail 3 per RFI-oolo
• Sheet S4.o:
i. Added Embed detail per RFI-oo55
• Sheet SS.o:
i. Updated Detail iz per RFI-oo56
• Sheet 55.i:
i. Added Detail z5 per RFI-oo45
• Sheet 55.z:
i. Adjusted Metal Stud Wall Schedule
• Sheet 56.i:
i. Updated Detail S per RFI-oo44
z. Updated Detail i3 per RFI-oo4z
3. Updated Detail i6 per RFI-oo55
• Sheet 56.z:
i. Updated Detail i3 per RFI-oo59
• Sheet 56.3:
i. Updated Detail iz with tie-off inember sizes
z. Updated Detail i3 with tie-off inember sizes
• Sheet 57.0:
i. Added Detail 9 per RFI-oo35 and RFI-ooi9
• Sheet 57.1:
i. Updated openings in core elevations.
• Sheet 57.�:
i. Updated openings in core elevations.
• NOTES:
i. RFI-oozo was not incorporated into this set as it was deemed a Means& Methods change by the steel
fabricator.
z. RFIs-oozi, -0057,and-0058 were not incorporated as they were RFI's regarding options allowed in the
Specifications or in the Structural General Notes.
3. RFI-oo7i required no changes to the structural drawings.
4. RFI-oo7z was not incorporated into this set as it was deemed a Means&Methods change by the rebar
detailer.
5. RFI-oo76 was not incorporated into this set as it was deemed a Means& Methods change by the rebar
detailer.
Pa�e�:u ofie
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
MECHANICAL:
• Sheet Mi.oz:
i. Added boiler manufacturer per RFI and V/E.
z. Revised hydronic UH schedule to delete heater changed to electric per V/E.
• Sheet Mi.o3:
i. Added humidifier schedule.
z. Deleted FCUV-8 from schedule for laundry room revision.
• Sheet Mi.o3:
1. Deleted EF-1z forthe forthe laundry room revision.
z. Deleted SF-z thru 6 per RFI-ooz9.
3. Deleted EDH schedule per RFI-ooz9.
4. Revised Electric CUH and UH schedules to add electric CUH and UH per V/E.
• Sheet Mi.o6:
i. Added sheet note#5 for clarification to unit heaters.
• Sheet Mi.o7:
i. Added sheet note#5 for clarification to unit heaters.
• Sheet Mi.o7:
1. Added sheet note#5 for clarification to unit heaters.
• Sheet Mi.o8:
1. Added sheet note#5 for clarification to unit heaters.
• Sheet Mi.o9 :
i. Added sheet note#5 for clarification to unit heaters.
• Sheet Mi.zz:
i. Added humidifierdetail.
• Sheet Mz.oP-3A:
i. Revised multiple unit heaters from hydronic to electric.
• Sheet Mz.oP-36:
i. Revised multiple unit heaters from hydronic to electric.
• Sheet Mz.oP-ZA:
i. Revised multiple unit heaters from hydronic to electric.
z. Revised chilled piping per RFI-Po54•
3. Revised duct routing per Coordination Meetings.
• Sheet Mz.oP-zB:
i. Revised multiple unit heaters from hydronic to electric.
Pa�e���,,ot,a
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
• Sheet MZ.oP-iA:
i. Revised multiple unit heaters from hydronic to electric.
z. Added piping to support new humidifiers.
3. Deleted mechanical associated with the laundry room per V/E.
• Sheet Mz.oP-iB:
i. Revised multiple unit heaters from hydronic to electric.
• Sheet Mz.oi-A:
i. Deleted EF and duct associated with laundry room per V/E.
z. Revised FCUH orientation above Men Ai3o,deleted RA duct for both FCUHs and added an R3 return
grille.
3. Added four humidifiers with humidistats and cabinets.
• Sheet Mz.oi-AP:
i. Revised multiple unit heaters from hydronic to electric.
z. Added piping for four new humidifiers.
• Sheet Mz.oi-B:
i. Revised multiple unit heaters from hydronic to electric.
• Sheet Mz.oi-BP:
i. Revised multiple unit heaters from hydronic to electric.
• Sheet Mz.o8-B:
1. Added OSA duct and rerouted vent per RFI-Po36.
• Sheet M�.18:
i. Rerouted duct to miss wall per OZ request.
• Sheet Mz.zi-B:
i. Added OSA duct per RFI-Po36.
PLUMBING:
• Sheet Pi.oi:
1. Revised Fixture Connection Schedule per RFI-Po47.
• Sheet Pi.o3:
i. Deleted clothes washer piping diagram for laundery room per V/E.
• Sheet Pz.oP-3A:
i. Revised AD-i location per RFI-Pozi.
• Sheet Pz.oP-zA:
i. Deleted and revised plumbing associated with the laundry room per V/E.
IJaJ.`:.�3,.of�.8
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
• Sheet PZ.oP-iA:
i. Deleted piping associated with the laundry room per V/E.
z. Added domestic water to serve new humidifiers.
• Sheet Pz.os-A:
i. Added domestic water to serve new humidifiers.
• Sheet Pz.oS-A:
i. Relocated storm drain per window size revisions.
• Sheet Pz.z6:
i. Deleted plumbing associated with the laundry room per V/E.
• Sheet PS.oi:
i. Deleted plumbing associated with the laundry room per V/E.
• Sheet PS.oz:
s. Deleted plumbing associated with the laundry room per V/E.
• Sheet P6.oi:
z. Deleted gas associated with the laundry room per V/E.
ELECTRICAL:
• Sheet Ei.o3:
i. Clarified distribution per RFI.
• Sheet Ei.oy:
1. Revised elevator feeds per VE.
• Sheet Ei.oS:
i. Clarified telecom conduits per RFI.
• Sheet El.o7:
i. Revised equipment schedule per RFI's and VE.
• Sheet Es.o8:
i. Revised equipment schedule per RFI's and VE.
z. Deleted Laundry Schedule
• Sheet Ez.io:
i. Revised panel schedules per RFI's and VE.
• Sheet Ei.ii:
i. Revised panel schedules per RFI's and VE.
• Sheet Ei.1z:
i. Revised panel schedules per RFI's and VE.
�iz��za�4
Page ir,of i8
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
• Sheet Ei.i3:
i. Revised panel schedules per RFI's and VE.
• Sheet Ez.00:
i. Clarified circuiting per RFI.
• Sheet Ez.oP-3A:
i. Clarified layouts per RFI's.
z. Revised elevator feeds per VE.
3. Revised heaters per VE
4. Added z-way communication.
• Sheet Ez.oP-3B:
1. Clarified layouts per RFI's.
z. Revised elevator feeds per VE.
3. Revised heaters per VE
4. Added�-way communication.
• Sheet Ez.oP-z:
i. Clarified layouts per RFI's.
• Sheet Ez.oP-zA:
i. Clarified layouts per RFI's.
z. Revised heaters per VE
3. Added�-way communication.
• Sheet E�.oP-zB:
i. Clarified layouts per RFI's.
z. Revised heaters per VE
3. Added z-way communication.
• Sheet Ez.oP-i:
i. Clarified layouts per RFI's.
• Sheet Ez.oP-iA:
1. Clarified layouts per RFI's.
z. Deleted laundry per VE, reconfigured space per new layout.
3. Revised heaters per VE
4. Added z-way communication.
• Sheet Ez.oP-zB:
i. Clarified layouts per RFI's.
2. Revised heaters per VE
3. Added z-way communication.
• Sheet Ez.oi-A:
s. Clarified layouts per RFI's.
z. Revised heaters per VE
3. Clarified motorized shade power.
�-�y��;or,x
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
��
• Sheet Ez.o1-B:
i. Clarified layouts per RFI's.
z. Revised heaters per VE
• Sheet Ez.o�-A:
i. Added z-way communication.
• Sheet Ez.oz-B:
i. Added z-way communication.
• Sheet Ez.o3-A:
1. Added z-way communication.
• Sheet Ez.o3-B:
1. Added�-way communication.
• Sheet Ez.o4-A:
i. Added�-way communication.
• Sheet Ez.o4-B:
i. Added z-way communication.
• Sheet Ez.oS-A:
i. Added z-way communication.
• Sheet Ez.oS-B:
1. Added z-way communication.
• Sheet Ez.o6-A:
i. Added z-way communication.
z. Revised elevator feeds per VE.
• Sheet Ez.o6-B:
i. Clarified layouts per RFI's.
z. Added z-way communication.
• Sheet Ez.o7-B:
i. Added z-way communication.
z. Revised elevator feeds per VE.
• Sheet E�.ii:
1. Clarified layouts per RFI's.
• Sheet Ez.zS:
i. Clarified layouts per RFI's.
��z�-;:�,�,,
Pa9e i�of:,.a
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Documents zoiy_o7i5.docx
�
��
• Sheet E3.oi-A:
i. Clarified layouts per RFI's.
• Sheet E3.o7-B:
i. Clarified layouts per RFI's.
FIRE ALARM:
• Sheet FA.oP-iA:
i. Revised devices for the deleted laundry room per V/E.
FIRE PROTECTION:
• Sheet FP.oP-iA:
i. Revised layoutforthe deleted laundry room perV/E.
SPECIFICATIONS:
Table of Contents:
All changes to the specifications table of contents are indicate in bold Italics.
Section oz8i5: Irrigation specifications were updated to reflect RFI questions.
Section o4860: Revised to Include item z.7 Rainscreen Drainage Mat by KeeneBuilding Products;this was included in
Addendum i.
Section o7i�i: Revised product type z.1 Pre-Applied Sheet Membrane Waterproofing from Preprufe i6oR to be
Preprufe�oo Membrane by Grace products; note all seems to be tapped;this was part of the VE process and aslo
further recommendation by Grace prodcuts.
Section o7�r.60: Delete reference to Fluid Applied Air Barrier.
Add Reference to Dupont CommercialWrap'D'.
Add Reference to Vapor-Permeable membrane Air Barrier by Reveal5hield to be paced behind
The Horizontal slat exteriorwall assembly;this was included in Addendum 1.
Section o��zS:This is a new section that was issued in Addendum z.
Section o7811: Products_Part�; z.1;Added Southwest Fireproofing Products and OrApproved Equal.
Section o84S2: Products 2.z ib. Revised thickness to be somm per RFI Pozg response.
Section o87io: o87io-i3; item i E;Added Reference for basis of design for Schlage card access keypad lever system
to be Merano Lever system Century Collection as indicated in Addendum i.
Section o�ii:This is a new section that was issued in RFI Po41 Response.
Section o9930:This is a new section that was addressed in RFI Po4i Response.
���,��,,� ,6
G:\zoo7\i7ooy Lionshead Inn\GA�A51\For Construction Set zoiy_o7so\ASI_om Narrative For Construction Docume�ts zoiy_o7i5.docx
�
�m
Section io3io:This clarifies the Fireplace insert Basis of Design; Monessen BLDVSC(7)50o Direct vent that was
included in Addendum i.
Section so5zz:This Clarifies the Fire Extinguisher type and rating;this was included in Addendum i.
Section i2z4i:This is a new section that was included in Addendum z.
Section i3i52:This is a new section that was included in Addendum i and RFI Poi7 Response.
Division i5 Mechanical :
All Sectians vaere rewised s�i htl due to VE e#etns tha#needed to be incor orated intv the s ec��catipns.
ATTACHMENTS:
Civil Sheets:C1.o3,C1.o36,Ci.o4, Ci.o8
Landscape Sheets:Li&L6
Irrigation Sheets: IR-i, IR-3
Architectural Sheets: Ti.i,Ti.2,Az.oP-ZA,Az.oP-iA,Az.oP-iB,Az.oi,Az.oiA,Az.oi-B,Az.ozA,Az.oz-B,Az.o3A,
Az.o36,Az.o4A,Azo4.B,Az.oSA,Az.o56,Az.o6A,Az.o6B,Az.o76,Az.31,A3.zz,A3.z3,A3�25,A3•31,A3•3z,A3•33,
A4.oi,A4oz,A4.o3,A4.o4,AS.oiA,AS.ozA,A5.o3A,A5.o4A,A5.o5A,A5.o6A,A5.o7A,A5.o8A,A5.o9A,AS.ioA,
AS.iiA,A5.iz6,A5.13B,A5.i46,A5.i56,A5.i6B,A5.i8A,A6.oz,A6.o3,A6.o6,A6.io,A6.1i,A6.iz,A7.o.i6,A7.i.3,
A7.i.6,A7.2o-A7.z5,A7.3.00-A7.3.ig,A7.3.oi,A7.4o,A8.oi.1,A8.oi.z,A8.oz,A8.o4, A8.iz,A8.14,A8.zo,A8.zz,
A8.z4,A8.z5,Ag.oi,Ag.oz,Ag.o3,Ag.o4,A9.zo,Ag.zi,Ag.zz,Ag.z3,A9•z4,A9�25,A9•35�A9•4�,A9•43,Aio.oi,
Aio.o3,Aio.o6,Aio.ii
UL system HW-D-o6i8 Re:exterior one hour rated head of wall detail.
Structural Sheets:Si.o, Si.i,All Plan Sheets,53.0, 53.5,53.6, 54.0,55.0,55.i, 55.z, 56.i, 56.z, 56.3,57.0, 57.i, 57.z
Mechanical Sheets:Mi.oz,Mi.o3, Mi.o4, Mi.o6, Mi.o7, Mi.o8, Ms.og, Mi.iz, Mz.oP-3A, Mz.oP-36, Mz.oP-zA, Mz.oP-
zB, Mz.oP-iA, Mz.oP-iB, Mz.oi-A, Mz.oi-AP, Mz.oi6,Mz.oi-BP, Mz.o8-B, Mz.18, Mz.zi
Plumbing Sheets: Pi.oi, Pi.o3, Pz.oP-3A, Pz.oP-zA, Pz.oP-iA, Pz.oi-A, Pz.oS-A, Pz.z6, PS.oi, PS.oz, P6.oi
Fire Alarm Sheets:FA.oP-iA
Fire Protection Sheets: FP.oP-iA
ISSUED BY: �,� ACCEPTED BY:
ARCHITECT: OZ Architecture CONTRACTOR:
7/zi�zoiy
Page i8 of i6
G:\zoo71i7ooq Lionshead Inn�CA�A511For Construction Set zosr,_o7io�A51_ooi Narrative For Constructwn Documentr mi4_o7i5 docx
System No. HW-D-0618
Assembly Ratings- 1 and 2 Hr(See Item 2)
Nominal Joint Width-3/4 in. or 1 in. (See Item 3)
L Rating At Ambient-Less Than 1 CFM/Lin Ft
L Rating At 400 F-Less Than 1 CFM/Lin Ft
Class II and III Movement Capabilities- 19%or 100% Compression or Extension
or 25% Compression (See Item 3A or 361)
3
C
1
a . a
a
a
3
3
B
1. Floor Assembly- Min 4-1/2 in. (114 mm)thick steel reinforced lightweight or normal weight(100-150 pcf or 1600-2400 kg/m3)
structural concrete. Floor may also be constructed of any min 6 in. (152 mm)thick UL Classified hollow-core Precast Concrete
Units*. See Precast Concrete Units (CFTV)category in the Fire Resistance Directory for names manufacturers.
The hourly fire rating of the floor assembly shall be equal or greater than the hourly fire rating of the wall assembly.
2. Wall Assembly-The 1 or 2 hr fire rated gypsum board/stud wall assembly shall be constructed of the materials and in the
manner described in the individual U400 or V400 Series Wall and Partition Design in the UL Fire Resistance Directory and shall
include the following construction features:
A. Steel Floor and Ceiling Runners- Floor and ceiling runners of wall assembly shall consist galv steel channels sized to
accommodate steel studs (Item 2B). Ceiling runner to be provided with min 2 in. (51 mm)to max 3 in. (76 mm)flanges.
B. Studs-Steel studs to be min 3-1/2 in. (89 mm)wide. Studs cut 1/2 in. to 3/4 in. (13 to 19 mm)less in length than
assembly height with bottom nesting in and secured to floor runner. Studs to nest in ceiling runner without attachment
unless slotted ceiling runner is used. When slotted ceiling runner(Item 2A1)is used, steel studs secured to slotted ceiling
runner with No. 8 by 1/2 (13 mm) long wafer head steel screws at mid-height of slot on each side of wall.
C. Gypsum Board*- Gypsum board sheets installed to a min total 5/8 in. (16 mm)or 1-1/4 in. (32 mm)thickness on each
side of wall for 1 hr and 2 hr fire rated assemblies, respectively. Wall to be constructed as specified in the individual U400
or V400 Series Design in the UL Fire Resistance Directory except that a max 3/4 or 1 in. (19 or 25 mm)gap shall be
maintained between the top of the gypsum board and the bottom of the floor. The gypsum board on the shaft side shall
extend flush with bottom of floor assembly. The screws attaching the gypsum board to the studs along the top of the wall
shall be located 1 in. (25 mm) below the bottom of the ceiling runner. No gypsum board attachment screws shall be driven
into the ceiling runner.
The hourly fire rating of the joint system is equal to the hourly fire rating of the wall.
3. Joint System- Max separation between bottom of floor and top of gypsum board panels(non-shaft side)and between gypsum
board panels(shaft side)at time of installation is 3/4 or 1 in. (19 or 25 mm).When Item 3B1 is used in lieu of the mineral wool
strips described in Item 3B, the maximum joint width is 3/4 in. and the movement capability of the joint system is 100 percent
compression or extension. Otherwise, the movement capability of the joint system is 19 percent compression or extension. The
joint system shall consist of forming and fill materials, as follows:
- - = Specified Technologies Inc. 210 Evans Way Somerville, NJ 08876
� Reproduced courtesy of Underwriters Laboratories, Inc. u�
S T I Created or Revised: June 17,2010 �
H W-D-0618
(800)992-1180•(908)526-8000• FAX(908)231-8415• E-Mail:techserv@stifirestop.com•Website:www.stifrestop.com PAGE 1 OF 2
A. Fill,Void or Cavity Material*- Min 1/2 in. (13 mm)depth of sealant applied within the joint between gypsum board sheets
and between gypsum board and concrete at top and bottom of floor.When gypsum board abuts top surface of floor,the fill
material is optional unless required by local code.When gypsum board on shaft side is continuous without a joint opening
to allow for movement, the joint system shall be limited to static conditions.
SPECIFIED TECHNOLOGIES INC -SpecSeal ES Sealant or LC150 Sealant
B. Forming Material*- (Not Shown)-As an alternate to Item 3A when used in conjunction with Item 3C,strips of nom 4 pcf
(64 kg/m3)mineral wool cut to a width equal to thickness of gypsum board layers are compressed 50 percent in thickness
and installed flush with wall surfaces.When gypsum board abuts top surface of floor,the forming material is optional
unless required by local code.
B1. Forming Material"- (Not Shown)-As an option to Item 3B when the nominal joint width is 3/4 in. (19 mm)or less, nom
3/16 in. (4.8 mm)thick by 4 in. (102 mm) high joint forming material profile installed on both sides of the wall assembly.
Profile installed by first marking a line across the top of the wall 3 in. (76 mm)below the bottom plane of the steel floor or
roof deck valleys.Joint profile material positioned with its top edge against both the underside of the spray-applied
fire-resistive material with its bottom edge on the line scribed on the wall assembly. Bottom of the joint profile attached to
gypsum board with nom 1/2 in. (13 mm) long steel staples spaced not greater than 8 in. (203 mm)OC.Adjoining lengths
of profile to overlap approx 3/4 in. (19 mm)at rabbeted ends. When Item 3C1 is used, the movement capability of the joint
system is 100 percent compression or extension.
SPECIFIED TECHNOLOGIES INC -SpecSeal Speed Flex Joint Profile
C. Fill,Void or Cavity Material*- (Not Shown)-When Item 3B is used, min 1/8 in. (3.2 mm)wet or 1/16 in. (1.6 mm dry)
thickness of spray applied atop mineral wool with 1/2 in. (13 mm)overlap onto surrounding substrates.When gypsum
board abuts top surface of floor,the fill material is optional unless required by local code.
SPECIFIED TECHNOLOGIES INC -SpecSeal AS200 Elastomeric Spray
*Bearing the UL Classification Mark
� Specified Technologies Inc. 210 Evans Way Somerville, NJ 08876
� Reproduced courtesy of Underwriters Laboratories, Inc. u�
STI Created or Revised: June 17,2010 � HW-D-0618
(800)992-1180•(908)526-8000• FAX(908)231-8415•E-Mail:techserv@stifirestop.com•Website:www.stifirestop.com PAGE 2 OF 2